Streetlight upgrades comprehensive project management - imsa 2015 annual conference
Click here to load reader
-
Upload
jim-frazer -
Category
Engineering
-
view
127 -
download
0
Transcript of Streetlight upgrades comprehensive project management - imsa 2015 annual conference
![Page 1: Streetlight upgrades comprehensive project management - imsa 2015 annual conference](https://reader038.fdocuments.us/reader038/viewer/2022100802/587b4eb11a28abff1a8b55d1/html5/thumbnails/1.jpg)
Panel Discussion: Panel Discussion: Panel Discussion: Panel Discussion: “Streetlight Upgrades: “Streetlight Upgrades: Comprehensive Project Management”Comprehensive Project Management”Comprehensive Project Management”Comprehensive Project Management”
![Page 2: Streetlight upgrades comprehensive project management - imsa 2015 annual conference](https://reader038.fdocuments.us/reader038/viewer/2022100802/587b4eb11a28abff1a8b55d1/html5/thumbnails/2.jpg)
Streetlight Upgrades: Comprehensive Project Management
ModeratorModeratorJim Frazer ‐ Gridaptive Technologies
PanelistsMichael Stern ‐ Smart City InfrastructureSteve McCrann ‐ Smart City InfrastructureH l Hi t HD S l P S l tiHal Hinton – HD Supply Power SolutionsEric Bronson ‐ HD Supply Power Solutions
![Page 3: Streetlight upgrades comprehensive project management - imsa 2015 annual conference](https://reader038.fdocuments.us/reader038/viewer/2022100802/587b4eb11a28abff1a8b55d1/html5/thumbnails/3.jpg)
Streetlight Upgrades: Comprehensive Project Management
LED li h d k dLED streetlights and networked control systems represent significant expenditures and a technological leap. pTo successfully implement these new systems a comprehensive projectsystems, a comprehensive project management plan is required.
![Page 4: Streetlight upgrades comprehensive project management - imsa 2015 annual conference](https://reader038.fdocuments.us/reader038/viewer/2022100802/587b4eb11a28abff1a8b55d1/html5/thumbnails/4.jpg)
Streetlight Upgrades: Comprehensive Project Management
Topics to be examined includeTopics to be examined include,
• Pre‐Proposal Phasep
• Proposal Phase
• Contract / Procurement Phase
l i h• Implementation Phase
• Maintenance Phase
![Page 5: Streetlight upgrades comprehensive project management - imsa 2015 annual conference](https://reader038.fdocuments.us/reader038/viewer/2022100802/587b4eb11a28abff1a8b55d1/html5/thumbnails/5.jpg)
Streetlight Upgrades: Comprehensive Project Management
Pre‐Proposal Phase
Explore, Define, and Document,• Rate Structures
• Budget and Expendituresg p
• Financing; CapEx, Bond, Lease
• Lighting Luminaires and Controls• Lighting, Luminaires, and Controls Specifications, (MLO)
• Project Schedule• Project Schedule
![Page 6: Streetlight upgrades comprehensive project management - imsa 2015 annual conference](https://reader038.fdocuments.us/reader038/viewer/2022100802/587b4eb11a28abff1a8b55d1/html5/thumbnails/6.jpg)
Streetlight Upgrades: Comprehensive Project Management
Proposal PhaseProposal Phase
• Request for Proposal• Questions, Corrections and Amendments
• Proposal Evaluation• Proposal Evaluation• Evaluation Criteria and Rationale
• Proposal Award• Single or Multiple Suppliersg p pp
![Page 7: Streetlight upgrades comprehensive project management - imsa 2015 annual conference](https://reader038.fdocuments.us/reader038/viewer/2022100802/587b4eb11a28abff1a8b55d1/html5/thumbnails/7.jpg)
Streetlight Upgrades: Comprehensive Project Management
Contract / Procurement Phase
• Contract • Contract Changes / Amendmentsg /
• Purchase Order(s)• Purchase Order Release(s)
• Purchase Order Changes / Amendments
![Page 8: Streetlight upgrades comprehensive project management - imsa 2015 annual conference](https://reader038.fdocuments.us/reader038/viewer/2022100802/587b4eb11a28abff1a8b55d1/html5/thumbnails/8.jpg)
Streetlight Upgrades: Comprehensive Project Management
Implementation PhaseImplementation Phase
• Implementation PhasesImplementation Phases
• Inventory
St i d Kitti• Staging and Kitting
• Testing
• Commissioning
• Acceptancep
![Page 9: Streetlight upgrades comprehensive project management - imsa 2015 annual conference](https://reader038.fdocuments.us/reader038/viewer/2022100802/587b4eb11a28abff1a8b55d1/html5/thumbnails/9.jpg)
Streetlight Upgrades: Comprehensive Project Management
• Maintenance Phase
• Warranty Issues• Obsolete HID Luminaire and LampObsolete HID Luminaire and Lamp
• Inventory• Recycling and ReclamationRecycling and Reclamation
• Maintenance Team
• Maintenance Software System
• Maintenance Inventory• Maintenance Inventory