Stratton Andrews Undergraduate Portfolio

40

description

Architecture. University of Arizona. B.ARCH.

Transcript of Stratton Andrews Undergraduate Portfolio

  • CONTENT

    UU CampusModest church campus design in the Catalina FoothillsDesign Studio IV : Land Ethics : Spring 2013

    6.

    7. One Way Structures SpanWood Construction Pin Connection CrushingStructures II : Spring 2013

    What we do for ourselves dies with us. What we do for others and the world remains and is immortal.

    - Albert Pine

    ACADEMIAUNIVERSITY OF ARIZONAProfessional Bachelors Degree [NAAB]University of Arizona: College of Architecture + Landscape ArchitectureTucson, Arizona : Top 20 Undergradute Program : Expected Graduation 2015

    AWARDS + MEMBERSHIPSAcademic Scholarships

    Memberships-[USGBC/SG] United States Green Building Council-[AIAS] America institute of architecture students-[SOPHOS] sophomore honorary club -Beta Theta Pi Fraternity- Delta Beta chapter-Boy Scouts of America-DECCA Business club

    CONTACTS

    CIC CenterUniversity of Arizona public library and integration centerDesign Studio V : Systems Integration : Fall 2013

    5.

    -CAPLA Design Excellence Finalist 2014-1st Place - I-11 Infrustructure Design Competition-Arizona Excellence Award & Scholarship-Beresford E. Beck Memorial Scholarship-The M. L. Tophoy Scholarship-Sidney W. Little Scholarship-Beta Theta Pi academic scholarship-ABA Award & Scholarship- J.B. Steel-ABA Award & Scholarship- Tom Dunn-ABA Award & Scholarship- Achilles AC Systems-Nicholas G. Sakellar Award & Scholarship-Deans List 2011-2014-Academic year of Excellence 2012-13-All-state soccer award 2010-All-conference baseball Award 2010

    Marana Master PlanExploring next generation green infrastructure a long the I-ll CorridorDesign Studio VI : Downtown Interdisciplinary Studio : Spring 2014

    4.

    Unconventional ResidenceHigh end modern family residence in Scottsdale, AZARA Design Competition : Summer 2014

    2.

    Parametric FacadeDesigning and parametric facade using REVIT software.ARC 499 : Independent Study : Fall 2014

    3.

    Michael Kothke, AIACapstone Coordinator : Internship + IDP Coordinator Principal at HK AssociatesUniversity of Arizona : School of ArchitectureEmail : [email protected]

    Mary Hardin, AIAAssociate Dean and Professor of Architecture University of Arizona : School of ArchitectureEmail : [email protected] 520.621.6751

    Linda C. Samuels, RA, PhDProject Director, Sustainable City ProjectAssistant Professor of Practice : Drachman InstituteUniversity of Arizona : School of ArchitectureEmail : [email protected] 520.621.0928

    Threshold for Cultural InformationModern Art Gallery in Vancouver, CADesign Studio VI : Senior Thesis : 2015

    1.

    SOFTWARE Software Proficiency

    STRATTON ANDREWS

    135 Wall StreetHebron, Connecticut

    [email protected][860] 331 0701

    REVIT : ProficientAuto CADD : ProficientSketch-up : ProficientAdobe Suite : ProficientMasterspec : Proficient

    3DS Max : ProficientEcotect : ProficientMS Office : ProficientV-Ray : ProficientResCheck : Proficient

  • CONTENT

    UU CampusModest church campus design in the Catalina FoothillsDesign Studio IV : Land Ethics : Spring 2013

    6.

    7. One Way Structures SpanWood Construction Pin Connection CrushingStructures II : Spring 2013

    What we do for ourselves dies with us. What we do for others and the world remains and is immortal.

    - Albert Pine

    ACADEMIAUNIVERSITY OF ARIZONAProfessional Bachelors Degree [NAAB]University of Arizona: College of Architecture + Landscape ArchitectureTucson, Arizona : Top 20 Undergradute Program : Expected Graduation 2015

    AWARDS + MEMBERSHIPSAcademic Scholarships

    Memberships-[USGBC/SG] United States Green Building Council-[AIAS] America institute of architecture students-[SOPHOS] sophomore honorary club -Beta Theta Pi Fraternity- Delta Beta chapter-Boy Scouts of America-DECCA Business club

    CONTACTS

    CIC CenterUniversity of Arizona public library and integration centerDesign Studio V : Systems Integration : Fall 2013

    5.

    -CAPLA Design Excellence Finalist 2014-1st Place - I-11 Infrustructure Design Competition-Arizona Excellence Award & Scholarship-Beresford E. Beck Memorial Scholarship-The M. L. Tophoy Scholarship-Sidney W. Little Scholarship-Beta Theta Pi academic scholarship-ABA Award & Scholarship- J.B. Steel-ABA Award & Scholarship- Tom Dunn-ABA Award & Scholarship- Achilles AC Systems-Nicholas G. Sakellar Award & Scholarship-Deans List 2011-2014-Academic year of Excellence 2012-13-All-state soccer award 2010-All-conference baseball Award 2010

    Marana Master PlanExploring next generation green infrastructure a long the I-ll CorridorDesign Studio VI : Downtown Interdisciplinary Studio : Spring 2014

    4.

    Unconventional ResidenceHigh end modern family residence in Scottsdale, AZARA Design Competition : Summer 2014

    2.

    Parametric FacadeDesigning and parametric facade using REVIT software.ARC 499 : Independent Study : Fall 2014

    3.

    Michael Kothke, AIACapstone Coordinator : Internship + IDP Coordinator Principal at HK AssociatesUniversity of Arizona : School of ArchitectureEmail : [email protected]

    Mary Hardin, AIAAssociate Dean and Professor of Architecture University of Arizona : School of ArchitectureEmail : [email protected] 520.621.6751

    Linda C. Samuels, RA, PhDProject Director, Sustainable City ProjectAssistant Professor of Practice : Drachman InstituteUniversity of Arizona : School of ArchitectureEmail : [email protected] 520.621.0928

    Threshold for Cultural InformationModern Art Gallery in Vancouver, CADesign Studio VI : Senior Thesis : 2015

    1.

    SOFTWARE Software Proficiency

    STRATTON ANDREWS

    135 Wall StreetHebron, Connecticut

    [email protected][860] 331 0701

    REVIT : ProficientAuto CADD : ProficientSketch-up : ProficientAdobe Suite : ProficientMasterspec : Proficient

    3DS Max : ProficientEcotect : ProficientMS Office : ProficientV-Ray : ProficientResCheck : Proficient

  • Gastown is growing in popularity among young, urban Vancouverites, and fully 39% of area residents are between the ages of 20-34. Most of them (69%) are renters, as compared with 52% for the city of Vancouver and 35% for Metro Vancouver. Due to the nature of the housing stock in Gastown, 99% of residents live in apartment buildings many of them built since 1991.

    Community

    Age 20-34 Renting Ratio

    39%

    69%

    % own cars

    36%

    City of Vancouver Founded[Previously known as Gastown]

    1918

    1935

    1938

    1944 1971 1986 1994 2010

    12

    Hour

    s of S

    un

    J F M A M J J A S O N0

    Threshold for Cultural InformationSenior Thesis : Vancouver CA [ -2015

    - A transitional neighborhood caught in the crosshairs of the most iconic and historic neighborhoods in Vancouver will become the site for a new art gallery. This physical and methapohrical threshold will help link the neighborhood allowing tourists to emerse themselves in the culture and residence a place to gather, study and converse.

    [

  • Gastown is growing in popularity among young, urban Vancouverites, and fully 39% of area residents are between the ages of 20-34. Most of them (69%) are renters, as compared with 52% for the city of Vancouver and 35% for Metro Vancouver. Due to the nature of the housing stock in Gastown, 99% of residents live in apartment buildings many of them built since 1991.

    Community

    Age 20-34 Renting Ratio

    39%

    69%

    % own cars

    36%

    City of Vancouver Founded[Previously known as Gastown]

    1918

    1935

    1938

    1944 1971 1986 1994 2010

    12

    Hour

    s of S

    un

    J F M A M J J A S O N0

    Threshold for Cultural InformationSenior Thesis : Vancouver CA [ -2015

    - A transitional neighborhood caught in the crosshairs of the most iconic and historic neighborhoods in Vancouver will become the site for a new art gallery. This physical and methapohrical threshold will help link the neighborhood allowing tourists to emerse themselves in the culture and residence a place to gather, study and converse.

    [

  • Staff:

    Event Staff -

    Janitor Staff -

    Museum Support Staff -

    Security Officer-

    Even Staff/Security

    Two Janitors

    Executive Director : Administrative Manager Director of Development & Communications :Membership Director & Development Associate :Visitor and Volunteer Services Manager :Marketing & Engagement Coordinator :Curator of Collections : Exhibitions Manager :Curator of Exhibitions : Director of Community Engagement :Youth Programs Manager : School Programs Coordinator

    Security guard

    Program

    Gallery Space10,500 SF

    Library/Study10,500 SF

    InteriorExterior 2,750 32,250

    Large GallerySmall Gallery 3,000 5,000

    GrossNet 5,000 25,250

    BuiltGreen Park 8,500 32,250

    Square Footage Comparison

    GallerysBetween Space 3,000 8,000

    43%

    Interior vs Exterior Space

    22,200 SF43%

    24,500 SF

    City Program

    PORT OF VANCOUVERSTANLEY PARK

    9:00 amAzimuth: 137Elevation: 5.8

    12:00 pmAzimuth: 177.4Elevation: 17.2

    3:00 pmAzimuth: 218.6Elevation: 8.1

    SummerWinter

    Lat: 49.3Lon: -123.0Elev 160 ft.

    9:00 amAzimuth: 93.5Elevation: 34.6

    12:00 pmAzimuth: 143.8Elevation: 60.3

    3:00 pmAzimuth: 228.3Elevation: 56.9

    6:00 pmAzimuth: 272.5Elevation: 29.5

    Downtown

    City Circulation

    RAIL LINESWATERFRONT

    ARTIERAL ROADSFREEWAY

    VancouverPopulation 578,040

    Regional + City analysis

    MAIN

    ST

    Single Family Home Values-Below $ 1 million

    -$1 million - 2$ million

    -$2 million - 3$ million

    -$3 million - 4$ million-$4 million - 5$ million-Over $ 5 million 0 1/4 MI

    0 4 MI

    0 4 MI

    The human experience is heightened to its fullest extent when we are in a state of transition. Transitions in architecture are dened as threshold. Architecture enhances and enriches the human quality of life and sensory engagement by creating thresholds. Interstitial thresholds are known in the architectural realm as a third dimension; they are the space between physical attributes and dierent temporal, philosophical, political, social or historical dimensions. [1]

    For Peter Zumthor, thresholds are moments and instants, not places. In his designs the passage between inside and outside is a crucial moment. At Sumvitg, a few steps and the change of materials create an awareness that you are about to leave solid ground. [2]

    In this project, cultural thresholds intuitively exist all around the site. A casual ve minute walk through this neighborhood is no average walk. You will consciously cross a multitude of social, cultural, and historical boundaries that give this site its disposition. The site sits on converging crosshairs in the historic Gastown District bordered by Japantown, Chinatown, Rail town, and Strathcona neighborhoods, each with their own distinct history and identity. Block by block, the neighborhoods drastically change; the Cultural Center will correlate directly with these distinct regions, highlighting and exempli-fying the history of the area while providing a place to learn as the develop-ing neighborhoods assimilate.

    The project proposes a Threshold for Cultural Information as the vehicle for highlighting the issues of identity, preservation, and education, with a focus on heightening and dening local culture. The design will lead the visitors beneath the linear threshold, breaking the normal grid as they arise through the glass substructure into the oating upper oors full of artifacts, artwork, books, and study space.

    CULTURAL THRESHOLDS

    2 Perspective

  • Staff:

    Event Staff -

    Janitor Staff -

    Museum Support Staff -

    Security Officer-

    Even Staff/Security

    Two Janitors

    Executive Director : Administrative Manager Director of Development & Communications :Membership Director & Development Associate :Visitor and Volunteer Services Manager :Marketing & Engagement Coordinator :Curator of Collections : Exhibitions Manager :Curator of Exhibitions : Director of Community Engagement :Youth Programs Manager : School Programs Coordinator

    Security guard

    Program

    Gallery Space10,500 SF

    Library/Study10,500 SF

    InteriorExterior 2,750 32,250

    Large GallerySmall Gallery 3,000 5,000

    GrossNet 5,000 25,250

    BuiltGreen Park 8,500 32,250

    Square Footage Comparison

    GallerysBetween Space 3,000 8,000

    43%

    Interior vs Exterior Space

    22,200 SF43%

    24,500 SF

    City Program

    PORT OF VANCOUVERSTANLEY PARK

    9:00 amAzimuth: 137Elevation: 5.8

    12:00 pmAzimuth: 177.4Elevation: 17.2

    3:00 pmAzimuth: 218.6Elevation: 8.1

    SummerWinter

    Lat: 49.3Lon: -123.0Elev 160 ft.

    9:00 amAzimuth: 93.5Elevation: 34.6

    12:00 pmAzimuth: 143.8Elevation: 60.3

    3:00 pmAzimuth: 228.3Elevation: 56.9

    6:00 pmAzimuth: 272.5Elevation: 29.5

    Downtown

    City Circulation

    RAIL LINESWATERFRONT

    ARTIERAL ROADSFREEWAY

    VancouverPopulation 578,040

    Regional + City analysis

    MAIN

    ST

    Single Family Home Values-Below $ 1 million

    -$1 million - 2$ million

    -$2 million - 3$ million

    -$3 million - 4$ million-$4 million - 5$ million-Over $ 5 million 0 1/4 MI

    0 4 MI

    0 4 MI

    The human experience is heightened to its fullest extent when we are in a state of transition. Transitions in architecture are dened as threshold. Architecture enhances and enriches the human quality of life and sensory engagement by creating thresholds. Interstitial thresholds are known in the architectural realm as a third dimension; they are the space between physical attributes and dierent temporal, philosophical, political, social or historical dimensions. [1]

    For Peter Zumthor, thresholds are moments and instants, not places. In his designs the passage between inside and outside is a crucial moment. At Sumvitg, a few steps and the change of materials create an awareness that you are about to leave solid ground. [2]

    In this project, cultural thresholds intuitively exist all around the site. A casual ve minute walk through this neighborhood is no average walk. You will consciously cross a multitude of social, cultural, and historical boundaries that give this site its disposition. The site sits on converging crosshairs in the historic Gastown District bordered by Japantown, Chinatown, Rail town, and Strathcona neighborhoods, each with their own distinct history and identity. Block by block, the neighborhoods drastically change; the Cultural Center will correlate directly with these distinct regions, highlighting and exempli-fying the history of the area while providing a place to learn as the develop-ing neighborhoods assimilate.

    The project proposes a Threshold for Cultural Information as the vehicle for highlighting the issues of identity, preservation, and education, with a focus on heightening and dening local culture. The design will lead the visitors beneath the linear threshold, breaking the normal grid as they arise through the glass substructure into the oating upper oors full of artifacts, artwork, books, and study space.

    CULTURAL THRESHOLDS

    2 Perspective

  • 0 401/4 = 1

    SECTIONA2 Perspective

  • 0 401/4 = 1

    SECTIONA2 Perspective

  • Level 10' - 0"

    Level 216' - 0"

    Level 321' - 0"

    Level 434' - 0"

    Basement-12' - 0"

    0 401 = 10

    SECTIONB

    Level 10' - 0"

    Level 216' - 0"

    Level 322' - 0"

    Level 434' - 0"

    Basement-12' - 0"

    0 401 = 10

    SECTIONC

    Existing Split Lot

    Spanning the GapGaining SF

    Releif SpaceView Extrusion

    Program HigherarchyStreet Front ReleifPublic Space

    Light WellsProper Museum LightingTargeting Views

    prog

    ram

    relief

    view

    extrude

    relief

    relief

    connection

    split

    split

    relief

    light

    light

    viewlight

    splitsplit

    connection

    relief

    relief

    extr

    ude

    view

    view

    view

    light

    light

    light

    light

  • Level 10' - 0"

    Level 216' - 0"

    Level 321' - 0"

    Level 434' - 0"

    Basement-12' - 0"

    0 401 = 10

    SECTIONB

    Level 10' - 0"

    Level 216' - 0"

    Level 322' - 0"

    Level 434' - 0"

    Basement-12' - 0"

    0 401 = 10

    SECTIONC

    Existing Split Lot

    Spanning the GapGaining SF

    Releif SpaceView Extrusion

    Program HigherarchyStreet Front ReleifPublic Space

    Light WellsProper Museum LightingTargeting Views

    prog

    ram

    relief

    view

    extrude

    relief

    relief

    connection

    split

    split

    relief

    light

    light

    viewlight

    splitsplit

    connection

    relief

    relief

    extr

    ude

    view

    view

    view

    light

    light

    light

    light

  • Level 10' - 0"

    Level 216' - 0"

    Level 322' - 0"

    Level 434' - 0"

    0 401 = 10

    EAST ELEVATIONB

    Level 10' - 0"

    Level 216' - 0"

    Level 322' - 0"

    Level 434' - 0"

    Level 10' - 0"

    Level 216' - 0"

    Level 322' - 0"

    Level 434' - 0"

    0 401 = 10

    SOUTH ELEVATIONA

    0 401 = 10

    NORTH ELEVATIONB

    South Asian208,535

    9.94%

    East Asian584,89527.88%

    British Isles753,21535.90%

    Eastern Euro219,32510.45%

    Western Euro289,03013.78%

    N. Euro123,620

    5.89%

    Other76

    0.20%

    Canadian296,89514.15%

    TOTAL PROJECTION36,000 110,000

    NonfamilyHouseholds101,20538.3%

    FamilyHouseholds

    213,70567.10%

    Marriedcouple246,00041.50%

    Malehouseholder

    6,3903.70%

    Femalehouseholder

    8,1306.90%

    Homeless2,650

    81,935.04%

    childrenunder 18

    100,30016.80%

    peopleover 6581,93513.60%

    11,295

    RACIAL DEMOGRAPHICS

    HOUSEHOLDS

    DEMOGRAPHICS

    Railtown

    Japantown

    Chinatown

    Strathcona Village

    Gastown

    - Art Museum Site Location

  • Level 10' - 0"

    Level 216' - 0"

    Level 322' - 0"

    Level 434' - 0"

    0 401 = 10

    EAST ELEVATIONB

    Level 10' - 0"

    Level 216' - 0"

    Level 322' - 0"

    Level 434' - 0"

    Level 10' - 0"

    Level 216' - 0"

    Level 322' - 0"

    Level 434' - 0"

    0 401 = 10

    SOUTH ELEVATIONA

    0 401 = 10

    NORTH ELEVATIONB

    South Asian208,535

    9.94%

    East Asian584,89527.88%

    British Isles753,21535.90%

    Eastern Euro219,32510.45%

    Western Euro289,03013.78%

    N. Euro123,620

    5.89%

    Other76

    0.20%

    Canadian296,89514.15%

    TOTAL PROJECTION36,000 110,000

    NonfamilyHouseholds101,20538.3%

    FamilyHouseholds

    213,70567.10%

    Marriedcouple246,00041.50%

    Malehouseholder

    6,3903.70%

    Femalehouseholder

    8,1306.90%

    Homeless2,650

    81,935.04%

    childrenunder 18

    100,30016.80%

    peopleover 6581,93513.60%

    11,295

    RACIAL DEMOGRAPHICS

    HOUSEHOLDS

    DEMOGRAPHICS

    Railtown

    Japantown

    Chinatown

    Strathcona Village

    Gastown

    - Art Museum Site Location

  • 2 Perspective

    UNCONVENTIONAL RESIDENCEARA DESIGN COMPETITION [ -Summer 2014

    - Eco-friendly rammed earth residence design in the upscale neighbors of Camelback Mountain. Indoor outdoor living design for a large family and in-law suite.

    [

  • 2 Perspective

    UNCONVENTIONAL RESIDENCEARA DESIGN COMPETITION [ -Summer 2014

    - Eco-friendly rammed earth residence design in the upscale neighbors of Camelback Mountain. Indoor outdoor living design for a large family and in-law suite.

    [

  • Winter Solsti

    ce 23.4 Degrees

    2 '

    5'

    Being located in Arizona this residency will capitalize on the extreme heat by implementing 57 cost effective 15% efficient solar panels. The average house this size consumes 48 Kwh per day and being located in Arizona the solar isolation is 6 Kwh/meters squared per day allowing us to be completely self-sufficient. After doing the math we must have 574sf of panels which is achieved with the 57 panels.

    The house is designed to channel and collect all the water off the roofs into an underground cistern that will be used as grey water on-site. The hardscape and condensation from the HVAC system will be also collected and stored underground helping minimize the consumption of water as much as possible.

    Stabilized rammed earth is one of the most environmental-ly-friendly and energy-efficient construction materials in the world due to its minimal impact on the environment during both in its production and lifetime as part of a building. The materials thickness allows you to build a passive solar home reducing the cost of air-conditioning and heat. Its night flushing is perfect for the desert allowing the house to remain cool and sealed during the day and ventilated at night.

    GREEN TECHNOLOGY

    6000 G. CisternIn-floor air distribution

    Thermal massNight flushing down off Camelback Mt.

    -57 Solar Panels creating 48 Kwh-Thermal Mass [rammed earth]-Cooling Tower-Night Flushing-6000 Gallon Cistern-Grey Water Irrigation-Positive Solar Orientation-Southern Overhangs-Eco Friendly Materials

    10 sf

    10sf x 57 Solar Panels= 570 sf of panels

    creating 48 Kwh 100 % self-sufficient

    SECTION A

    2 Perspective

  • Winter Solsti

    ce 23.4 Degrees

    2 '

    5'

    Being located in Arizona this residency will capitalize on the extreme heat by implementing 57 cost effective 15% efficient solar panels. The average house this size consumes 48 Kwh per day and being located in Arizona the solar isolation is 6 Kwh/meters squared per day allowing us to be completely self-sufficient. After doing the math we must have 574sf of panels which is achieved with the 57 panels.

    The house is designed to channel and collect all the water off the roofs into an underground cistern that will be used as grey water on-site. The hardscape and condensation from the HVAC system will be also collected and stored underground helping minimize the consumption of water as much as possible.

    Stabilized rammed earth is one of the most environmental-ly-friendly and energy-efficient construction materials in the world due to its minimal impact on the environment during both in its production and lifetime as part of a building. The materials thickness allows you to build a passive solar home reducing the cost of air-conditioning and heat. Its night flushing is perfect for the desert allowing the house to remain cool and sealed during the day and ventilated at night.

    GREEN TECHNOLOGY

    6000 G. CisternIn-floor air distribution

    Thermal massNight flushing down off Camelback Mt.

    -57 Solar Panels creating 48 Kwh-Thermal Mass [rammed earth]-Cooling Tower-Night Flushing-6000 Gallon Cistern-Grey Water Irrigation-Positive Solar Orientation-Southern Overhangs-Eco Friendly Materials

    10 sf

    10sf x 57 Solar Panels= 570 sf of panels

    creating 48 Kwh 100 % self-sufficient

    SECTION A

    2 Perspective

  • INITIAL MASSING

    -Provides the initial backing for the new ns created.

    -Create the shape of which you want to place your facade. -Set your work plans to the face of the building. Draw the exact shape you want to create.-Extrude the shape back one foot so you can see the mass.

    DIVIDING THE MASS

    -Create the exact shape of the new ns. Your paramet-ric object will be morphed into these divided zones.

    -Select the face of the mass and create surface.-Using the U + V lines create a system that works for your desired design.-These 1 4 strips match the ns created in the family space.

    APPLYING FINS

    -Loading your initially created ns into the project and applying the to the mass.

    -Open your n family and click load into project.-Once in the project select the divided surface and load this n le-This will create what is shown above.-Edit preferences will allow you to modify the length of the openings-Allow you to control the rotation angle of the n and each individual points because of the preset parameters

    FINISHED DESIGN

    -Applying material to the facade and hiding masses in order to created this nished product.

    -Open the n family le again and select the prole we created.-In the preferences category change the material and reload this back into your project.-Under visibility and graphics make sure mass is unchecked and you will have completed this model.

    FACADE OFFSET CONSTRAINT

    -Allows the control of the oset from the face of the mass to where the screen wall wants to reside.

    -Create a new work plane that is copied o the base grid system. -Apply a distance parameter that allows the control of this distance easily in your building model.-Make sure the grid system is shape of the panel you want to apply in the model.

    FIN PROFILE

    -Design the approximate shape of panel that you wish to create. This will be able to morph once control points are applied.

    -Setting you work planes properly create each on the planes shown here.-Rotate the center plane 90 degrees so it is perpendicular to the base and elevate this up nearly 6.-Loft these planes together so they create one cohesive n.

    PARAMETRIC CONTROL POINTS

    -Apply the shown control points in order to set parame-ters that will allow the easy adaption of the shape and angles of the n.

    -Create reference points at each of these locations that and set each to there own distance parameter.-This will allow you to enter numbers and distances into you preferences in order to elongate and morph the n.

    ROTATION PARAMETER

    -Allows you to enter degrees into the preferences changing the rotation of the center portion of the n.

    -Create a reference plan on the center of the middle blade and constrain the center portion of the n to it.-This will be a rotation/angle constraint that will allow you to enter an angle 0-90 degrees and changes the opening.

    2 Perspective

    PARAMETRIC FACADEREVIT MODELING [ -FALL 2014

    -Independent study regimented around the use of revit as a design tool to enhance my computer modeling abilities while furthering my design as a architecture student.

    [

  • INITIAL MASSING

    -Provides the initial backing for the new ns created.

    -Create the shape of which you want to place your facade. -Set your work plans to the face of the building. Draw the exact shape you want to create.-Extrude the shape back one foot so you can see the mass.

    DIVIDING THE MASS

    -Create the exact shape of the new ns. Your paramet-ric object will be morphed into these divided zones.

    -Select the face of the mass and create surface.-Using the U + V lines create a system that works for your desired design.-These 1 4 strips match the ns created in the family space.

    APPLYING FINS

    -Loading your initially created ns into the project and applying the to the mass.

    -Open your n family and click load into project.-Once in the project select the divided surface and load this n le-This will create what is shown above.-Edit preferences will allow you to modify the length of the openings-Allow you to control the rotation angle of the n and each individual points because of the preset parameters

    FINISHED DESIGN

    -Applying material to the facade and hiding masses in order to created this nished product.

    -Open the n family le again and select the prole we created.-In the preferences category change the material and reload this back into your project.-Under visibility and graphics make sure mass is unchecked and you will have completed this model.

    FACADE OFFSET CONSTRAINT

    -Allows the control of the oset from the face of the mass to where the screen wall wants to reside.

    -Create a new work plane that is copied o the base grid system. -Apply a distance parameter that allows the control of this distance easily in your building model.-Make sure the grid system is shape of the panel you want to apply in the model.

    FIN PROFILE

    -Design the approximate shape of panel that you wish to create. This will be able to morph once control points are applied.

    -Setting you work planes properly create each on the planes shown here.-Rotate the center plane 90 degrees so it is perpendicular to the base and elevate this up nearly 6.-Loft these planes together so they create one cohesive n.

    PARAMETRIC CONTROL POINTS

    -Apply the shown control points in order to set parame-ters that will allow the easy adaption of the shape and angles of the n.

    -Create reference points at each of these locations that and set each to there own distance parameter.-This will allow you to enter numbers and distances into you preferences in order to elongate and morph the n.

    ROTATION PARAMETER

    -Allows you to enter degrees into the preferences changing the rotation of the center portion of the n.

    -Create a reference plan on the center of the middle blade and constrain the center portion of the n to it.-This will be a rotation/angle constraint that will allow you to enter an angle 0-90 degrees and changes the opening.

    2 Perspective

    PARAMETRIC FACADEREVIT MODELING [ -FALL 2014

    -Independent study regimented around the use of revit as a design tool to enhance my computer modeling abilities while furthering my design as a architecture student.

    [

  • 11

    Transit Hub

    Marana Rd

    Sand

    ario

    Rd

    Barnett Rd

    2

    2

    Skyview Exit/Entrance Ramp

    3

    3

    Naranja Farmers Market

    4

    4

    Copper Theater

    5

    5

    Fountain of Youth

    6

    6

    The Citrus Hotel

    7

    7

    Aerospace Nucleus

    8

    8

    Financial District

    9

    9

    Yoem Pueblo Fountain

    10

    10

    Skyview Tower

    11

    11

    Yoem Pueblo

    12

    12

    Shopping Center

    1313

    City Hall

    14

    14

    Honea Tower

    15

    15

    Green Industrial

    16

    16

    Marana Fire Dept. Station

    17

    17

    Bikeway + Greenway

    18

    18

    Grand Canyon University

    Perspective View

    2

    0.25 0 0.50 MI

    3.5 M SF + SF of new construction for proposed mixed-use development adjacent to the transit hub. $235 M in new construction costs

    FINANCIAL SUMMARY | MAKING IT HAPPENInitial construction will be

    short-term construction loan. A local bank

    will be used so the developer can receive a high loan-to-value (LTV)

    ratio of 75%.

    Long-term permanent loans will be secured to cover the

    permanent loans will reduce the to the developer

    Mezzanine debt will be utilized to improve the LTV to 80% +

    Median Household Income

    Median Home Value

    Town of Marana

    City of Tucson

    $68,000

    $37,000

    Town of Marana

    City of Tucson

    $280,000

    $174,000

    TUCSO

    N BY-PASS

    ROUTE 83

    RO

    U TE 216

    ROUTE 19

    ROUTE 85

    RO

    UTE

    77

    ROUTE 86

    I-10

    I-10 WESTfuture i11 supercorridor

    TUCSON

    MARANA

    NOGALES

    2 Perspective

    CITY OF MARANA MASTER PLAN I-11 SUPER CORRIDOR [ -Spring 2014

    - A transit oriented city capitalizing on next generation technology helping link the city of Marana with Tucson, Pheonix and on up the new CANAMEX corridor.

    [

  • 11

    Transit Hub

    Marana Rd

    Sand

    ario

    Rd

    Barnett Rd

    2

    2

    Skyview Exit/Entrance Ramp

    3

    3

    Naranja Farmers Market

    4

    4

    Copper Theater

    5

    5

    Fountain of Youth

    6

    6

    The Citrus Hotel

    7

    7

    Aerospace Nucleus

    8

    8

    Financial District

    9

    9

    Yoem Pueblo Fountain

    10

    10

    Skyview Tower

    11

    11

    Yoem Pueblo

    12

    12

    Shopping Center

    1313

    City Hall

    14

    14

    Honea Tower

    15

    15

    Green Industrial

    16

    16

    Marana Fire Dept. Station

    17

    17

    Bikeway + Greenway

    18

    18

    Grand Canyon University

    Perspective View

    2

    0.25 0 0.50 MI

    3.5 M SF + SF of new construction for proposed mixed-use development adjacent to the transit hub. $235 M in new construction costs

    FINANCIAL SUMMARY | MAKING IT HAPPENInitial construction will be

    short-term construction loan. A local bank

    will be used so the developer can receive a high loan-to-value (LTV)

    ratio of 75%.

    Long-term permanent loans will be secured to cover the

    permanent loans will reduce the to the developer

    Mezzanine debt will be utilized to improve the LTV to 80% +

    Median Household Income

    Median Home Value

    Town of Marana

    City of Tucson

    $68,000

    $37,000

    Town of Marana

    City of Tucson

    $280,000

    $174,000

    TUCSO

    N BY-PASS

    ROUTE 83

    RO

    U TE 216

    ROUTE 19

    ROUTE 85

    RO

    UTE

    77

    ROUTE 86

    I-10

    I-10 WESTfuture i11 supercorridor

    TUCSON

    MARANA

    NOGALES

    2 Perspective

    CITY OF MARANA MASTER PLAN I-11 SUPER CORRIDOR [ -Spring 2014

    - A transit oriented city capitalizing on next generation technology helping link the city of Marana with Tucson, Pheonix and on up the new CANAMEX corridor.

    [

  • Passenger TrainStreet Car

    3 Lane Road 3 Lane Road Freight TrainLiving MachineBio-filtration

    Train Station

    .

    .

    Marana Construction CostsProject Duration: 156Net Leasable Area: 400,000 SFLand: 35-50 acresSoft Costs: Architecture, Engineering, Title, Title Insurance, Taxes, Developm-ent Fee, Project Overhead, Legal, Inspection Fees, Marketing, Leasing ommis-sions, Construction Loan Fee, Acquistion Fee, Operating, Cost Deficit Hard Costs: Base Building, Tenant Improvements, Residential Infrastructure, Retail Infrastructure, Office Infrastructure, Commercial Infrastructure, Flex infrastructure

    3.5 M SF + SF of new construction for proposed mixed-use development adjacent to the transit hub. $235 M in new construction costs

    South BoundInterstate Movement

    Frieght lineRail lines

    Passenger line

    Frieght Access to Industries

    Passenger transit station

    Bike CirculationPedestiran Movement

    Walking Circulation

    Green circulation

    Light Rail CirculationLight Rail

    Lightrail transit Hub

    North Bound

    2 Perspective

  • Passenger TrainStreet Car

    3 Lane Road 3 Lane Road Freight TrainLiving MachineBio-filtration

    Train Station

    .

    .

    Marana Construction CostsProject Duration: 156Net Leasable Area: 400,000 SFLand: 35-50 acresSoft Costs: Architecture, Engineering, Title, Title Insurance, Taxes, Developm-ent Fee, Project Overhead, Legal, Inspection Fees, Marketing, Leasing ommis-sions, Construction Loan Fee, Acquistion Fee, Operating, Cost Deficit Hard Costs: Base Building, Tenant Improvements, Residential Infrastructure, Retail Infrastructure, Office Infrastructure, Commercial Infrastructure, Flex infrastructure

    3.5 M SF + SF of new construction for proposed mixed-use development adjacent to the transit hub. $235 M in new construction costs

    South BoundInterstate Movement

    Frieght lineRail lines

    Passenger line

    Frieght Access to Industries

    Passenger transit station

    Bike CirculationPedestiran Movement

    Walking Circulation

    Green circulation

    Light Rail CirculationLight Rail

    Lightrail transit Hub

    North Bound

    2 Perspective

  • Two703

    2.00%

    Black806

    2.30%

    White24,05068.80%

    Asian1,2803.70%

    Indian1,2803.70%

    Islander282

    0.80%

    Other76

    0.20%

    Hispanic7,730

    22.10%

    TOTAL PROJECTION36,000 110,000

    Living Alone2,129

    18.80%

    NonfamilyHouseholds2,81224.90%

    FamilyHouseholds

    8,48375.10%

    Marriedcouple

    7,28564.50%

    Malehouseholder

    4213.70%

    Femalehouseholder

    7776.90%

    over65 years

    5645.00%

    childrenunder 18

    4,04935.80%

    peopleover 652,66923.60%

    11,295

    Kindergarten490

    6.00%

    Preschool677

    8.30%

    High School1,546

    19.00%

    Elementary School3,483

    42.90%

    College1,927

    23.70%

    8,123

    OtherMarana UnifiedSchool District

    1,800

    Ritz-Carlton350

    Wal-mart450 Town of

    Marana300

    Frys Foodand Drug

    240

    MaranaHealthCenter

    195Sargent Controlsand Aerospace

    255

    RACIAL DEMOGRAPHICS

    HOUSEHOLDS

    SCHOOL ENROLLMENT

    EMPLOYMENT 6,388

    DEMOGRAPHICS | THOSE WHO DWELL HERE

    DESIGN IMPLICATIONSMarana has the economic potential to develop into a transit oriented, economically viable, livable city. Planning efforts must be aggressive and utilize the citys unique location to produce jobs and promote sustainable development.

    North Marana

    East Marana

    113

    160

    2012

    NEW SINGLE FAMILYHOME PERMITS

    AREA IN SQ MI 121 (of town)MILES OF STREETS 300MILES OF 1-10 20

    102

    375

    South Marana

    2 Perspective

    GREEN FINGER CIRCULATION

  • Two703

    2.00%

    Black806

    2.30%

    White24,05068.80%

    Asian1,2803.70%

    Indian1,2803.70%

    Islander282

    0.80%

    Other76

    0.20%

    Hispanic7,730

    22.10%

    TOTAL PROJECTION36,000 110,000

    Living Alone2,129

    18.80%

    NonfamilyHouseholds2,81224.90%

    FamilyHouseholds

    8,48375.10%

    Marriedcouple

    7,28564.50%

    Malehouseholder

    4213.70%

    Femalehouseholder

    7776.90%

    over65 years

    5645.00%

    childrenunder 18

    4,04935.80%

    peopleover 652,66923.60%

    11,295

    Kindergarten490

    6.00%

    Preschool677

    8.30%

    High School1,546

    19.00%

    Elementary School3,483

    42.90%

    College1,927

    23.70%

    8,123

    OtherMarana UnifiedSchool District

    1,800

    Ritz-Carlton350

    Wal-mart450 Town of

    Marana300

    Frys Foodand Drug

    240

    MaranaHealthCenter

    195Sargent Controlsand Aerospace

    255

    RACIAL DEMOGRAPHICS

    HOUSEHOLDS

    SCHOOL ENROLLMENT

    EMPLOYMENT 6,388

    DEMOGRAPHICS | THOSE WHO DWELL HERE

    DESIGN IMPLICATIONSMarana has the economic potential to develop into a transit oriented, economically viable, livable city. Planning efforts must be aggressive and utilize the citys unique location to produce jobs and promote sustainable development.

    North Marana

    East Marana

    113

    160

    2012

    NEW SINGLE FAMILYHOME PERMITS

    AREA IN SQ MI 121 (of town)MILES OF STREETS 300MILES OF 1-10 20

    102

    375

    South Marana

    2 Perspective

    GREEN FINGER CIRCULATION

  • CAP

    PRIMARY CIRCULATION

    Residential Community

    Residential Community

    Transit Hub CRITICAL NODE

    CAP Living MachineStaging

    WaterFrom Hub

    Downtown

    PRIMARY CIRCULATION WATER FILTRATION PROGRAM

    Residential Community

    Residential Community

    Transit Hub CRITICAL NODE

    CAP

    FilteredTo Hub

    + Downtown

    Living MachineStaging

    WaterFrom Hub

    Public Park

    DowntownResidential Community

    Residential Community

    Transit Hub CRITICAL NODE

    Tech IndustryPublic Plaza

    WATER FILTRATION

    ESSENTIAL PROGRAM

    CIRCULATION + VITAL AREAS

    TUCSON BASIN

    MARANA

    IF MARANA BECAME MANHATTEN ISLANDThe Tucson and Tortilita Mountains contain the town to the west and the

    residents with excellent view shed amenities. Architect Bill Mackey created an overlay graphic of available developable land in Southern Arizona.

    east. between these mountain ranges is relatively flat land. providing the

    FilteredTo Hub

    + Downtown

    Downtown

    2 Perspective

  • CAP

    PRIMARY CIRCULATION

    Residential Community

    Residential Community

    Transit Hub CRITICAL NODE

    CAP Living MachineStaging

    WaterFrom Hub

    Downtown

    PRIMARY CIRCULATION WATER FILTRATION PROGRAM

    Residential Community

    Residential Community

    Transit Hub CRITICAL NODE

    CAP

    FilteredTo Hub

    + Downtown

    Living MachineStaging

    WaterFrom Hub

    Public Park

    DowntownResidential Community

    Residential Community

    Transit Hub CRITICAL NODE

    Tech IndustryPublic Plaza

    WATER FILTRATION

    ESSENTIAL PROGRAM

    CIRCULATION + VITAL AREAS

    TUCSON BASIN

    MARANA

    IF MARANA BECAME MANHATTEN ISLANDThe Tucson and Tortilita Mountains contain the town to the west and the

    residents with excellent view shed amenities. Architect Bill Mackey created an overlay graphic of available developable land in Southern Arizona.

    east. between these mountain ranges is relatively flat land. providing the

    FilteredTo Hub

    + Downtown

    Downtown

    2 Perspective

  • CENTER FOR INFORMATION + COLLABORATIONUU I UNVIERSITY OF ARIZONA [ -Fall 2013

    - Linking the northern edge of campus creating a hub for academia, public exhibit space and more,

    [

    CONCRETE

    EARTH WORK

    LSTREET LIGHTBBENCH

    RBIKE RACK

    CHILLED WATER LINE

    SITE BOUNDARY

    SEWER LINE

    ASPHALT

    PPARKING

    LEGEND

    UNDERGROUND ACCESS

    WATER

    E SPEEDWAY BLVD

    N. E

    uclid

    Ave

    .

    N

    0 32magnetic north

    N

    CIC SITE

    TREE PALM TREE

    CIC SITE PLAN

    0 200

    -Vertical Plumbing-Restrooms

    -Screen Wall Shading-Structural Walls-Super Structure

    -Vertical Mechanical Shafts

    -Vertical Circulation-Horizontal Circulation

    -Glass Glazing

    -Super Structure

    PROGRAM DIAGRAM

    TOTAL w EXTERIOR 94,584

    NET +

    GR

    OS

    S

    NET AREA: 51,588

    NET AREA: 104,715

    Building Efficiency: 49%

    BE: 49% Service: 14.3%

    OPEN STUDY

    OUTDOOR SPACE

    PUBLIC SPACE

    LOBBY ATRIUM

    ADMINISTRATION

    SERVICE

    COLLABERATION2 Perspective

  • CENTER FOR INFORMATION + COLLABORATIONUU I UNVIERSITY OF ARIZONA [ -Fall 2013

    - Linking the northern edge of campus creating a hub for academia, public exhibit space and more,

    [

    CONCRETE

    EARTH WORK

    LSTREET LIGHTBBENCH

    RBIKE RACK

    CHILLED WATER LINE

    SITE BOUNDARY

    SEWER LINE

    ASPHALT

    PPARKING

    LEGEND

    UNDERGROUND ACCESS

    WATER

    E SPEEDWAY BLVD

    N. E

    uclid

    Ave

    .

    N

    0 32magnetic north

    N

    CIC SITE

    TREE PALM TREE

    CIC SITE PLAN

    0 200

    -Vertical Plumbing-Restrooms

    -Screen Wall Shading-Structural Walls-Super Structure

    -Vertical Mechanical Shafts

    -Vertical Circulation-Horizontal Circulation

    -Glass Glazing

    -Super Structure

    PROGRAM DIAGRAM

    TOTAL w EXTERIOR 94,584

    NET +

    GR

    OS

    S

    NET AREA: 51,588

    NET AREA: 104,715

    Building Efficiency: 49%

    BE: 49% Service: 14.3%

    OPEN STUDY

    OUTDOOR SPACE

    PUBLIC SPACE

    LOBBY ATRIUM

    ADMINISTRATION

    SERVICE

    COLLABERATION2 Perspective

  • Car Circulation

    Site Circulation

    Site entrance

    Site setbacks

    Utility Tunnel

    Utilities

    SITE ACCESS

    Access AlleyUTILITYTUNNEL A - Metal Mesh Screen

    B - Wide FlangeC - Round Steel Tube

    Building

    Parti Procession

    Breezeway

    Outdoor space

    Pedestrian Circulation

    PossibleMassing

    SITE ANALYSIS:

    2 Perspective

    WALL DETAILD - Rectangular Steel TubeE - Square Steel TubeF - Metal Strip Shading

    G - Steel FrameH - Curtain WallI - Mullion

    J - Glass StructureK - Rectangular Glass ClipL - Spider Fitting

  • Car Circulation

    Site Circulation

    Site entrance

    Site setbacks

    Utility Tunnel

    Utilities

    SITE ACCESS

    Access AlleyUTILITYTUNNEL A - Metal Mesh Screen

    B - Wide FlangeC - Round Steel Tube

    Building

    Parti Procession

    Breezeway

    Outdoor space

    Pedestrian Circulation

    PossibleMassing

    SITE ANALYSIS:

    2 Perspective

    WALL DETAILD - Rectangular Steel TubeE - Square Steel TubeF - Metal Strip Shading

    G - Steel FrameH - Curtain WallI - Mullion

    J - Glass StructureK - Rectangular Glass ClipL - Spider Fitting

  • 1/16 STRUCTURAL MODEL2 Perspective

    1/16 Model

  • 1/16 STRUCTURAL MODEL2 Perspective

    1/16 Model

  • 2 Perspective - Aerial

    UNITARIAN UNIVERSALIST[ UU I FOOTHILLS CHURCH CAMPUS [ -Spring 2013

    - A new Unitarian Church proposal nestled in the precious Sonora desert landscape located just north of Tucson Arizona.

    NORTH ORACLE RO

    AD

    N

    DOWNTOWN TUCSON

    10500 N. ORACLE RD5,137 ABOVE SEA

    14.8 Miles

    BROWN MT. RANGE

    PUSCH RIDGE8,257 ASL

    CATALINA MOUNTAIN

    9,157 ABOVE SEA

    EAST NARANJA ROAD

    EAST

    PUSCH VIEW

    LA

    NE

    NO

    RTH

    1st A

    VENUE

    OR

    ACLE R

    OAD

    ORACLE SITE10500 N. Oracle

    Lat: 3223'36.78"NLong: 11057'22.79"W

    SANTA CATALINA MOUNTAIN RANGE0 30

    magnetic north

    N

    1" = 30-0"

    1:30 SITE PLANLOT SIZE: 14.66 ACRES

    638,493 sq. ft.

    ZONING: SR (SUBURBAN RANCH)

    A

    C

    E

    F

    B

    D

    Social hall

    Education

    Sanctuary

    Chapel

    Parking

    Courtyard

    G Info Center

    SIDE YARD SET BACK: 10FRONT YARD SET BACK: 50

    H Nursery

    I Kitchen

    2,016 sq. ft.

    1,592 sq. ft.

    2,160 sq. ft.

    198 sq. ft.

    8,000 sq. ft.

    3,036 sq. ft.

    980 sq. ft.

    952 sq. ft.

    672 sq. ft.

    J Library 1130 sq. ft.

  • 2 Perspective - Aerial

    UNITARIAN UNIVERSALIST[ UU I FOOTHILLS CHURCH CAMPUS [ -Spring 2013

    - A new Unitarian Church proposal nestled in the precious Sonora desert landscape located just north of Tucson Arizona.

    NORTH ORACLE RO

    AD

    N

    DOWNTOWN TUCSON

    10500 N. ORACLE RD5,137 ABOVE SEA

    14.8 Miles

    BROWN MT. RANGE

    PUSCH RIDGE8,257 ASL

    CATALINA MOUNTAIN

    9,157 ABOVE SEA

    EAST NARANJA ROAD

    EAST

    PUSCH VIEW

    LA

    NE

    NO

    RTH

    1st A

    VENUE

    OR

    ACLE R

    OAD

    ORACLE SITE10500 N. Oracle

    Lat: 3223'36.78"NLong: 11057'22.79"W

    SANTA CATALINA MOUNTAIN RANGE0 30

    magnetic north

    N

    1" = 30-0"

    1:30 SITE PLANLOT SIZE: 14.66 ACRES

    638,493 sq. ft.

    ZONING: SR (SUBURBAN RANCH)

    A

    C

    E

    F

    B

    D

    Social hall

    Education

    Sanctuary

    Chapel

    Parking

    Courtyard

    G Info Center

    SIDE YARD SET BACK: 10FRONT YARD SET BACK: 50

    H Nursery

    I Kitchen

    2,016 sq. ft.

    1,592 sq. ft.

    2,160 sq. ft.

    198 sq. ft.

    8,000 sq. ft.

    3,036 sq. ft.

    980 sq. ft.

    952 sq. ft.

    672 sq. ft.

    J Library 1130 sq. ft.

  • LAND ETHICS PROGRAMMING

    The resolution to this solar issue was to rotate the southern building 90 degrees while maintaining the same FFE. This new orientation created a central courtyard that would channel wind water and people through, creating a lush heavily vegetat-ed garden space.

    These new lines allowed for window targeting and narrowing your view on this breath taking Pusch Ridge. Minor cuts allowed for all rooms to have a glimpse of this views while the major spaces (Sanctuary, Social Hall, Courtyard) were given the best views.

    LEVEL FFE

    SOLAR ORIENTATION

    N

    SOLAR ORIENTATION

    VIEW

    AN

    GLE

    S

    TOPO

    GRAP

    HY AN

    GLES

    N

    PUSCH RIDGE VIEW

    TARGETED VECTORS

    2 Section - East

    SANCTUARY EXTERIOR

    SANCTUARY

  • LAND ETHICS PROGRAMMING

    The resolution to this solar issue was to rotate the southern building 90 degrees while maintaining the same FFE. This new orientation created a central courtyard that would channel wind water and people through, creating a lush heavily vegetat-ed garden space.

    These new lines allowed for window targeting and narrowing your view on this breath taking Pusch Ridge. Minor cuts allowed for all rooms to have a glimpse of this views while the major spaces (Sanctuary, Social Hall, Courtyard) were given the best views.

    LEVEL FFE

    SOLAR ORIENTATION

    N

    SOLAR ORIENTATION

    VIEW

    AN

    GLE

    S

    TOPO

    GRAP

    HY AN

    GLES

    N

    PUSCH RIDGE VIEW

    TARGETED VECTORS

    2 Section - East

    SANCTUARY EXTERIOR

    SANCTUARY

  • Plan 3" = 1'-0"

    2

    Section Perspective 6" = 1'-0"

    5

    Elevation

    Force Diagram

    Deformation Diagram

    Moment Diagram

    This one way system attempts to bridge the gap while remaining outside the no build zone. The no build zone forced the design vertical while the spanning the gap at the 8 mark. This design attempts to fabricate a pin connection at both ends of the vertical piers allowing deformation forced down by the load applicator. Lateral stability was acheived through the double system that has trianglular legs that stems out providing even more stablity. The legs are capped with steel on both ends allowing the vectors to allign as they feed into the next material. Both systems are tied together with a welded compressive steel plate that runs the distance of the barring surface which allows even greater lateral stability. The top fanned out pieces of steel create the bench where the applicator sits and was designed to be form specic to the forces coming down. The steel should deform and bow outward but is held in check by the welded peices on the inside.

    CONCEPT EVOLUTION

    STURCTURES FORM CRUSHING[ ONE WAY CRUSHING I ARC322 [ -Spring 2013

  • Plan 3" = 1'-0"

    2

    Section Perspective 6" = 1'-0"

    5

    Elevation

    Force Diagram

    Deformation Diagram

    Moment Diagram

    This one way system attempts to bridge the gap while remaining outside the no build zone. The no build zone forced the design vertical while the spanning the gap at the 8 mark. This design attempts to fabricate a pin connection at both ends of the vertical piers allowing deformation forced down by the load applicator. Lateral stability was acheived through the double system that has trianglular legs that stems out providing even more stablity. The legs are capped with steel on both ends allowing the vectors to allign as they feed into the next material. Both systems are tied together with a welded compressive steel plate that runs the distance of the barring surface which allows even greater lateral stability. The top fanned out pieces of steel create the bench where the applicator sits and was designed to be form specic to the forces coming down. The steel should deform and bow outward but is held in check by the welded peices on the inside.

    CONCEPT EVOLUTION

    STURCTURES FORM CRUSHING[ ONE WAY CRUSHING I ARC322 [ -Spring 2013