“Strategic*Gold*Concessions*in*Ghana’s*Ashan5*Belt ... - Castle Peak Mining.pdf ·...

22
TSX.V: CAP | castlepeakmining.com “Strategic Gold Concessions in Ghana’s Ashan5 Belt” Corporate Presenta5on – June 2011

Transcript of “Strategic*Gold*Concessions*in*Ghana’s*Ashan5*Belt ... - Castle Peak Mining.pdf ·...

TSX.V:  CAP  |  castlepeakmining.com  

“Strategic  Gold  Concessions  in  Ghana’s  Ashan5  Belt”  Corporate  Presenta5on  –  June  2011  

TSX.V:  CAP  |  castlepeakmining.com  

Forward  Looking  Statements  

 2  

The  informa5on  contained  in  this  presenta5on  is  provided  by  Castle  Peak  Mining  Ltd.  (“Castle  Peak”  or  the  “Company”)  for  informa5onal  purposes  only  and  does  not  cons5tute  an  offer  to  issue  or  arrange  to  issue,  or  the  solicita5on  of  an  offer  to  issue,  securi5es  of  Castle  Peak  or  other  financial  products.  The  informa5on  contained  herein  is  not  investment  or  financial  product  advice  and  is  not  intended  to  be  used  as  the  basis  for  making  an  investment  decision.  The  views,  opinions  and  advice  provided  in  this  presenta5on  reflect  those  of  the  individual  presenters,  and  are  provided  for  informa5on  purposes  only.    The  presenta5on  has  been  prepared  without  taking  into  account  the  investment  objec5ves,  financial  situa5on  or  par5cular  needs  of  any  par5cular  person.  No  representa5on  or  warranty,  express  or  implied,  is  made  as  to  the  fairness,  accuracy,  completeness  or  correctness  of  the  informa5on,  opinions  and  conclusions  in  this  presenta5on.  To  the  maximum  extent  permiTed  by  law,  none  of  Castle  Peak  nor  its  directors,  officers,  employees  or  agents,  nor  any  other  person  accepts  any  liability,  including,  without  limita5on,  any  liability  arising  out  of  fault  or  negligence,  for  any  loss  arising  from  the  use  of  the  informa5on  contained  in  this  presenta5on.      Except  for  statements  of  historical  fact,  this  presentaDon  contains  certain  “forward-­‐looking  informaDon”  and  "forward-­‐looking  statements”  within  the  meaning  of  applicable  securiDes  laws.  Forward-­‐looking  statements  and  informaDon  are  frequently  characterized  by  words  such  as  “plan”,  “expect”,  “project”,  “intend”,  “believe”,  “anDcipate”,  “esDmate”  and  other  similar  words,  or  statements  that  certain  events  or  condiDons  “may”  or  “will”  occur  and  include,  but  are  not  limited  to,  statements  with  respect  to  the  Dming  and  amount  of  esDmated  future  exploraDon,  success  of  exploraDon  acDviDes,  expenditures,  permiPng,  and  requirements  for  addiDonal  capital  and  access  to  data.    Forward-­‐looking  statements  involve  known  and  unknown  risks,  uncertainDes  and  other  factors  which  may  cause  the  actual  results,  performance  or  achievements  of  the  Company  to  be  materially  different  from  any  future  results,  performance  or  achievements  expressed  or  implied  by  the  forward-­‐looking  statements.  Such  factors  include,  among  others,  risks  related  to  actual  results  of  current  exploraDon  acDviDes;  changes  in  project  parameters  as  plans  conDnue  to  be  refined;  the  ability  to  enter  into  joint  ventures  or  to  acquire  or  dispose  of  property  interests;  future  prices  of  mineral  resources;  accidents,  labour  disputes  and  other  risks  of  the  mining  industry;  ability  to  obtain  financing;  and  delays  in  obtaining  governmental  approvals  or  financing,  as  well  as  those  risk  factors  idenDfied  in  the  Company’s  filing  statement  filed  under  the  Company’s  profile  on  SEDAR.  Castle  Peak  undertakes  no  obligaDon  to  update  forward-­‐looking  informaDon  if  circumstances  or  management’s  esDmates  or  opinions  should  change  except  as  required  by  law.  The  reader  is  cauDoned  not  to  place  undue  reliance  on  forward-­‐looking  statements.          Castle  Peak’s  disclosure  of  technical  informaDon  in  this  presentaDon  has  been  reviewed  and  approved  by  Darren  Lindsay,  P.  Geo.,  Castle  Peak’s  President  and  CEO,  who  serves  as  a  Qualified  Person  under  the  definiDon  of  NaDonal  Instrument  43-­‐101.  Joe  Amanor  and  John  Coates  of  SEMS  ExploraDon  Services  Ltd.  in  Accra,  Ghana  have  reviewed  the  technical  informaDon  in  this  presentaDon  and  served  as  Qualified  Person’s  for  the  Castle  Peak  exploraDon  program.  Castle  Peak  Mining’s  properDes  are  early  stage  exploraDon  properDes  and  do  not  contain  any  mineral  resources  as  defined  by  NaDonal  Instrument  43-­‐101.      

TSX.V:  CAP  |  castlepeakmining.com  

Investment  Highlights  

•  Reputable  management  team  with  established  relaDonships  with  local  officials  

•  Located  in  poliDcally  stable,  mining  friendly  jurisdicDon  

•  Large  land  posiDon  adjacent  to  producing  gold  mines  in  Ghana’s  AshanD  belt  

•  Favourable  infrastructure  

•  Quality  projects  and  a  systemaDc  value  creaDng  exploraDon  strategy  to  uncover  abundant  resource  potenDal  

 3  

Canadian-­‐based  exploraDon  and  development  company  focused  on  advancing  greenfield  and  early  stage  gold  projects.    

TSX.V:  CAP  |  castlepeakmining.com  

Financing  &  Share  Structure  

4  

     Issued  and  outstanding  common  shares   45,357,143  

     Warrants   12,048,241  

     Stock  OpDons   3,800,000  

     Fully  Diluted  (35%  insider  ownership)   61,205,384  

March  4,  2011  –  CPC  qualifying  transac5on  completed  concurrent    with  private  placement    

•  Total  raised  $8,000,000  •  22,857,843  units  @  $0.35/unit    •  one  unit  includes  one  common  share  and  

one-­‐half  of  one  share  purchase  warrant  •  whole  share  purchase  warrant  enDtles  

common  share  at  $0.50  for  12  months  

Cri5cal  Capital    10%   Brokered  

Private  Placement  

12%  

Non-­‐brokered  Private  

Placement  39%  

Castle  Peak  2006  -­‐  

Shareholders  19%  

Castle  Peak  2006  -­‐  

Founders  20%  

TSX.V:  CAP  |  castlepeakmining.com  

Trading  History  

5  

Key  Points  

•  Commenced  trading  on  TSX  Venture  Exchange  March  9,  2011  

•  Currently  9,890,798  free  trading  shares    

•  32,747,941  shares  will  be  free  trading  as  at    July  5,  2011  following    4-­‐month  hold  period  

$0.00  $0.20  $0.40  $0.60  $0.80  $1.00  $1.20  $1.40  $1.60  

Price  

0  200000  400000  

Volume  

TSX.V:  CAP  |  castlepeakmining.com  

Reputable  Management  Team    Darren  Lindsay,  BSc,  PGeo  –  President  &  Chief  Execu5ve  Officer  Registered  geoscienDst  with  15  years  internaDonal  experience;  key  player  in  developing  the  mulD-­‐million  ounce  Hope  Bay  gold  deposits  with  Miramar  Mining  and  later  Newmont  Mining;    prior  experience  with  BHP  Minerals,  Inmet  Mining,  and  Kodiak  ExploraDon.    

Paula  Rogers,  CA  -­‐  Chief  Financial  Officer    Chartered  Accountant  with  15  years  internaDonal  experience;  Corporate  Treasurer  with  Wheaton  River  Minerals  before  becoming  Vice-­‐President,  Treasurer  with  Goldcorp;  prior  experience  with  Finning  InternaDonal  and  Deloise  and  Touche  

Henry  Nii  Nai  Sowah,  BSc,  MBA  –  Explora5on  Manager  NaDve  Ghanaian  with  more  than  eight  years  experience  in  mining,  three  with  Castle  Peak  properDes,  three  with  Etruscan  Resources  ,  student  with  AshanD  GoldFields  

Giovanna  Mar5no  –  Corporate  Secretary  15  years  experience  with  Nortec  Minerals,  FronDer  Pacific  ,  law  firm  Holmes  Greenslade  

Marlo  Hamer-­‐Jackson  –  Investor  Rela5ons  Manager  10  years  experience  in  corporate  relaDons    with  Placer  Dome,  Goldcorp,  Ventana  Gold  Corp.  

 

 

6  

TSX.V:  CAP  |  castlepeakmining.com  

Board  of  Directors  

Brian  Lock  (Chairman)  -­‐  30  years  experience  in  mining;  founder  of  Proton  InternaDonal  Engineering  Corp.,  devoted  to  development  of  junior  mining  projects;  EVP  of  FronDer  Pacific  Mining  CorporaDon  since  early  2006  unDl  Eldorado  Gold’s  takeover  in  July  2008;  currently  Director  of  Scorpio  Gold  CorporaDon  and  Canaco  Resources  Inc.    

Randy  Smallwood  -­‐  Founding  member  and  current  President  and  CEO  of  Silver  Wheaton  Corp.;  geological  engineer  with  original  Wheaton  River  Minerals  who  played  instrumental  part  in  2005  merger  with  Goldcorp  into  one  of  the  largest,  most  profitable  gold  companies  in  the  world;  former  Director  of  Ventana  Gold  Corp.,  current  Director  of  Canaco  Resources  Inc.,  Geologix  ExploraDons  Inc.  and  Riva  Gold  CorporaDon.  

Peter  J.  Hawley  -­‐  Chairman,  CEO  and  Director  of  Scorpio  Mining  CorporaDon;  CEO,  President  and  Director  of  Scorpio  Gold  CorporaDon;  Director  of  Maxtech  Ventures  Inc.;  and  Director  of  Abitex  Resources  Inc.  

Darren  Lindsay  –  Castle  Peak  President  &  CEO    

Randal  Gindi  -­‐  Founding  shareholder  

7  

TSX.V:  CAP  |  castlepeakmining.com  

Advisory  Commisee  

Andrew  Lee  Smith,  BSc,  PGeo  More  than  20  years  experience  in  exploring,  developing  and  operaDng  North  American  base  and  precious  metal  mining  and  gem  projects.    Currently  President  and  CEO  of  Canaco  Resources,  previously  VP,  ExploraDon  with  Aurizon  Mines,  and  co-­‐founder  of  True  North  Gems.  

Dr.  David  Groves  Emeritus  Professor  at  the  Centre  for  ExploraDon  TargeDng,  previously  Professor  of  Economic  Geology  and  Director  of  University  Western  Australia's  Centre  for  Global  Metallogeny.  Received  nine  medals  for  his  research  over  his  career,  and  just  recently  received  the  presDgious  Penrose  Gold  Medal  of  the  Society  of  Economic  Geologists.    

David  Parsons,  CGA  More  than  20  years  experience  in  the  mining  industry  as  Controller,  CFO  and  Director  of  mining  companies.    Currently  Vice-­‐President,  Insurance  with  Goldcorp  Inc.  awer  helping  to  execute  the  acquisiDon  of  Wheaton  River  Minerals  and  merger  with  Goldcorp.  

David  Smalley,  LL.B.  More  than  16  years  experience  with  public  companies  as  founding  Director  and  Legal  Counsel  for  both  CriDcal  Capital  CorporaDon  and  Castle  Peak  Mining  Ltd.,  partner  at  Fraser  and  Company  LLP,  and  current  Director  of  Scorpio  Gold  Ltd.  and  Corporate  Secretary  of  Canaco  Resources  Inc.  

 

8  

TSX.V:  CAP  |  castlepeakmining.com  

Mining  Friendly  JurisdicDon  

•  Stable  governmental  system  since  Ghana  became  a  BriDsh  colony    

•  Rated  an  investment  grade  country  •  Favourable  mining  and  tax  code  •  Import  taxaDon  excluded  on  equipment  

for  foreign  mining  companies  •  Excellent  infrastructure  and  well  trained  

labour  force  available  

 9  

Ghana  is  now  the  second  largest  gold  producer  in  Africa.  Castle  Peak’s  Akorade  project  is  located  in  southwest  Ghana  in  the  southern  porDon  of  the  AshanD  volcanic  belt.  

TSX.V:  CAP  |  castlepeakmining.com  

West  African  Development  -­‐  15  new  mines  in  5  years  

10  

2005      2006              2007                      2008                        2009                      2010  

Loulo  

Chirano  

Wassa    

370k  

170k  

200k  

Ahafo  

Gluelb  520k  

85k  

Taparko  

Tasiast  

100k  

230k  

Mana  

Bonikro  

Youga  

HBB  

130k  

140k  

70k  

160k  

Syama  

Tabakoto  

Kalsaka  

Sabodala  

250k  

100k  

60k  

160k  

Tongon  

Essakane  

Inata  

265k  

320k  

100k  

2011+  Pipeline  Nzema  

CAGP  

Akyem  

Bibiani  

Esaase  

Konongo  

Massawa  

Agbaou  

Finkolo  

New  Liberty  

120k  

200k  

500k  

150k  

200k  

25k  

?  

?  

?  

?  

Source:  Perseus  Mining  Corporate  PresentaDon  –  September  2010  

Ghana  

 10  

TSX.V:  CAP  |  castlepeakmining.com  

Adjacent  to  Producers  

There  are  currently  eight  producing  gold  mines  and  mulDple  development  projects  in  Ghana.  Six  of  the  eight  producers  and  one  near-­‐term  developer  lie  within  100  kilometres    of  Akorade,  and  account  for  more  than  95  million  ounces  in  gold  reserves  and  resources.    

1AngloGold  AshanD  Mineral  Resource  and  Ore  Reserve  Report  2010  2  www.gsr.com  3  GoldFields  Integrated  Annual  Report  Mineral  Resources  &  Mineral  Reserves  –  April  2011    4  www.kinross.com  5  Newmont  2010  Reserves  and  Non-­‐Reserve  MineralizaDon  6  ww.adamusresources.com.au        7  Perseus  Mining  PresentaDon  –  May  2011    8  www.nobleminres.com.au  

 

 11  

 11  

TSX.V:  CAP  |  castlepeakmining.com  

Favourable  Infrastructure  

Castle  Peak’s  large  land  posiDon  (~235  square  kilometres)  lies  20  kilometres  south  of  the  town  of  Tarkwa,  a  regional  mining  centre.      

•  Takoradi-­‐Tarkwa  road  runs  through  CAP  properDes  

•  Projects  are  on  the  naDonal  power  grid  

•  Located  between  the  mining  centre  of  Tarkwa  and  the  port  city  of  Takoradi  

•  Established  mining  infrastructure  due  to  proximity  to  mulD-­‐million  ounce  producers  

1AngloGold  AshanD  Mineral  Resource  and  Ore  Reserve  Report  2010  2  www.gsr.com  3  GoldFields  Fiscal  2010  Annual  Report    4  www.adamusresources.com.au    

 12  

 12  

TSX.V:  CAP  |  castlepeakmining.com  

Akorade  Project  

13  

•  Eight  conDguous  licenses  known  as  Bonsaso,  Dompem,  POW,  Enyinase,  Asuogya,  Ayiem,  Nkwanta,  and  Kedadwen  

•  Encompass  ~235  square  kilometres  

•  90%  ownership  interest  in  Bonsaso;  100%  interest  in  Dompem  subject  to  a  2.5%  NSR;  82.5%  ownership  interest  in  POW;  100%  interest  in  Enyinase;  and  95%  interest  in  Nkwanta,  Asuogya,  Ayiem,  and  Kedadwen    

TSX.V:  CAP  |  castlepeakmining.com  

Target  GeneraDon  -­‐  Soil  Anomalies  

•  335  historical  stream  samples  taken  across  complete  land  package  to  idenDfy  key  exploraDon  areas  

•  More  than  12,355  historical  soil  samples  on  200m  x  50m  grid  completed  

•  Largest  anomaly  9500m  x  1000m  on  Asuogya-­‐Ayiem  trend  

•  Two  to  three  strong  anomalies  per  concession  and  many  more  moderate  anomalies  

•  Next  steps:    grid  expansion  samples  for  complete  coverage  of  enDre  land  package    

 

 14  

TSX.V:  CAP  |  castlepeakmining.com  

Target  GeneraDon  –  Auger/Trench  

•  1,978  out  of  10,000  planned  auger  samples  taken  to  date  to  follow  up  on  high  priority  soil  anomalies  

•  3,118  historical  auger  samples  followed  up  on  large  Asuogya-­‐Ayiem  anomaly  

•  691m  historical  trenching  completed  on  POW  (121m)  and  Bonsaso  (570m)  

•  Next  steps:  infill  auger  sampling  50m  x  10m  to  idenDfy  higher  grade  porDons  of  trends;  potenDal  trenching  depending  on  arDsinal  access  

 

 15  

TSX.V:  CAP  |  castlepeakmining.com  

Target  GeneraDon  -­‐  POW  Trench  Results  

16  

*Technical  NI  43-­‐101  report  on  POW  completed  Feb  2011  

TSX.V:  CAP  |  castlepeakmining.com  

Target  GeneraDon  –  Airborne  Survey  

17  

•  3,425  kilometre  airborne  survey  program  (VTEM,  magneDcs,  radiometrics)  completed  in  May  2011    

•  Analysis  to  be  provided  by  end  of  Q2  

•  Interpreted  geology  and  structural  maps  to  enhance  target  compilaDon  

•  Next  steps:  targeted  geological  mapping  based  on  geophysical  interpretaDons  to  confirm  and  refine  conceptual  targets  

 

Photo  source:  Geotech  Airborne  Ltd.  

TSX.V:  CAP  |  castlepeakmining.com  

Phase  I  Drill  Targets  

18  

Four  Phase  I  drill  targets:  Apankrah  Mine,  Nana  Structures,  Asuogya-­‐Ayiem  trend,  and  POW  Main      

1.  Apankrah  Mine:    6  holes  drilled  –  awaiDng  results  

2.  Nana  Structures:    currently  being  drilled    

3.  Asuogya-­‐Ayiem  trend:  next  target  

4.  POW  Main:  forestry  permit  received,  access  road  now  being  built  

 

TSX.V:  CAP  |  castlepeakmining.com  18  

TSX.V:  CAP  |  castlepeakmining.com  

ExploraDon  Plans  

19  

•  $4  M  budget  •  First  phase:  7,500  metres  on  five  drill  targets  on  

Nkwanta,  Asuogya-­‐Ayiem,  and  POW    •  Second  phase:  11,000  metres  based  on  first  

phase  drill  results  •  Aggressive  target  generaDon  on  Ayiem  and  

Kedadwen  

Awer  extensive  evaluaDon  of    soil  sample,  stream  sediment,  auger  drill  and  trench  results,  CAP  plans  to  launch  a  two  phased  drill  program  on  several  idenDfied  targets.  

TSX.V:  CAP  |  castlepeakmining.com  

Value  CreaDng  Strategy  

20  

Mission  Statement:      

Castle  Peak  is  a  junior  mining  company  striving  to  idenDfy  grassroots  targets  and  under-­‐valued  gold  assets  in  Ghana  with  the  potenDal  for  advancing  to  near  term  development.  The  Company  endeavours  to  operate  in  a  safe  and  environmentally  sound  manner  while  conDnuing  to  develop  working  relaDonships  with  government  officials  and  members  of  the  local  communiDes.  

Next  Steps:  

•  Compile  historical  data  to  idenDfy  quality  targets  by  end  of  Q2  

•  Refine  exploraDon  targets  using  trenching,  mapping  and  geophysical  interpretaDon  throughout  Q3  

•  PrioriDze  targets  and  conDnue  aggressive  drill  evaluaDon  program  with  the  intenDon  of  developing  a  NI  43-­‐101  compliant  resource  statement  

TSX.V:  CAP  |  castlepeakmining.com  

Why  Castle  Peak?  

21  

•  Reputable  management  team  

•  Mining  friendly  jurisdicDon  

•  Strategic  land  posiDon  adjacent  to  several  mulD-­‐million  ounce  gold  deposits  in  Ghana’s  AshanD  belt  

•  Favourable  infrastructure  

•  Quality  project  with  a  substanDal  grassroots  database  indicaDng  high  potenDal  for  discovery  

TSX.V:  CAP  |  castlepeakmining.com  

Contact  

22  

Corporate  Office  #510  –  999  West  HasDngs  Street  Vancouver,  BC  V6C  2W2  Tel:  604.681.1466  Fax:    604.681.1404  Email:    [email protected]    

Ghana  Office    №  22  Third  Close  Airport  ResidenDal  Area  Extension  Accra,  Ghana      

Investor  Rela5ons  Marlo  Hamer-­‐Jackson  Investor  RelaDons  Manager  Tel:  604.681.1466  (ext.  235)  Email:  [email protected]