StoryBoardRound6 God's Lake -...

15
WELCOME! to the East Side Transportation Initiative COMMUNITY MEETING PROJECT 6 ALL-SEASON ROAD LINKING MANTO SIPI CREE NATION, BUNIBONIBEE CREE NATION AND GOD’S LAKE FIRST NATION StoryBoardRound6LowRes.indd 1 2017-08-16 9:57 PM

Transcript of StoryBoardRound6 God's Lake -...

Page 1: StoryBoardRound6 God's Lake - content.gov.mb.cacontent.gov.mb.ca/mit/project6/glfn_nov7/storyboard.pdf · and ring-necked ducks are present in about the same numbers as mallards •

WELCOME!

to the East Side Transportation Initiative

COMMUNITY MEETING

PROJECT 6 ALL-SEASON ROADLINKING MANTO SIPI CREE NATION,

BUNIBONIBEE CREE NATION AND GOD’S LAKE FIRST NATION

StoryBoardRound6LowRes.indd 1 2017-08-16 9:57 PM

Page 2: StoryBoardRound6 God's Lake - content.gov.mb.cacontent.gov.mb.ca/mit/project6/glfn_nov7/storyboard.pdf · and ring-necked ducks are present in about the same numbers as mallards •

PROJECT 6 ALL-SEASON ROAD LINKING MANTO SIPI CREE NATION, BUNIBONIBEE CREE NATION AND GOD’S LAKE FIRST NATION

EAST SIDE ROAD NORTHERN PROJECT ALIGNMENTS

StoryBoardRound6LowRes.indd 2 2017-08-16 9:57 PM

Page 3: StoryBoardRound6 God's Lake - content.gov.mb.cacontent.gov.mb.ca/mit/project6/glfn_nov7/storyboard.pdf · and ring-necked ducks are present in about the same numbers as mallards •

PROJECT 6 ALL-SEASON ROAD LINKING MANTO SIPI CREE NATION, BUNIBONIBEE CREE NATION AND GOD’S LAKE FIRST NATION

MAJOR WATER CROSSINGS

StoryBoardRound6LowRes.indd 3 2017-08-16 9:57 PM

Page 4: StoryBoardRound6 God's Lake - content.gov.mb.cacontent.gov.mb.ca/mit/project6/glfn_nov7/storyboard.pdf · and ring-necked ducks are present in about the same numbers as mallards •

PROJECT 6 ALL-SEASON ROAD LINKING MANTO SIPI CREE NATION, BUNIBONIBEE CREE NATION AND GOD’S LAKE FIRST NATION

Since 2009, meetings have been held with God’s Lake First Nation to discuss the Project and select the best road location

PRE-ASSESSMENT COMMUNITY ENGAGEMENT

Community MeetingsJanuary 6, 2016November 4, 2014June 9, 2010April 17, 2009

Meetings with Chief and CouncilOctober 25, 2016July 15, 2014May 10, 2010

Traditional Knowledge Studies, Workshops and InterviewsJanuary 6 and March 22, 2016 November 19 - 26, 2015October 6, 2015April 17, 2009

StoryBoardRound6LowRes.indd 6 2017-08-16 9:57 PM

Page 5: StoryBoardRound6 God's Lake - content.gov.mb.cacontent.gov.mb.ca/mit/project6/glfn_nov7/storyboard.pdf · and ring-necked ducks are present in about the same numbers as mallards •

PROJECT 6 ALL-SEASON ROAD LINKING MANTO SIPI CREE NATION, BUNIBONIBEE CREE NATION AND GOD’S LAKE FIRST NATION

EIA COMMUNITY ENGAGEMENT

Round 4 meetings were held with the communities on:December 8, 2016 in Bunibonibee Cree NationDecember 9, 2016 in God’s Lake First Nation and God’s Lake NarrowsSeptember 22, 2017 in Manto Sipi Cree Nation

Round 5 meetings were held with the communities on:March 15, 2017 in Bunibonibee Cree NationMarch 24, 2017 in God’s Lake First Nation and God’s Lake NarrowsSeptember 22, 2017 in Manto Sipi Cree Nation

Manitoba Infrastructure is conducting meetings with communities in the area toinform and obtain input on the project and Environmental Impact Assessment (EIA)

This engagement is not part of the Duty to Consult

The Purpose of the Round 4 and 5 meetings was to:• Provide an overview of the proposed P6 All-Season Road project

• Inform the community of the overall EIA process

• Discuss how the proposed road alignment has evolved based on feedback to avoid community sensitive areas

• Dialogue with the community about which Valued Components should be the focus of the EIA process

• Discuss potential effects and mitigation

• Discuss prior engagement

StoryBoardRound6LowRes.indd 8 2017-08-16 9:57 PM

Page 6: StoryBoardRound6 God's Lake - content.gov.mb.cacontent.gov.mb.ca/mit/project6/glfn_nov7/storyboard.pdf · and ring-necked ducks are present in about the same numbers as mallards •

PROJECT 6 ALL-SEASON ROAD LINKING MANTO SIPI CREE NATION, BUNIBONIBEE CREE NATION AND GOD’S LAKE FIRST NATION

WHAT WE HEARD

Round 4• There is an interest in how the TK collected will be used especially given the East Side Road

Authority was absorbed by MI• Interest in the realignment history in the vicinity of the community• Interest in contracts to work on the ASR• ��������������� ��������� ������������ ������������ ����� ��������� �• ������������������ ������� ������������������������� ��!������� ��� ��� �� ��"������������

�!������#������� �������� ���������$• Less ducks are seen now but geese are about the same in numbers. There are less mallards,

and ring-necked ducks are present in about the same numbers as mallards• Geese, moose and caribou are hunted• Ice/snow weather conditions make it dangerous to be on the land in the spring – there’s a small

window of time to get out on the land

During Round 4 and 5 meetings, God’s Lake First Nation shared the following with theManitoba Infrastructure Team

Round 5• The moose population in the area seems to be declining and it might be because of clearing in

the area• The ASR won’t affect animals as they will return once construction is completed. The road may

also attract animals• MI should involve the youth of the community for input into the project and what to expect in the

future• Concern was expressed about how the ASR will affect traplines• Concern was expressed about how the ASR will affect the community once it is constructed.

Concerns include alcohol and drugs coming into the community, as well as new businesses ��������%������ ����� ����������� ����������� ����������������&������������� ����� ������� ���������������� ���

StoryBoardRound6LowRes.indd 10 2017-08-16 9:57 PM

Page 7: StoryBoardRound6 God's Lake - content.gov.mb.cacontent.gov.mb.ca/mit/project6/glfn_nov7/storyboard.pdf · and ring-necked ducks are present in about the same numbers as mallards •

PROJECT 6 ALL-SEASON ROAD LINKING MANTO SIPI CREE NATION, BUNIBONIBEE CREE NATION AND GOD’S LAKE FIRST NATION

ENVIRONMENTAL IMPACT ASSESSMENT (EIA)

As a planning and decision-making tool, an EIA aims to minimize or avoid negative environmental effects before they occur, and incorporate environmental factors into the decision making process. EIA’s;• Identify potential effects of a project• Propose measures to mitigate those effects• Predict whether effects will remain after mitigation is implemented• Follow up to verify anticipated effects and effectiveness of mitigation

An EIA involves a variety of factors, including the proposed project, the existing social and natural environment, community engagement and mitigation and follow up on possible effects.

The EIA involves a wide variety of inputs from a diverse range of sources, including input from community and stakeholders in the immediate project area, the general public and other stakeholders groups, regulatory agencies, baseline studies, technical input from consultants and previous project experience.

An EIA is a process to predict environmental effects of proposed projectsbefore they are carried out

Community Engagement

Mi�ga�on & Follow UP

SOCIAL AND NATURALENVIRONMENT PROJECT

Poss

ible

E�e

cts

SOCIAL AND NATURALENVIRONMENT PROJECT

Poss

ible

E�e

cts

StoryBoardRound6LowRes.indd 12 2017-08-16 9:57 PM

Page 8: StoryBoardRound6 God's Lake - content.gov.mb.cacontent.gov.mb.ca/mit/project6/glfn_nov7/storyboard.pdf · and ring-necked ducks are present in about the same numbers as mallards •

PROJECT 6 ALL-SEASON ROAD LINKING MANTO SIPI CREE NATION, BUNIBONIBEE CREE NATION AND GOD’S LAKE FIRST NATION

MITIGATION

In terms of mitigating potential impacts, the environmental impact assessment uses a variety of ����� ���� �������!����!��� ��#������������ ��� ���'

Mitigation measures are actions that can be done to reduce or avoid the effects that a project could have on the environment

AVOID

MINIMIZE

RESTORE

REDUCE OR ELIMINATE

OFFSET

MONITOR

• AVOIDING������!!��������������"��������!����$

• MINIMIZING effects by limiting the degree or magnitude of the action and its implementation

• RESTORING by applying rehabilitation techniques after the effect may have occurred, such as revegetation of disturbed areas

• REDUCING OR ELIMINATING the potential effect over time by preservation and maintenance operations

• OFFSETING potential effects through measures such as offsite habitat creation

• MONITORING the project over time to identify and reduce potential effects

StoryBoardRound6LowRes.indd 13 2017-08-16 9:57 PM

Page 9: StoryBoardRound6 God's Lake - content.gov.mb.cacontent.gov.mb.ca/mit/project6/glfn_nov7/storyboard.pdf · and ring-necked ducks are present in about the same numbers as mallards •

PROJECT 6 ALL-SEASON ROAD LINKING MANTO SIPI CREE NATION, BUNIBONIBEE CREE NATION AND GOD’S LAKE FIRST NATION

• (������� '� �������������� ��#� ����������#�� �signage on road

• Limit construction worker activity to project area• Maintain habitat, encourage natural re-vegetation and

planting with native species• Limit access of right-of-way

• Clearing and blasting to occur as much as possible in winter, outside reproductive period

• Restrict hunting in construction contract areas

• Block temporary access roads after construction

Change in habitat

Disturbance from ����������

Accidentalwildlife-vehicle

collisions

Increased access to resource areas

MOOSE/CARIBOUPOSSIBLE CHANGES (EFFECTS) SUGGESTED MITIGATION DO YOU WANT MI TO USE

THIS MITIGATIONYES NO )*+�3�:+*<

StoryBoardRound6LowRes.indd 14 2017-08-16 9:57 PM

Page 10: StoryBoardRound6 God's Lake - content.gov.mb.cacontent.gov.mb.ca/mit/project6/glfn_nov7/storyboard.pdf · and ring-necked ducks are present in about the same numbers as mallards •

PROJECT 6 ALL-SEASON ROAD LINKING MANTO SIPI CREE NATION, BUNIBONIBEE CREE NATION AND GOD’S LAKE FIRST NATION

FURBEARERS

• Improve sightlines, reduced speed, and signage on road• Design equalization culverts to provide an alternate

means of access for furbearers

• Minimize extent of vegetation clearing• =�� �������������� �������&� ������������!������������• Maintain habitat, encourage re-vegetation and planting

with native species

• Clearing and blasting to occur as much as possible in winter, outside reproductive period

• Maintain camp standards to avoid creating wildlife attractants

• Block temporary access roads after construction

Change in habitat

Disturbance from ����������

Accidentalwildlife-vehicle

collisions

Increased access toresource areas

POSSIBLE CHANGES (EFFECTS) SUGGESTED MITIGATION DO YOU WANT MI TO USETHIS MITIGATION

YES NO )*+�3�:+*<

StoryBoardRound6LowRes.indd 15 2017-08-16 9:57 PM

Page 11: StoryBoardRound6 God's Lake - content.gov.mb.cacontent.gov.mb.ca/mit/project6/glfn_nov7/storyboard.pdf · and ring-necked ducks are present in about the same numbers as mallards •

PROJECT 6 ALL-SEASON ROAD LINKING MANTO SIPI CREE NATION, BUNIBONIBEE CREE NATION AND GOD’S LAKE FIRST NATION

BIRDS

• No work below high water mark in spring to prevent accidental nest disturbance

• �� �������� �� ���������� ��!��������� ���� ����������� ��construction

• Buffer around active nests and stick nests

• Minimize extent of vegetation clearing• Maintain riparian buffer zones along water’s edge

• Restrict construction worker activity to project area• Clearing and blasting to occur as much as possible in the

winter, outside reproductive period

• Restrict hunting in construction areas• Block temporary access roads after construction limiting

access of the right-of-way

Change in habitat

Disturbance anddisplacement from

noise

Disturbance of����� �����

Increased access toresource areas

POSSIBLE CHANGES (EFFECTS) SUGGESTED MITIGATION DO YOU WANT MI TO USETHIS MITIGATION

YES NO )*+�3�:+*<

StoryBoardRound6LowRes.indd 16 2017-08-16 9:57 PM

Page 12: StoryBoardRound6 God's Lake - content.gov.mb.cacontent.gov.mb.ca/mit/project6/glfn_nov7/storyboard.pdf · and ring-necked ducks are present in about the same numbers as mallards •

PROJECT 6 ALL-SEASON ROAD LINKING MANTO SIPI CREE NATION, BUNIBONIBEE CREE NATION AND GOD’S LAKE FIRST NATION

VEGETATION

• Reclaim disturbed areas not required for road operation and maintenance

• Restore ground cover in ditches with native species

• Minimize extent of clearing to right-of-way, quarries, and borrow pits

• Prohibit equipment outside of construction area

• Minimize extent of clearing to right-of-way, quarries, and borrow pits

• Survey for species of concern

• ��� ��� � ������!���� &����� >�&� �������� ���� � � installation of equalization culverts

Removal of trees and shrubs in

���������������

Loss of species of concern and habitat

����������� ��������

Spread of invasive and ��������������

Change in wetland����������������

Increased access toresource areas

• Block access roads after construction

POSSIBLE CHANGES (EFFECTS) SUGGESTED MITIGATION DO YOU WANT MI TO USETHIS MITIGATION

YES NO )*+�3�:+*<

StoryBoardRound6LowRes.indd 17 2017-08-16 9:57 PM

Page 13: StoryBoardRound6 God's Lake - content.gov.mb.cacontent.gov.mb.ca/mit/project6/glfn_nov7/storyboard.pdf · and ring-necked ducks are present in about the same numbers as mallards •

PROJECT 6 ALL-SEASON ROAD LINKING MANTO SIPI CREE NATION, BUNIBONIBEE CREE NATION AND GOD’S LAKE FIRST NATION

POSSIBLE CHANGES (EFFECTS) SUGGESTED MITIGATION

FISH, REPTILES AND AMPHIBIANSDO YOU WANT MI TO USE

THIS MITIGATIONYES NO )*+�3�:+*<

• Avoid critical reproduction period and locations• No work below the high water mark in spring

• Clear in winter and limit clearing near watercourses and restore vegetation

• Use erosion protection and sediment control

• Block access roads after construction

• )���� ���������!������������ � ������>�&

• )���� ���������!������������ � ������>�&

• Protect water quality through proper equipment maintenance, handling and storage of fuel, and disposal of waste

• Prohibit use of herbicides near watercourses

• Ensure equipment working beside or in water has been properly cleaned

Habitat loss or change in ����������

���� ����������������from sediment

Improved access to��������

Blocked movements

���� ��������������

Harm fromaccidental spills

���������������������������������

equipment

StoryBoardRound6LowRes.indd 18 2017-08-16 9:57 PM

Page 14: StoryBoardRound6 God's Lake - content.gov.mb.cacontent.gov.mb.ca/mit/project6/glfn_nov7/storyboard.pdf · and ring-necked ducks are present in about the same numbers as mallards •

PROJECT 6 ALL-SEASON ROAD LINKING MANTO SIPI CREE NATION, BUNIBONIBEE CREE NATION AND GOD’S LAKE FIRST NATION

HERITAGE AND CULTURAL SITESPOSSIBLE CHANGES (EFFECTS)

• Limit equipment and workers to construction areas

• Avoid known heritage sites or recover artifacts• Maintain buffers and temporary fencing around

heritage sites that are near the proposed All-Season Road during construction

• Conduct appropriate community and cultural activities prior to construction activities or disturbance of the land

• Block temporary access roads after construction

Loss or disturbance toheritage, culture (sacred) or

���������������

SUGGESTED MITIGATION DO YOU WANT MI TO USETHIS MITIGATION

YES NO )*+�3�:+*<

StoryBoardRound6LowRes.indd 19 2017-08-16 9:57 PM

Page 15: StoryBoardRound6 God's Lake - content.gov.mb.cacontent.gov.mb.ca/mit/project6/glfn_nov7/storyboard.pdf · and ring-necked ducks are present in about the same numbers as mallards •

PROJECT 6 ALL-SEASON ROAD LINKING MANTO SIPI CREE NATION, BUNIBONIBEE CREE NATION AND GOD’S LAKE FIRST NATION

TRADITIONAL RESOURCE ACTIVITIESPOSSIBLE CHANGES (EFFECTS) SUGGESTED MITIGATION

������������������������plants from clearing

Change tomoose/caribou

������������!��� ����

Change to furbearer ������������!���

trapping

���� ����"����harvest and

�����������������������������"��� �

������ �����������������������������

Increased access to resource areas

DO YOU WANT MI TO USETHIS MITIGATION

YES NO )*+�3�:+*<

• Map important traditional use areas for project planning and ���� �"����� ��� ����������$

• Protect moose and caribou (see boards)

• Protect furbearers (see boards)• Maintain access to traplines and trails during construction

• Design trail crossings to maintain trapper access and trails

• ?����������#��������#��������� � (see boards)

• Provide an approach for current users to cross the road and signs posted showing the road crossing at portages

• Block temporary access roads after construction

StoryBoardRound6LowRes.indd 20 2017-08-16 9:57 PM