Stormwater Vortex Clarifi er #DIYBMP Project Build ... · Stormwater Vortex Clarifi er Project...
Transcript of Stormwater Vortex Clarifi er #DIYBMP Project Build ... · Stormwater Vortex Clarifi er Project...
www.watertectonics.com
Stormwater Vortex Clarifi erProject Build Instructions
#DIYBMPDo-It-Yourself : Best Management Practice
TARGET CONTAMINANTS Total Suspended Solids
ESTIMATED FLOW25gpm
ACTIONSeparates bulk solids that sink or fl oat
PROJECT ESTIMATE$45
Downspout
Skim drain
COMPONENT QTY SOURCE PURPOSE
55 gal drum 1 Local reclaim Tank
Banjo 1.5" bulkhead 2 Amazon.com Fill & Drain
1.5" x 2" PVC adapter (MPT x slip) 1 Home Depot Fill tube
2" PVC stub (3") 1 Home Depot Fill tube
2" PVC drop tube (28") 1 Home Depot Fill tube
2" PVC Elbow 90 2 Home Depot Fill tube
2" PVC Tee 1 Home Depot Skim Drain
1.5" PVC stub (6") 1 Home Depot Skim Drain
1.5" PVC adapter (MPT x slip) 1 Home Depot Skim Drain
PARTS
A
C
D
E
B
A
B
C
D
E
STEP 1:Drill holes for the fill tube and skim drain bulkheads approximately 3” from top of inverted barrel. Cut hole on top of barrel to reclaim stormwater from site downspout, diverter, or pump and to allow access for internal plumbing. See
STEP 2:Install bulkheads for fill tube and skim drain. See
STEP 3:Install internal adapters. See
STEP 4:Install fill tube and skim drain PVC assemblies. See
STEP 5:Install fill and drain plumbing as desired. See
PROCEDURE
www.watertectonics.com
Stormwater Active Media BarrelProject Build Instructions
#DIYBMPDo-It-Yourself : Best Management Practice
TARGET CONTAMINANTS Total Suspended SolidsHeavy Metals (Zn, Cu, Al, Fe)Nutrients (COD, BOD)
ESTIMATED FLOW25gpm
ACTIONActively adsorbs heavy metals and nutrients
PROJECT ESTIMATE$240
Underdrain
Downspout
Splash Dampener
Active Media
Pea Gravel
Pool Filter Sand
Drain Rock
COMPONENT QTY SOURCE PURPOSE
55 gal drum 1 Local reclaim Tank
Banjo 2" bulkhead 1 Amazon.com Underdrain
2" PVC adapter (MPT x slip) 2 Home Depot Underdrain
2" PVC perforated underdrain (14") 1 Home Depot Underdrain
2" PVC Cap 1 Home Depot Underdrain
2’ x 2’ section weed barrier fabric 3 Home DepotMedia Layer separators
PARTS
A
B
C
D
E
A
B
C
E
D
STEP 1:Drill hole for the underdrain bulkhead approximately 3” from bottom of inverted barrel. See
STEP 2:Cut hole on top of barrel as appropriate to receive stormwater from site downspout, diverter, pump, or vortex clarifier pretreatment. See
STEP 3:Install underdrain bulkhead and underdrain perforated PVC pipe. See
STEP 4:Install discharge plumbing as desired. SeeSTEP 5:Install media, separating each type with a section of weed barrier fabric. See
PROCEDURE
MEDIA QTY SOURCE PURPOSE
Drain Rock 0.5 cu. ft. bag
4 Home Depot Drainage support (10" layer)
Pea gravel 0.5 cu. ft. bag
4 Home Depot Solids separation to 300um (5" layers)
Pool Filter Sand 50lb bag
2 Local Pool Supply Solids separation to 30um (5" layer)
Active Media: Zeolite Granules 40 lb bag
10 HomeDepot.com Adsorption of metals & nutrients (25” layer)
MEDIA PURPOSE SOURCE RECHARGEABLE
Zeolite Adsorption – metals, nutrients HomeDepot.com Yes *
Bio-Char Adsorption – metals, nutrients Online No
Oyster Shells Metals precipitation via pH change Online No
Compost Absorption – metals, nutrients Local No
Peat Absorption – metals, nutrients Local No
MEDIA RECOMMENDATION
ACTIVE MEDIA ALTERNATIVES
* Soak used Zeolite in 5% salt solution for 24 hours. Dispose of solution in sanitary drain, rinse media with clean water. 5% salt solution = approximately 5 lbs. water softener salt in 10 gals freshwater.
www.watertectonics.com
Stormwater Filter BarrelProject Build Instructions
#DIYBMPDo-It-Yourself : Best Management Practice
TARGET CONTAMINANTS Total Suspended Solids
ESTIMATED FLOW25gpm
ACTIONFilters suspended solids
PROJECT ESTIMATE$130
Underdrain
Downspout
Splash DampenerPea Gravel
Pool Filter Sand
Pea Gravel
Drain Rock
COMPONENT QTY SOURCE PURPOSE
55 gal drum 1 Local reclaim Tank
Banjo 2" bulkhead 1 Amazon.com Underdrain
2" PVC adapter (MPT x slip) 2 Home Depot Underdrain
2" PVC perforated underdrain (14") 1 Home Depot Underdrain
2" PVC Cap 1 Home Depot Underdrain
2" PVC riser (34") 1 Home Depot Drain plumbing
2" PVC stub (3") 2 Home Depot Drain plumbing
2" PVC stub (6") 1 Home Depot Drain plumbing
2" PVC Tee 1 Home Depot Drain plumbing
2" PVC Elbow 90 2 Home Depot Drain plumbing
2" PVC valve 1 Home DepotMaintenance drain
2’ x 2’ section weed barrier fabric 4 Home DepotMedia Layer separators
PARTS
A
C
D
F
EB
MEDIA QTY SOURCE PURPOSE
Drain Rock 0.5 cu. ft. bag
4 Home DepotDrainage support (10" layer)
Pea Gravel 0.5 cu. ft. bag 4 Home Depot
Solids separation to 300um (2 x 5" layers)
Pool Filter Sand 50lb bag 6
Local Pool Supply
Solids separation to 30um (15" layer)
MEDIA RECOMMENDATIONA
B
C
D
E
F
STEP 1:Drill hole for the underdrain bulkhead approximately 3” from bottom of inverted barrel. See
STEP 2:Cut hole on top of barrel as appropriate to receive stormwater from site downspout, diverter, pump, or vortex clarifier pretreatment. See
STEP 3:Install underdrain bulkhead. See
STEP 4:Install underdrain perforated PVC pipe. See
STEP 5:Install discharge plumbing as desired. See
STEP 6:Install media, separating each type with a section of weed barrier fabric. See
PROCEDURE
Stormwater BarrelTreatment TrainProject Build Instructions
TARGET CONTAMINANTS Total Suspended SolidsHeavy Metals (Zn, Cu, Al, Fe)Nutrients (COD, BOD)
ESTIMATED FLOW25gpm
ACTIONRemoves bulk solids prior to fi ltering suspended solids and actively adsorbing heavy metals and nutrients
PROJECT ESTIMATE$0 (to connect previously built Vortex Clarifi er, Filter Barrel, and Media Barrel)
#DIYBMPDo-It-Yourself : Best Management Practice
www.watertectonics.com
Underdrain
SplashDampener
ActiveMedia
PeaGravel
DrainRock
VortexClarifier Filter
Barrel
MediaBarrel
Splash DampenerPea
Gravel
Pool FilterSand
Pea Gravel
DrainRock Underdrain
Downspout
Skim drain
Place barrels on de-escalating platforms (e.g. 3 concrete blocks) to maintain gravity fl ow confi guration. Extend external plumbing as necessary to reach subsequent treatment barrels.
PROCEDURE
www.watertectonics.com
TARGET CONTAMINANTS Total Suspended SolidsHeavy Metals (Zn, Cu, Al, Fe)Nutrients (COD, BOD)
ESTIMATED FLOW25gpm
ACTIONRemoves bulk solids prior to fi ltering suspended solids and actively adsorbing heavy metals and nutrients.
Higher capacity solids fi ltration, with segregated active media for easier replacement or recharge.
PROJECT ESTIMATE$0 (to connect previously built Filter Box and Media Barrel)
#DIYBMPDo-It-Yourself : Best Management Practice
Stormwater Hybrid Treatment TrainProject Build Instructions
On a level surface, the system will maintain gravity fl ow confi guration. Extend external plumbing as necessary to reach the media barrel or drain site drain.
Underdrain
Splash Dampener
Active Media
Pea Gravel
Pool Filter Sand
Drain Rock
MediaBarrel
FilterBox
Downspout
Underdrain
Splash DampenerPea Gravel
Pool Filter Sand
Pea Gravel
Drain Rock
IBCDrain
PROCEDURE