Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for...

42
Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and Pre-Design Funded by the National Estuary Program Watershed Protection & Restoration Grant Program

Transcript of Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for...

Page 1: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

1

Stormwater Target Watersheds:Methods and Maps

February 2013

In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and Pre-Design

Funded by the National Estuary Program Watershed Protection & Restoration Grant Program

Page 2: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

2

Methods

1. Select Assessment Units (AUs) with High/Moderate High values for overall Water Flow

2. Select those that intersect/border urban growth areas (UGAs)

3. Add AUs with sound-wide H/MH value that intersect/border UGA

4. Remove AUs with >90% urban area

Page 3: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

3

1. Select AUs with High (H) and Moderate High (MH) Scores for Water Flow

Page 4: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

4

2. Select Those H & MH AUs that Intersect or Border UGAs

Page 5: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

5

H & MH AUs Remaining after Intersection

Page 6: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

6

3 & 4. Add AUs with Sound-wide importance; Select Any Remaining AUs with UGA That Is Either Immediately Upstream or Intersects H & MH AUs

Remove any areas of high imperviousness (i.e. >90% developed)

This UGA will directly affect a downstream AU of high or moderate high importance for Puget Sound

This AU of high or moderate high importance for Puget Sound intersects a UGA

Page 7: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

7

Final Target AU’s

Page 8: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

8

By using the characterization results for water flow we will be able to evaluate the relative degree of intactness (less degradation) and importance for water flow processes for these Watershed Management Units (WMU). A watershed that is more intact and has a higher importance should provide a greater “lift” in biological functions as stormwater restoration measures are applied.

Overlay Stormwater Target Areas with Watershed Management Units (black boundary)

Page 9: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

9

Summary Overlay of Stormwater Target Areas (pink) with Watershed Management Units (WMU – black outlines) for Puget Sound Watersheds

Page 10: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

10

Steps for Applying Watershed Integrity Index to Watershed Management Units

1) Divide the watershed roughly in half, thus creating an upper and lower watershed

2) Pick the dominant color or color combinations in the two halves, upper and lower watersheds, and match as closely as possible to one of the index diagrams

3) The color combinations are limited to dark green/light green; dark yellow/light yellow; orange/red. Ignore colors, for the time being, that do not match these set combinations.

4) Add a “+” or “-” to the score based on the presence of additional colors not matching the individual matrix diagram. For example, if the watershed is predominately “yellow” you would pick index 5, but add a “-” if more “red” was present as a secondary color. If “green” was present you would add a “+”.

In the example above the dominant color combination matching the diagram for the upper watershed would be “orange/red” and for the lower it would just be “yellow”. This would match the #2 index. The presence of the “green” non-dominant colors in the upper and lower watershed would indicate a shift in integrity towards the left of the index; thus a “+” would be added to the score.

Score = 2+

Page 11: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

11

Watershed Management Units & Watershed Integrity Index For Each WMU Containing a Target Stormwater Area

WMUs on the mainstem of the Nooksack were evaluated relative to their upper watershed in the Cascades which is judged to be relatively “intact” (i..e green colors, not shown on map) and were scored an “8”

Page 12: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

12

Watershed Management Units & Watershed Integrity Index For Each WMU Containing a Target Stormwater Area

WMUs on the mainstem of the Skagit were evaluated relative to their upper watershed in the Cascades which is judged to be relatively “intact” (i..e green colors, not shown on map) and were scored an “8”

Page 13: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

13

Watershed Management Units & Watershed Integrity Index For Each WMU Containing a Targety Stormwater Area

WMUs on major streams (Sammamish, Snohomish, Skykomish, Snoqualamie & Cedar Rivers ) were evaluated based on the cumulative upstream condition of those watersheds (e.g some of which extend into the Cascades).

Page 14: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

14

Watershed Management Units & Watershed Integrity Index For Each WMU Containing a Target Stormwater Area

WMUs major streams (Cedar, Green Rivers ) were evaluated based on the cumulative upstream condition of those watersheds (e.g some of which extend into the Cascades).

Page 15: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

15

Watershed Management Units & Watershed Integrity Index For Each WMU Containing a Target Stormwater Area

WMUs on major streams (Deschutes, Puyallup, White) were evaluated based on the cumulative upstream condition of those watersheds (e.g which extend into the Cascades).

Page 16: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

16

Watershed Management Units & Watershed Integrity Index

For Each WMU Containing a Target Stormwater Area

Page 17: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

17

Watershed Integrity Index with Watershed Management Unit

(WMU) Names

Page 18: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

18

WRIA 1

Page 19: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

19

WRIA 2

Page 20: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

20

WRIA 3, 4, & 5

Page 21: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

21

WRIA 6 & Upper 17

Page 22: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

22

WRIA 7

Page 23: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

23

Seattle & Lower WRIA 8

Page 24: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

WRIA 9 & Upper WRIA 8

Page 25: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

25

WRIA 10_11

Page 26: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

26

WRIA 13_14

Page 27: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

27

WRIA 15

Page 28: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

28

WRIA 18

Page 29: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

29

WRIA 19

Page 30: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

30

Stormwater Retrofit Target Watersheds

With Watershed Integrity Index (1-9)for the

Watershed Management Unit (Black boundary)

Page 31: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

31

WRIA 1

Page 32: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

32

WRIA 2

Page 33: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

33

WRIA 3, 4, & 5

Page 34: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

34

WRIA 6 & Upper 17

Page 35: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

35

WRIA 7

Page 36: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

36

Seattle / Lower WRIA 8

Page 37: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

37

WRIA 9/ Upper WRIA 8

Page 38: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

38

WRIA 10_11

Page 39: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

39

WRIA 13_14

Page 40: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

40

WRIA 15

Page 41: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

41

WRIA 18

Page 42: Stormwater Target Watersheds: Methods and Maps February 2013 1 In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and.

42

WRIA 19