Stormwater Management Stormwater Management Initiative UpdateInitiative Update
ODOT’s GoalODOT’s Goal
Develop a streamlined stormwater Develop a streamlined stormwater runoff treatment program to: runoff treatment program to:
meet all regulatory needs;meet all regulatory needs; provide ODOT with certainty provide ODOT with certainty
regarding scope, schedule, and regarding scope, schedule, and budget budget
result in an overall environmental result in an overall environmental benefit and promote species benefit and promote species recovery.recovery.
Components of the Stormwater Components of the Stormwater Initiative Work PlanInitiative Work Plan
I.I. Streamline the ODEQ Stormwater Streamline the ODEQ Stormwater Management Plan Approval Management Plan Approval ProcessProcess
II.II. Develop Strategy/Process for Develop Strategy/Process for ODOT Projects with T&E Species ODOT Projects with T&E Species and Stormwater Effectsand Stormwater Effects
III.III. Develop a Watershed Approach to Develop a Watershed Approach to Mitigate for Unavoidable Mitigate for Unavoidable Stormwater EffectsStormwater Effects
I. Streamline the ODEQ Stormwater I. Streamline the ODEQ Stormwater Management Plan Approval ProcessManagement Plan Approval Process
Problem StatementProblem Statement
All applications for SWMPs reviewed in All applications for SWMPs reviewed in detail by ODEQ, which results indetail by ODEQ, which results in
Multiple requests for more Multiple requests for more information, design changesinformation, design changes
Constant danger of schedule slippingConstant danger of schedule slipping Heavy load on ODEQ/ODOT liaisonHeavy load on ODEQ/ODOT liaison
I. Streamline the ODEQ Stormwater I. Streamline the ODEQ Stormwater Management Plan Approval ProcessManagement Plan Approval Process
Proposed Strategy/SolutionProposed Strategy/Solution ODOT to develop a more rigorous QC ODOT to develop a more rigorous QC
Process (i.e., ODOT review equivalent Process (i.e., ODOT review equivalent to existing DEQ review)to existing DEQ review)
Shift QC for SWMPs from ODEQ to Shift QC for SWMPs from ODEQ to ODOTODOT
ODEQ moves into more of a QA roleODEQ moves into more of a QA role
I. Streamline the ODEQ Stormwater I. Streamline the ODEQ Stormwater Management Plan Approval ProcessManagement Plan Approval Process
Determine Objectives/
Goal(s)
Water Resources
Impact Assessment
Water Quality Management
Design
Internal ODOT Quality
Control - QC Checklist
Optimize Treatment Option
Selection
ODOT Submits to DEQ- Submittal Application Form- Project Description- Objectives and Goals- Stormwater Treatment Measures- Project Plan Sheets
DEQ Reviews SWMP Submittal
Package
DEQ Approves
SWMP
I. Streamline the ODEQ Stormwater I. Streamline the ODEQ Stormwater Management Plan Approval ProcessManagement Plan Approval Process
Anticipated BenefitsAnticipated BenefitsODEQODEQ Assurance that state water quality Assurance that state water quality
standards are being met through ODOT standards are being met through ODOT diligence diligence
Substantial reduction in amount of time Substantial reduction in amount of time reviewing SWMPsreviewing SWMPs
More time to provide early project supportMore time to provide early project support More time to participate in programmatic More time to participate in programmatic
and policy issuesand policy issues
I. Streamline the ODEQ Stormwater I. Streamline the ODEQ Stormwater Management Plan Approval ProcessManagement Plan Approval Process
Anticipated BenefitsAnticipated Benefits
ODOTODOT Shorter timeframe for approval of Shorter timeframe for approval of
SWMPsSWMPs
Higher degree of certainty about Higher degree of certainty about requirements and schedule, based requirements and schedule, based upon well-defined expectationsupon well-defined expectations
Where We are Now:Where We are Now:DEQDEQ
Draft QC Checklist in final DEQ Draft QC Checklist in final DEQ reviewreview
Draft Stormwater Management Plan Draft Stormwater Management Plan submittal Checklist in final DEQ submittal Checklist in final DEQ reviewreview
MOA in developmentMOA in development Water Quality Goals and Performance Water Quality Goals and Performance
Standards in developmentStandards in development
II. Develop Strategy/Process for ODOT II. Develop Strategy/Process for ODOT Projects with Stormwater EffectsProjects with Stormwater Effects
Problem StatementProblem StatementStormwater had become a major Stormwater had become a major
impediment to efficient ESA process due impediment to efficient ESA process due to:to:
Lack of congruence in water quality Lack of congruence in water quality requirements between ODEQ and NMFSrequirements between ODEQ and NMFS
Changing thresholds for effects Changing thresholds for effects determinations in ESA Section 7 determinations in ESA Section 7 consultations consultations
Difficulties in using NMFS HCD Guidance Difficulties in using NMFS HCD Guidance
II. Develop Strategy/Process for ODOT II. Develop Strategy/Process for ODOT Projects with Stormwater EffectsProjects with Stormwater Effects
Proposed Strategy/ProcessProposed Strategy/Process Compile and synthesize literature on BMPs Compile and synthesize literature on BMPs
for stormwater treatmentfor stormwater treatment Compile and synthesize literature on Compile and synthesize literature on
Pollutants of ConcernPollutants of Concern Develop criteria for identifying the water Develop criteria for identifying the water
quality design stormquality design storm Develop a BMP Selection MatrixDevelop a BMP Selection Matrix Formalize a process to select BMPsFormalize a process to select BMPs Develop a performance measurement and Develop a performance measurement and
reporting methodreporting method
II. Develop Strategy/Process for ODOT II. Develop Strategy/Process for ODOT Projects with Stormwater EffectsProjects with Stormwater Effects
Anticipated BenefitsAnticipated Benefits
Regulatory AgenciesRegulatory Agencies Meet regulatory requirementsMeet regulatory requirements Well-defined terms and conditions Well-defined terms and conditions
that allow for flexibility in applicationthat allow for flexibility in application Protect ESA-listed fishProtect ESA-listed fish Protect Oregon’s water quality and Protect Oregon’s water quality and
wetland resourceswetland resources
II. Develop Strategy/Process for ODOT II. Develop Strategy/Process for ODOT Projects with Stormwater EffectsProjects with Stormwater Effects
Anticipated BenefitsAnticipated BenefitsODOTODOT Certainty in project development and Certainty in project development and
constructionconstruction Reduction in project delaysReduction in project delays Support ODOT’s Sustainability goalsSupport ODOT’s Sustainability goals
III. Develop a watershed approach to III. Develop a watershed approach to mitigate for unavoidable stormwater effectsmitigate for unavoidable stormwater effects
Problem StatementProblem Statement Current approach to mitigate impacts of Current approach to mitigate impacts of
transportation projects on water resources transportation projects on water resources is project specific, on-site treatmentis project specific, on-site treatment
Energy is devoted to mitigation efforts that Energy is devoted to mitigation efforts that can result in little net benefit to the can result in little net benefit to the watershedwatershed
Projects that don’t meet Resource Agency Projects that don’t meet Resource Agency goals subject to squabbling and uncertain goals subject to squabbling and uncertain additional requirements additional requirements
III. Develop Watershed Approach to III. Develop Watershed Approach to Mitigate for Unavoidable Stormwater Mitigate for Unavoidable Stormwater
EffectsEffects
Proposed Strategy/Solution (In Proposed Strategy/Solution (In Development)Development)
Technical evaluation of needs and Technical evaluation of needs and opportunities for mitigationopportunities for mitigation
Political effort to achieve agreement Political effort to achieve agreement on goals, methods, and interagency on goals, methods, and interagency coordinationcoordination
III. Develop Watershed Approach to Mitigate III. Develop Watershed Approach to Mitigate for Unavoidable Stormwater Effectsfor Unavoidable Stormwater Effects
Work will commence when Task II is Work will commence when Task II is close to completionclose to completion
Where We are NowWhere We are NowStormwater EffectsStormwater Effects
Active working group with NMFS, Active working group with NMFS, USFWS, EPA and DEQUSFWS, EPA and DEQ
Design Storm survey completeDesign Storm survey complete– Work beginning on defining criteriaWork beginning on defining criteria
Literature review complete, focused Literature review complete, focused review beginningreview beginning
Where We are NowWhere We are NowStormwater EffectsStormwater Effects
Agreement that adequacy of design Agreement that adequacy of design selection process and BMP selection selection process and BMP selection matrix will be memorialized in Biological matrix will be memorialized in Biological OpinionsOpinions
Agreement that the selection process and Agreement that the selection process and BMP matrix can facilitate batched BOsBMP matrix can facilitate batched BOs
Work order for Matrix development is in Work order for Matrix development is in the worksthe works
Work order includes formulating strategy Work order includes formulating strategy for development of the Watershed for development of the Watershed ApproachApproach