Stoge Shed - · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb)...

47
&DOO XV IRU DQ\ PLVVLQJ RU GDPDJHG SDUWV 'R QRW UHWXUQ WR WKH VWRUH CustRPeU 6eUYiFe +RtOiQe 00 3 3A57 1 A66(MB/,1* 6+(' :,7+ (X7(16,21 .,7 3A57 2 A'',1* (X7(16,21 .,7 72 (X,67,1* 6+(' 1Rte FRU sKed ZitK e[teQsiRQ use tKis PDQuDO RQO\. 9HU 2:1(5·6 MA18A/ ,QVWUXFWLRQV IRU $VVHPEO\ 6i]e Ft [ Ft $SSUR[ ZitK ´([teQsiRQ .itsµ StoUDge Shed StoUDge Shed Building 'imensions (2ne ([tension) : ASSro[imate 6i]e 6torage Area 6T. Ft. Cu. Ft. ([terior 'imension Roof (dJe to Roof (dJe Interior 'imension :all to :all :idtK 'eStK +eigKt :idtK 'eStK +eigKt 8 [ 2 12 20 105 12 94 38 31 73 92 14 31 63 38 Feet incK incK incK incK incK incK $OO :HDWKHU 'XUDEOH 39& :RQ·W 'HQW RXVW RRW RU 0LOGHZ 1HYHU 1HHGV 3DLQWLQJ µ :LGH 'RXEOH 'RRUV (DV\ $VVHPEO\ +LJK :LQG THVWHG SQRZ /RDG THVWHG OEVVT IRRW 3DG /RFN RHDG\ /RFN QRW LQFOXGHG :RRGHQ RU &HPHQW )RXQGDWLRQ 1HHGHG <RuU 7RtDO 6ROutiRQ 7R MDiQteQDQFe FUee 6tRUDge 6Keds. AYDiODEOe .its )RXQGDWLRQ .LW $YDLODEOH 0RGXODU · ([WHQVLRQ .LWV $YDLODEOH ·[· :LQGRZ .LWV $YDLODEOH ZZZGXUDPD[ESFRP Patent 416.091

Transcript of Stoge Shed - · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb)...

Page 1: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

Call us for any missing or damaged parts.Do not return to the store.

CustomerService Hotline(800) 483-4674

PART 1ASSEMBLING SHED WITH EXTENSION KIT

PART 2ADDING EXTENSION KIT TO EXISTING SHED

Note: For shed with extension use this manual only.

Ver: 2.2

OWNER’S MANUAL / Instructions for AssemblySize 8 Ft x 6 Ft (Approx.) with “Extension Kits”

Storage ShedStorage Shed

Building Dimensions (One Extension) :Approximate

SizeStorage Area

Sq. Ft. Cu. Ft.

Exterior Dimension ( Roof Edge to Roof Edge )

Interior Dimension ( Wall to Wall )

Width Depth Height Width Depth Height

8 x 2 1/2 20 105 1/2 94 3/8 31 73 92 1/4 31 63 3/8

Feet ( inch ) ( inch ) ( inch ) ( inch ) ( inch ) ( inch )

• All Weather Durable PVC• Won’t Dent, Rust, Rot or Mildew• Never Needs Painting• 61” Wide Double Doors• Easy Assembly• High Wind Tested• Snow Load Tested 20lbs/sq. foot• Pad Lock Ready (Lock not included)• Wooden or Cement Foundation Needed

Your Total Solution To Maintenance Free Storage Sheds.

Available Kits• Foundation Kit Available• Modular 2.5’ Extension Kits Available• 8’x6’ Window Kits Available

www.duramaxbp.com

Patent #416.091

Page 2: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

Duramax Storage ShedLimited Fifteen Year Warranty

U.S. Polymer Inc. will send a replacement part free of charge, in the event of material defects and or workmanship for a period of fifteen years from the date of purchase.

This warranty is extended only to the original purchaser. A purchase receipt or other proof of date of original purchase will be required before warranty service is rendered. In no event shall we pay the cost of flooring, labor, installation or any other costs related thereto.

This warranty only covers failures due to defects in material or workmanship which occurs during normal use and does not extend to color change arising due to normal weathering or to damage resulting from misuse or neglect, commercial use, failure to follow assembly instructions and the owner’s manual (including proper anchoring of the shed), painting, forces of nature and other causes which is beyond our control.

Claims under this warranty must be made within the warranty period by calling 1-800-483-4674 or mail in a dated sales slip and clear photograph of the part to:

U.S. Polymers Inc.1057 S. Vail AveMontebello,CA 90640.

We reserve the right to discontinue or change components. If a component has been discontinued or is not available, U.S. Polymers, Inc. reserves the right to substitute a component of equal quality as may be compatible.

Limits and Exclusions

There are no express warranties except as listed above. The warrantor shall not be liable for incidental or consequential damages resulting from the use of this product, or arising out of any breach of this warranty. All express warranties are limited to the warranty period set forth above. Some states do not allow the exclusion or limitation on how long an implied warranty lasts, so the above limitations may not apply to you.

This warranty gives you specific legal rights and you may also have other rights which vary from state to state and country to country.

Page 3: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

Note: Check all parts prior to installation.

CODE DESCRIPTION QTY

B1LB FRONT ‘U’ CHANNEL LEFT 1B1RB FRONT ‘U’ CHANNEL RIGHT 1B2B SIDE ‘U’ CHANNEL 2B21 BACK ‘U’ CHANNEL LEFT 1B22 BACK ‘U’ CHANNEL RIGHT 1CMB MIDDLE COLUMN 4CCB CORNER COLUMN 4CDLB LEFT DOOR COLUMN 1CDRB RIGHT DOOR COLUMN 1CB1B FRONT CENTER BAND 2CB2B SIDE CENTER BAND 2CB3B BACK CENTER BAND SHORT 1CB3XB BACK CENTER BAND LONG 1CB4B FRONT CROSS CENTER BAND 2RS1XB RS1 ROOF STRUCTURE 4RS2B RS2 ROOF STRUCTURE 4RS3B RS3 ROOF STRUCTURE 2RS4XB RS4 ROOF STRUCTURE 2RS5B RS5 ROOF SRTUCTURE 4RS8B RS8 ROOF STRUCTURE SUPP. LONG 4RS9B RS9 ROOF STRUCTURE SUPP. SHORT 4MJ MIDDLE JOINING SUPPORT 3RS10B RS10 ROOF STRUCTURE SUPPORT 2RS11B RS11 ROOF STRUCTURE SUPPORT SHORT 1RS12B RS12 ROOF STRUCTURE SUPPORT LONG 1RS14B SAGGING SUPPORT 8DSH DOOR STOPPER HORIZONTAL 1SP SIDE PANEL 7FPLB FACIA PANEL LEFT 2FPRB FACIA PANEL RIGHT 2RP ROOF PANEL 4RRS RIDGE COVER 2DL LEFT DOOR 1DR RIGHT DOOR 1FSP FRONT SIDE PANEL 2

8’ x 6’ Parts List

Cordless Drill - Philips HeadHammer or Rubber malletCarpenters Square8’ Step LadderAdjustable pliersLevel - 3ft.Tape MeasureCaulk GunWaterproof Clear SiliconSealantHand Gloves

Tools You Will Need

MIDDLE COLUMNS (CMB)

U-Channels (B1LB)(B1RB)(B21) (B22) (B2B)

ROOF STRUCTURE (RS5B)

ROOF STRUCTURES (RS - 1XB, 3B, 8B, 9B) (CB- 1B, 2B, 3B, 3XB, 4B), (MJ)

PVC 90 DEGREE JOINT(RJ)

ROOF PIN (PIN)

END PLUG SQUARE (EPS)

ROOF SUPPORT (RS2B)(RS10B)

ROOF SUPPORT (RS4XB) (RS11B) (RS12B)

DOOR COLUMN FITTING(FDCL)

DOOR COLUMN FITTING(FDCR)

CORNER COLUMN FITTING(FCC)

ACCESSORIES

CODE DESCRIPTION QTY

FDCL DOOR COLUMN FITTING LEFT 1FDCR DOOR COLUMN FITTING RIGHT 1FCC CORNER COLUMN FITTING 4FMC MIDDLE COLUMN FITTING 4FCB CENTER BAND FITTING 4RJ 90 DEGREE JOINT 4PPG ROOF PLUG w/WASHER 64PIN ROOF PIN 64EPS END PLUG SQUARE 4CBC CENTER BAND COVER 1S1 DIA. 4.2 x 16mm. (5/32” x 5/8”) SHEET METAL SCREW 168S2 DIA. 4.2 x 32mm. (5/32” x 1 1/4”) SHEET METAL SCREW 8S7 DIA. 4.2 x 10mm. (5/32” x 3/8”) SHEET METAL SCREW 8

LEFT DOOR COLUMN (CDLB)

CORNER COLUMNS (CCB)

RIGHT DOOR COLUMN (CDRB)

DOOR STOPPER (DSH)

SAGGING SUPPORT (RS14B)

MIDDLE COLUMN FITTING(FMC)

CENTER BAND COVER (CBC)

CENTER BAND FITTING(FCB)

ROOF PLUG WITH WASHER (PPG)

Maximum no. of Extension can be build upto 8’x10’ (ie. Two Extension only).Note

Page 4: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

8’ x 6’ Exploded View

RS5

DLDR

FPRB

FPLB

CMB

CCB

B2B

CCB

RS5

FPLB

FPRB

RS10B

RS10B

RS4XB

RS3B

RS3B

RS5B

RS4XB

CCB

CCB

B1LB

B1RB

B21

B22

B2B

CDLB

CDRB

CMB

CMB

CMB

CB2B

CB2B CB1B

CB1B

CB3XB

RS11B

RS5B

RS2B

RS2B

RRS

RS2B

RS2B

DSH

CB4B

CB4B

FSP

FSP

RP

RP

RP

RP

CB3B

RS1XB

RS1XB

MJ

RS9BRS8B

MJ

RS12B

RRS

Page 5: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

Note: Check all parts prior to installation.

CODE DESCRIPTION QTY

EXTL EXTENSION ‘U’ CHANNEL LEFT 1EXTR EXTENSION ‘U’ CHANNEL RIGHT 1CMB MIDDLE COLUMN 2CB3LB BACK CENTER BAND LONG 2RS3SB RS3 ROOF STRUCTURE SHORT 2RS4B RS4 ROOF STRUCTURE 2RS6B RS6 ROOF STRUCTURE 2RS7B RS7 ROOF STRUCTURE 2RS11B RS11 ROOF STRUCTURE SUPPORT SHORT 1RS12B RS12 ROOF STRUCTURE SUPPORT LONG 1RS13B RS13 ROOF STRUCTURE 8RS14B SAGGING SUPPORT 4SP SIDE PANEL 2RP ROOF PANEL 2RRS RIDGE COVER 1

One Extension Parts List

MIDDLE COLUMNS (CMB)

U-Channels (EXTL) (EXTR)

ROOF STRUCTURE(RS6B) (RS7B) (RS13B)

ROOF STRUCTURES(RS3SB) (CB3LB)

ROOF PIN (PIN)

ROOF SUPPORT (RS4B) (RS11B) (RS12B)

ACCESSORIES

CODE DESCRIPTION QTY

FMC MIDDLE COLUMN FITTING 2PPG ROOF PLUG w/WASHER 16PIN ROOF PIN 16S1 DIA. 4.2 x 16mm. (5/32” x 5/8”) SHEET METAL SCREW 40S3 M4 x 10mm. (M5/32” x 3/8”) MACHINE SCREW WITH NUT 62

SAGGING SUPPORT (RS14B)

MIDDLE COLUMN FITTING(FMC)

ROOF PLUG WITH WASHER (PPG)

Page 6: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

Exploded View with One Extension

CB3LB

CB3LBEXTL

EXTRCMB

CMB

RS4B

RS4B

RS7B RS3SB

RS11B

RS12B

RS3SBRS13B

RS13BRS13B

RS13B

RS13B

RS6B

Page 7: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

A. Foundation & Base Frame

1. Use pressure treated wood studs 2” x 4”(5 x 10cm) to build a foundation structure that has an outside dimension of 65” x 96” (1651mmx2438.4mm).

3. Start with U-Channel bases (B21) & (B22) to insure a quick and accurate layout.Position all bases (B1LB, B1RB, B2B) on wood foundation. It is critical that you allow 61 1/4” (1556mm) between front bases (B1RB) and (B1LB) for door placement. Measure in all directions as shown in fig.1. Make sure the U-channel assembly is a perfect square.

DuraMax must be installed on a level wooden platformor a level concrete foundation.

The following are a list of lumber and sizes you will need.

2. Using exterior grade CDX 3/4” (19mm) plywood, cut and fit together the sheets to form solid plywood floor as shown. Foundation must be square and level.

Wooden Platform (Not Included)Note: It is important that these instructions are followed step by step.

Wooden platform is extra and is not included.Don’t install under windy conditions.

Parts needed:

1

Note

(1) Extn. U channel left (EXTL) (1) Extn. U channel right (EXTR) (6) Dia. 4.2 x 16mm Screws (S1)

Parts needed For Each Extension:

The following are a list of lumber and sizes you will need.

Wooden Platform for Each Extension (Not Included)

Pressure Treated - Wood Studs: Exterior Grade (CDX):2ea 2”x4”x89” (50 x 88.9 x 2260.6mm) 3/4” (19mm) plywood2ea 2”x4”x32” (50 x 88.9 x 812.8mm) 1ea 3/4” x 32” x 96” (19x812.8x2260.6mm)L-Brackets: 4ea

Pressure Treated - Wood Studs: Exterior Grade (CDX):4ea 2” x 4” x 89” (50 x 88.9 x 2260.6mm) 3/4” 19mm plywood2ea 2” x 4” x 65” (50 x 88.9 x 1651mm) 1ea 3/4” x 48” x 96” (19 x 1219.2 x 2438.4mm) 1ea 3/4” x 17” x 96” (19 x 431.8 x 2438.4mm)L-Brackets: 4ea

3a. For each extension add one (EXTL) & (EXTR) in the back side, moving (B21) & (B22) backwards.

(1) U channel Front left (B1LB)(1) U channel Front right (B1RB)(1) U channel Back (B21)(1) U channel Back (B22)(2) U channel Side (B2B)(22) Dia. 4.2 x 16mm Screws (S1)

1a. Use pressure treated wood studs 2” x 4”(5 x 10cm) to build a foundation structure that has an outside dimension of 32” x 96” (812.8mm x 2438.4mm) for each extension.

65”

(165

1mm

)L- BRACKET

96” (2438.4mm)

L- BRACKET

L- BRACKET

11 1/2” (292.1mm)

20 ” (508mm)

19 1/2” (495.3mm)

L- BRACKET

32”

(812

.8m

m)

96” (2438.4mm)

17”

(431

.8m

m)

48”

(121

9.2m

m)

32”

(812

.8m

m)

Left Side Right Side

Door Opening

61 1/4” (1556mm)

B1LB

B2B

B21 B22

B2B

EXTL EXTR

PART 1: Assembling Shed With Extension Kit

Lay 2”x 4” (5cm x 10cm) Flat

Note

OR 1b. Use pressure treated wood studs 2” x 4”(5 x 10cm) to build a foundation structure that has an outside dimension of 97” x 96” (2463.8mm x 2438.4mm) for shed with one extension.

B1RB

92 1

/4”

(234

3mm

) 92 1/4” (2343mm

)

92 1/4” (2343mm

)92 1

/4”

(234

3mm

)

92 1/4” (2343mm)

92 1/4” (2343mm))

Fig.1

Foundation Structure

Plywood Floor

U-Channel Layout

Page 8: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

Parts Needed: Parts Needed For Each Extension:

(4) Corner Column (CCB)(1) Left Door Column (CDLB)(1) Right Door Column (CDRB)(4) Middle Column (CMB)(7) Side Panels (SP )(2) Front Side Panels (FSP )(2) Front Center Band (CB1B)(2) Side Center Band (CB2B)(1) Back Center Band short (CB3B)(1) Back Center Band long (CB3XB)(2) Front cross center band (CB4B)(1) Middle Joining Support (MJ)(4) Center Band Fitting (FCB)(1) Center Band Cover (CBC)

1.Slide right door column (CDRB) into the U-Channel Base (B1RB) on the right side of the door. Line up the pre-drilled holes on (CDRB) Column with pre-drilled holes on U-Channel Base. Secure with two (S1) screws from inside.(See blowup detail fig.1)

4. Using a carpenters square, line up all corners. Secure base to wood foundation using (S1) screws

B. Walls & Columns

1.All parts are clearly marked and care should be taken to use the correct one.

2

EXTR

B22

fig.1

S1

Inside

Note

B1RB

CDRB

CDRB

B1RB

(2) Middle Column (CMB)(2) Side Panels (SP )(2) Back Center Band long (CB3LB)

Right

CDRB

Concrete foundation

4b. Shed or shed foundation should be placed on concrete footing by use of anchor bolt and nut. Using a carpenters square, line up corners. Align U-Channel base, mark the concrete through the holes in the base and drill concrete with 1/2” (dia. 12.5mm) concrete bit to accept anchor bolts to a 1 3/4” (44mm) depth. Replace base and secure with 1/4” x 1 1/2” (M6 x 40mm) anchor bolts.Anchor bolt for Basic Shed - 22Nos. (not provided)Each Extension - 6Nos. (not provided)

2. Set the Torque limit of your Screw drill to #3 or #4 to ensure the screws do not strip the metal reinforcements.

Page 9: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

Always place panels into frame at an angle on top and slide in sideways and downward for easy insertion.

2. Insert the front side panel (FSP ) into the groove of column (CDRB). Start at the bottom of the panel at an angle then push into place.

0utside

S1

3. Slide corner column (CCB) into side panel (FSP ) pushing the column to the side panel.

4. Working outside use (S1) screws to secure column to bases (B1RB) and (B2B).

3

Note

Make sure panels are right side upwith panel shingles facing down.Check the stamped label on top.of all panels.

Note

CCB

B1RBB2B

FSP

Inside

FS

CDR

B1RB

CDRB

CDRB

FSP

FSP

CCB

Inside

FSP

CCB

Page 10: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

5.To stabilize the front panel attach the front center band right (CB1B). Start with the center band fitting. Fix to corner column (CCB) with (S2) screws. To continue See figures (fig.1) (fig.2) and (fig.3).

4

Tip To insure easy assembly Locate the identification number of eachpart.

CB1B

Inside

CCB CDRB

B1RB

CB4B

CB1B1&3

2

6. Attach center band (CB4B) to door column (CDRB) and base channel (B1RB).

Fig.2: Use(S1) screw.Fix (CB4B) to base (B1RB)

CB4B

B1RB

Fig.1: Use (S1) screw.Fix (CB4B) to (CDRB)

CDRB

CB4B

CB1B

Fig.3: Use (S1) screw.Fix (CB1B) to (CDRB).

Fig.2: Use (S1) screw.Fix (CB1B) to (FCB).

Fig.1: Use (S2) screw.Fix (FCB) to (CCB).Leave it loose.

CB1B EPS

CB4B

Fig.3: Fix the (EPS) at the endof (CB1B) & (CB4B).

CB4B

Inside

CB1B

CDRBCCB

31&2

FSP

CB1B

CDRB

CCB

CB1B

FCB

CCB

FCBS2

S1 S1

S1

S1

EPS

Page 11: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

5

For Center Band, Roof structure (RS3B) & (RS3SB).

Overlapping Method

Step 2 Step 5

Step 4

TIP

Step 1Step 3

Use a hammer toalign the holes.

MJ

CB3XB

MJ

7. Assemble back center bands (CB3B) and (CB3XB) with middlejoining support (MJ). Use (S1) screws.

CB3BCB3B

CB3XB

CB2B

CB3LB

S1

8. Assemble the center bands (CB2B) & (CB3LB) with (S3) screws with nuts. Follow Overlapping Method shown below. Make 2 sets.Add one (CB3LB) for each extension.

S3

Page 12: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

6

CCB

EXTRB22

11. Working from outside use (S1) screws to secure the column to bases (B22) and (EXTR).

EXTR

CCB

0utside

S1

B22

9. Working from inside, continue connecting the side panels (SP ) and columns (CMB) in sequence along (B2B) & (EXTR) base. Use (S1) screws to fix columns to base.

InsideB2B

CMB CMB

CMB

S1

EXTR

Inside

9a. For each extension add one side panel (SP ) and one middle column (CMB) in extension base U-channel (EXTR) & (EXTL).

10. Slide corner column (CCB) into side panel (SP ) pushing the column to the side panel.

CCB

Page 13: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

7

Fig.4: Use (S1)screws. Fix (CB3LB) to (CMB) columns.

12. Stabilize the side panels with center bands (CB3LB) & (CB2B). Fix the center band fitting (FCB) to corner column (CCB) See Fig.1Follow the Fig. 2, 3, 4 & 5.

Fig.3: Fix to (CMB)with (S1) screw.

CMB

CB3LB CB2B

CMB

CB3LB

CB2B

CB3LB

CMB

B2B

CCB

CB3LB

1&54

EXTRInside

CB2B

23

Fig. 2 : Use (S1) screws.Fix (CB2B) to (FCB)and (CB1B).

Fig.1: Use (S2)screws. Fix (FCB)to (CCB). Leave itloose.

Fig.5: Use (S1)screws. Fix (CB3LB) to (FCB).

CB1ACCB

FCB

CB1BCB2B

CCB

FCB

CCB

FCB

CB3LB

S2

S1

S1 S1

S1

Page 14: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

14. Fix the corner column (CCB) to last panel and base.

15. Working from outside use (S1) screws to secure the corner column (CCB) to bases (B21) and (EXTL).

13. Continue connecting the back panels and columns in sequence along base (B22) and (B21). Fix columns to base with (S1) screws.

8

CMBCMB CCB

B21

CCB

EXTL

S1

CMB

S1B22B21

Back Wall

SP SP SP

SP

CCBCMB

CCB

B21EXTL

SP

Inside

Outside

Page 15: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

9

16. Stabilize the side panels with center bands (CB3B & CB3XB). Fix the center band fitting (FCB) to corner column (CCB) see figure 1. Follow figures 2, 3, 4 and 5.

CMB

B21

CCB

CB3XB

B22

CB3B

1&5 4 3 & 6 2

CB3XB

CB3B

Fig. 2: Use (S1) screws.Fix (CB3B) to (FCB)and (CB2B).

Fig.1: Use (S2)screws. Fix (FCB)to (CCB). Leave itloose.

Fig.5: Use (S1)screws. Fix (CB3XB) to (FCB).

Fig.4: Fix to (CMB)with (S1) screws.

CB1A

FCB

CB2BCB3B

CCB

FCB

CCB

FCB

CB3XB

CMB

CB3XB

Fig.6: Center band jointmust be cover with (CBC)cover to avoid the injury.

CB3BCMB

CBC

Fig.3: Fix to (CMB)with (S1) screw.

CB3BCMB

CB3XB

CB3XB

S2

S1

S1

S1S1

Page 16: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

10

19. Working from outside use (S1) screws to secure column to bases (B2B) and (B1LB).

18. Slide corner column (CCB) into side panel (SP ) pushing the column to the side panel.

B2B

CCB

0utside

S1

B1LB

17. Working from inside, continue connecting the side panels (SP ) and columns (CMB) in sequence along (B2B) & (EXTL) base. Use (S1) screws to fix columns to base.

InsideEXTL

CMB CMB

CMB

S1

B2BB1LB

CCB

B2BB1LB

Inside

CCB

Page 17: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

11

Fig.3: Use (S1)screws. Fix (CB3LB) to (CMB) columns.

20. Stabilize the side panels with center bands (CB3LB) & (CB2B). Fix the center band fitting (FCB) to corner column (CCB). See Fig.1Follow the Fig. 2, 3, 4 & 5.

Fig.4: Fix to (CMB)with (S1) screw.

Inside

CMB

B22

CCB

CB2B

1&54

EXTR

CB3LB

23

CB2B

CB3LB

CMB

CB3LB

CMB

CB3LBCB2B

Fig.2: Use (S1) screws. Fix (CB3LB) to (FCB)and (CB3XB).

Fig.1: Use (S2) screw. Fix (FCB)to (CCB). Leaveit loose.

Fig.5: Use(S1) screw.Fix (CB2B) to (FCB).

CCB

FCB

CB2B

CB1A

FCB

CB3LB

CCB

FCBCB3XB

S2

S1

S1S1

S1

Page 18: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

23. Attach the center band (CB1B) to door column, corner column and center band (CB2B). See figures 1 and 2.

21. Insert the side panel (FSP ) into the groove of column (CCB). Start at the bottom with panel at an angle then push into place.

22. Slide door column (CDLB) into the U-Channel Base (B1LB) on the left side of the door. Line up the pre-drilled holes on (CDLB) Column with pre-drilled holes on U-Channel Base (B1LB). Secure with two (S1) screws from inside.(see blowup detail).

12

CDLB CCB

CB1B

CCB

B1LB

CDLB

B1LBS1

CDLB

Fig.2: Use(S1) screw.Fix (CB1B) to (CDLB)

CDLB

CB1B

B1LB

21

FSP

Note After completing the center band assembly fully tighten the four center band fittings (FCB) to the corner column (CCB).

CDLB

Fig.1: Use (S1) screws. Fix (CB1B) to (FCB) and (CB2B).

CB2BCB1B

FCB

SP

Inside

CCB

B1LB

B1LB

CCB

FSP

FSP

S1S1

Inside

Page 19: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

13

CDLB CCB

CB1B

Inside

Fig.1: Use(S1) screw.Fix (CB4B) to (CDLB)

Fig.2: Use(S1) screw.Fix (CB4B) to base (B1LB)

CB4B

CDLB

CB4B

CB1B

B1LB

CB4B

B1LB

1 3

2

24. Fix the center band (CB4B) to (CDLB) and base (B1LB).See Fig. 1, 2 and 3.

Fig.3: Fix the (EPS)at the end of(CB1B) & (CB4B).

25. Make sure the door opening between the door columns (CDLB) and (CDRB) is 61 1/4” (1556mm). This will ensure a perfect fit for the doors.

C. Roof FrameParts Needed:

(4) RS1 Roof Structure (RS1XB)(4) RS2 Roof Structure (RS2B)(2) RS3 Roof Structure (RS3B)(2) RS4 Roof Structure (RS4XB)(4) RS5 Roof Structure (RS5B)(4) RS8 Roof Structure Support (RS8B)(4) RS9 Roof Structure Support Short (RS9B)(2) Middle Joining Support (MJ)(2) RS10 Roof Structure Support (RS10B)(1) RS11 Roof Structure Support Short (RS11B)(1) RS12 Roof Structure Support Long (RS12B)(1) Door Stopper Horizontal (DSH)(1) Door Column Fitting Left (FDCL)(1) Door Column Fitting Right (FDCR)(4) Corner Column Fitting (FCC)(4) Middle Column Fitting (FMC)(4) 90 Degree Joint (RJ)

Parts Needed For Each Extension:(2) RS3 Roof Structure Short (RS3SB)(2) RS4 Roof Structure (RS4B)(2) RS6 Roof Structure (RS6B)(2) RS7 Roof Structure (RS7B)(1) RS11 Roof Structure Support Short (RS11B)(1) RS12 Roof Structure Support Long (RS12B)(8) RS13 Roof Structure (RS13B)(2) Middle Column Fitting (FMC)

CDRB

CDLB

61 1/4”Door Opening

1556mm

S1

S1 EPS CB1B

CDLB

CB4B

EPS

Page 20: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

14

CDRB CDLB

FMC

FMC

FMC

FMC

FMC

CMB

CMB

CMBCMB

CMB

CMB

FCC

CCB

FCC

FCC

FCC

CCB

CCB

CCB

FDCR FDCL

3. Insert the door column fittings (FDCL) and (FDCR) left and right into the door columns (CDLB) and (CDRB). Fix with (S1) screws from inside the shed.

1. Insert the middle column fitting (FMC) intotop of the middle columns (CMB). Fix thecolumn to fittings with (S1) screws from insidethe shed.

2. Insert the corner column fittings (FCC) intothe corner columns (CCB). Fix with (S1) screws from out side of the shed.

CCB

S1

FCC

FDCR

FMC

Inside

S1

Inside

CMB

CMB

FCC

CCB

S1

FMC

Page 21: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

15

DSH

RS12B

RS10B

RS10B

RS3B

RS4XB

RS11B RS5B

RS2B

RS2B

RS2B

RS1XB

RS1XB

RS1XB

RS1XB

RS8B

RS9B

RS9B

MJ

RS2B

RS3B

RS4XB

RS5B

MJ

RO

OF

STR

UC

TUR

E E

XP

LOD

ED

VIE

W

Page 22: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

RO

OF

STR

UC

TUR

E E

XP

LOD

ED

VIE

W W

ITH

ON

E E

XTE

NS

ION

RS3SB

RS3SB

RS4B

RS4B

RS7B

RS6BRS11B RS13B

RS13B

RS13B

RS13B

RS13B

RS13B

RS13B

RS13B

RS6B

RS12B

16

Page 23: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

17

Front roof structure assembly

4. Assemble front roof structures (RS1XB) 2nos. and middle joiningsupport (MJ) together with 4 (S1) screws as shown in fig.

Step 1

These holes up

RS9B

5. Assemble roof structure support (RS8B) and (RS9B) to (RS1XB) assembly with only 4 (S1) screws.

6. Assemble roof structure (RS2B) to (RS8B) and (RS9B) with 8 (S1) screws.

MJ

U-Channel Opening

U-Channel Opening

U-Channel Opening

S1

RS1XB

RS1XB

RS1XB

RS8BRS1XB

RS9B

RS2B

RS2B

RS8BRS9B

RS9B

RS1XB

RS1XB

S1

S1

Page 24: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

18

Back roof structure assembly

7. Assemble back roof structures (RS1XB) 2 nos. and middle joiningsupport (MJ) together with 4 (S1) screws .

Step 1

These holes up

8. Assemble roof structure support (RS8B) and (RS9B) to (RS1XB) assembly with 8 (S1) screws.

9. Assemble roof structure (RS2B) to (RS8B) and (RS9B) with 8 (S1) screws.

U-Channel Opening

U-Channel Opening

U-Channel Opening

S1

S1

RS1XB

MJ

RS1XB

RS1XB

RS1XB

RS8B

RS9B

RS1XB

RS9B

RS1XB

RS9BRS8B

RS2B

RS9B

RS2B

S1

Page 25: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

10a. Insert 90 degree joint (RJ) into the (RS3B) U-channel Roof support. Use a hammer to push in. Use (S1) screws to fix. Repeat on other end of (RS3SB).See fig.2 and fig.3.Add one (RS3SB) for each extension.

RJ

RS3B

RS3SB

10. Assemble (RS3B) & (RS3SB) with (S1) screws (2 sets). See fig 1.

fig.1 fig.2 fig.3

19

Note Refer Page No.5 for Overlapping Method of (RS3B) & (RS3SB).

11. Assemble the roof structure (RS5B) into (RS6B) with 6 (S3) screws with nuts.Make 2 setsAdd one (RS6B) for each extension.

12. Assemble the roof structure (RS5B) into (RS7B) with 6 (S3) screws with nuts. Make 2 sets.Add one (RS7B) for each extension.

RS5B

RS6B

RS5B

RS7B

S1

S3

S3

2&3

RS3BRS3SB

2&31

Page 26: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

13. Assemble the roof structure(RS5B) & (RS6B) into roof structure (RS13B) with 8(S3) screws with nuts at both ends.Make 2 sets.

14. Assemble the roof structure(RS5B) & (RS7B) into roof structure (RS13B) with 8(S3) screws with nuts at both ends.Make 2 sets.

RS5B

RS6B

RS13B

RS13B

RS5B

RS13B

RS7B

RS13B

20

Note This step 13 applies only from Ver: 2.0 Extension kits.If you have a Ver: 1.1 extension kit, the RS13B part will not be in the extension kit and you can skip this step.

Note This step 14 applies only from Ver: 2.0 Extension kits.If you have a Ver: 1.1 extension kit, the RS13B part will not be in the extension kit and you can skip this step.

S3

S3

Page 27: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

21

15. Place the assembled front roof structure into position on top of door columns. Line up pre-drilled holes with door column fittings (FDCL) & (FDCR). Use (S1) screws to fix front roof structure to the door columns with left and right door fittings.

16. Fix the door stopper horizontal (DSH) to the front roof structure from inside with 8 (S1) screws. Position the latch hole to face down.

Front Inside Of Shed

CDRB

FDCR

CDLB

FDCL

Latch HoleU-channel openinginside the shed.

Inside Shed

DSH

DSH

DSH

Page 28: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

22

17. Place the assembled back roof structure into position on top of columns (CMB). Line up pre-drilled holes with column fittings (FMC). Use (S1) screws to fix back roof structure to (FMC).

FMCFMC

Inside Back of Shed

CMBCMB

CMBCMB

FMCFMC

Note Make sure front and back assembly, the (RS2B ) roof structure position towards inside the shed as shown in Fig.1 & Fig.2

Fig.1

RS2B

RS2B

Fig.2

RS2B

RS2B

1

2

Page 29: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

23

18. Insert the 90 degree joint (RJ) (Assembled with roof support RS3B & RS3SB)in to the roof structure (RS1XB). See fig. Follow Fig. 2 and 3.

Note Notice the U-channel up positionon roof structures (RS1XB).

CCB

fig.1

RS2B RJ

Note After assembly make sure this roof structure’s U-Channel is positioned down.

RS3B

RS3B

RS3SB

RS3SB

RS3B

RS3SB

RS1XB

RS1XB

Fig.2

RSTRS2B

Fig.3Fix (RS2B) to 90 degree joint (RJ) through (RS3B) with (S1) screw.

Secure (RJ) 90 degree joint to (RS1XB) with (S1) screws on top of the four corner columns (CCB).Secure (RJ) with (FCC) using (S2) screw on all the four corner columns.

S1

RS1XB

S1

S2

CCB

RJFCC RJ

CCB

Page 30: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

24

RS5B

19. Fix the (RS3B) & (RS3SB) to middle column fitting (FMC) with (S1) screws.

fig.2fig.1

RS5B

RS6B

RS7B

20. Place the assembled roof structure (RS5B) & (RS6B)into position on roof structure supports (RS8B) at theleft side of the shed. Use (S1) screws to fix.See Fig.1 & Fig.2

21. Place the assembled roof structure (RS5B) & (RS7B) into position on roof structure supports (RS8B) at the right side of the shed.Use (S1) screws to fix.See Fig.1 & Fig.2

CMB

FMC1

2

3

4

2

1

fig.1 to 4

RS13B

RS2B

RS5B

RS8B

RS8BFront Inside

S1

RS13B

RS6B

Back Inside

RS2B

RS8B

RS8BS1

RS13B

RS13B

RS5B

RS6B

RS7BRS7B

Page 31: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

fig.1

25

22. Place the assembled roof structure (RS5B) & (RS6B) into position on roof structure supports (RS9B) at the left side of the shed. Use (S1) screws to fix. See Fig.1 & Fig.2

23. Place the assembled roof structure (RS5B) & (RS7B) into position on roof structure supports (RS9B) at the right side of the shed. Use (S1) screws to fix.See Fig.3 & Fig.4

RS5B

FRONTRS9B

RS5B

RS2B

S1

RS5B

fig.3

RS9B

RS6B

BACK

RS2B

S1

RS5B

FRONTRS9B

RS5B

fig.2

RS2B

S1

fig.4

RS5B

BACKRS9B

RS7B

RS2B

S1

RS5B

RS6B

RS5B

RS7B

1

3

2

4

RS13B

RS7B

RS13B

RS5B

RS6B

RS7B

Page 32: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

24. Attach the roof structures (RS4XB) to (RS3B) with (S1) screws. see fig. 1 & 2.

24a. Attach the roof structures (RS4XB) to (RS5B), (RS6B) assembly and (RS5B), (RS7B) assembly with (S7) screws. see fig. 3 & 4.

RS4XB

RS4XB

26

fig.1 fig.3fig.2

1 3

2

4

4

RS4B

RS4B

13

2

4

4

RS3B

RS5B

RS5B

RS3B

RS4XB

RS4XB

RS3B

RS7A

fig.4

RS7B

RS4XB

RS5B

S7

RS4XB

RS4XB

RS5B

RS6B

RS7B

S7

RS4XB

RS3B

RS3SB

RS6B

RS7B

RS7A

25. Attach the roof structures (RS4B) one end to roof structure (RS3SB)with (S1) screws. see fig. 1& 2. Fix the other end to roof structure (RS6B) & (RS7B) with (S1) screws see fig. 3. Fix the middle portion to (RS6B) & (RS7B) roof structure with (S1) screws see fig. 4.For each extension add two (RS4B) roof structure.

RS4B

fig.1 fig.2 fig.3 fig.4

RS4B

RS3SBRS4B

RS4BRS7B

RS6BRS3SB

RS4B

RS4B

RS7BS1 S1S1 S1

S1 S1

Page 33: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

26. Attach roof structure support (RS10B) and (RS11B) to roof structures (RS5B), (RS6B) & (RS7B) using (S1) screws. See (fig.1), (fig.2) and (fig.3).Add one (RS11B) for each extension.

RS10B

RS11B

Note Make sure the hole in (RS10B) face outward on both side.

RS10B

27

RS11B

RS10B

fig.1

Inside Front

RS8B RS8B

RS6B

RS7B

RS10B

fig.3

Inside Back

RS8BRS8B

RS5B

RS5B

2

3

2

1

RS11B

RS10B

RS11B

RS10B

RS11B

RS5B

RS5B

fig.2

S1

S1 S1

RS10B

Page 34: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

27. Attach the roof structures support (RS12B) with (RS5B) and (RS5B) with (S1) screws. See fig.1 and 2.

fig.1

28

RS4XB

RS5B

RS12B

RS12B

S1

fig.2

RS4XB

RS5BRS12B

S1

RS12B

RS12B

Note This step 27 applies only from Ver: 2.0 Extension kits. If you have a Ver: 1.1 extension kit, the RS12B part will not be in the extension kit and you can skip this step.

Page 35: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

D. Roof panels

(4) Roof Panels (RP )(2) Facia Panel Left (FPLB)(2) Facia Panel Right (FPRB)(2) Ridge Cover (RRS)(64) Roof Plugs w/Washer (PPG)(64) Roof Pins (PIN)(8) Sagging Support (RS14B)

Parts Needed:(2) Roof Panels (RP )(1) Ridge Cover (RRS)(16) Roof Plugs w/Washer (PPG)(16) Roof Pins (PIN)(4) Sagging Support (RS14B)

Parts Needed For Each Extension:

3. Start attaching the roof panels from (FPLB) corner side by sliding the roof panel (RP ) to roof structure. Locate the hole positions of the roof panel and roof structure. Fix roof plugs with washers. Use a hammer to drive in roof pins. See figures 1 thru 6.Add two roof panels for each extension.

1. Place facia panel (FPRB) to front roof structure right side.

2. Line up the holes with roof structure and fix the roof plugs w/washers. Use a hammer (rubber mallet) to drive in roof pin. See figures 1, 2and 3 for details. Place facia panel left (FPLB) to the front roof structure left side. Make sure (FPLB) overlaps on (FPRB). Repeat action to fix facia panels on backside. See Fig. 4, 5 & 6.

Insert roof plugs into roof panelsonly as indicated.

Note

29

4. Attaching the ridge cover (RRS) on top of the roof panels (RP ) start from the front side of the shed. See Fig.7 Fig.8 Fig.9Add one ridge cover for each extension.

First insert all roof plugs with washers to the panels (left & right) then drive in the roof pins.

TIP

Fig.1

Note Do not insert Plugs at this point.

FPLB

KEYRoof Plugs

FPRB

Fig.3

FPLB FPRB

Fig.1

Front

Fig.2

FPRB

Front

FPRB

Fig.6

FPLB FPRB

Fig.4

Back

Fig.5

FPRB

Back

Front

Back

Use a screw driver to align the holes.

Page 36: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

30

Fig.7 Front of Shed

RRS

Fig.2 Fig.3

RP

Fig.4 Fig.5

Fig.6FPRB

RP

RPRP

Fig.8

RRS

Fig.9

RRS

Roof Panel installation by using ladder from inside at missing Panels.

Note

Page 37: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

31

1.Attach the doors left and right (see fig.1) with Loose pin hinges on door columns (CDLB) and

(CDRB).

E. Doors

Parts Needed: (1) Door Left

(1) Door Right

fig.1

5. Insert the sagging support (RS14B) from inside the shed by sliding in between roof structure (RS5) and roof panel until it reaches (RS3) roof structure for each panel. See fig.1.

6. Insert the sagging support (RS14B) from inside the shed by sliding in between roof structure (RS5) and roof panel until it touches the other roof structure. See fig.2.

RS14B

RS3

RS5 RS14B

Inside ViewOutside View

Page 38: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

32

2. After completing the panel assembly, applysilicone around the roof plugs. This is optional and should be done for heavy rain areas if needed.

Note: To prevent water leakage it is important that these instructions are followed.

1. After completing the assembly apply siliconearound the perimeter of the base U-channel.Seal the corners, joints and base of door column also.

Base U-channel

4 3 2

Inside

Page 39: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

33

F. Ventilation Kit

ACCESSORIES

CODE DESCRIPTION QTY

VC VENTILATION COVER 2VCP VENTILATION COVER PIN 4

VENTILATION COVER PIN (VCP)

VENTILATION COVER (VC)

Outside

Optional ventilation kits can be installed on any of the wall panels. However, we recomend mounting them on the top of the shed’s back wall.

1. Place the ventilation cover (VC) as shown in fig.1.Using a pencil, mark the two side hole locations.

3. Use a dia. 1/2” (12.5mm) drill bit to drill out as many holes as desired behind the ventilation cover mounting area as in fig.3.

2. On the marked hole locations, drill out two holes using dia. 3/16” (5mm) drill bit as shown in fig.2. These holes will be used to attach the ventilaion cover with the ventilation cover pins (VCP).

4. Attach the ventillation cover (VC) with the ventilation cover pin (VCP) as in fig.4.

5. Repeat the same to fix the second ventilation cover.

fig.1

fig.4

VC

VC

fig.3fig.2

Side View

VC

TOOLS YOU WILL NEED

Power DrillDia 3/16” (5mm) drill bitDia 1/2” (12.5mm) drill bit

VCP

VCP

Page 40: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

Note: To ensure that your shed withstands high winds,you will need the following reinforcement.

34

High wind area installation instructions

Parts needed:CODE DESCRIPTION QTY

S4 DIA. 4.2 x 16mm. (5/32” x 5/8”) SHEET METAL SCREW 36S5 M6 x 40mm. (1/4” x 1 1/2”) Anchor bolt with nut 22

(not included with shed)

(not included with shed)

Concrete

Base U-channel

Anchor bolt & nut

Base U-channel

2. Attach each side panel (SP ) on the bottom tothe U-channel base. Using a dia. 3mm (1/8”) drillwith a power drill, make two equal distance holeson the U-channel base through the side panel.Drive a self tapping screw (S4) through the baseU-channel to the side panel. Repeat this for everyside panel. See blowup.

RS1RS3

S4

Parts needed for each extension:CODE DESCRIPTION QTY

S4 DIA. 4.2 x 16mm. (5/32” x 5/8”) SHEET METAL SCREW 8S5 M6 x 40mm. (1/4” x 1 1/2”) Anchor bolt with nut 6

(not included with shed)

(not included with shed)

Using a carpenter square, line up corners. Align base bars, mark the concrete at the holes in the base and drill concrete with suitable concrete bit to accept 1/4” x 1 1/2” (M6 x 40mm) anchor bolts. (Qty - 22Nos. not provided).

Page 41: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

35

3. Attach each side panel (SP ) on top to the roof structure (RS1) and (RS3). Using a dia. 3mm (1/8”)drill with a power drill, make two equal distanceholes on the side panel through the roof structure.Drive a self tapping screw (S4) through the sidepanel to the roof structure. Repeat this for every side panel. See blowup.

The Duramax shed has been tested and passed wind loads of up to 115 mph in a controlled laboratory environment. Natural high wind areas create wind at unpredictable speeds that are very difficult to capture accurately by location. As such we cannot guarantee the performance of the shed in these extreme situations.

RS1

S4

RS1

Base U-channel

Side Panel

(RS1) & (RS3)roof structure

S4

S4

Important Warranty Information

“We recommend to clear snow from the Roof top after each Snowfall.”

Page 42: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

PART 2: Adding Extension Kit to Existing Shed

1. Remove one ridge cover (RRS) from the back side . See the figure.

Front

Back

Remove this Ridge cover.

36

2. Remove from back side left and right roof panels. See the figure.

TIP Use a drilling machine to remove the pins and plugs from the ridge cover, roof panel and facia panel.Care should be taken not to damage the panels.Extra pins, plugs and washers are available in the accessory box.

RRS

Note

Page 43: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

5. Remove (RS10B) from inside. See the figure.

37

4. Support the roof structure (RS5B) & (RS5B) by using an appropriate support to avoid the roof structure from collapsing.

Support not included. Note

RS5B

RS5B

RS10B

Inside Back

RS8B

FPLB

FPRB

3. Remove the roof plugs (PPG) and pins (PIN) from backside facia panel and detach it from the shed.

RS10B

Support

RS8B

Page 44: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

6. Detach (RS2B) from (RS5B). Then detach (RS5B) from (RS8B).

RS5B

RS5B

Back Inside

RS2B

RS8B

RS8B

38

7. Detach (RS2B) from (RS5B) then (RS5B) from (RS9B) See fig.1 and fig.2.

RS9B

RS5B

fig.1

InsideLeft

RS2B

RS9B

RS5B

fig.2

InsideRight

RS2B

2

1

Page 45: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

8. Detach roof structure (RS2B) from roof structure (RS3B) from both corners. See fig.1. Detach 90-degree joint (RJ) from corner column fitting (FCC) from both corners. See fig.2.Detach (RS3B) from 90-degree joint (RJ) from both corners. See fig.3.

RSTRS3B

RS2B

CCB

FCCRJ

fig.2fig.1

CCB

RJ

fig.3

39

9. Detach the middle column fittings (FMC) from back roof structure (RS1XB) assembly. See figure.

FMC

CMB

10. Pull the back roof structure assembly. See figure.

RS3B

1,2,3

1,2,3

Page 46: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

40

11. Detach the center bands (CB3XB) & (CB3B) assembly from the back wall of the shed. Follow the figures.

Fig.1: Detach (CB3B) from(CB2B). Then detach (CB3B)& (CB2B) from (FCB).

Fig.4: Detach (CB3)assembly from (CMB).

Fig.3: Detach (CB3XB) from (CMB).

B2B

CCB

0utside

B22

fig. 1

12. From outside back of the shed, detach the base angles from the corner column (CCB) at both corners and remove the corner columns. See fig.1.From inside detach the (B21) & (B22) base angles from middle column (CMB). See fig.2.

fig. 2

13. Come back to 8’ x 6’ Extension Kit manual (PART 1) and follow the steps accordingly.

CMB

B21

CCB

CB3XB

B22

CB3B

23 4

1

Fig.2: Detach (CB3XB) from(CB2B). Then detach (CB3XB)& (CB2B) from (FCB).

Inside back wall

CMB

B21

CCB

B22Inside back wall

1

CMB CCB

CMB

CB1ACCB

FCB

CB2BCB3B

CB1ACCB

FCB

CB3XBCB2B

CMB

CB3BCB3XB

CMB

CB3XB

Page 47: Stoge Shed -   · PDF fileai pprt (r14b) mi cm fitti (fmc) ctr ba cr (cbc) ctr ba fitti (fcb) rf p it ar (pp) 0d[lpxp qr ri ([whqvlrq fdq eh exlog ote 0

U.S. Polymers, Inc.1057 S. Vail Ave Montebello, CA 90640,United States of America

RD-2.2 2014-03-08