© 2015 STION CONFIDENTIAL AND PROPRIETARY | 2
AGENDA
• Stion Introduction
• Cost and Production
• Field data
© 2016 STION
© 2015 STION CONFIDENTIAL AND PROPRIETARY | 3
STION OVERVIEW
720,000 sq.ft. factory Hattiesburg, MS
Monolithically-integrated
CIGSS panel
• Founded in 2006 with goal to produce highest-efficiency, lowest-cost solar PV modules
• Khosla Ventures backed; largest cleantech investor ($2.8B AUM)
• Utilize 30 year old PV technology and manufacturing processes
• 150 MW production capacity in 2016
• Shipping 14% Gen 1 product to 20 countries world wide
• Gen 1 technology roadmap to 16+% & disruptive Gen 2 tandem in R&D
• Raising small incremental capex to get 150MW ($20M)
• EBITDA positive in Q4 2016
© 2016 STION© 2016 STION
© 2015 STION CONFIDENTIAL AND PROPRIETARY | 4
PROJECT HIGHLIGHTS
India:• Initial project with Tata
Mauritius:• 4 MW project sold & under construction• Financed by Mauritius Commercial Bank
Singapore:• 1 MW Housing
Dev Board project• Sold to Sunseap
(Developer backed by Goldman Sachs)
Australia:• Selling to #1
Distributor: RFI
South East US:• 5 x 1 MW projects in Georgia • Financed by Washington Gas
• 3 500kW turnkey projects developed by Stion in for MS Utility Entergy
Puerto Rico:• 1 MW shipped and 1 MW in
backlog • Financed by Banco Popular
West US:• Stion turnkey projects:
• 250kW Project for Kern County Sanitation Authority
• 170 kW project at SFO Airport
The Netherlands:• Selling to distributors:
Shipped over 2MW to date
Turkey:• Supplied 1st MW of
4MW portfolio
© 2015 STION CONFIDENTIAL AND PROPRIETARY | 5
AGENDA
• Stion Introduction
• Cost and Production
• Field data
© 2016 STION
© 2015 STION CONFIDENTIAL AND PROPRIETARY | 6
10%
11%
12%
13%
14%
15%
16%
17%
2011 2012 2013 2014 2015 2016 2017
Mod
ule
Effic
ienc
yTECHNOLOGY ROADMAP
Elevation 1SN (framed)
100‐120 W‐0.39%/oC600V UL1000V IEC
Elevation 2STN (framed)
120‐130 W‐0.34%/oC600V UL1000V IEC
Elevation 3STO (framed)STL(frameless)130‐150 W‐0.26%/oC1000V UL1000V IEC
Elevation 4STL (frameless)
135‐155W‐0.26%/oC1000V UL1000V IEC
Elevation 5STL‐A (frameless)
145‐170W‐0.26%/oC1500V UL1500V IECAR Glass
Latest
152W
Latest avg. efficiency: 152W
© 2015 STION CONFIDENTIAL AND PROPRIETARY | 7
NARROW BIN DISTRIBUTION
0%
10%
20%
30%
40%
50%
60%
70%
135W 140W 145W 150W 155W 160W
HMS ‐ Trailing 4‐week Bin Distribution
WW19 WW20 WW21 WW22
80% >150Wp
© 2015 STION CONFIDENTIAL AND PROPRIETARY | 8
INDUSTRY LEADING COST @ 1/10 THE SCALE
Stion existing 150MW Crystalline Silicon 2+GW
Stion expansion300MW
First Solar 2+ GW
Cost of Goods Sold ($/W)
SS4
Folie 8
SS4 Adjust Colors and perhaps put graph on right side Seth Stulgis; 18.04.2016
© 2015 STION CONFIDENTIAL AND PROPRIETARY | 9
LOWEST CAPEX COST FOR EXPANSION ($/W)
c‐Si Polysilicon Stion 150MW Original Stion Expansion FSLR Malaysia
Total Capex ($/W)
SS5
Folie 9
SS5 Adjust Colors and perhaps put graph on right side Seth Stulgis; 18.04.2016
© 2015 STION CONFIDENTIAL AND PROPRIETARY | 10
Total Units ROY
2016 PRODUCTION RAMP
*June, September, and December = 5 week fiscal months
3,000
4,000
5,000
6,000
7,000
8,000
9,000
10,000
11,000
12,000
13,000
14,000
15,000
16,000
17,000WW19
WW20
WW21
WW22
WW23
WW24
WW25
WW26
WW27
WW28
WW29
WW30
WW31
WW32
WW33
WW34
WW35
WW36
WW37
WW38
WW39
WW40
WW41
WW42
WW43
WW44
WW45
WW46
WW47
WW48
WW49
WW50
WW51
WW52
Outs ‐
# of Pan
els P
rodu
ced
Ramp Plan for Weekly Production(Week 19 ‐Week 52)
10MW/10MW/monthproduction in
Q4/16
© 2015 STION CONFIDENTIAL AND PROPRIETARY | 11
ROADMAP FOR SUSTAINED LEADERSHIP
High Low
Low
High
PRODUCTION COST
EFFI
CIE
NC
Y
High Efficiency c-Si
Amorphous Si
c-Si Tier 1
CDTE thin-filmCIGS thin-film
© 2016 STION© 2016 STION
© 2015 STION CONFIDENTIAL AND PROPRIETARY | 12
AGENDA
• Stion Introduction
• Cost and Production
• Field data
© 2016 STION
© 2015 STION CONFIDENTIAL AND PROPRIETARY | 13
PV SYST SIMULATIONS SHOW HIGHER YIELDS AGAINST C-SI
3-7% MORE
ENERGY
CityStion Yield Advantage
vs. c‐Si1 MW
Phoenix 6.7%Las Vegas 6.1%Honolulu 5.5%
St. Petersburg 5.2%Austin 5.0%
New Orleans 4.6%Los Angeles 4.4%Atlanta 4.0%St Louis 3.4%Newark 2.8%Boston 2.6%
Mineapolis 2.5%Boulder 2.5%
PVsyst: Estimates are conservative. Stion systems consistently outperform PVsyst.
© 2015 STION CONFIDENTIAL AND PROPRIETARY | 14
PROVEN PERFORMANCE WORLDWIDE
Michigan (vs. mono c-Si) 1st year = 8% more 2nd year = 12% more
Florida (vs c-Si) 30% more kWh
NY (PVMC) (vs. CdTe) 1st year = 7% more 2nd year = 12% more 3rd year = 18%
Belgium (vs c-Si) 1st year = 2% more 2nd year = 10% more
Colorado (NREL) Zero Degradation Outperforming c-Si
California Outperforming LG
by 6%
Singapore (vs c-Si) 3% more
©2016 STION
© 2015 STION CONFIDENTIAL AND PROPRIETARY | 15
STION OUTPERFORMING AT NREL
• System size = 1.82 kW
• Installed in Aug 2012
• Stion system performing above median of 13 PV technologies
• Zero Degradation
GOLDEN, CO Historical Performance Ratio
Stion Historical Performance Ratio (gold) compared to the median of all systems (blue) at the OTF.
http://maps.nrel.gov/pvdaq[1289] NREL CIS
0,76
0,78
0,8
0,82
0,84
0,86
0,88
0,9
0,92
0,94
0,96
10.1.2012
12.1.2012
2.1.2013
4.1.2013
6.1.2013
8.1.2013
10.1.2013
12.1.2013
2.1.2014
4.1.2014
6.1.2014
8.1.2014
10.1.2014
12.1.2014
2.1.2015
4.1.2015
6.1.2015
8.1.2015
10.1.2015
12.1.2015
2.1.2016
Stion PR Average PR for non‐Stion
©2016 STION
© 2015 STION CONFIDENTIAL AND PROPRIETARY | 16
CIGS TECHNOLOGY OVER 10 YEARS AT NREL WITH ZERO DEGRADATION
• System size = 1.12 kW
• Installed in Jan 2006
• Shell CIGS technology
• Zero Degradation
GOLDEN, CO
http://maps.nrel.gov/pvdaq[10] NREL CIS #1
0
50
100
150
200
250
Historical Yield
Stion Stion Average Yield
* Dashed line represents missing data points
©2016 STION
© 2015 STION CONFIDENTIAL AND PROPRIETARY | 17
OUTPERFORMING MONO c-Si SE US
• PVSyst predictions:
• Stion system will outperform all year due to temperature coefficient
• Stion = ‐0.26%/oC
• Suniva = ‐0.45%/oC
• Stion system will outperform in winter months due to greater tilt angle
• PVSyst predicts 8.3% performance advantage (Jan through Mar)
• Actual performance advantage = 30%*
SEMINOLE, FLORIDA
‐ 1.000 2.000 3.000 4.000 5.000 6.000 7.000 8.000
Jan14
Mrz14
Mai14
Jul 14 Sep14
Nov14
Jan15
Mrz15
Mai15
Jul 15 Sep15
Nov15
Jan16
Mrz16
kWh
Stion vs Suniva
Stion Suniva
Stion Suniva
Total Module Power Rating (kW‐dc) 49.88 50.49
Module Stion STO‐145 Suniva MVX60 255
Tilt 15o 7o
Azimuth 23o SE 0o S
Total Lifetime Energy (MWh) 154.6 118
MoreEnergy
*Data based on actual production of arrays. Does not account for irradiance, or inverter down time.
©2016 STION
Stion 1MW system in Georgia performing above expectations as of Jan 2016
© 2015 STION CONFIDENTIAL AND PROPRIETARY | 18
OUTPERFORMING c-Si in California
LIVERMORE, CA
• System size = 3.36 KW• Commission date = Feb
2014• Customer home• Module Type: STO 140• Outperforming LG Mono
X 290 over 18 months ‐
100
200
300
400
500
600
700
Mrz14
Mai14
Jul 14 Sep14
Nov14
Jan15
Mrz15
Mai15
Jul 15 Sep15
Nov15
Jan16
Mrz16
kWh Prod
uctio
n
Monthly System Performance Comparison
Stion LG Mono X 290
Date Stion kWh Competitor kWh Stion Performance Benefit
Year 1 5,471 5,272 4%Year 2 5,392 5,048 7%Year 3 1,460 1,343 9%Total 12,323 11,663 6%
©2016 STION
© 2015 STION CONFIDENTIAL AND PROPRIETARY | 19
ACHIEVING PV SYST SIMULATIONS
• 255kW System• Year 1 Production: 99.44%
compared to PVSYST• Year 2 Production: 99.8%
compared to PVSYST
• BAKERSFIELD, CA
0
50
100
150
200
250
300
350
400
450
500
0
10
20
30
40
50
60
70
80
90
100
Irrad
iance W/m
2
kWh Prod
uctio
n
Stion Production vs Irradiance
Stion Irradiance
©2016 STION
© 2015 STION CONFIDENTIAL AND PROPRIETARY | 20
REFERENCES