TRANSFORMER GEN SET EMH. 600X600 EMH. 600X600 EMH. 600X600 NP2 RCC PIPE -150MM NP2 RCC PIPE -100MM 2. .')'0&Ä 1. GATE LIGHT WITH 70 W SODIUM VAPOUR LAMP 3. UNDER GROUND CABLE (PVC. INSULATED ARMOURED ALUMINIUM) 4. 5. A.C.S.R. CONDUCTOR (OVER HEAD) L.T. DISTRIBUTION. TUBULLAR POLE (7.5 M. LONG) WITH 1X150 W. SODIUM VAPOUR LAMP(FOR STREET LIGHTING) E.M.H 6. BACK FILL CABLE CABLE CROSSING THE ROAD 150 MM. SAND EARTH FILLING C.I. PIPE CABLE CABLE CROSSING THE DRAIN SINGLE BRICK LAYER SHEET TITLE : PROJECT : KEY PLAN NORTH POINT: DRAWING NO. SHEET SIZE SCALE 1:200 A3 SHEET NO REVISION SCHEDULE 01 of 06 PURPOSE OF ISSUE : RELEASED FOR TENDER OWNER: ARCHITECTS: ASSOCIATES (P) LTD. Architects, Engineers, Interior designers, Project Management Consultants STHAPATI Lucknow Studio : 1/24, Vipul Khand, Gomti Nagar, Lucknow - 226010 Ph no. 0522 - 4027793, 011 - 21211409 Delhi Studio : T - 34/ 702, Common Wealth Games Village, Delhi - 110092 SITE PLAN (External Electrical Layout) DATED 25/11/2017 SNO NOTES DATED BANK OF BARODA ZONAL OFFICE LUCKNOW CONSTRUCTION OF BARODA SWAROJGAR VIKASH SANSTHAN, AT PRATAPGARH BSVS/PBH/ELEC./TENDER/FP/01

Transcript of STHAPATI - Bank of Baroda...Delhi Studio : T - 34/ 702, Common Wealth Games Village, Delhi - 110092...

Page 1: STHAPATI - Bank of Baroda...Delhi Studio : T - 34/ 702, Common Wealth Games Village, Delhi - 110092 TERRACE FLOOR [ELECTRICAL PLAN] DATED 25/11/2017 BANK OF BARODA ZONAL OFFICE LUCKNOW

TRA

NSF

OR

MER

GEN

SET

EMH. 600X600 EMH. 600X600

EMH. 600X600

NP2 RCC PIPE -150MMNP2 RCC PIPE -100MM

2.

1.

GATE LIGHT WITH 70 W SODIUM VAPOUR LAMP

3.

UNDER GROUND CABLE (PVC. INSULATED

ARMOURED ALUMINIUM)

4.

5.

A.C.S.R. CONDUCTOR (OVER HEAD) L.T. DISTRIBUTION.

TUBULLAR POLE (7.5 M. LONG) WITH 1X150 W.

SODIUM VAPOUR LAMP(FOR STREET LIGHTING)

E.M.H

6.

BACK FILL

CABLE

CABLE CROSSING THE ROAD

150 MM. SAND

EARTH FILLING

C.I. PIPE

CABLE

CABLE CROSSING THE DRAIN

SINGLE BRICK LAYER

SHEET TITLE :

PROJECT :

KEY PLAN

NORTH POINT:

DRAWING NO.

SHEET SIZE

SCALE 1:200

A3

SHEET NO

REVISION SCHEDULE

01 of 06

PURPOSE OF ISSUE :

RELEASED FOR TENDER

OWNER:

ARCHITECTS:

ASSOCIATES (P) LTD.Architects, Engineers, Interior designers, Project Management Consultants

STHAPATILucknow Studio : 1/24, Vipul Khand, Gomti Nagar, Lucknow - 226010

Ph no. 0522 - 4027793, 011 - 21211409Delhi Studio : T - 34/ 702, Common Wealth Games Village, Delhi - 110092

SITE PLAN

(External Electrical Layout)

DATED

25/11/2017

SNO NOTES DATED

BANK OF BARODAZONAL OFFICE

LUCKNOW

CONSTRUCTION OFBARODA SWAROJGAR VIKASH

SANSTHAN,

AT PRATAPGARH

BSVS/PBH/ELEC./TENDER/FP/01

Page 2: STHAPATI - Bank of Baroda...Delhi Studio : T - 34/ 702, Common Wealth Games Village, Delhi - 110092 TERRACE FLOOR [ELECTRICAL PLAN] DATED 25/11/2017 BANK OF BARODA ZONAL OFFICE LUCKNOW

LEVEL±00

LEVEL+600

LEVEL+600 LEVEL+300 LEVEL±00

SB

SBSB

SB

SB SB

SB

SB

SB

SB

SB

SB

D D

DDD

D

D

D D

(B2)

(B3)

(B1)

(B4)

(B8)(B9)

(B10)

(B11)

ML

ML

P.D

.B

-(B

)

UP

S-D

.B

-(A

)

PANEL

MAIN L.T.

SB

SB

SB

SBSB

SB

SBSB

SB

(A1)

SB

(A2)

(A2)

(A3)

(A3)

(A4)(A4)

(A5)

(A5)

(A6)

(A6)

(A6)

(A7)

(A13)

(A9)

(A9)

(A10)

(A12)

(A12)

(A12)

(B12)

(C1)

(C1)

(C2)

(C2)

(C3) (C3)(C3)

(C4)(C4)

(C4)

(C5)

A 12

INCOMING :- 40 AMP TPN MCB LOAD-10.40KW

A 1

NO.

CKT.

A 4

A 6

A 5

A 3

A 2

A 10

A 11

A 9

A 8

A 7

LIGHTING DISTRIBUTION BOARD (A) 4 WAY TPN LOCATION GROUND FLOOR

6

WIRE SIZE

IN

SQ.MM.

SPMCB'S

RATING

IN AMP.

ENT. FOYER

L O C A T I O N

PHASE

2X1.5+1.5E

NO. OF

POINT

6

6

6

6

6

6

MALE FACULTY ROOM, PASSAGE

MALE FACULTY ROOM, WORK SHOP

OFFICE, PASSAGE

BSVS HEAD ROOM,RECORD,TOILET

COMPUTER LAB

2X1.5+1.5E

2X1.5+1.5E

2X1.5+1.5E

2X1.5+1.5E

2X1.5+1.5E

2X1.5+1.5E

B 12

B 1

NO.

CKT.

B 4

B 6

B 5

B 3

B 2

B 10

B 11

B 9

B 8

B 7

POWER DISTRIBUTION BOARD (B) 4WAY TPN LOCATION GROUND FLOOR

WIRE SIZE

IN

SQ.MM.

SPMCB'S

RATING

IN AMP.

L O C A T I O N

PHASE

NO. OF

POINT

INCOMING :- 80 AMP TPN MCB LOAD-25.20KW

1

1

1

1

1

1

1

1

25

MALE FACULTY ROOM (AC)

2X4.0+2.5E

25

WORKSHOP (AC)

2X4.0+2.5E

252X4.0+2.5E

252X4.0+2.5E

252X4.0+2.5E

252X4.0+2.5E

OFFICE (AC)

CLASS ROOM (AC)

BSVS HEAD ROOM (AC)

COMPUTER LAB (AC)

BEAUTY PARLOR/ SWING ROOM

6 PASSAGE2X1.5+1.5E

MALE TOILET62X1.5+1.5E

CLASS ROOM62X1.5+1.5E

CLASS ROOM62X1.5+1.5E

FEMALE TOILET62X1.5+1.5E

L.D

.B

-(A

)

A 13 STAIR62X1.5+1.5E

SPARE

SPARE

SPARE

SPARE

SPARE

A 14

A 15

A 16

A 17

A 18

25

FEMALE FACULTY ROOM (AC)

2X4.0+2.5E

1

252X4.0+2.5E

BEAUTY PARLOR/ SWING ROOM (AC)

1

252X4.0+2.5E

CLASS ROOM (AC)

1

252X4.0+2.5E

CLASS ROOM (AC)

1

252X4.0+2.5E

CLASS ROOM (AC)

1

C 12

INCOMING :- 32 AMP DP MCB LOAD-3.75KW

C 1

NO.

CKT.

C 4

C 6

C 5

C 3

C 2

C 10

C 11

C 9

C 8

C 7

UPS DISTRIBUTION BOARD (C) 12 WAY SPN LOCATION GROUND FLOOR

6

WIRE SIZE

IN

SQ.MM.

SPMCB'S

RATING

IN AMP.

MALE-FEMALE FACULTY ROOM

L O C A T I O N

PHASE

2X2.5+1.5E

NO. OF

POINT

6

6

6

6

OFFICE & COMPUTER LAB

COMPUTER LAB, BSVS HEAD ROOM

CLASS ROOM

2X2.5+1.5E

2X2.5+1.5E

2X2.5+1.5E

2X2.5+1.5E

BSVS HEAD ROOM

D

(A4)

S.NO.SYMBOL

DESCRIPTION

1

1x 7 W LED WALL MOUNTED LIGHT FIXTURE

1x 7 W LED CEILING LIGHT (SURFACE)

2

3

4

5

6

7

8

9

10

11

12

13

ML

POSITION

2250

ON CEILING

ON CEILING

2250

1x 18 W LED MIRROR LIGHT

6/16 -AMP POWER POINT

600

2250

20/32 -AMP MCB(A.C.POINT)

1650

CEILING FAN(1200mmØ)

ON CEILING

EXHAUST FAN

IN WIN/VEN.

DISTRIBUTION BOARD

14

15

16

17

TELEPHONE / INTERCOM SOCKET

INDICATES CONTROLING OF LIGHT/FAN

FROM SWITCH BOARD.

SWITCH BOARD

1200

18

1x20W LED LIGHT FIXTURE(SURFACE)

19

20

21

22

SB

23

SOCKET-1650

6/16 -AMP POWER POINT

6 -AMP PLUG POINT

1100 or 300 ABOVE

PLATFORM

3 PHASE POINT

1650

1100 OR 300

ABOVE PLATFORM

6 -AMP PLUG POINT

900

ON CEILING

6 -AMP PLUG POINT

600

G

1x20W LED LIGHT FIXTURE(CEILING)

1x34W LED LUMINAIRE FIXTURE(CEILING)

1950

6 -AMP PLUG POINT

6 AMP. LIGHT PLUG AT 1200 MM AT MAIN BOARD

16 AMP. POWER SOCKET FOR GEYSER

25

T.V OUTLET

1800

(TOP OF D.B.)

600

LEGEND:-ELECTRICAL

24

900

BZ 2250

BUZER

26

COMPUTER POINT (2Nos. 5Amp. & 1No. 16Amp. socket outlet )

600

CALL BELL

1200

1x 9 W LED LAMP LIGHT FIXTURE

2250

1200

SHEET TITLE :

PROJECT :

KEY PLAN

NORTH POINT:

DRAWING NO.

SHEET SIZE

SCALE 1:100

A3

SHEET NO

REVISION SCHEDULE

02 of 06

PURPOSE OF ISSUE :

RELEASED FOR TENDER

OWNER:

ARCHITECTS:

ASSOCIATES (P) LTD.Architects, Engineers, Interior designers, Project Management Consultants

STHAPATILucknow Studio : 1/24, Vipul Khand, Gomti Nagar, Lucknow - 226010

Ph no. 0522 - 4027793, 011 - 21211409Delhi Studio : T - 34/ 702, Common Wealth Games Village, Delhi - 110092

GROUND FLOOR

[ELECTRICAL PLAN]

DATED

25/11/2017

SNO NOTES DATED

BANK OF BARODAZONAL OFFICE

LUCKNOW

CONSTRUCTION OFBARODA SWAROJGAR VIKASH

SANSTHAN,

AT PRATAPGARH

BSVS/PBH/ELEC./TENDER/FP/02

Page 3: STHAPATI - Bank of Baroda...Delhi Studio : T - 34/ 702, Common Wealth Games Village, Delhi - 110092 TERRACE FLOOR [ELECTRICAL PLAN] DATED 25/11/2017 BANK OF BARODA ZONAL OFFICE LUCKNOW

FIRST FLOOR PLAN

SBSB

SB

SB

ML

ML

L.D

.B

-(A

)

P.D

.B

-(B

)

SB

SB

SB

SB

SB

SB

SB

(A1)

(A3)

(A4)(A4)

(A4)

(A5)

(A7)

(A13)

(B1)(B2)

(B3)

(B5)(B6)

(B8)

(A5)

A 12

INCOMING :- 40 AMP TPN MCB LOAD-5.60KW

A 1

NO.

CKT.

A 4

A 6

A 5

A 3

A 2

A 10

A 11

A 9

A 8

A 7

LIGHTING DISTRIBUTION BOARD (A) 4 WAY TPN LOCATION FIRST FLOOR

6

WIRE SIZE

IN

SQ.MM.

SPMCB'S

RATING

IN AMP.

KITCHEN & STORE

L O C A T I O N

PHASE

2X1.5+1.5E

NO. OF

POINT

6

6

6

6

6

6

DINING HALL

LOBBY

MALE TOILET

BOYS DORMITORY

GIRLS DORMITORY

FEMALE TOILET

2X1.5+1.5E

2X1.5+1.5E

2X1.5+1.5E

2X1.5+1.5E

2X1.5+1.5E

2X1.5+1.5E

B 12

B 1

NO.

CKT.

B 4

B 6

B 5

B 3

B 2

B 10

B 11

B 9

B 8

B 7

POWER DISTRIBUTION BOARD (B) 4WAY TPN LOCATION FIRST FLOOR

WIRE SIZE

IN

SQ.MM.

SPMCB'S

RATING

IN AMP.

L O C A T I O N

PHASE

NO. OF

POINT

16

KITCHEN (P)

INCOMING :- 63 AMP TPN MCB LOAD-15.20KW

1

1

1

1

1

1

1

1

16

KITCHEN (P)

25

DINING HALL (AC)

SPARE

2X2.5+1.5E

2X2.5+1.5E

2X4.0+2.5E

25

DINING HALL (AC)

2X4.0+2.5E

252X4.0+2.5E

252X4.0+2.5E

252X4.0+2.5E

252X4.0+2.5E

BOYS DORMITORY (AC)

GIRLS DORMITORY (AC)

GIRLS DORMITORY (AC)

BOYS DORMITORY (AC)

SPARE

SPARE

SPARE

SHEET TITLE :

PROJECT :

KEY PLAN

NORTH POINT:

DRAWING NO.

SHEET SIZE

SCALE 1:100

A3

SHEET NO 03 of 06

PURPOSE OF ISSUE :

RELEASED FOR TENDER

OWNER:

ARCHITECTS:

ASSOCIATES (P) LTD.Architects, Engineers, Interior designers, Project Management Consultants

STHAPATILucknow Studio : 1/24, Vipul Khand, Gomti Nagar, Lucknow - 226010

Ph no. 0522 - 4027793, 011 - 21211409Delhi Studio : T - 34/ 702, Common Wealth Games Village, Delhi - 110092

FIRST FLOOR

[ELECTRICAL PLAN]

DATED

25/11/2017

BANK OF BARODAZONAL OFFICE

LUCKNOW

CONSTRUCTION OFBARODA SWAROJGAR VIKASH

SANSTHAN,

AT PRATAPGARH

BSVS/PBH/ELEC./TENDER/FP/03

REVISION SCHEDULE

SNO NOTES DATED

Page 4: STHAPATI - Bank of Baroda...Delhi Studio : T - 34/ 702, Common Wealth Games Village, Delhi - 110092 TERRACE FLOOR [ELECTRICAL PLAN] DATED 25/11/2017 BANK OF BARODA ZONAL OFFICE LUCKNOW

BALCONYBALCONYKITCHEN2690X1885

KITCHEN2690X1885 DRAWING

ROOM3850X4400

DRAWINGROOM

3850X4400

BED ROOM4035X3000

BED ROOM4035X3000

TOILET2500X1500

TOILET2500X1500

LEVEL+7800

LOWTERRACE

900 highparapet

900 highparapet

PERGOLA

LEVEL+4200

LOWTERRACE

LEVEL+4200

LOWTERRACE

100Ø RWP 100Ø RWP

900 highparapet

900 highparapet

LEVEL+7800

LOWTERRACE

LEVEL+7800

LOWTERRACE

100Ø RWP

900 highparapet

900 highparapet

SECOND FLOOR PLAN

SB

SB

SB

(A3)

(A4)

SB

BZ

SB

G

G G

(A1)

(A2)

(A2)

(A1)

(A1)

(A3)

(A5)

(A6)

(A3)

(A4)

(A1)

(A2)

(A2)

(A1)

(A1)

(A3)

(A5)

(A6)

BZ

D.B

- (A

)

D.B

- (A

)

A 12

INCOMING :- 40 AMP TPN MCB LOAD-8.00KW

A 1

NO.

CKT.

A 4

A 6

A 5

A 3

A 2

A 10

A 11

A 9

A 8

A 7

DISTRIBUTION BOARD (A) 4 WAY TPN LOCATION SECOND FLOOR-RESIDENCE-1 & 2

6

WIRE SIZE

IN

SQ.MM.

SPMCB'S

RATING

IN AMP.

DRAWING ROOM & KITCHEN,BALCONY

L O C A T I O N

PHASE

2X1.5+1.5E

NO. OF

POINT

6

25

25

16

BED ROOM & TOILET

BED ROOM (AC) & TOILET(G)

DRAWING ROOM (AC)

KITCHEN (P)

SPARE

2X1.5+1.5E

2X4.0+2.5E

2X4.0+2.5E

2X2.5+1.5E

2X2.5+1.5E

16

KITCHEN (P)

2X2.5+1.5E

SPARE

SPARE

SPARE

SPARE

SPARE

1

1

1

1

SHEET TITLE :

PROJECT :

KEY PLAN

NORTH POINT:

DRAWING NO.

SHEET SIZE

SCALE 1:100

A3

SHEET NO 04 of 06

PURPOSE OF ISSUE :

RELEASED FOR TENDER

OWNER:

ARCHITECTS:

ASSOCIATES (P) LTD.Architects, Engineers, Interior designers, Project Management Consultants

STHAPATILucknow Studio : 1/24, Vipul Khand, Gomti Nagar, Lucknow - 226010

Ph no. 0522 - 4027793, 011 - 21211409Delhi Studio : T - 34/ 702, Common Wealth Games Village, Delhi - 110092

SECOND FLOOR

[ELECTRICAL PLAN]

DATED

25/11/2017

BANK OF BARODAZONAL OFFICE

LUCKNOW

CONSTRUCTION OFBARODA SWAROJGAR VIKASH

SANSTHAN,

AT PRATAPGARH

BSVS/PBH/ELEC./TENDER/FP/04

REVISION SCHEDULE

SNO NOTES DATED

Page 5: STHAPATI - Bank of Baroda...Delhi Studio : T - 34/ 702, Common Wealth Games Village, Delhi - 110092 TERRACE FLOOR [ELECTRICAL PLAN] DATED 25/11/2017 BANK OF BARODA ZONAL OFFICE LUCKNOW

900 highparapet

100Ø RWP

LEVEL+11400TERRACE

100Ø RWP

900 highparapet

LEVEL+7800

LOWTERRACE

LEVEL+4200

LOWTERRACE

LEVEL+4200

LOWTERRACE

PERGOLA

900 highparapet

900 highparapet

RISER-150TREAD-300WIDTH-1200

DN

900 highparapet

100Ø RWPLEVEL+7800

LOWTERRACE 100Ø RWP

100Ø RWP 100Ø RWP

900 highparapet

900 highparapet

900 highparapet

900 highparapet

SB

(A13)

SHEET TITLE :

PROJECT :

KEY PLAN

NORTH POINT:

DRAWING NO.

SHEET SIZE

SCALE 1:100

A3

SHEET NO 05 of 06

PURPOSE OF ISSUE :

RELEASED FOR TENDER

OWNER:

ARCHITECTS:

ASSOCIATES (P) LTD.Architects, Engineers, Interior designers, Project Management Consultants

STHAPATILucknow Studio : 1/24, Vipul Khand, Gomti Nagar, Lucknow - 226010

Ph no. 0522 - 4027793, 011 - 21211409Delhi Studio : T - 34/ 702, Common Wealth Games Village, Delhi - 110092

TERRACE FLOOR

[ELECTRICAL PLAN]

DATED

25/11/2017

BANK OF BARODAZONAL OFFICE

LUCKNOW

CONSTRUCTION OFBARODA SWAROJGAR VIKASH

SANSTHAN,

AT PRATAPGARH

BSVS/PBH/ELEC./TENDER/FP/05

REVISION SCHEDULE

SNO NOTES DATED

Page 6: STHAPATI - Bank of Baroda...Delhi Studio : T - 34/ 702, Common Wealth Games Village, Delhi - 110092 TERRACE FLOOR [ELECTRICAL PLAN] DATED 25/11/2017 BANK OF BARODA ZONAL OFFICE LUCKNOW

1. ACB/MCCB

2. MCB

3. SPMCB

4. 3Ø DUAL SOURCE METER

5.

6.

LEGEND:-ELECTRICAL

CAPACITOR

SHEET TITLE :

PROJECT :

KEY PLAN

NORTH POINT:

DRAWING NO.

SHEET SIZE

SCALE N.T.S.

A3

SHEET NO

REVISION SCHEDULE

06 of 06

PURPOSE OF ISSUE :

RELEASED FOR TENDER

OWNER:

ARCHITECTS:

ASSOCIATES (P) LTD.Architects, Engineers, Interior designers, Project Management Consultants

STHAPATILucknow Studio : 1/24, Vipul Khand, Gomti Nagar, Lucknow - 226010

Ph no. 0522 - 4027793, 011 - 21211409Delhi Studio : T - 34/ 702, Common Wealth Games Village, Delhi - 110092

S.L.D.

ELECTRICAL

DATED

25/11/2017

SNO NOTES DATED

BANK OF BARODAZONAL OFFICE

LUCKNOW

CONSTRUCTION OFBARODA SWAROJGAR VIKASH

SANSTHAN,

AT PRATAPGARH

BSVS/PBH/ELEC./TENDER/Det./01