Transcript of Stevens-Rugg Brook: Diversion Structure Improvement Alternatives St Albans, Vermont.
Background
Flood damage to homes, businesses, rec areas, and ag areas led to need for detention structure between Stevens and Rugg Brooks
Water quality, sediment and erosion concerns
Three proposed initial routes: railroad, power line, trailer park
Many problems existed between the city and landowners leading to the selection and implementation of the power line alternative.
1974 construction began on structure
Stevens Brook diverts water to Rugg Brook
Detention Structure
Map of Jewett Brook and Mill River Watersheds
Two streams are Stevens (N) and Rugg (S)
City of St Albans in orange/teal
Problem
The existing St. Albans diversion structure is not effective at preventing floods during high water flow events and does not produce effluent that meets water quality standards.
Stevens Brook and existing Culvert
Culvert holds 70 cfs when full
Base flow is 2 cfs
When flow exceeds 70 cfs, pooling occurs which leads to diversion structure
Improvement Measures: 1 Construct Sediment Traps in Existing Basin
Excavate permanent deep pools for sediment
revegetation for aquatic habitat
Removal of pollutants bound to sediments
Improvement Measures: 2Construct Detention Basin by Excavating Diversion
Channel
Excavate 2-3 ft deep basin at downstream end
Low flow outlet in existing weir
Sediment forebay at head of basin
Revege for aquatic habitat
Improvement Measures: 3Construct Detention Basin by Raising Outlet
Structure
Low flow outlet at current elevation, raise weir 1-2 feet
Sediment forebay at head of basin
Revege for aquatic habitat
Improvement Measures: 4Construct Enhanced Wetland in Diversion Channel
Enhance habitat
Sinuous low flow channel for settling
Shallow and deep pools
Sediment forebay
Revegetation for aquatic habitat
Alternative Constructed Wetlands
Flood attenuation
Pollutant removal
Aquatic habitat
Extended detention wetland
Pond/wetland system
Pocket wetland
Findings: Multiple Criteria Decision Analysis
Sediment Removal
Pollutant Removal
Flood Detention
Aquatic Habitat
Cost Geomorph.
Aesthetics
Agency of Natural Resources
3 3 1 3 1 2 0
Town Residents
1 3 2 0 3 3 2
City Residents
1 2 3 0 3 3 2
Developers 0 0 3 0 0 3 0
Recreational users downstream (St. Albans bay)
3 3 2 3 0 1 3
Total 8 11 11 6 7 12 7
From MCDA most important criteria are: pollutant removal, flood water detention and stream geomorphology
Pollutant Removal
Flood Water Detention
Geomorphology of Rugg Brook
Total
Measure 1 3 0 1 4
Measure 2 1 3 3 7
Measure 3 1 1 2 4
Measure 4 3 0 1 4
Recommendations: MCDAMeasure 2: sediment forebay and detention pond
Constructed wetland close to outlet including native plant stock
Reduction and development of effective impervious surfaces in the city of St Albans.
Riparian buffers
Buffer
Along sides of detention pond and constructed wetland
Increase bank stability
Habitat
Aesthetics
Recommendations: Monitoring and Maintenance
Are the improvements functioning as designed?
Future sediment removal and disposal
Testing effluent against water quality standards
Geomorphologic assessment of Rugg