STEVEN HOLL ARCHITECTS...STEVEN HOLL ARCHITECTS October 16, 2018 59’ tall lightning mast above...
Transcript of STEVEN HOLL ARCHITECTS...STEVEN HOLL ARCHITECTS October 16, 2018 59’ tall lightning mast above...
![Page 1: STEVEN HOLL ARCHITECTS...STEVEN HOLL ARCHITECTS October 16, 2018 59’ tall lightning mast above finish grade of Ginkgo Grove. 10’ tall lightning mast on existing building Gives](https://reader034.fdocuments.us/reader034/viewer/2022052501/6078cab2a20818605d7b6de1/html5/thumbnails/1.jpg)
The John F. Kennedy Center for the Performing Arts
Expansion Project
INSTALLATION OF TWO LIGHTNING MASTS
Submission to the National Capital Planning Commission
STEVEN HOLL ARCHITECTSOctober 16, 2018
![Page 2: STEVEN HOLL ARCHITECTS...STEVEN HOLL ARCHITECTS October 16, 2018 59’ tall lightning mast above finish grade of Ginkgo Grove. 10’ tall lightning mast on existing building Gives](https://reader034.fdocuments.us/reader034/viewer/2022052501/6078cab2a20818605d7b6de1/html5/thumbnails/2.jpg)
![Page 3: STEVEN HOLL ARCHITECTS...STEVEN HOLL ARCHITECTS October 16, 2018 59’ tall lightning mast above finish grade of Ginkgo Grove. 10’ tall lightning mast on existing building Gives](https://reader034.fdocuments.us/reader034/viewer/2022052501/6078cab2a20818605d7b6de1/html5/thumbnails/3.jpg)
59’ tall lightning mast above finish grade of Ginkgo Grove.
![Page 4: STEVEN HOLL ARCHITECTS...STEVEN HOLL ARCHITECTS October 16, 2018 59’ tall lightning mast above finish grade of Ginkgo Grove. 10’ tall lightning mast on existing building Gives](https://reader034.fdocuments.us/reader034/viewer/2022052501/6078cab2a20818605d7b6de1/html5/thumbnails/4.jpg)
10’ tall lightning maston existing buildingGives coverage to the Welcome Pavilion.
59’ tall lightning mast above finish grade of Ginkgo Grove.
![Page 5: STEVEN HOLL ARCHITECTS...STEVEN HOLL ARCHITECTS October 16, 2018 59’ tall lightning mast above finish grade of Ginkgo Grove. 10’ tall lightning mast on existing building Gives](https://reader034.fdocuments.us/reader034/viewer/2022052501/6078cab2a20818605d7b6de1/html5/thumbnails/5.jpg)
99’
80’
44’
29’
59’
109’
10’ tall lightning maston existing building.
59’ tall lightning mastalong I-66.
![Page 6: STEVEN HOLL ARCHITECTS...STEVEN HOLL ARCHITECTS October 16, 2018 59’ tall lightning mast above finish grade of Ginkgo Grove. 10’ tall lightning mast on existing building Gives](https://reader034.fdocuments.us/reader034/viewer/2022052501/6078cab2a20818605d7b6de1/html5/thumbnails/6.jpg)
59’ tall lightning along I-66
+29’-0” Elevation at Ginkgo Grove
![Page 7: STEVEN HOLL ARCHITECTS...STEVEN HOLL ARCHITECTS October 16, 2018 59’ tall lightning mast above finish grade of Ginkgo Grove. 10’ tall lightning mast on existing building Gives](https://reader034.fdocuments.us/reader034/viewer/2022052501/6078cab2a20818605d7b6de1/html5/thumbnails/7.jpg)
10’ tall lightning mast on existing building
![Page 8: STEVEN HOLL ARCHITECTS...STEVEN HOLL ARCHITECTS October 16, 2018 59’ tall lightning mast above finish grade of Ginkgo Grove. 10’ tall lightning mast on existing building Gives](https://reader034.fdocuments.us/reader034/viewer/2022052501/6078cab2a20818605d7b6de1/html5/thumbnails/8.jpg)
10’ tall lightning maston existing building.
NORTH ELEVATION OF EDWARD DURELL STONE BUILDING
![Page 9: STEVEN HOLL ARCHITECTS...STEVEN HOLL ARCHITECTS October 16, 2018 59’ tall lightning mast above finish grade of Ginkgo Grove. 10’ tall lightning mast on existing building Gives](https://reader034.fdocuments.us/reader034/viewer/2022052501/6078cab2a20818605d7b6de1/html5/thumbnails/9.jpg)
10’ tall lightning maston existing building.
EAST ELEVATION OF EDWARD DURELL STONE BUILDING
![Page 10: STEVEN HOLL ARCHITECTS...STEVEN HOLL ARCHITECTS October 16, 2018 59’ tall lightning mast above finish grade of Ginkgo Grove. 10’ tall lightning mast on existing building Gives](https://reader034.fdocuments.us/reader034/viewer/2022052501/6078cab2a20818605d7b6de1/html5/thumbnails/10.jpg)
![Page 11: STEVEN HOLL ARCHITECTS...STEVEN HOLL ARCHITECTS October 16, 2018 59’ tall lightning mast above finish grade of Ginkgo Grove. 10’ tall lightning mast on existing building Gives](https://reader034.fdocuments.us/reader034/viewer/2022052501/6078cab2a20818605d7b6de1/html5/thumbnails/11.jpg)
10’ tall lightning maston existing building.
59’ tall lightning mastalong I-66.
![Page 12: STEVEN HOLL ARCHITECTS...STEVEN HOLL ARCHITECTS October 16, 2018 59’ tall lightning mast above finish grade of Ginkgo Grove. 10’ tall lightning mast on existing building Gives](https://reader034.fdocuments.us/reader034/viewer/2022052501/6078cab2a20818605d7b6de1/html5/thumbnails/12.jpg)
THE LIGHTNING MAST WILL BLEND INTO EXISTING SIGNS AND LAMP POSTS ALONG I-66
![Page 13: STEVEN HOLL ARCHITECTS...STEVEN HOLL ARCHITECTS October 16, 2018 59’ tall lightning mast above finish grade of Ginkgo Grove. 10’ tall lightning mast on existing building Gives](https://reader034.fdocuments.us/reader034/viewer/2022052501/6078cab2a20818605d7b6de1/html5/thumbnails/13.jpg)
VIEWS FROM THE LINCOLN MEMORIAL