A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor
…
This LPA was adopted by Broward County and approved by FHWA
The “corridor” LPA is advancing through two separate projects:
●
●
![Page 3: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/3.jpg)
Project LimitsProject Limits
To Naples
To Naples
To Port Everglades/
Airport
To Port Everglades/
Airport
To Miami
To Miami
Project LimitsProject Limits
![Page 4: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/4.jpg)
The Planning The Planning ““Vision” for I-595Vision” for I-595
Transit Facility
Reversible Lanes
Ramp Braid
![Page 5: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/5.jpg)
Project NeedProject Need
• Broward County has been one of the fastest growing urban areas in the US
• Only east-west expressway in Broward County• Strategic Intermodal Corridor• Existing AADT >180,000 vpd• 2034 AADT >300,000 vpd
![Page 6: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/6.jpg)
• District 4 SIS – Growth Management Priority
• Truly Multi-Modal Corridor I-75 & Sawgrass Expressway I-95 & Florida’s Turnpike Fort Lauderdale-Hollywood International Airport Port Everglades Connection to Tri-Rail and Amtrak Proposed Transit Facility Broward County Greenway
Strategic Strategic Intermodal CorridorIntermodal Corridor
![Page 7: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/7.jpg)
Key ComponentsKey Components
• Transit Facility
• Highway Improvements Reversible Lanes Ramp Braids Turnpike Interchange CD (Collector-Distributor) System SR 84 Continuous Connection Auxiliary Lanes
![Page 8: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/8.jpg)
PD&E Study PD&E Study
• Unique project due to complexity and integration with other projects
• Overall project cost >$1 Billion• High profile project with interest by many
agencies, municipalities, residential communities and businesses
• Priority corridor for roadway and transit improvements
![Page 9: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/9.jpg)
The I-595 SystemThe I-595 System
ReversibleLanes
C-D System
Transit System
Davie Rd.University Dr.
Pine Island Rd.Nob Hill Rd.Hiatus Rd.
Flamingo Rd.136th Ave.
Sawgrass Mills /Bank Atlantic Center
SR 84SR 7
Florida'sTurnpike
To Downtown Ft. Lauderdale
Florida'sTurnpike
I-595 GPLanes
To Port / Airport
75
Saw
gras
s Ex
pres
sway
/ In
ters
tate
75
![Page 10: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/10.jpg)
PD&E Study Functions PD&E Study Functions & Goals& Goals
• Maintain Consistency with the LPA • Minimize overall project impacts • Develop a project that can be implemented
• Build Consensus • Maintain project schedule
•Advance corridor improvements•Phases of project funded
![Page 11: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/11.jpg)
• Priority project• High profile complex project
– Public Understanding– Design Decisions
• Early validation of project alternatives• Public expectations
Why Invest in Why Invest in 3D Visualization?3D Visualization?
![Page 12: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/12.jpg)
• Obtain (and maintain) buy-in from: Management Stakeholders Agencies Team members
Why Invest in Why Invest in 3D Visualization?3D Visualization?
![Page 13: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/13.jpg)
12-mile Corridor Focus Areas
•Cost & Schedule•Developed one section of the corridor
Different AlternativesElevated Reversible LanesTransit LocationRamp BraidsCommunity Concerns (Location, Noise, Visual)
Turnpike Interchange
Development Development of 3D Visualizationof 3D Visualization
![Page 14: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/14.jpg)
Elevated Elevated Reversible Reversible Lanes ????Lanes ????
Oh, Okay … Oh, Okay … Elevated Elevated
Reversible Reversible LanesLanes ! !
![Page 15: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/15.jpg)
What is a “Braided What is a “Braided Ramp” ??Ramp” ??
![Page 16: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/16.jpg)
No, seriously … No, seriously … what is a “Braided what is a “Braided
Ramp” ??Ramp” ??
![Page 17: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/17.jpg)
Braided RampsBraided Ramps
![Page 18: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/18.jpg)
Public HearingPublic Hearing
![Page 19: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/19.jpg)
REV
I-595 EBI-595 WB
AUX AUXGENERALPURPOSE
SR 84WB
SR 84EB
PROPOSEDTRANSIT
GENERALPURPOSE
CONCRETESIDEWALK
REV
I-595 EBI-595 WB
AUX AUXGENERALPURPOSE
SR 84WB
SR 84EB
PROPOSEDTRANSIT
GENERALPURPOSE
CONCRETESIDEWALK
Master Plan’s LPAMaster Plan’s LPA
![Page 20: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/20.jpg)
REVERSIBLE LANES
I-595 EBI-595 WB
AUX AUXGENERALPURPOSE
SR 84WB
SR 84EBGENERAL
PURPOSE
CONCRETE SIDEWALK
PROPOSEDTRANSITOR AUXLANES
PD&E PD&E Preferred AlternativePreferred Alternative
![Page 21: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/21.jpg)
The ResultsThe Results
• Improved deliverable from the PD&E process
• Better Integration of Transit Improvements
• Helped identify the best use of existing right of way for both roadway and transit
• Helped create a shared vision
• Helped “visualize” the vision
![Page 22: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/22.jpg)
The ResultsThe Results
• Gained consensus
• Project is being advanced
• Better understanding of proposed improvements
• Ownership of the PD&E alternative’s geometry = No major re-design
• Selection of THE Preferred Alternative
• BEAT the original aggressive
project schedule!
![Page 23: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/23.jpg)
Use the 3D Visualization as a Tool …
• 3D Visualization at Key Milestones
• Project Website
• Future Public Meetings
• Agency Coordination
• Value Engineering / Design Review
• Incorporate Data
(GIS, Environment, Traffic, Land Use, Public Comments)
Future Future Opportunities?Opportunities?
![Page 24: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/24.jpg)
Future Future Opportunities?Opportunities?
Develop a Project that can be Implemented • Constructability Review• Review key decisions• Facilitate a “seamless” transition to Final Design • Develop the phasing of multiple design/construction
packages• Build onto the 3D Model
• Review & evaluate constructability, compatibility and MOT between adjacent projects
![Page 25: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/25.jpg)
Steven C. Braun, P.E.Senior Project Manager
![Page 26: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/26.jpg)
![Page 27: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/27.jpg)
PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY
• Martin County MPO’s #1 Priority
• Engineering & Environmental Analysis
• New Bridge Crossing on a New Alignment
• Connecting Palm City with the City of Stuart
• Alternate Route to SR 714 & the Palm City Bridge
• Widen Existing Local Roads
• Environmental Impact Statement (EIS)
• Cost Estimate: $200 Million
![Page 28: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/28.jpg)
![Page 29: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/29.jpg)
Kanner Highway Intersection
Environmentally Sensitive Area
Palm City Bridge
Palm City Residential Community
CR 714
Indian Street
SR 714
Proposed Bridge
![Page 30: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/30.jpg)
PUBLIC INVOLVEMENT
• Community Assessment Task Team (CATT)
• Agency & Stakeholder Workshops
• Continuous Public Involvement
• Exchange Information Build Consensus
• Community Characteristics Inventory & Database
![Page 31: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/31.jpg)
CATT MEETINGS WITH STAKEHOLER GROUPS
Regulatory Agencies Community Associations Local Government Community Services Emergency Services
![Page 32: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/32.jpg)
![Page 33: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/33.jpg)
3D VISUALIZATION
Justification Public Interest and Expectations
• Participation in the process
• Understand the alignment alternatives
• Martin County MPO’s #1 Priority
3D Model = Database
• Design / Permitting
• Construction
![Page 34: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/34.jpg)
3D VISUALIZATION
Implementation “In-house” Project “Hybrid” Project
Consultant Support
District 4 Commitment
• Management Support
• High Profile Project
• Understanding of the Benefits
![Page 35: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/35.jpg)
3D VISUALIZATION
Development 4-mile Corridor
Key Areas to Reference (“Landmarks”)
Different Alternatives
Grade Separation
“Phased Development” for the Public
![Page 36: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/36.jpg)
Interactive Stations:• Typical Sections• Alignment Alternatives• Evaluation Matrices• 3D Visualization
PUBLIC WORKSHOPS
![Page 37: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/37.jpg)
3D Visualization …Allowed people to have a better understanding of the project, visualize the alternatives & make constructive comments.
PUBLIC WORKSHOPS
![Page 38: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/38.jpg)
Please show me the Please show me the difference between difference between the alternatives…the alternatives…
![Page 39: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/39.jpg)
ALIGNMENT ALTERNATIVES
![Page 40: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/40.jpg)
Alternative 2A
![Page 41: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/41.jpg)
Alternative 2B
![Page 42: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/42.jpg)
Alternative 2C
![Page 43: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/43.jpg)
![Page 44: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/44.jpg)
![Page 45: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/45.jpg)
![Page 46: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/46.jpg)
What is a What is a ““Grade Grade
Separation” ??Separation” ??
![Page 47: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/47.jpg)
![Page 48: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/48.jpg)
What will the What will the intersection intersection look like??look like??
![Page 49: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/49.jpg)
![Page 50: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/50.jpg)
What is the What is the bridge going to bridge going to
look like from my look like from my patio??patio??
![Page 51: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/51.jpg)
PUBLIC HEARING
870 Attendees …
… 1600 comments received within the Public Hearing comment period
![Page 52: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/52.jpg)
• Open Workshop• 3D Visualization • Video Presentation
PUBLIC HEARING
![Page 53: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/53.jpg)
This was worth This was worth the the investmentinvestment, , good job CATTgood job CATT!!
![Page 54: Steven C. Braun, P.E. Senior Project Manager](https://reader036.fdocuments.us/reader036/viewer/2022062807/568150c4550346895dbee3cb/html5/thumbnails/54.jpg)
Thank You