Steven C. Braun, P.E.Steven C. Braun, P.E.Senior Project ManagerSenior Project Manager
A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor
…
This LPA was adopted by Broward County and approved by FHWA
The “corridor” LPA is advancing through two separate projects:
●
●
Project LimitsProject Limits
To Naples
To Naples
To Port Everglades/
Airport
To Port Everglades/
Airport
To Miami
To Miami
Project LimitsProject Limits
The Planning The Planning ““Vision” for I-595Vision” for I-595
Transit Facility
Reversible Lanes
Ramp Braid
Project NeedProject Need
• Broward County has been one of the fastest growing urban areas in the US
• Only east-west expressway in Broward County• Strategic Intermodal Corridor• Existing AADT >180,000 vpd• 2034 AADT >300,000 vpd
• District 4 SIS – Growth Management Priority
• Truly Multi-Modal Corridor I-75 & Sawgrass Expressway I-95 & Florida’s Turnpike Fort Lauderdale-Hollywood International Airport Port Everglades Connection to Tri-Rail and Amtrak Proposed Transit Facility Broward County Greenway
Strategic Strategic Intermodal CorridorIntermodal Corridor
Key ComponentsKey Components
• Transit Facility
• Highway Improvements Reversible Lanes Ramp Braids Turnpike Interchange CD (Collector-Distributor) System SR 84 Continuous Connection Auxiliary Lanes
PD&E Study PD&E Study
• Unique project due to complexity and integration with other projects
• Overall project cost >$1 Billion• High profile project with interest by many
agencies, municipalities, residential communities and businesses
• Priority corridor for roadway and transit improvements
The I-595 SystemThe I-595 System
ReversibleLanes
C-D System
Transit System
Davie Rd.University Dr.
Pine Island Rd.Nob Hill Rd.Hiatus Rd.
Flamingo Rd.136th Ave.
Sawgrass Mills /Bank Atlantic Center
SR 84SR 7
Florida'sTurnpike
To Downtown Ft. Lauderdale
Florida'sTurnpike
I-595 GPLanes
To Port / Airport
75
Saw
gras
s Ex
pres
sway
/ In
ters
tate
75
PD&E Study Functions PD&E Study Functions & Goals& Goals
• Maintain Consistency with the LPA • Minimize overall project impacts • Develop a project that can be implemented
• Build Consensus • Maintain project schedule
•Advance corridor improvements•Phases of project funded
• Priority project• High profile complex project
– Public Understanding– Design Decisions
• Early validation of project alternatives• Public expectations
Why Invest in Why Invest in 3D Visualization?3D Visualization?
• Obtain (and maintain) buy-in from: Management Stakeholders Agencies Team members
Why Invest in Why Invest in 3D Visualization?3D Visualization?
12-mile Corridor Focus Areas
•Cost & Schedule•Developed one section of the corridor
Different AlternativesElevated Reversible LanesTransit LocationRamp BraidsCommunity Concerns (Location, Noise, Visual)
Turnpike Interchange
Development Development of 3D Visualizationof 3D Visualization
Elevated Elevated Reversible Reversible Lanes ????Lanes ????
Oh, Okay … Oh, Okay … Elevated Elevated
Reversible Reversible LanesLanes ! !
What is a “Braided What is a “Braided Ramp” ??Ramp” ??
No, seriously … No, seriously … what is a “Braided what is a “Braided
Ramp” ??Ramp” ??
Braided RampsBraided Ramps
Public HearingPublic Hearing
REV
I-595 EBI-595 WB
AUX AUXGENERALPURPOSE
SR 84WB
SR 84EB
PROPOSEDTRANSIT
GENERALPURPOSE
CONCRETESIDEWALK
REV
I-595 EBI-595 WB
AUX AUXGENERALPURPOSE
SR 84WB
SR 84EB
PROPOSEDTRANSIT
GENERALPURPOSE
CONCRETESIDEWALK
Master Plan’s LPAMaster Plan’s LPA
REVERSIBLE LANES
I-595 EBI-595 WB
AUX AUXGENERALPURPOSE
SR 84WB
SR 84EBGENERAL
PURPOSE
CONCRETE SIDEWALK
PROPOSEDTRANSITOR AUXLANES
PD&E PD&E Preferred AlternativePreferred Alternative
The ResultsThe Results
• Improved deliverable from the PD&E process
• Better Integration of Transit Improvements
• Helped identify the best use of existing right of way for both roadway and transit
• Helped create a shared vision
• Helped “visualize” the vision
The ResultsThe Results
• Gained consensus
• Project is being advanced
• Better understanding of proposed improvements
• Ownership of the PD&E alternative’s geometry = No major re-design
• Selection of THE Preferred Alternative
• BEAT the original aggressive
project schedule!
Use the 3D Visualization as a Tool …
• 3D Visualization at Key Milestones
• Project Website
• Future Public Meetings
• Agency Coordination
• Value Engineering / Design Review
• Incorporate Data
(GIS, Environment, Traffic, Land Use, Public Comments)
Future Future Opportunities?Opportunities?
Future Future Opportunities?Opportunities?
Develop a Project that can be Implemented • Constructability Review• Review key decisions• Facilitate a “seamless” transition to Final Design • Develop the phasing of multiple design/construction
packages• Build onto the 3D Model
• Review & evaluate constructability, compatibility and MOT between adjacent projects
Steven C. Braun, P.E.Senior Project Manager
PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY
• Martin County MPO’s #1 Priority
• Engineering & Environmental Analysis
• New Bridge Crossing on a New Alignment
• Connecting Palm City with the City of Stuart
• Alternate Route to SR 714 & the Palm City Bridge
• Widen Existing Local Roads
• Environmental Impact Statement (EIS)
• Cost Estimate: $200 Million
Kanner Highway Intersection
Environmentally Sensitive Area
Palm City Bridge
Palm City Residential Community
CR 714
Indian Street
SR 714
Proposed Bridge
PUBLIC INVOLVEMENT
• Community Assessment Task Team (CATT)
• Agency & Stakeholder Workshops
• Continuous Public Involvement
• Exchange Information Build Consensus
• Community Characteristics Inventory & Database
CATT MEETINGS WITH STAKEHOLER GROUPS
Regulatory Agencies Community Associations Local Government Community Services Emergency Services
3D VISUALIZATION
Justification Public Interest and Expectations
• Participation in the process
• Understand the alignment alternatives
• Martin County MPO’s #1 Priority
3D Model = Database
• Design / Permitting
• Construction
3D VISUALIZATION
Implementation “In-house” Project “Hybrid” Project
Consultant Support
District 4 Commitment
• Management Support
• High Profile Project
• Understanding of the Benefits
3D VISUALIZATION
Development 4-mile Corridor
Key Areas to Reference (“Landmarks”)
Different Alternatives
Grade Separation
“Phased Development” for the Public
Interactive Stations:• Typical Sections• Alignment Alternatives• Evaluation Matrices• 3D Visualization
PUBLIC WORKSHOPS
3D Visualization …Allowed people to have a better understanding of the project, visualize the alternatives & make constructive comments.
PUBLIC WORKSHOPS
Please show me the Please show me the difference between difference between the alternatives…the alternatives…
ALIGNMENT ALTERNATIVES
Alternative 2A
Alternative 2B
Alternative 2C
What is a What is a ““Grade Grade
Separation” ??Separation” ??
What will the What will the intersection intersection look like??look like??
What is the What is the bridge going to bridge going to
look like from my look like from my patio??patio??
PUBLIC HEARING
870 Attendees …
… 1600 comments received within the Public Hearing comment period
• Open Workshop• 3D Visualization • Video Presentation
PUBLIC HEARING
This was worth This was worth the the investmentinvestment, , good job CATTgood job CATT!!