[email protected] Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss...

40
[email protected] v Josh Stein 10.31. 07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls CAM/TL Bill Berg ANL/APS Diagnostics Group Arturo Alarcon SLAC Controls
  • date post

    21-Dec-2015
  • Category

    Documents

  • view

    222
  • download

    4

Transcript of [email protected] Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss...

Page 1: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

LCLS Undulator SystemsBeam Loss Monitor Control Interface

Josh Stein LCLS Undulator Controls CAM/TL

Bill Berg ANL/APS Diagnostics Group

Arturo Alarcon SLAC Controls

Page 2: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

Undulator Protection Requirements

Inputs to inhibit the e-beamPrimary protection from a number of Beam Loss Monitors (BLMs) along the undulatorSecondary protection from control system monitoring of

BPM orbitMagnet power supply statusMagnet mover status

Long-term monitoring of the radiation doseDosimeters attached to the magnets

Page 3: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

BLM Specification

A single BLM will be placed in each of the gaps between undulator modules.

Design is to maximize the sensitivity of the monitorLocated as close as possible to the beam axis as the vacuum chamber allows

Choose a sensitive Cerenkov medium coupled to a high gain photomultiplier tube

The detector will not be segmented to provide transverse position information of the losses

Page 4: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

BLM Rolls Out with Undulator Magnet

The BLM is mounted to tightly surround the vacuum pipe near the beam finder wire

It is on a linear slide so that it can be moved off the beam when the undulator magnet is rolled out

An detachable arm makes the BLM and magnet roll out together

The BLM will automatically be less sensitive to beam loss when the undulator is in the out position

The BLM can be manually inserted on the beam pipe for special calibration procedures

Page 5: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

BLM reliability and self test

Each loss monitor is equipped with a LED that flashes between beam pulses.

Provides a pre-beam test of the BLM system before beam is sent through the undulator

Provides a stay-alive signal for the control system to monitor the BLM system during operation

Page 6: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

BLM dynamic range

For simplicity and cost the BLM will be optimized for maximum sensitivity And allowed to saturate the signal if a large loss occurs

The trip threshold is still exceeded if the device saturates so the MPS will still trip and protect the undulatorMonitoring of the loss signal to integrate the dose received by the undulator will not be valid if the device saturatesHowever, if large losses are anticipated such as when the beam finder wires are inserted, the gain of the PMT will be reduced to prevent saturation.

Page 7: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

BLM Signal Monitoring

The BLM has a fast, dedicated link to the MPS to shutoff the beam within 1 pulseThe local MPS link node chassis also has a ‘slow’ network connection to the control system via channel access

Allows monitoring of the BLM level at any timeReads back and controls the PMT voltageControls the LED test pulseControls the threshold set point for MPS trips

Page 8: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

BLM Controls Architecture pk

The BLM PMT interfaces to the MPS link node chassis.

The IO board of the MPS link node chassis provides the ADC & DAC for the PMT.

A cable interface box is the treaty point between the MPS and the undulator BLM.

There are 5 link node chasses serving up to 8 BLMs along the undulator. (expandable to 16 channels)

Page 9: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

Beam Loss Monitors with Link Nodes

Use Link Node tosupport analog I/O IndustryPack modules

provide analog readouts to control system

set threshold levels

control HV power supplies

control LED Pulser

Page 10: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

Undulator Hardware

LINKNODE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

LINKNODE

LINKNODE

LINKNODE

LINKNODE

SparesSpares

Page 11: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

Beam Loss Monitors using Link Nodes

Page 12: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

Beam Loss Monitor - Undulator Hardware (m. brown)

In Undulator Hall

Long Haul Cables

Power

ControlSystem

MPSNetwork

HVPS CONTROL

LED PULSER AMPL.

( IP DAC )

HVPS READ BACK

( IP ADC )

CUSTOM

GATED INTEGRATOR

( IP )

LED PULSER BOARD

HV POWER SUPPLY

PMT&

BASE

LED

FIBER

ColdFire

FPGA

I/O

TRIGGER

119 MHz + FIDUCIAL

*

LINK NODE CHASSIS

AC POWER

UndulatorBeam Loss

Detector(8)

888

Timing Fanout

Timing Distribution

*

MPSLINK

*Fiber

Page 13: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

BLM Interconnect Diagram m. brown

Page 14: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

Future expansion

The link node chassis can handle more than the present number of installed BLMs

During commissioning a long fiber BLM will also be tested

It is compatible with the link node chassis controls

Page 15: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

BLM System Support Focus Topics1. Assignment of Eric Norum to controls design oversight and testing.

2. Funding of beam based prototyping and test program.

3. Group Leaders to significantly step up direct involvement in system oversight, program implementation, and schedule tracking (controls: n. arnold, diag: g. decker, lcls: g. pile, ops/analysis: m. borland).

4. Active participation in simulations and simulation priority from slac.

5. Implementation of upstream profile monitor (halo or at min. cal foil).

6. Adequate analysis and shielding of upstream beam dump.

7. Develop long term collaboration plan for the pursuit of determining magnet damage mechanisms and thresholds via empirical methods.

8. Determine need and priority of BLM signal integration (diagnostic).

Page 16: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

Summary

Undulator magnets protection is critical for machine commissioning period.

Schedule for development of the blm program is very aggressive and Funding is limited.

System design and fabrication must go in parallel with simulation and testing program.

Consider Minimum requirements for first level implementation. Taking advantage of existing mps infrastructure.

BLM system is now defined as a component of the mps with an upgrade path to a diagnostic (low gain detection).

36 distributed channels (2 static devices) capable of single pulse detection and rate limiting reaction.

Detectors track with undulator position with detach option for manual operation.

Calibration plan and hardware is vital to proper system operation (Threshold detection with empirically derived levels).

Page 17: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

End of Presentation

Page 18: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

Supporting slides

Page 19: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

Segment Design Layout m. brown

Page 20: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

Interface Box Location

Page 21: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

Plan View of Short Drift

Page 22: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

BFW Pump Out Port Relocation

Page 23: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

Removable Pin for Manual Insertion

Page 24: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

Undulator Retracted Position

Page 25: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

Undulator Inserted Position

Page 26: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

Rendering of Detector

Page 27: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

Cross Section of BLM Detector

Page 28: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

Proposed PMT Device (420nm)

Page 29: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

Proposed PIC / BLM Timing

PIC TIMINGFIDUCIAL

or Trigger near Fiducial time

INTEGRATIONWINDOW = 2.5 mSec

2.5 mSec

BLM TIMING

FIDUCIAL FIDUCIAL

INTEGRATIONWINDOW = 20uSec

1020 uSecDELAY = 1020 uSec

DELAY = 0

The proposed trigger timing for the BLM and PIC Systems will be derived from 119MHz with Fiducial ( i .e.nomial Fido signal )

FIDUCIAL119 MHz

The MPS Link chassis will receive this signal on a trigger input and will output a trigger for the BLM or PIC IP Modules .

FIDUCIALor Trigger near Fiducial time

Page 30: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

Link Node Block Diagram

ColdfireComputer

( RTEMS /EPICS )

FPGAVitrex -4

XC4VFX20

Interface Transceivers

MPS Fiber Link

SFP

Gereral-Purpose TTL I /O

Output Ifc Bd(Opto -Isolators )

MPS Link Node – Functional Block Diagram

Ethernet

MPS Devices

Fault

Inputs(96)

Mitigation Device Outputs

(8)

Industry PackInterface

Industry PackModule 1

SignalCond Board

Industry PackModule 2

SignalCond Board

GPIO for status , ctrl , etc .( Unused Trigger I /O signals)

Industry PackModule 3

SignalCond Board

Industry PackModule 4

SignalCond Board

Input Ifc Bd 6(Opto -Isolators )

Input Ifc Bd 1(Opto -Isolators )

Trigger I /O

USB Ifc

4

4

Trigger I /O can be configured as

needed

From EVR

To other devices

PC Laptop

Local Debug Port

Node Address Switches

Page 31: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

MPS Overview (m. brown)

Page 32: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

( )( )1

1122

cos

sinsin

βω

φφγ

−×

×−×=

A

rr

System Roll

Page 33: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

Introduction• Physics Requirements Document: Heinz-Dieter Nuhn 9-28-07

(prd: 1.4-005-r0 undulator beam loss monitor).

• Scope Reduction: diagnostic to mps detector. • Purpose and Requirements.

• Budget: M&S 500k (325 detector ctls/mps 175).

• Schedule: (design: n-m, test: f-m, fab: m-j, inst: july).

• Organization: 4 groups.

• Group Definition: controls, detector, simulation, test & calibration.

• Design Highlights and System overview (detectors: dynamic 33, static: 2, r&d fiber:1).

• Detector design details and focus topics.

• Funds are limited and efforts need to be focused to minimize costs (h-dn).

• Simulation of losses and damage in the undulator will proceed in parallel with the present effort (pk).

Page 34: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

BLM Purpose h-dn

The BLM will be used for two purposes:

A: Inhibit bunches following an “above-threshold” radiation event.

B: Keep track of the accumulated exposure of the magnets in each undulator.

Purpose A is of highest priority. It will be integrated into the Machine Protection System (MPS) and requires only limited dynamic range from the detectors.

Purpose B is also desirable for understanding long-term magnet damage in combination with the undulator exchange program but requires a large dynamic range for the radiation detector (order 106 ) and much more sophisticated diagnostics hard and software.

The BLM will be used for two purposes:

A: Inhibit bunches following an “above-threshold” radiation event.

B: Keep track of the accumulated exposure of the magnets in each undulator.

Purpose A is of highest priority. It will be integrated into the Machine Protection System (MPS) and requires only limited dynamic range from the detectors.

Purpose B is also desirable for understanding long-term magnet damage in combination with the undulator exchange program but requires a large dynamic range for the radiation detector (order 106 ) and much more sophisticated diagnostics hard and software.

Page 35: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

BLM requirements pk

Primary function of the BLM is to indicate to the MPS if losses exceed preset thresholds.

MPS processor will rate limit the beam according to which threshold was exceeded and what the current beam rate is.

The thresholds will be empirically determined by inserting a thin obstruction upstream of the undulator.

Simulation of losses and damage in the undulator will proceed in parallel with the present effort.

Page 36: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

Draft Budget Breakdown

500k M&S Total325k Detector Development25k Interface Box150k Control and MPS integration

25k link node chassis 25k long haul cables 50k davis bacon labor 15k ctl modules and signal conditioning electronics 25k clean power distribution 10k racks

Page 37: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

Draft scheduledetector nov dec jan feb march april may june july aug septdetector design prototype x xprototype fabrication x x xprototype testing (beam) x xdetector design lock xdetector fabrication x xdetector assembly xship to slac xinstallation x x

interface boxprototype xtesting x xdesign lock x

custom control/sc boardsckt brd prototype design x xckt brd prototype fabrication x xcontrol/sc prototype test xcontrol/sc proto test (beam) x xdesign lock xfabrication x xsystem build xinstallation x x

mps and infrastructurecable plant (utility bldg) xcable plant (tunnel) xrack power xtunnel racks xmps system x x

calibration planstart xfinish x

simulation (ongoing effort)

Page 38: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

LCLS MPS Beam Loss Monitor

System Engineer: W. Berg

Cost Account Manager: G. Pile Technical Manager: D. Walters

Scientific advisor: P. Krejcik* FEL Physics: H. Nuhn* Scientific advisor: B. Yang FEL Physics: P. Emma*

Controls/MPS Group Lead (ctls) : J. Stein Lead (mps): A. Alacron*

Detector Group

Lead: W. Berg

Simulations and analysis Group

Lead: M. White

Testing and Calibration Group

Lead: B. Yang

M. Brown *R. Diviero E. NorumS. Norum *B. LairdJ. Dusatko*

A. BrillL. ErwinR. KeithleyJ. Morgan

J. DoolingB. Yang

W. BergJ. Bailey J. DoolingL. MoogE. NorumM. White

* Slac employee

Page 39: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

MPS Beam Loss Monitor Group Functions

Controls Group: J stein, A. Alacron

Develop BLM control and mps system:Interface Box and Control

PMT Signal conditioning

Control and user displays

Detector Group: W. Berg

Develop Detector and Interface.

Simulations and Analysis Group: M. White

Provide collaborative blm simulation support and test analysis.

Test and Calibration Group: B. Yang

Provide beam based hardware testing programs and calibration plan.

Page 40: Stein@aps.anl.gov Josh Stein 10.31.07 Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.

[email protected]

Josh Stein10.31.07

Beam Loss Monitor Control

Design Highlights33 distributed detectors (one preceding each undulator segment), two static units (up and downstream of undulator hall).

One additional channel reserved for r&d fiber based system.

Dynamic detector, 100mm stroke (tracks undulator) with undulator position detection (in/out) for adjusting mps threshold levels.

Large area sensor (full horizontal width of top and bottom magnet blocks).

Manual insertion option via detachable arm for special calibration and monitoring.

Fiber out for low gain upgrade (full integration and dyn range diagnostic) system expandable to 80 channels.

Calibrated using upstream reference foil (initial use of simulation based levels).

MPS threshold detection and beam rate limiting.

Heart beat led pulser for system validation before each pulse up to full rep rate (pseudo calibration).

Remote sensitivity adjust (dynamic range) by epics controlled pmt dc power supply (600-1200Vdc out).

Single pulse detection, level measurement, and mps action at max rep rate via dedicated mps link.

Radiation hard detector (materials and electronics).

Monitoring live single shot signal levels (dedicated) and recording of integrated values to one second.