Steering Committee February 11, 2019
![Page 2: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/2.jpg)
Partners
![Page 3: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/3.jpg)
Project Benefits30-minute congestion-proof trip from
Bridgeport to PortlandServes a two-way commute
3
![Page 4: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/4.jpg)
Project Benefits
4
43,000 rides on the line on an average weekday in 2035
1 in 5 commuters on MAX going southbound from downtown during 2035 PM rush hour
![Page 5: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/5.jpg)
SW Equitable Development Strategy (SWEDS)• Ensure opportunities for all current
and future SW Corridor residents• Housing• Workforce development• Business stabilization
• Collaboration with public, private, and non-profit partners
• Pilot programs• Identify pre-light rail investments
![Page 6: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/6.jpg)
6
![Page 7: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/7.jpg)
7
![Page 8: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/8.jpg)
Steering Committee
PMG (executive)
PTL (manager)
Technical staff
CAC and other
community engagement
Decision-making
![Page 9: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/9.jpg)
Near-term design topics
9
Feb Mar Apr May JuneCrossroads routeBonita to Bridgeport routeMarquam Hill Connector type
Park & RidesStation areas
![Page 10: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/10.jpg)
Project Development
10
• Respond to issues in DEIS; define mitigation in FEIS
• Refine project scope, cost• Secure 30% of local funding• Advance design to 30%
Develop designs
Technical review and
cost estimates
Community feedback
2019-2020
![Page 11: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/11.jpg)
Engineering
11
• Advance design to 100%• Secure permits• Begin property acquisition,
early construction
Develop designs
Technical review and
cost estimates
Community feedback
2021-2022
![Page 12: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/12.jpg)
Construction, startup
12
• Full Funding Grant Agreement (FFGA) from Federal Transit Administration (FTA)
• Construction and mitigation• Testing and training
Develop designs
Technical review and
cost estimates
Community feedback
2023-2027
![Page 13: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/13.jpg)
Finance
13
Regional funds for project development• Partner contributions• Regional transportation funding
measure: November 2020
• Federal Transit Administration (FTA) New Starts grant program
![Page 14: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/14.jpg)
Design Team: SWTPSW Transit Partners: AECOM, David Evans & Associates, Parametrix
Akana* Barsum Consulting*Brightside Engagement*CH2MDKS AssociatesDonaldson Enterprises*Elcon Associates*Epic Land Solution, Inc*Faithful+GouldGlobal Signals Group
14
Global Transportation Engineering*IML Services*LTK Engineering ServicesLife Simplified*Maintenance Design Group/HDR*Ott-Sakai & Associates*Shannon and WilsonTriunity Engineering & Management*
* DBE, MBE, and/or WBE
![Page 15: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/15.jpg)
Design Team: UDIGUrban Design Integration Group: ZGF, VIA, Mayer-Reed
2. Ink studio*ALTA Planning & DesignArchitectural ApplicationsCarleton HartCascadia Partners**Consult: Ron Stewart**DAO Architecture*Donaldson Enterprises*ECONorthwestFehr & Peers
15
GreenworksHolst Architects*Larco/Knudsen**Merryman Barnes Arch*Marianne Zarkin LA*NNA LA*Pacific HabitatWinterbrook Planning*** DBE, MBE, and/or WBE** ESB
![Page 16: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/16.jpg)
Crossroads
![Page 17: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/17.jpg)
LPA• Steering Committee
directed more study of Refinement 2 and Alternative B2 prior to the FEIS
• CAC also recommended a third idea
17
![Page 18: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/18.jpg)
Community Engagement• Letter to 60
property owners
• Three meetings attended by 190 people
• 125 comments by email
18
![Page 19: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/19.jpg)
October optionsAlternative B2 from Steering Committee
Smith Modified developed by staff
Collins developed by staff
Refinement 2 from Steering Committee
Smith from neighbor suggestion
![Page 20: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/20.jpg)
December options
Alternative B2
Collins
B2 – station near pedestrian bridgeB2 – station near Barbur*
Collins – station on CollinsCollins – station on Collins w/buses*Collins – station on Barbur*
* New variations
![Page 21: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/21.jpg)
B2 / Collins Comparison
![Page 22: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/22.jpg)
Collins
![Page 23: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/23.jpg)
B2
![Page 24: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/24.jpg)
Route preference• Support for B2• Concerns about Collins: impacts to Woods
Creek, park, businesses and homesCrossroads area• Concern about traffic congestion• Desire for safe, comfortable walking and
biking; easy access between MAX, bus, Park & Ride
What we heard
![Page 25: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/25.jpg)
New information• No significant cost difference between
Collins and B2• Support column for lower-cost I-5
bridge would trigger additional impacts• Complexity of utility conflicts via Collins
![Page 26: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/26.jpg)
Bonita to Bridgeport
![Page 27: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/27.jpg)
Locally Preferred Alternative (LPA) route between Bonita and Bridgeport
• Draft Environmental Impact Statement (DEIS) identified significant traffic issues at Upper Boones Ferry Rd at-grade crossing
• DEIS received hundreds of comments advocating against Village Inn displacement at Bridgeport station
![Page 28: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/28.jpg)
Community Engagement• Letter to 70
property owners
• Meeting attended by 60 people
28
![Page 29: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/29.jpg)
Locally Preferred Alternative (LPA) selected by Steering Committee
74th Ave.
Bonita Rd.
BRIDGEPORT VILLAGE
Bonita Station
Upper Boones Ferry
Station
Bridgeport Station
Interstate 5
Durham
72nd Ave.72nd Ave.
NORTH
Elevated StructureImpact/Concern
![Page 30: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/30.jpg)
2019 Design Exploration: LPA Elevated Route
74th Ave.
Bonita Rd.
BRIDGEPORT VILLAGE
Bonita Station
Upper Boones Ferry Station?
Bridgeport Station
Interstate 5
Durham
72nd Ave.72nd Ave.
CONCERNS• Long structure and
property impacts, including Fought Steel
• Elevated alignment carries high cost
• Calls into question Upper Boones Ferry Station, which has very low projected ridership
NORTH
Elevated Structure
![Page 31: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/31.jpg)
2019 Design Exploration: 74th Ave Route
74th Ave.
Bonita Rd.
BRIDGEPORT VILLAGE
Bonita Station
Bridgeport Station
Interstate 5
Durham
72nd Ave.72nd Ave.
CONCERNS• Property and
employment impacts• Calls into question
Upper Boones Ferry Station, which has very low projected ridership
74th
NORTH
Elevated Structure
More alternatives being explored
![Page 32: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/32.jpg)
Via LPA Route: Bridgeport Station east of 72nd Ave2018 DEIS layout
72nd Ave.
Retail
Village Inn
AB
MAX StationBus Hub
Park & Ride (P&R)Mobility Plaza
CD
A
B
E
BRIDGEPORT VILLAGE
Signalized IntersectionImpact or Concern
• Station adjacent to bus hub
• Park & Ride south of Bridgeport Rd, with pedestrian bridge
• Impact to Village Inn
CD
NORTH
Pedestrian BridgeTransit Oriented Development (TOD)
EF
Retail
![Page 33: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/33.jpg)
• Station adjacent to bus hub
• Park & Ride south of Bridgeport Rd, with pedestrian bridge
• Impact to retail site• Potential bus/auto
traffic conflict• Potential
redevelopment
72nd Ave.
Retail
AB
MAX StationBus Hub
Park & Ride (P&R)Mobility Plaza
CD
AB
E
BRIDGEPORT VILLAGE
Signalized Intersection
CD
NORTH
Pedestrian BridgeTransit Oriented Development (TOD)
EF
Via LPA Route: Bridgeport Station east of 72nd Ave2019 concept B
F
Village Inn
![Page 34: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/34.jpg)
72nd Ave.
AB
MAX StationBus Hub
Park & Ride (P&R)Mobility Plaza
CD
AB
BRIDGEPORT VILLAGE
Signalized Intersection
F
D
NORTH
Pedestrian BridgeTransit Oriented Development (TOD)
EF
F
Via LPA Route: Bridgeport Station east of 72nd Ave2019 concept C
Village Inn
FC
F
• Station adjacent to bus hub and Park & Ride
• More impacts retail site
• Potential bus/auto traffic conflict
• Potential redevelopment
![Page 35: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/35.jpg)
• Station adjacent to bus hub
• Park & Ride across 72nd Ave, east of Village Inn
• Impact to flex‐office site
• At‐grade crossing of Durham Rd
• Potential bus/auto traffic conflict
• Potential redevelopment
72nd Ave.
Retail
AB
MAX StationBus Hub
Park & Ride (P&R)Mobility Plaza
CD
AB
BRIDGEPORT VILLAGE
Signalized Intersection
C
D
NORTH
Pedestrian BridgeTransit Oriented Development (TOD)
EF
Village Inn
F
Via 74th Ave route: Bridgeport Station west of 72nd Ave2019 concept D
F
Connection to Neighborhood south of Upper Boones Ferry Rd.
![Page 36: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/36.jpg)
What we heard• Concerns from potentially
impacted property owners• Concerns about pedestrian
access, safety• Preference to avoid at-grade
crossings; concerns about traffic • Preference for consolidated
station, bus hub, Park & Ride
![Page 37: Steering Committee February 11, - TriMet](https://reader034.fdocuments.us/reader034/viewer/2022051420/627e40478a91d4222a6a80d1/html5/thumbnails/37.jpg)
Steering CommitteeMarch 119 a.m.Tigard City Hall
CACMarch 76 p.m.Girl Scouts
Bonita to BridgeportFeb 216 p.m.Tigard Library
MarquamHill ConnectorFeb 134 p.m.OHSU
trimet.org/swcorridor