![Page 1: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/1.jpg)
Stay Cable Replacement of the Luling Bridge
2009 Louisiana Transportation Engineering ConferenceFebruary 8-11, 2009, Baton Rouge, LA
Armin Mehrabi, Bridge Engineering Solutions, PC
![Page 2: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/2.jpg)
![Page 3: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/3.jpg)
![Page 4: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/4.jpg)
Lower Anchorage
![Page 5: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/5.jpg)
Upper Anchorage
![Page 6: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/6.jpg)
Stay Cables
![Page 7: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/7.jpg)
Statement of Problem
Rusting and water leakage in anchorage zonesCracking/splitting of cable cover pipesSigns of compromise in cables safetyIn 2002, LADOTD initiated a project for Structural Evaluation of the Stay Cables
![Page 8: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/8.jpg)
Three Phases of Investigation
Phase I: Assessing extent of problems and the overall integrity check Phase II: Hands-on inspection of the suspect locations and critical elementsPhase III: Detailed design of repairs
![Page 9: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/9.jpg)
Phase II- Inspection
![Page 10: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/10.jpg)
Inspection of Deck Anchorage Boxes
![Page 11: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/11.jpg)
Source of Problem
![Page 12: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/12.jpg)
Cable Free Length Inspection
![Page 13: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/13.jpg)
Cable Free Length Inspection
Hands-on inspection and Tap Testing
![Page 14: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/14.jpg)
Cable Free Length Inspection
Thermography
![Page 15: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/15.jpg)
Damages to Anchorage Zone
Missing or broken seals Broken transition joints Open grout portsCorrosion of sockets and wires
![Page 16: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/16.jpg)
Damages to Cable Free LengthDamages to UV protection tape Grout voids & delamination Bulges and holes in the PE Longitudinal & transverse splits in PEPE joint separationsFailure of previous repairsExposure & degradation of grout fillerExposure & corrosion of steel wires
![Page 17: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/17.jpg)
Inspection findingsDamage Severity Levels
Severity Level Status Description
1 Satisfactory Minor deterioration and anomalies noted
2 Poor Deterioration of the protective elements and potential for degradation. Cables with this level of damages need to be routinely monitored and corrective action needs to be planned.
3 Critical Deterioration or potential for deterioration of the main tension elements (steel wires) exists. Action (repair) is necessary. Cables with this level of damages shall be closely monitored until repairs are applied.
![Page 18: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/18.jpg)
Severity Level 3, Exposed Grout and Steel Wires, Heavy Rust
![Page 19: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/19.jpg)
Summary
40 out of 72 cables are rated critical All cables have at least damage Level 2Damage causes still presentIncreasing rate of deterioration is evidentTimely corrective action is needed
![Page 20: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/20.jpg)
Decision MakingLife Cycle Cost Analysis
Define planning horizonDefine repair strategiesEstimate costs for strategiesCalculate present valuesSelect preferred strategy
![Page 21: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/21.jpg)
Repair/Replacement Strategies
Base CaseRepair allRepair-Replace 1Repair-Replace 2Replace all
![Page 22: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/22.jpg)
Cost Structure
Initial CostsDistributed Annual CostsPeriodic Repair CostsVulnerability Costs
Agency CostsUsers’ Costs
![Page 23: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/23.jpg)
Comparison among Cost of Various Strategies
0.7
6.4
10.1
14.0
19.0
0
5
10
15
20
25
30
35
40
Base Case Repair all Repair-Replace 1 Repair-Replace 2 Replace all
Pres
ent V
alue
($ M
illio
ns) Initial Cost
![Page 24: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/24.jpg)
Comparison among Cost of Various Strategies
35.9
20.2 19.8 20.5 19.9
0
5
10
15
20
25
30
35
40
Base Case Repair all Repair-Replace 1 Repair-Replace 2 Replace all
Pres
ent V
alue
($ M
illio
ns) Initi. + dis. + Per. + Vuln. Costs
![Page 25: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/25.jpg)
Phase III
Additional InspectionCable Replacement Design
![Page 26: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/26.jpg)
Cable Replacement Design Team
Client: Louisiana Department of Transportation and Development (LADOTD), Paul Fossier, Project Manager,
Prime Consultant: CTLGroupProject Manager: Armin Mehrabi, Bridge Engineering SolutionsCable replacement design: International Bridge Technologies, Inc.Deck repair design: TranSystemsMOT, Survey & Plans: ABMB Engineers, Inc.
![Page 27: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/27.jpg)
Cable Replacement Design
Develop a cost effective design that requires minimal engineering by contractors.Minimize impact on traffic and Maintenance of Traffic (MOT).Analyze for live load, wind force, and construction load effects.
Objectives:
![Page 28: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/28.jpg)
Assess current conditions
Existing Cable ForcesGeometry SurveySuperstructure Inspection
![Page 29: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/29.jpg)
Replacement Cable DesignCable systems consideredParallel strand system
Parallel wire system
![Page 30: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/30.jpg)
Replacement cable designParallel strand, preferred systemAvailability in the US Used in most new bridge constructionsEase of inspection and replacementCorrosion protection system
No major failures documented in bridges using this system
![Page 31: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/31.jpg)
Replacement cable designParallel strand, preferred system
Larger anchorages – requiring modifications– Increase wind load – Change aerodynamic characteristics
Installation methodEquivalent stiffness (24,48,61,71 strand)Additional 24 reference strand
![Page 32: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/32.jpg)
Maintenance of Traffic
![Page 33: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/33.jpg)
Temporary cable designNeed for Temporary cables
Uncertainty in cable condition Large cable group spacingNeed to maintain traffic w/o load limits
![Page 34: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/34.jpg)
Temporary cable design
![Page 35: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/35.jpg)
Construction SequenceHighlights:
Using Temporary CablesUsing “Highline” or “Cableway”Limiting operation to one sideMinimizing construction space needs on deck and impact on trafficConcentrating operation at deck level– Use of saddle as top support– Lower ends as live ends
![Page 36: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/36.jpg)
Construction Sequence
![Page 37: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/37.jpg)
Construction Sequence
![Page 38: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/38.jpg)
Construction Sequence
![Page 39: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/39.jpg)
Construction Sequence
![Page 40: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/40.jpg)
Modeling & Structural Analysis
CAD model to determine geometry conflictsFinite Element Model for structural analysis
![Page 41: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/41.jpg)
CAD Model
![Page 42: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/42.jpg)
Modeling and Structural Analysis
![Page 43: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/43.jpg)
Finite Element Analysis
Analyze each stage of constructionGenerate member action envelopes for all load combinationsProvide geometry control variablesDetermine stressing sequencesAnalyze Live load, wind load and construction load effects
![Page 44: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/44.jpg)
Design for Peripherals
Anti-vandalism and security Cable vibration suppression measuresAnchorage drainage design
![Page 45: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/45.jpg)
Cable Vibration Suppression Measures
![Page 46: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/46.jpg)
Cable Vibration Suppression Measures
![Page 47: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/47.jpg)
Anchorage Box Drainage
![Page 48: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/48.jpg)
Other Work
Deck repairs, weld cracks & JointCable instrumentation for wire break Cleaning & sealing of the superstructure Access hatch retrofitFairing plate repair
![Page 49: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/49.jpg)
Summary
Inspection performed 2004-2006Cable replacement design 2007-8Final Plans submitted Dec. 2008Project bid February 25, 2009Construction begins Summer/Fall 2009
![Page 50: Stay Cable Replacement of the Luling Bridge Armin.pdfStay Cable Replacement of the Luling Bridge 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge,](https://reader030.fdocuments.us/reader030/viewer/2022020411/5aba8b4b7f8b9a24028b9751/html5/thumbnails/50.jpg)
Questions?
Questions?