Status Update Instructions(Required by NASA/Wallops)
These completed slides are due to [email protected] no later than Wednesday, March 6th, 2013, at midnight.
• For each parameter, indicate the percentage complete• Color code:
– Green: Confident in successful completion (4-5 blocks)– Yellow: Minor concerns (3 blocks)– Red: Major concerns (explain on “Issues” slide) (1-2 blocks)
• Describe Issues and Concerns on next slide• Insert pictures as appropriate
Payload YOUR NAME HERE: Status Updates Payload Overview and Functional Block Diagram
Payload YOUR NAME HERE: Status Updates
Status Updates
% Complete
Mechanical Elements DesignedMechanical Elements FabMechanical Elements Tested
Electrical Elements DesignElectrical Elements FabElectrical Elements Tested
Software WrittenSoftware Tested
Subsystem TestingSystem IntegrationFull System Testing
Picture ??
Mission Statement:
Payload YOUR NAME HERE: Status Updates
Issues and Concerns:
1.) Power won’t latch on
2.) Trying to determine the best method of reducing shock that the science instrument experiences
3.) Laser calibration requires additional equipment that must be acquired
To the left is the dummy block used to test out methods of shock reduction.
Laser Test Fixture
Power Supply Design
PowerInterconnect
Design
PL9 PL8 PL7 PL6 PL5 PL4 PL2 PL1PL3