Status Report4
-
Upload
team-02 -
Category
Technology
-
view
202 -
download
1
description
Transcript of Status Report4
![Page 1: Status Report4](https://reader036.fdocuments.us/reader036/viewer/2022062513/55589ccdd8b42aa6708b4c4b/html5/thumbnails/1.jpg)
Drinks UnlimitedAVD&FDS
Automated Volume Detection & Fluid Dispensing System.
Status Report #4Design Team #2Frederick WeissbachBrendan BakerSean TovarEE 4813 – Electrical Engineering Design II22 February, 2010
![Page 2: Status Report4](https://reader036.fdocuments.us/reader036/viewer/2022062513/55589ccdd8b42aa6708b4c4b/html5/thumbnails/2.jpg)
Overall Need& Milestones Our product will help disperse lines and increase productivity while also helping with sanitation at public beverage dispensing locations.
Milestones – • Finalized Design - 03 February, 2010• Receive Ordered Parts – 21 February, 2010• Working Code – 22 March, 2010• Functional Prototype – 13 April, 2010
![Page 3: Status Report4](https://reader036.fdocuments.us/reader036/viewer/2022062513/55589ccdd8b42aa6708b4c4b/html5/thumbnails/3.jpg)
Recent Tasks
• Completed Tasks -• Image Acquisition • Hardware/Software
Collaboration• Working Code• Tentative GUI
![Page 4: Status Report4](https://reader036.fdocuments.us/reader036/viewer/2022062513/55589ccdd8b42aa6708b4c4b/html5/thumbnails/4.jpg)
Recent Tasks
![Page 5: Status Report4](https://reader036.fdocuments.us/reader036/viewer/2022062513/55589ccdd8b42aa6708b4c4b/html5/thumbnails/5.jpg)
Recent Tasks
![Page 6: Status Report4](https://reader036.fdocuments.us/reader036/viewer/2022062513/55589ccdd8b42aa6708b4c4b/html5/thumbnails/6.jpg)
Recent Tasks
![Page 7: Status Report4](https://reader036.fdocuments.us/reader036/viewer/2022062513/55589ccdd8b42aa6708b4c4b/html5/thumbnails/7.jpg)
Recent Tasks
![Page 8: Status Report4](https://reader036.fdocuments.us/reader036/viewer/2022062513/55589ccdd8b42aa6708b4c4b/html5/thumbnails/8.jpg)
Recent Tasks
![Page 9: Status Report4](https://reader036.fdocuments.us/reader036/viewer/2022062513/55589ccdd8b42aa6708b4c4b/html5/thumbnails/9.jpg)
Ongoing/Pending Tasks
• 100k Competition• Changes in
product equipment
• Including needed software on different PC
Pending Tasks -
![Page 10: Status Report4](https://reader036.fdocuments.us/reader036/viewer/2022062513/55589ccdd8b42aa6708b4c4b/html5/thumbnails/10.jpg)
Upcoming Tasks
• Valve integration• New Camera Decisions• GUI additions• New Hardware
Integration with new cameras
Approaching Tasks -
![Page 11: Status Report4](https://reader036.fdocuments.us/reader036/viewer/2022062513/55589ccdd8b42aa6708b4c4b/html5/thumbnails/11.jpg)
Block Diagram Percentages
![Page 12: Status Report4](https://reader036.fdocuments.us/reader036/viewer/2022062513/55589ccdd8b42aa6708b4c4b/html5/thumbnails/12.jpg)
Schedule Percentages