Status report of MPPC mass measurement 15/20 2007/Jan/30 Shinshu Univ. HE lab. M2 Takashi Tsubokawa 1 / 1/4 • ADC measurement •Threshold curve measurement

description

15/20. Status report of MPPC mass measurement. ADC measurement Threshold curve measurement. 2007/Jan/30 Shinshu Univ. HE lab. M2 Takashi Tsubokawa. 1/15. 1/4. Measurement setup. Gate generator. LED Driver. Coincidence. Clock Generator. Thermo-static chamber - PowerPoint PPT Presentation

Transcript of Status report of MPPC mass measurement

Page 1: Status report of MPPC mass measurement

Status report of MPPC mass measurement

15/20

2007/Jan/30

Shinshu Univ.

HE lab. M2

Takashi   Tsubokawa1/15

1/4

• ADC measurement•Threshold curve measurement

Page 2: Status report of MPPC mass measurement

        Gain

      Noise rate

ADC

Thermo-static chamber (kept at 15 oC)

Clock Generator Gate generator

16chASD

Discri Scaler

Output register

10chMPPCboard

Bias voltage

MPPC

LED

LED Driver

470nm

MPPC

Coincidence

Measurement setup

2/4

Control PC

One channel on the board is kept as reference

FPCB

・・・

Page 3: Status report of MPPC mass measurement

19/20

3/4

Measurement time (data taking)

Gain measurement Change MPPCs ,,,,,,,,,,,,,,,,,,,,,,,,2min Stabilize temperature ,,,,,,,,,,,,,,,,,,,,,,,,5min ADC data taking ,,,,,,,,,,,,,,,,,,,,,,,,3min

Sum:10min / 9MPPC(1 FPCB sheet) Noise rate measurement

Change MPPCs ,,,,,,,,,,,,,,,,,,,,,,,,2min Stabilize temperature ,,,,,,,,,,,,,,,,,,,,,,,,5min Discriminator curve data

taking ,,,,,,,,,,,,,,,,,,,,9min Sum:16min / 9MPPC(1 FPCB sheet)

All:26min / 9MPPC(1 FPCB sheet)

Page 4: Status report of MPPC mass measurement

Progress Re-measurement have been finished 600 MPPCs have been delivered

on Feb-8 2007 351 MPPCs with FPCB 249 plastic-package MPPCs

351 MPPCs with FPCB have been measured.

Analysis of re-measurement and 351 MPPCs measurement is on going.Analysis will be done as soon as possible

4/4