Status Report #7 Zachary Luna Phillip Cox Dasola Alatise April 11, 2012
description
Transcript of Status Report #7 Zachary Luna Phillip Cox Dasola Alatise April 11, 2012
![Page 1: Status Report #7 Zachary Luna Phillip Cox Dasola Alatise April 11, 2012](https://reader035.fdocuments.us/reader035/viewer/2022062811/5681603a550346895dcf5df3/html5/thumbnails/1.jpg)
Status Report #7Zachary LunaPhillip Cox
Dasola AlatiseApril 11, 2012
A IR toilet adapter that allows the toilet to flush only when bathroom latch is moved from the
locked to unlocked position
Hands-Free Toilet Flush Adapter
![Page 2: Status Report #7 Zachary Luna Phillip Cox Dasola Alatise April 11, 2012](https://reader035.fdocuments.us/reader035/viewer/2022062811/5681603a550346895dcf5df3/html5/thumbnails/2.jpg)
Need For Design
• This adapter will provide a hands-free flush, maximize sanitation, and minimize water used per use
![Page 3: Status Report #7 Zachary Luna Phillip Cox Dasola Alatise April 11, 2012](https://reader035.fdocuments.us/reader035/viewer/2022062811/5681603a550346895dcf5df3/html5/thumbnails/3.jpg)
Flusher and Latch Code Written
Circuit is fully connected and programmed
Getting the HTFA ready for demo day
Design Milestones
![Page 4: Status Report #7 Zachary Luna Phillip Cox Dasola Alatise April 11, 2012](https://reader035.fdocuments.us/reader035/viewer/2022062811/5681603a550346895dcf5df3/html5/thumbnails/4.jpg)
Circuit is fully connected and programmed
Completed a Design for the Device’s casing
Demo Day Poster Complete
Recently Completed Tasks
![Page 5: Status Report #7 Zachary Luna Phillip Cox Dasola Alatise April 11, 2012](https://reader035.fdocuments.us/reader035/viewer/2022062811/5681603a550346895dcf5df3/html5/thumbnails/5.jpg)
Ongoing Tasks
Receive Casing from machine shop
Testing
![Page 6: Status Report #7 Zachary Luna Phillip Cox Dasola Alatise April 11, 2012](https://reader035.fdocuments.us/reader035/viewer/2022062811/5681603a550346895dcf5df3/html5/thumbnails/6.jpg)
Upcoming Tasks
Writing the final draft of the final report
Demo Day
![Page 7: Status Report #7 Zachary Luna Phillip Cox Dasola Alatise April 11, 2012](https://reader035.fdocuments.us/reader035/viewer/2022062811/5681603a550346895dcf5df3/html5/thumbnails/7.jpg)
100%
100%
100%
100%
Block Diagram
100%
100%100%
100%
![Page 8: Status Report #7 Zachary Luna Phillip Cox Dasola Alatise April 11, 2012](https://reader035.fdocuments.us/reader035/viewer/2022062811/5681603a550346895dcf5df3/html5/thumbnails/8.jpg)
Schedule
100%
100%
100%
100%
100%
100%100%100%
100%100%
100%
100%
100%
100%