Status Report # 4 LCDE Noe Flores, Marcos Lujan, Andrew Patton, Mark Steele September 17, 2012 The...

7
Status Report # 4 LCDE Noe Flores, Marcos Lujan, Andrew Patton, Mark Steele September 17, 2012 The goal of our project is rectify problems with an existing LCD screen including but not limited to physical damage.

Transcript of Status Report # 4 LCDE Noe Flores, Marcos Lujan, Andrew Patton, Mark Steele September 17, 2012 The...

Page 1: Status Report # 4 LCDE Noe Flores, Marcos Lujan, Andrew Patton, Mark Steele September 17, 2012 The goal of our project is rectify problems with an existing.

Status Report # 4

LCDE

Noe Flores, Marcos Lujan, Andrew Patton, Mark Steele

September 17, 2012

The goal of our project is rectify problems with an existing LCD screen including but not limited to physical damage.

Page 2: Status Report # 4 LCDE Noe Flores, Marcos Lujan, Andrew Patton, Mark Steele September 17, 2012 The goal of our project is rectify problems with an existing.

Overall Need:Improve current LCD Design Excessive failure/breakage rate Look at current design and research

alternatives. Research parts needed Enter design phase Implement and test design Redesign (if needed) and Finalize

Page 3: Status Report # 4 LCDE Noe Flores, Marcos Lujan, Andrew Patton, Mark Steele September 17, 2012 The goal of our project is rectify problems with an existing.

Recent Tasks completed:

Met with engineers at KCI Obtained materials needed to test

durability of existing screens. Completed and updated Project

Schedule

Page 4: Status Report # 4 LCDE Noe Flores, Marcos Lujan, Andrew Patton, Mark Steele September 17, 2012 The goal of our project is rectify problems with an existing.

Ongoing/Pending tasks

Began construction of Website Weekly meetings with engineers at KCI Isolating issues with screen damage Testing possible design alterations

Page 5: Status Report # 4 LCDE Noe Flores, Marcos Lujan, Andrew Patton, Mark Steele September 17, 2012 The goal of our project is rectify problems with an existing.

Upcoming Tasks

Order alternative parts Follow up with Engineers at KCI for

project advancement Screen simulation code

Page 6: Status Report # 4 LCDE Noe Flores, Marcos Lujan, Andrew Patton, Mark Steele September 17, 2012 The goal of our project is rectify problems with an existing.

Project Schedule

Page 7: Status Report # 4 LCDE Noe Flores, Marcos Lujan, Andrew Patton, Mark Steele September 17, 2012 The goal of our project is rectify problems with an existing.

Project Schedule (contd.)