Status Report # 4
LCDE
Noe Flores, Marcos Lujan, Andrew Patton, Mark Steele
September 17, 2012
The goal of our project is rectify problems with an existing LCD screen including but not limited to physical damage.
![Page 2: Status Report # 4 LCDE Noe Flores, Marcos Lujan, Andrew Patton, Mark Steele September 17, 2012 The goal of our project is rectify problems with an existing.](https://reader036.fdocuments.us/reader036/viewer/2022083005/56649f115503460f94c246c0/html5/thumbnails/2.jpg)
Overall Need:Improve current LCD Design Excessive failure/breakage rate Look at current design and research
alternatives. Research parts needed Enter design phase Implement and test design Redesign (if needed) and Finalize
![Page 3: Status Report # 4 LCDE Noe Flores, Marcos Lujan, Andrew Patton, Mark Steele September 17, 2012 The goal of our project is rectify problems with an existing.](https://reader036.fdocuments.us/reader036/viewer/2022083005/56649f115503460f94c246c0/html5/thumbnails/3.jpg)
Recent Tasks completed:
Met with engineers at KCI Obtained materials needed to test
durability of existing screens. Completed and updated Project
Schedule
![Page 4: Status Report # 4 LCDE Noe Flores, Marcos Lujan, Andrew Patton, Mark Steele September 17, 2012 The goal of our project is rectify problems with an existing.](https://reader036.fdocuments.us/reader036/viewer/2022083005/56649f115503460f94c246c0/html5/thumbnails/4.jpg)
Ongoing/Pending tasks
Began construction of Website Weekly meetings with engineers at KCI Isolating issues with screen damage Testing possible design alterations
![Page 5: Status Report # 4 LCDE Noe Flores, Marcos Lujan, Andrew Patton, Mark Steele September 17, 2012 The goal of our project is rectify problems with an existing.](https://reader036.fdocuments.us/reader036/viewer/2022083005/56649f115503460f94c246c0/html5/thumbnails/5.jpg)
Upcoming Tasks
Order alternative parts Follow up with Engineers at KCI for
project advancement Screen simulation code
![Page 6: Status Report # 4 LCDE Noe Flores, Marcos Lujan, Andrew Patton, Mark Steele September 17, 2012 The goal of our project is rectify problems with an existing.](https://reader036.fdocuments.us/reader036/viewer/2022083005/56649f115503460f94c246c0/html5/thumbnails/6.jpg)
Project Schedule
![Page 7: Status Report # 4 LCDE Noe Flores, Marcos Lujan, Andrew Patton, Mark Steele September 17, 2012 The goal of our project is rectify problems with an existing.](https://reader036.fdocuments.us/reader036/viewer/2022083005/56649f115503460f94c246c0/html5/thumbnails/7.jpg)
Project Schedule (contd.)