Transcript of Status Report #07 AVTS Automated Vehicle Tracking System David Brenner Caleb Douglas Ahmed Elsherif...
Status Report #07
AVTS Automated Vehicle Tracking SystemDavid BrennerCaleb DouglasAhmed ElsherifMichael W. Timme
An automated license plate detection system used to build a database for law enforcement to utilize when searching for vehicles.
Mar 26th 2012
•Need for Design• Aid in the apprehension of suspects and the rescue of
abductees in the event that vehicular information is known.
•Milestones• Assembly – 02/24/2012 04/12/2012• GUI Completion – 03/1/2012• Server Integration – 03/30/2012• Data Encryptions – 04/10/2012• License Algorithm Completion – 04/17/2012
•Need for Design• Aid in the apprehension of suspects and the rescue of
abductees in the event that vehicular information is known.
•Milestones• Assembly – 02/24/2012 04/12/2012• GUI Completion – 03/1/2012• Server Integration – 03/30/2012• Data Encryptions – 04/10/2012• License Algorithm Completion – 04/17/2012
Recent Tasks
• Image Processing• Obtained the First of Two Demo Images• No Other Pertinent Updates• Panda Board Automation• No Pertinent Updates• Server Automation• No Pertinent Updates
Recent Tasks
•User GUI Access• Test GUI Has Been Implemented• Prototype•Modifications Have Been Completed• Circuitry Has Been Installed•Milestone Complete• Final Report• Began Writing First Draft
Recent Tasks
• Image Processing• Tweak Algorithm• Work with 2+ demo images• Improve performance
• Panda Board Automation• Finalize Automation Process• Panda-Server Integration• All Pieces Need to Work Together
Ongoing Tasks
•User GUI Access• Improvements are Imperative• Final Report• Continue to Write• First Draft Due - 04/2/2012
Ongoing Tasks
Upcoming Tasks
• BBQ at David’s House – xx/xx/xxxx•Design Demo Day Poster – 04/09/2012•Demo to Professor – 04/13/2012• Final Report 2nd Draft – 04/16/2012•Demo Day – 04/19/2012• Final Submission – 04/25/2012• Final Report, Evaluations, Project File
Block Diagram
Schedule