Status of the EURISOL Design Study

19
Status of the EURISOL Design Study Yorick Blumenfeld IPN Orsay

description

Status of the EURISOL Design Study. Yorick Blumenfeld IPN Orsay. Changes to the Management proposed by MB. Y. Blumenfeld interim project leader to replace G. Fortuna. G. Fortuna will remain member of the MB at least until April 2007. C. Hovaguimian management support at Orsay - PowerPoint PPT Presentation

Transcript of Status of the EURISOL Design Study

Page 1: Status of the EURISOL Design Study

Status of the EURISOL Design Study

Yorick Blumenfeld

IPN Orsay

Page 2: Status of the EURISOL Design Study

Changes to the Management proposed by MB

• Y. Blumenfeld interim project leader to replace G. Fortuna.

• G. Fortuna will remain member of the MB at least until April 2007.

• C. Hovaguimian management support at Orsay• R. Batistella will continue to administer website

at LNL (and assist with specific legal questions)• Changes submitted to SC on November 30.

Page 3: Status of the EURISOL Design Study

TABLE 1). Participants in EURISOL Design Study

Participant Country Participant Country  

GANIL (coordinator)

France Inst. Physics Vilnius Lithuania

 

CNRS/IN2P3 France Warsaw University Poland 

INFN Italy Inst. Phys. Bratislava Slovakia  

CERN Europe U. Liverpool United Kingdom  

U. C. Louvain Belgium GSI Darmstadt Germany 

CEA France U. Santiago Spain  

NIPNE Romania CCLRC Daresbury United Kingdom  

U. Jyväskylä Finland Paul Scherrer Institute Switzerland 

L.M.U. München

Germany Inst. Phys. Latvia Latvia 

FZ Jülich Germany Stockholm. U. MSL Sweden  

20 Participants

Page 4: Status of the EURISOL Design Study

  Topical areas and tasks of the EURISOL Design Study

Topical Area Tasks Lead Institution  

Management Management GANIL  

Accelerators Driver acceleratorPost Accelerator

Superconducting cavity prototyping

INFNGANILIN2P3

 

Targets Liquid Hg ConverterDirect targets

High power fission target

CERNCERNINFN

 

Physics, beams and safety Safety and radioprotectionBeam PreparationBeam Intensities

Physics and Instrumentation

CEAU. Jyväskylä

GSIU. Liverpool

 

Beta Beams Beta Beam Conceptual Design Study CERN  

12 Tasks

Page 5: Status of the EURISOL Design Study

The EURISOL Road Map

• Vigorous scientific exploitation of current ISOL facilities : EXCYT, Louvain, REX/ISOLDE, SPIRAL

• Construction of intermediate generation facilities: SPIRAL2, MAFF,HIE-ISOLDE, SPES

• Design and prototyping of the most specific and challenging parts of EURISOL in the framework of EURISOL_DS.

Page 6: Status of the EURISOL Design Study

= 0.03 = 0.78

Ionsources

RFQ176 MHz

HWRs176MHz

Elliptical ISCL704 MHz

1 GeV/qH-, H+, 3He++

1.5 MeV/u

100 keV

60 MeV/q 140 MeV/q

>200 MeV/qD+, A/q=2

Charge-breeder

Low-resolutionmass-selector

UCx

target

1+ ionsource

n-generator

= 0.065= 0.14= 0.27= 0.385

QWRISCL

88 MHz

3 QWRs ISCL

88 MHz

8 HWRsISCL

176 MHz

SpokeISCL

264 MHz

2-150 MeV/u (for Sn-132)

To low-E areas

Secondaryfragmentation

target

A possible schematic layout

for a EURISOL facility

One of severaltarget stations

= 0.047

3-spoke ISCL 325 MHz

High-resolution mass-selectors

Bunching RFQ

To medium-energy experimental areas

= 0.65

Elliptical ISCL704 MHz

= 0.09, = 0.15

H-

H+, D+,3He++

To low-E areas

9.3- 62.5 MeV/u 2.1-19.9 MeV/u

To experimental area

RFQs

Page 7: Status of the EURISOL Design Study

The Main Challenges

• Design a 5MW; 1GeV proton driver with additional capability of 200 AMeV deuterons and A/Q=2 Heavy Ions; build and test prototypes of the cavities.

• Design a liquid Hg converter which will accept 5 MW of beam power.

• Design a UCx target which will make the most efficient use of the neutrons produced.

• Evaluate the safety constraints of the above set up.• Design an efficient multi-user beam distribution system.• Design a superconducting HI LINAC capable of accelerating 132Sn

up to 150 AMeV• Investigate technologies for the instrumentation of the future• Provide a conceptual study for a beta-beam neutrino facility.

Page 8: Status of the EURISOL Design Study

Gathering the expertise in joint Management-Task meetings

• User Requirements– Post accelerator, beam preparation, physics– Orsay, May 2

• Extended Driver capability– Direct target, driver, cavities, beam intensity– GSI, May 5

• High Power target– Hg converter, fission target– Legnaro, Oct 4

Page 9: Status of the EURISOL Design Study

Driver accelerator1 GeV 5 MW proton beam3He at 2 GeV,

deuterons at 250 MeV,

heavy ions of A/Q=2 at 125AMeV

From A. Facco, task 7

Page 10: Status of the EURISOL Design Study

Reference MMW Target Station

Hg converter and secondary fission targets

Hg loop with window8 UCX targets40x6x3 cm

Y. Kadi and L. Tecchio; tasks 2 and 4

Problems : Diffusion-Effusion TimeIon Sources

Page 11: Status of the EURISOL Design Study

Next Joint Meetings

• Ion Sources

• Safety

• Multi-User capability

• ….

Page 12: Status of the EURISOL Design Study

Other Achievements:Please visit www.eurisol.org

• Fully functional dynamic website• Agenda and Minutes of 71 meetings• 60 Publications and internal reports• Official Documents, Annual Reports, Presentations ….• Automatic publication review procedure

• Full compliance by task leaders• Milestones and deliverables• Outreach Pages• …

Page 13: Status of the EURISOL Design Study

A Slow Start…

• Initial difficulties in recruiting post docs• Spending for the first year was only 35% of first

advance : Second advance delayed by 1 year. • Some delays in milestones• Pace has picked up strongly in the second year• Change of expenditure profile will be requested.• Possible extension of contract by 6 months will

be discussed in Spring 2007.

Page 14: Status of the EURISOL Design Study

Design StudyPROJECT PERSON MONTHS STATUS WITH INFORMATION AT

26/5/2006 PER PARTICIPANT

81,00

216,00

234,00

247,20

90,00

48,00

30,00

78,00

0,0012,00

44,40

12,00

78,12

48,00

127,90

0,00

22,00

10,0016,00

37,00

7,250,00

72,00

12,00

44,4036,00

84,00

24,0024,0012,00

30,00

12,00

5,599,20

24,000,00

13,79

21,50

0,000,000

20

40

60

80

100

120

140

160

180

200

220

240

260

TOTAL PROJECT P/M FUNDED BY EC

TOTAL PROJECT P/M ALREADY ENGADED

FOR INSTITUTIONS INVOLVED IN TASK 2, 3 AND 4 DATA AT 31/1/2006

Page 15: Status of the EURISOL Design Study

Milestone StatusDesign Study

G. Fortuna, PSI JUNE 2006

STATUS OF THE PROJECT MILESTONES (16 MONTH)

0,00

3,00

6,00

9,00

12,00

15,00

18,00

21,00

24,00

27,00

30,00

33,00

36,00

39,00

42,00

45,00

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

FIRST 16 MONTHS MILESTONES DUE

FIRST 16 MONTHS MILESTONES ACHIEVED

(3) (1)

(3)

(3)

Page 16: Status of the EURISOL Design Study

Possible Locations?

Administration / Stay at GANIL

                                                                           

                       

                 

The Design Study will investigate the implementation and cost of EURISOL in these 3 hypotheses by putting in place a committee in Spring

2007, including the MB + technical coordinator + experts.Report in Spring 2008

Page 17: Status of the EURISOL Design Study

New research New research infrastructures in FP7infrastructures in FP7

•Objective: To help create new research infrastructures of pan-European interest (or major upgrades of existing ones)

•- Design studies: to support feasibility studies for new infrastructures through a “bottom-up approach” of calls for proposals

•- Construction of new infrastructures (incl. major upgrades): to promote the creation of new infrastructures through a strategic approach based on the work conducted by ESFRI* on the development of a European roadmap fro new research infrastructures

-* ESFRI – European Strategy Forum for Research Infrastructures

From Alex Mueller

Page 18: Status of the EURISOL Design Study

New research New research infrastructures in FP7infrastructures in FP7

• Support to Construction via a two-stage process:

• The preparatory phase

- restricted calls targeting priority projects (based on the work of ESFRI)

to support finalisation of construction plans, legal organisation, financial engineering, management aspects (Second call in 2009)

• The construction phase- developed following the satisfactory implementation of the preparatory phase- “case by case” approach (e.g. use of Article 171)

From Alex Mueller

Page 19: Status of the EURISOL Design Study

You are cordially invited to attend the EURISOL DS Town Meeting at CERNon Nov. 27-28.Registration is open until Nov. 1 at www.eurisol.org

For next year we are considering the possibility of a jointTown meeting with EURONS