Status of Telecom Works for Railway Electrification ...

73
Project: UMB Main Section: RKM: 197 CRS Targeted Section: Khurja- Merrutcity RKM: 84 Gr.No. 107 As on 30.05.2014 OFC 6 Quad Total (Km) Comp. (Km) At Stns. At SP/SSP/ TSS 1 Khurja Jn. (KRJ) 2 Khurja City (KJY) SP 100% 0.6 3 Maman (MOM) 4 Bulandshahr (BSC) SSP 100% 0.9 5 Baral (BARL) 6 Gulaothi (GLH) TSS 100% 1.0 7 Hafizpur (MZR) SP 100% 1.6 8 Hapur Jn. (HPU) TSS 100% 2.0 9 Kharkhauda (KXK) SSP 100% 4.8 10 Meerut City Jn. (MTC) SP 100% 10.0 Status of Telecom Works for Railway Electrification targetted in 2014-15 Khurja-Merrut City-Saharanpur Comp. TELECOM PDC-Apr'14 Sl. No Stations C/H Bldg. Main Addnl MUX By RE SP/SSP/ TSS Bldg Location Work Completed. OFC blowing work completed by RE/UMB Agency :- Outdoor- M/s Poorvanchal,Jaunpur Anand-09919065561 LOA-08.12.08,DOC-31.10.13 Indoor- M/s Artek,NDLS Satnarayan-09310629372 LOA-09.06.11,DOC-31.01.13 Provided SP/SSP/ TSS Bldg status Cable laying for SP/SSP/TSS Status of TPC phone REPC Remark/ Status Existing Not Req. Provided 25 KV clearance received. All indoor & outdoor work completed. OFC handed over to RCIL on 02.05.14

Transcript of Status of Telecom Works for Railway Electrification ...

Project: UMB Main Section: RKM: 197

CRS Targeted Section: Khurja- Merrutcity RKM: 84

Gr.No. 107 As on 30.05.2014

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

1 Khurja Jn. (KRJ)

2 Khurja City (KJY) SP 100% 0.6

3 Maman (MOM)

4Bulandshahr

(BSC)SSP 100% 0.9

5 Baral (BARL)

6 Gulaothi (GLH) TSS 100% 1.0

7 Hafizpur (MZR) SP 100% 1.6

8 Hapur Jn. (HPU) TSS 100% 2.0

9 Kharkhauda (KXK) SSP 100% 4.8

10Meerut City Jn.

(MTC)SP 100% 10.0

Status of Telecom Works for Railway Electrification targetted in 2014-15

Khurja-Merrut City-Saharanpur

Comp.

TELECOM PDC-Apr'14

Sl.

NoStations

C/H

Bldg.

MainAddnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

Wo

rk C

om

ple

ted

.

OF

C b

low

ing

wo

rk c

om

ple

ted

by R

E/U

MB

Agency :-

Outdoor- M/s Poorvanchal,Jaunpur

Anand-09919065561

LOA-08.12.08,DOC-31.10.13

Indoor- M/s Artek,NDLS

Satnarayan-09310629372

LOA-09.06.11,DOC-31.01.13

Provided

SP/SSP/

TSS

Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

REPCRemark/

Status

Exis

ting

Not

Req.Provided

25

KV

cle

ara

nce

re

ce

ived

.

All indoor &

outdoor work

completed.

OFC handed

over to RCIL on

02.05.14

Project: UMB RKM: 160

RKM: 92

RKM: 160

Gr.No. 107 & 107A As on 30.05.2014

OFC 6 QuadTotal

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

1 Ghaziabad (GZB)

2Naya Ghaziabad

Jn.(GZN)

3 Guldhar (GUH) SP Comp 0.6 Comp.

5 Muradnagar (MUD) TSS Comp 1.35 Comp

6 Modinagar (MDNR)

7Muhiuddin Pur

(MUZ)SSP Comp 0.75 Comp

8 Partapur (PRTP)

9Meerut City Jn.

(MTC)

Exis

ting

Exis

ting

Exis

ting

Not

Req.Provided Provided

25

KV

cle

ara

nce

ava

ilab

le.

All indoor work

completed.

Status of Telecom Works for Railway Electrification targetted in 2014-15

2.2 to 25 KV Targeted Section: Sakhoti Tanda - Saharanpur

CRS Targeted Section:GZB-MTC-SRE

REPC Remark/ Status

Agency :-M/s Anand Enterprises, Jaunpur

LOA-11.03.14, DOC- 10.6.14

TELECOM PDC-Oct'14

Sl.

NoStations

C/H

Bldg.

MainAddnl

MUX

By RE

GZB-Merrut City-Saharanpur

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS

Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

Main Section:

OFC 6 QuadTotal

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

REPC Remark/ StatusSl.

NoStations

C/H

Bldg.

MainAddnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS

Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

10Meerut Cantt.

(MUT)SP 90% 4.2 0.0

11 Pabli Khas (POY)

12 Daurala (DRLA) SSP 90% 0.8 0.0

13Sakhoti Tanda

(SKF)

14 Khatauli (KAT) SSP 90% 0.2 0.0

15 Mansurpur (MSP)

16Jarauda Nara

(JDW)TSS 0% 0.5

17Muzaffar Nagar

(MOZ)

18Baman Heri

(BMHR)SP 90% 3.5 0

19Rohana Kalan

(RNA)

20 Deoband (DBD) SSP Comp 1.86 1.86

21Talheri Buzurg

(THA)

22 Nagal (NGL) SSP Comp 0.69 0.69

23 Tapari Jn. (TPZ) TSS Comp 1 0

24Saharanpur Jn.

(SRE)

Exis

ting

Exis

ting

Exis

ting

Not

Req.

Not

Provided

Not

Provided

25

KV

cle

ara

nce

ava

ilab

le.

Control

Tapping work

in progress.

MTWE

installation

done at

MTC,MUT,

KAT

Project: UMB RKM: 159

25 KV Targeted Section: Bajalata- Ramnagar Gr.No. 143 C RKM: 21

RKM: 53

Gr.No. 143 B&C RKM: 153

Gr.No. 143 As on 30.05.2014

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

1 Chakki Bank

(CHKB)2 Pathankot (PTK)

3 Bharoli (BHRL) SSP 100% 1.0 1.0

4 Sujanpur (SJNP) TSS 95% 1.6 1.6

5Madhopur

Punjab (MDPB)6 Kathua (KTHU) SSP 100% 0.7 0.7

7 Buddhi (BDHY)

8 Chhanaroria

(CHNR)SP 100% 3.2 3.2

9 Chakdayala

(CKDL)

10Hira Nagar

(HRNR)SSP 100% 2.1 2.1

11 Ghagwal (GHWL)

12 Sambha (SMBX) TSS 100% 1.0 1.0

Gr.No. 143 C

Status of Telecom Works for Railway Electrification targetted in 2014-15

TELECOM

Addnl

MUX

By RE

Status of TPC

phone

Stations REPC

MainSP/SSP/

TSS Bldg

Location

Remark/ Status

2.2 to 25 KV Targeted Section: Jammu Tawi-Udhampur

Chakki Bank-Pathankot-Jammu Tawi-Udhampur

CRS Targeted Section: Pathankot-Jammu Tawi-Udhampur

Sl.

No

SP/SSP/

TSS Bldg

status

C/H

Bldg.

-

Exis

tin

g

Exis

tin

g

Exis

tin

g

Not

Req

Main Section:

Trenching work

completed in full

section.

Cable laying completed.

(17.29/17.29 Km)

Equipment earthing in

progress.

PDC- Sep'14

M/s C.K.Traders,JAT,

R.K.Gupta-9419197630

LOA-28.12.12,DOC-31.03.14

Agency :-

Cable laying for

SP/SSP/TSS

25 K

V D

yn

am

ic C

leara

nce

re

ceiv

ed.

Provided Provided

Provided CRS obtainedComp

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

Addnl

MUX

By RE

Status of TPC

phone

Stations REPC

MainSP/SSP/

TSS Bldg

Location

Remark/ Status Sl.

No

SP/SSP/

TSS Bldg

status

C/H

Bldg.

Cable laying for

SP/SSP/TSS

13Vijaypur Jammu

(VJPJ)SSP 100% 1.1 1.1

14Baribrahmana

(BBMN)

15 Jammutawi (JAT) SSP 80% 3.0 3.0

16 Bajalta (BLA) SP 0% 1.0 1.0

17 Sangar (SGR) SSP 0% 1.0 1.0

18 Manwal (MNVL) TSS 0% 0.7 0.7

19Ram Nagar Rd

(RNJK)SSP 0% 1.0 1.0

20 Udhampur (UHP)

Provided

Provided

Exis

tin

g

Exis

tin

g

Exis

tin

g

Not

Req

Provided

Not

Provided

Trenching work

completed in full

section.

Cable laying completed.

(17.29/17.29 Km)

Equipment earthing in

progress.

25 K

V D

yn

am

ic C

leara

nce

re

ceiv

ed.

Project: UMB RKM: 140

RKM: 33

RKM: 81

RKM: 0

Gr.No. 159 As on 30.05.2014

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

1 Ghaziabad (GZB)

2 Mahrauli (MFH) SP 0% 1.4 1.4

3Adhyatmik Nagar

Halt

4 Dasna (DS)

5 Pilkhuwa (PKW) SSP 0% 1.2 1.2

6 Hapur (HPU) TSS 0%

7 Babugarh (BBG)

8 Kuchesar (QXR)

9 Simbhaoli (SMBL) SSP 0% 0.9

10Garhmukteshwar

(GGB)7.8 7.8

11 Kankather (KHE) SP 0% 2.3

12 Gajraula (GJL)

Status of Telecom Works for Railway Electrification targetted in 2014-15

Ghaziabad(Ex.)-Moradabad(Ex.)

2.2 to 25 KV Targeted Section: GZB-Garhmukteshwar & Moradabad-Hakeempur

CRS Targeted Section: NIL

25 KV Targeted Section: Garhmukteshwar-Amroha

REPCRemark/

Status

Sl.

No

Addnl

MUX

By RE

2.2

KV

an

ti t

he

ft c

lea

ran

ce

rece

ived

.

Not

Provided

Not

Provided

StationsC/H

Bldg.

MainSP/SSP/

TSS Bldg

Location

SP/SSP/

TSS

Bldg

status

Cable laying for

SP/SSP/TSS

Main Section:

TELECOMStatus of TPC

phone

Trenching work

stated.

Cable laying in

progress.

(10.4/18 Km)

Cable laying at

Garhmukteshwar

Bridge

completed.

PDC-Sep'14

M/s Micromap,LKO

LOA-28.12.12,DOC-27.11.14

A.K.Gupta-941517401Agency :-

Exis

ting

Exis

ting

Exis

ting

To be

provided

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

REPCRemark/

Status

Sl.

No

Addnl

MUX

By RE

StationsC/H

Bldg.

MainSP/SSP/

TSS Bldg

Location

SP/SSP/

TSS

Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

13 Maheshra (MHHR) SSP 0% 0.8

14 Kafurpur (KFPR) TSS 0% 1.3

15 Amroha (AMRO)

16 Kailsa (KIV)

17 Chakkalilati Halt SSP 0% 0.9

18 Hakeempur (HKP)

19Lodhipur Bishanpur

(LPB)SP 0% 1.5

20 Moradabad (MB)

Not

Provided

2.2

KV

an

ti t

he

ft c

lea

ran

ce

rece

ived

.

Not

Provided

Trenching work

started.

SP/SSP/TSS

building

construction not

started.

Exis

ting

Exis

ting

Exis

ting

To be

provided

Project: UMB RKM: 25

Gr.No. 179 As on 30.05.2014

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

1 Udhampur (UHP)

2 Chakarawaha SP (2 Nos) 0% 11

3 Katra SSP 0% 0.5

Not

Provided

Not

Provided

Not

Provided

Wo

rk in

pro

gre

ss

by N

R.

Status of Telecom Works for Railway Electrification targetted in 2014-15

Udhampur-Katra

25 KV Targeted Section: Udhampur-Katra

Sl.

NoStations

C/H

Bldg.

TELECOMStatus of TPC

phone

REPCRemark/

Status

MainAddnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

PDC-Sep'14

Tender to be floatedAgency :-

Main Section:

Schedule for

approval is

under process

SP/SSP/

TSS

Bldg

status

Cable laying for

SP/SSP/TSS

Project: UMB RKM: 252

RKM:

As on 30.05.2014

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

1 Rohtak (ROK) (Excl)

2 Samar Gopalpur

(SMF)3 Karainthi (KHV)

4 Kila Zafargarh (KZH)

5 Julana (JJO)

6 Jai Jai Wanti (JJI)

7 Kinana (KIU)

8Bishnupura Haryana

((BSPH)

9 jind (JHI)

10 Barsola (BZO)

11 Uchana (UCA)

12 Ghaso (GSO)

Status of Telecom Works for Railway Electrification targetted in 2014-15

Main Section: Rohtak (ex.)-Bhatinda- Lehra Muhabbat

25 KV Targeted Section:

SP/SSP/

TSS Bldg

Location

Agency :

TELECOM Gr.No. 160

Sl.

NoStations

C/H

Bldg.

MainAddnl

MUX

By RE

SP/SSP/

TSS

Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

REPC

Exis

ting

Exis

ting

Exis

ting

To be

provided

Remark/

Status

To be

provided

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

SP/SSP/

TSS Bldg

Location

Sl.

NoStations

C/H

Bldg.

MainAddnl

MUX

By RE

SP/SSP/

TSS

Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

REPCRemark/

Status

13 Narwana Jn (NRW)

14 Dharodi (DHY)

15Dhamtan Sahib

(DTN)

16 Tohana (TUN)

17 Himmatpura (HMQ)

18 Jakhal Jn (JHL)

19 Kahangarh (KGH)

20 Bareta ((BRZ)

21 Datewas(DTW)

22 Budhlada (BLZ)

23Narender Pura

(NPX)

24 Mansa (MSZ)

25Sadda Singhwala

(SSZ)

27 Maru (MAUR)

28Maisar Khana

(MASK)

29 Kot Fateh (KTF)

30Kattar Singh Wala

(KZW)

31 Bhatinda (BTI)

32Bhatinda Cantt

(BTIC)

33 Bhuchchu (BCU)

34 Lehra Muhabbat

To be

provided

Exis

ting

Exis

ting

Exis

ting

To be

provided

Project: JP RKM:

RKM:

As on 30.05.2014

OFC4

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

1Delhi Sarai

Rohilla

2 Patel Nagar

3 Delhi Cannt

4 Palam

5 Bijwasan

6 Gurgaon

7 Garhi Hansaru

8 Palli

9Jataula Jauri

Sampka

10 Pataudi Road

11 Inchhapuri

12 Khaililpur

Status of Telecom Works for Railway Electrification targetted in 2014-15

Main Section: Delhi Sarai Rohila-Rewari-Jaipur-Ahmedabad

25 KV Targeted Section:

SP/SSP/

TSS Bldg

Location

Agency :

TELECOM Gr.No. 182

Sl.

NoStations

C/H

Bldg.

MainAddnl

MUX

By RE

Exis

ting

Exis

ting

6 Q

ua

d t

o b

e la

id

To be

provided

To be

provided

To be

provided

SP/SSP/

TSS

Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

REPCRemark/

Status

Project: BBS RKM: 138

RKM: 37

RKM: 63

RKM: 0

As on 30.05.2014

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

1 Vizianagram (VZM)

2 Gotlam (GTLM) SP 60%

3 Garudaballi (GRBL)

4Gajapati Nagaram

(GPI)TSS 0%

5 Komatipalli (KMX) SSP 50%

6Donkinavalasa

(DNV)

7 Bobbili (VBL) SP 20%

8 Sitanagaram (SNM) TSS 80%

9 Narasipuram

10Paravatipuram

(PVP)SSP 70%

11 Paravatipuram TownYet to

start

12 Gumada (GMDA) SSP 0%

Exis

ting

Exis

ting To be

provide

d

To be

provided

Exis

ting

Remark/

Status

Agency : M/s Puncom

LOA-30.01.13,DOC-30.06.14

To be

provided

2.2

KV

cle

ara

nce

rece

ived

.

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS

Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

REPCSl.

NoStations

C/H

Bldg.

MainAddnl

MUX

By RE

PDC-Dec'14 Gr.No. 166

Status of Telecom Works for Railway Electrification targetted in 2014-15

Main Section: Vizianagaram (Excl.) -Singapur Road (Incl.)

25 KV Targeted Section: Kuneru - Singapur Road

2.2 to 25 KV Targeted Section: Vizianagaram - Sitaramnagaram

CRS Targeted Section: NIL

TELECOM

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

Remark/

Status

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS

Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

REPCSl.

NoStations

C/H

Bldg.

MainAddnl

MUX

By RE

13 Kuneru SP 0%

14 Jimidipeta

15 Ladda

16 RayagadahYet to

startTSS 30%

17Singapur Road

(SPRD)

1.SP/SSP/TSS Building U/P.

2.Cable route plan approved but agency not yet started work.

3.OFC System Existing. But as demanded by SrDSTE/WAT, variation under process for supply & installation of STM equipt at all stations.

4.Cable laying & Outdoor work to be completed within 1 Month of completion of building.

5. Indoor OFC system to be commissioned within 3 Months after sanction of variation.

Exis

ting

Exis

ting To be

provide

d

To be

provided

Exis

ting

Work Yet to

Start

To be

provided

2.2

KV

cle

ara

nce

rece

ived

.

Project: BBS RKM: 124

RKM: 107

PDC-Mar'15 As on 30.05.2014

OFC6

Quad

Total

(Km)

Comp.

(Km)

At

Stns.

At

SP/SSP

/ TSS

1Singapur Road

(SPRD)

2 Theruvali (THV) SP 0%

3BissamCuttack

(BMCK)TSS 60%

4 Sansartali

5 Muniguda (MNGD) SSP 0%

6 Doikallu (DKLU) SP 0%

7 Ambodala (AMB) SSP 0%

8Langigarh Road

(LJR)TSS 0%

9Norla Road

(NRLR)SSP 0%

10Rupra Road

(RPRD)SP 0%

11Kandel Road

(KDLR)SSP 0%

12 Kesinga (KSNG TSS 0%

13 Titlagarh (TIG)Work

Started

Exis

ting

Exis

ting

Not

Provided

Not

ProvidedExis

ting

Remark/ Status

Agency : M/s Benzfab,BBS

LOA-27.12.12,DOC-30.06.14

Not

Provided

Su

rve

y C

harg

es P

aym

en

t m

ade

.

Materials supplied

on 27.05.2013.

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS

Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

REPCSl.

NoStations

C/H

Bldg.

MainAddnl

MUX

By RE

Gr.No. 167

Status of Telecom Works for Railway Electrification targetted in 2014-15

Singapur Road (Excl)- Titlagarah (Incl)

25 KV Targeted Section: Theruvali - Titlagarh

Main Section:

TELECOM

1.SP/SSP/TSS Building U/P.

2.Cable route plan under approval.

3.OFC System Existing. But as demanded by SrDSTE/SBP, variation under process for supply & installation of STM equipt at all stations.

4.Cable laying & Outdoor work to be completed within 1 Month of completion of building.

5. Indoor OFC system to be commissioned within 3 Months after sanction of variation.

Project: BBS RKM: 66

RKM:

Gr.No. 172 As on 30.05.2014

OFC6

QuadTotal Comp. At Stns.

At

SP/SSP/

TSS

1 Pakur (PKR) TSS

2 Tilbihita (TBB)

3 Kotalpukur (KLP) SSP

4 Gumani (GMAN)

5 Barharwa (BHW)

6 Bonidanga (BDAG)

7 Bindubas SP

8 Tildanga (TLDE)

9 New Farakka (NFK) SSP

10 Chamagram (CMX)

11 Khaltipur (KTJ) TSS

12 Jamir Ghat (JMQ)

13 Gour Malda (GZM SSP

14 Malda Town (MLDT)

Exis

tin

g

Exis

tin

g

Exis

tin

g

Not

Provided

Not

Provided

Not

Provided

SP/SSP/

TSS

Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

REPCRemark/

Status

Status of Telecom Works for Railway Electrification targetted in 2014-15

Pakur-Malda Town

TELECOM

Sl.

NoStations

C/H

Bldg.

Main

Addnl

MUX

SP/SSP/

TSS Bldg

Location

25 KV Targeted Section:

Agency : Tender to be floated

Main Section:

Project: KKK RKM: 152

25 KV Targeted Section: NIL RKM: 0

RKM: 123

RKM: 152

Gr.No. 162A PDC-Nov'14 As on 30.05.2014

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

1 Khana (KAN)

2Jhapatpur Dhal

(JDL)SP 0% 0.7

3 Bonpas (BPS)

4Noadar Dhal

(NRX)SSP 0% 1.2

5 Guskara (GKH)

6Pichkurir Dhal

(PCQ)SSP 0% 0.7

7 Bhedia (BDH)

8 Bolpur (BHP)

9 Prantik (PNE) TSS 90% 0.8

Provided ProvidedNot

Provided

Exis

ting

Exis

ting

Exis

ting

25

KV

Dya

na

mic

cle

ara

nce

rece

ived

1.MUX

installed at all

stations.

2.SP/SSP/

TSS building

not ready.

3. Cable laying

for

SP/SSP/TSS

to be started.

TELECOM

Sl.

NoStations

C/H

Bldg.

Main

Addnl

MUX

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

REPCRemark/

Status

Outdoor- M/s Shivani Entp

Nikhil Ghosh-09002978939

LOA-06.09.11,DOC-31.07.14

Indoor- M/s Puncom

Rajesh Soni-09815651646

LOA-02.06.11,DOC-01.07.14

Agency :-

Status of Telecom Works for Railway Electrification targetted in 2014-15

Khana (Excl.)-Saintha-Pakur (Incl)

2.2 to 25 KV Targeted Section: Rampurhat-Pakur & Khana - Sainthia

CRS Targeted Section: Rampurhat-Pakur & Khana - Sainthia & Sainthia-Rampurhat

Main Section:

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

Sl.

NoStations

C/H

Bldg.

Main

Addnl

MUX

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

REPCRemark/

Status

10 Kopai (KPLE) SSP 90% 0.5 0.5

11 Ahmadpur (AMP) SSP 0% 1.6 1.6

12 Bataspur (BSLE)

13 Sainthia (SNT) SP 90% 1.5 1.5

14Gadadharpur

(GHLE)

15 Mollarpur (MLV) SSP 90% 1.0 Comp

16Tarapitha Road

(TPF)

17Rampur Hat

(RPH)TSS 98% 1.5 Comp

18Swadhinpur

(SDLE)

19 Nalhati (NHT) SSP 90% 1.0 Comp

20 Chatra (CTR)

21 Murarai (MRR) SP 90% 0.5 Comp

22Bansalai Bridge

(BSBR)

23 Rajgram (RJG) SSP 90% 0.5 Comp

24 NagarNabi (NGF)

25 Pakur (PKR) TSS 95% 3

ProvidedNot

Provided

Provided

Not

Provided

Exis

ting

Exis

ting

Exis

ting

25

KV

Dya

na

mic

cle

ara

nce

rece

ived

1.MUX

installed at all

stations.

2.SP/SSP/

TSS building

not ready.

3. Cable laying

for

SP/SSP/TSS

completed at

RPH,NHT,MR

R,RJG.

Termination

not done.

Project: KKK Main Section: RKM: 53

RKM: 0

RKM: 30

Gr.No. 162B PDC- Jun'14 As on 30.05.2014

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

1Pandebeshwar

(PAW)TSS 100% 1 Comp Provided

2 Bhimgara (BMGA)

3 Panchra (PCR)

4 Dubrajpur (DUJ) SSP 100% 0.4 Comp

5 Chinpai (CPLE)

6 Kachujor (KOX) SSP 100% 4.0 Comp

7 Jibdharpur (JDQ)

8 Suri (SURI) SP 100% 0.7 Comp

9 Kunuri (KNRI)

10Mahishadahari

(MWZ)

11 Kherua (KVF)

12 Sainthia (SNT) SP 90% 1.0 1.0Not

Provided

All work

completed

except at

Sainthia

where SP

building is not

ready.

However

cable laying

at SNT is

complete.25

KV

cle

ara

nce

ob

tain

ed

ProvidedExis

ting

Exis

ting

Exis

ting

Provided

Provided

Agency :-

M/s Shivani Entp

Nikhil Ghosh-09002978939

LOA-06.09.11,DOC-31.07.14

Indoor- M/s Puncom

Rajesh Soni-09815651646

LOA-02.06.11,DOC-01.07.14

Status of Telecom Works for Railway Electrification targetted in 2014-15

Pandebeshwar (Excl) -Sainthia (Excl)

2.2 to 25 KV Targeted Section: NIL

CRS Targeted Section:Kachujor-Sainthia

Remark/

Status

TELECOM

Sl.

NoStations

C/H

Bldg.

MainAddnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

REPC

Project: BBS Main Section: RKM: 124

25 KV Targeted Section: Jharsuaguda - Sambalpur RKM: 45

Gr.No. 170A PDC- Jun'14 As on 30.05.2014

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

1Jharsuaguda Jn.

(JSG)

2Jharsuaguda Rd.

Jn. (JSGR)

3 Brundamal (BXQ)

4 Lopanga (LPG)

5 Rengali (RGL)

6 Sasan (SSN)

7 Sarala Jn. (SLR)

8Sambalpur Rd

Halt

9 Sambalpur (SBP)

10 Hirakud (HKG)

11 Godbhaga

(GBHQ)12 Attabitra (ATS)

13Bargarh Rd.

(BRGA)

14 Bappali (BRPL)

15 Dungripali (DJX)

Agency :-

Status of Telecom Works for Railway Electrification targetted in 2014-15

Jharsuaguda - Dungripali

Remark/ Status

TELECOM

Sl.

NoStations

C/H

Bldg.

MainAddnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

REPCE

xis

ting

Exis

ting

Exis

ting

To be

provided

by RE

Not

Provided

Not

Provided

Project: BBS Main Section: RKM: 238

25 KV Targeted Section: NIL RKM: 0

Gr.No. 170B PDC- As on 30.05.2014

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

1 Dungripali (DJX)

2 Khaliapali (KHPL)

3 Loisinga (LSX)

4Balangir Rd P.H.

(BNDR)

5 Balangir (BLGR)

6Deogaon Rd

(DFR)

7 Saintala (SFC)

8 Badmal (BUDM)

9 Sikir (SFK)

10Titalagarh Jn.

(TIG)

Agency :-

Status of Telecom Works for Railway Electrification targetted in 2014-15

Dungripali (Excl)-Titlagarh (Excl)

Remark/

Status

TELECOM

Sl.

NoStations

C/H

Bldg.

MainAddnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

REPC

Exis

ting

Exis

ting

Exis

ting

To be

provided

by RE

Not

Provided

Not

Provided

Project: KKK RKM: 57

RKM: 57

Gr.No. 168 PDC-Dec'14 As on 30.05.2014

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

1 Andal (UDL)

2 Sonachara (SCH) SSP 0%

3 Tapasi (TOP) SSP 0%

4 Ikra

5 Jamuria SP 0%

6 Barabani (BBI) TSS 0%

7 Chinchuriya (COR) SSP 0%

8 Sitarampur (STN)

Status of TPC

phone

REPC

Su

rve

y c

harg

e

sa

nctio

ne

d.

To be

laid

Exis

tin

g

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS

Bldg

status

Cable laying for

SP/SSP/TSS

Status of Telecom Works for Railway Electrification targetted in 2014-15

Main Section: Andal-Sitarampur

25 KV Targeted Section: Andal-Sitarampur

Tender

opening on

06.06.14

Agency : Tender refloated.

TELECOM

Sl.

NoStations

C/H

Bldg.

MainAddnl

MUX

By RE

Remark/

Status

Exis

tin

g

Not req

Req.

Req.

Exis

tin

g

Exis

tin

g

Project: MAS Main Section: RKM: 175

25 KV Targeted Section: Calicut Yard RKM: 4

RKM: 89

RKM: 86

Gr.No. 157 PDC-Jun'14 As on 30.05.2014

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

1 Shorannur (SRR)

2 Karakad (KRKD)

3 Pattambi (PTB) SSP 80% 0.5 Comp

4Kodumunda

(KODN)

5 Pallippuram (PUM) SP 90% 1.5 Comp

6Perashshannur

(PEU)

7 Kuttippuram (KTU) SSP 40% 0.6 Comp

8 Tirunnavaya (TUA)

9 Tirur (TIR) TSS 0% 0.4

Status of Telecom Works for Railway Electrification targetted in 2014-15

Shoranur - Kannur

2.2 to 25 KV Targeted Section: Calicut- Kannur

Agency :-

Outdoor- M/s Thakur Entp

Rajiv-09438587275

LOA-01.11.11,DOC-28.02.14

Indoor- M/s Webfill

Uttam-09681755645

LOA-01.11.11,DOC-30.4.14

TELECOM

Sl.

NoStations

C/H

Bldg.

MainAddnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

REPCRemark/

Status

1. Cable

terminated at

KRKD, PTB,

PUM, KTU,

CLK & FK.

2. 18 EMC

post erected.

3. Earth

provided at

PTB,PGI &

VLI

ProvidedNot

Provided

CRS Targeted Section:Shoranur-Calicut

Not

Provided

25 K

V D

yn

am

ic c

leara

nce

re

ceiv

ed

Exis

tin

g

Exis

tin

g

Exis

tin

g

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

Sl.

NoStations

C/H

Bldg.

MainAddnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

REPCRemark/

Status

10 Tannur (TA)

11Parapanangadi

(PGI)SSP 40% 0.8 Comp

12 Vallikunnu (VLI)

13 Kadalundi (KN)

14 Ferok (FK) SP 60% 1.5 Comp

15 Kallayi (KUL)

16 Kozhikode (CLT) SSP 0% 0.5

17 Vellayel (VLL)

18 West Hill (WH)

19 Elattur (ETR)

20 Chemacheri (CMC)

21 Quilandi (QLD) TSS 0% 0.8 Comp

22 Vellarakkad (VEK)

23 Tikkotti (TKT) SSP 0% 0.6 Comp

24 Payyoli (PYOL)

25 Iringal (IGL)

Exis

tin

g

Exis

tin

g

Exis

tin

g

ProvidedNot

Provided

Not

Provided

25 K

V D

yn

am

ic c

leara

nce

re

ceiv

ed

22 MUX & 5

STM for LH

installed.

Indoor work

Completed.

Outdoor Work

for

SP/SSP/TSS

in progress.

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

Sl.

NoStations

C/H

Bldg.

MainAddnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

REPCRemark/

Status

26 Badagara (BDJ)

27Nadapuram

Rd.(NAU)

28 Mukkali (MUKE) SP 0% 4.5 Comp

29 Mahe (MHE)

30Jagannath Temple

(JGE)

31 Tellicherry (TLY)

32 Dharmadam (DMD)

33 Etakkot (ETK)

34 Kannur South (CS) TSS 0% 0.5 Comp

35 Kannur (CAN)

Exis

tin

g22 MUX & 5

STM for LH

installed.

Indoor work

Completed.

Outdoor Work

for

SP/SSP/TSS

in progress.

Exis

tin

g

Exis

tin

gProvided

Not

Provided

Not

Provided

25

KV

Dyn

am

ic c

lea

ran

ce

re

ce

ive

d

Project: MAS RKM: 153

25 KV Targeted Section: Nethtavati-Penambur RKM: 23

RKM: 50

Gr.No. 158 PDC-Jun'14 As on 30.05.2014

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

1 Kannur (CAN)

2 Chirakkal (CQL)

3Valapattinam

(VAPM)

4Pappinisseri

(PPNS)SSP 0%

5Kannapuram

(KPQ)

6 Payangadi (PAZ) SP 0%

7 Elimala (ELM)

8 Payyanur (PAY) SSP 0%

9 Trikarpur (TKQ)

Exis

tin

g

Exis

tin

g

Exis

tin

g

ProvidedNot

Provided

REPC Remark/ Status

Not

Provided

2.2

KV

anti t

heft

cle

ara

nce

ob

tain

ed

20 MUX & 10 STM for

long haul installed.

Indoor work complete.

SP/SSP/TSS building

work not yet started.

Addnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

TELECOM

Sl.

NoStations

C/H

Bldg.

Main

2.2 to 25 KV Targeted Section: Kannur-Charvattur

Status of Telecom Works for Railway Electrification targetted in 2014-15

Kannur-Manglore-PenamburMain Section:

Agency :- Outdoor- Tender discharged.

Indoor- M/s Webfill

Uttam-09681755645

LOA-01.11.11,DOC-30.4.14

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

REPC Remark/ Status

Addnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phoneSl.

NoStations

C/H

Bldg.

Main

10Chandera (H)

(CDRA)

11 Charvattur (CHV) TSS 0%

12 Nileshwar (NLE)

13 Kanhangad (KZE) SSP 0%

14 Pallikere (PKP)

15 Kotikulam (KQK)

16 Kalanad (KLAD)

17 Kasaragod (KGQ) TSS 0%

18 Kumbla (KMQ) SSP 0%

19 Uppala (UAA)

20 Manjeshwar (MJS) SP 0%

21 Ullal (ULL)

22 Tokkuttu (KOT) SSP 0%

23Nethravathi

(NTVT)

24 Bekal Fort (BFR) SP 0%

25Mangalore Jn.

(MAQ)TSS 0%

Not

Provided

2.2

KV

anti t

heft

cle

ara

nce

ob

tain

ed

20 MUX & 10 STM for

long haul installed.

Indoor work complete.

SP/SSP/TSS building

work not yet started.

Exis

tin

g

Exis

tin

g

Exis

tin

g

ProvidedNot

Provided

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

REPC Remark/ Status

Addnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phoneSl.

NoStations

C/H

Bldg.

Main

26Nethravathi

(NTVT)

27 Sutarpete (SOTE)

28Kankanadi

(KNKD)

29 Thokur (TOK)

30Panambur

(PNMB)

Exis

tin

g

Exis

tin

g

Exis

tin

g

ProvidedNot

Provided

Not

Provided

2.2

KV

anti t

heft

cle

ara

nce

obta

ined

Project: MAS RKM: 262

2.2 KV to 25 KV Targeted section : NIL RKM: 56

CRS Targeted section : Virudhunagar-MEJ-TEN & MEJ-TN RKM: 147

Gr.No. 154 PDC-Jun'14 As on 30.05.2014

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

1 Madurai Jn.(MDU) SSP 0.8

2Tiruparankundram

(TDN)

3Tirumangalam

(TMG)SP 3.5

4 Kalligudi (KGD) SSP 0.2

5Virudunagar Jn.

(VPT)TSS 1.0

6 Tulukapatti (TY) SSP 0.3

7 Sattur (SRT) SP 6.1

8 Nalli (NLL)

9 Kovilpatti (CVP) TSS 0.2

10Kumarapuram

(KPM)SSP 0.2

11 Kadambur (KDU) SP 1.2

12

Vanchi

Maniyachchi Jn.

(MEJ)TSS 0.5

Status of Telecom Works for Railway Electrification targetted in 2014-15

Main Section:

Agency :- M/s J.Hussain Farid

LOA-12.11.10,DOC-31.12.13

Comp

Remark/ Status

TELECOM

Sl.

NoStations

C/H

Bldg.

MainAddnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS Bldg

status

Cable laying for

SP/SSP/TSS

Madurai (Excl)-Nagercoil & Vanchimanyachi-Tutucorin

REPC

Status of TPC

phone

Not

Provided

Provided Provided

Exis

ting

Exis

ting

Exis

ting

Additional

Muxes

provided

by division

against

RE Funds

25

KV

Dyn

am

ic C

lea

ran

ce

ob

tain

ed

Not

Provided

Comp

CRS inspection

completed on

21.08.13

Comp Work completed

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

Remark/ StatusSl.

NoStations

C/H

Bldg.

MainAddnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS Bldg

status

Cable laying for

SP/SSP/TSS

REPC

Status of TPC

phone

13 Naraikkinar (NRK)

14Gangaikondan

(GDN)SSP 0.3

15 Talaiyuthu (TAY)

16Tirunelveli Jn.

(TEN)

17Melappalayam

(MP)SP 0.2

18 Sengulam (SGLM) SSP 0.6

19 Nanguneri (NNN) TSS 50% 0.3

20 Valliyur (VLY) SSP 0.6

21 Aralvaymoli (AAY)

22 Tovalai (THX) SP 4

23 Nagercoil Jn. (NCJ)

24

Vanchi

Maniyachchi Jn.

(MEJ)

TSS 0.5

25Pandiyapuram

(PYM)

26Kailaspuram

(KLPM)

27 Tattapparai (TIP) SSP 0.2

28 Milavittan (MVN)

29 Tutimellur (TME)

30 Tuticorin (TN)

Provided Provided

Provided ProvidedE

xis

tin

g

Exis

tin

g

Exis

tin

g

Additional

Muxes

provided

by division

against

RE Funds

Comp

Comp

Work completed

Provided Provided

25

KV

Dyn

am

ic C

lea

ran

ce

ob

tain

ed

Comp

Project: MAS RKM: 150

CRS Targeted section : Villipuram - Vellore RKM: 150

Gr.No. 155 PDC-Apr'14 As on 30.05.2014

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

1Vullupuram

Jn.(VM)

2Venkatesapuram

(VKM)

3 Teli (TEI)

4Mambalapattu

(MMP)SP Comp 1.7

5 Ayandur (AYD)

6 Mugaipur (MUY)

7 Tirikkovilur (TRK) SSP Comp 0.5

8 Adichchanur

(ACN)9

Andampallam

(AND)

10 Tandarai (TNI) TSS Comp 0.7

11Tiruvannamalai

(TNM)SSP Comp 0.6

12Turinjapuram

(TJM)

Addnl

MUX

By RE

SP/SSP/

TSS

Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

REPC

TELECOM

Sl.

NoStations

C/H

Bldg.

Main

Status of Telecom Works for Railway Electrification targetted in 2014-15

Main Section: Villipuram (Excl)-Vellore (Excl)

Agency :- M/s-Puncom

LOA-06.09.11, DOC-31.03.14

Comp Provided Provided

SP/SSP/

TSS Bldg

Location

Exis

ting

Exis

ting

Exis

ting

Not Req.

Remark/ Status

25

KV

Dyn

am

ic C

lea

ran

ce

ob

tain

ed

Work Completed

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

Addnl

MUX

By RE

SP/SSP/

TSS

Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

REPCSl.

NoStations

C/H

Bldg.

MainSP/SSP/

TSS Bldg

Location

Remark/ Status

13Agaram Sibbandi

(AGM)SP 1.7

14 Polur (PLR) SSP 0.4

15 Arni Road (ARV) TSS 0.4

16Sedarampattu

(SDPT)

17Kannamangalam

(KMM)SSP Comp 0.5

18Kaniyambadi

(KNB)

19

Vellore

Cantonment

(VLR)

SP Comp 4.5

Comp Provided Provided

Comp

Exis

tin

g

Exis

tin

g

Exis

tin

g

Not Req.

25

KV

Dyn

am

ic C

lea

ran

ce

ob

tain

ed

Work Completed

Project: MAS RKM: 33

25 KV Targeted Section: Mettupalayam Yard RKM: 3

RKM: 33

CRS Targeted section : Coimbatore North - Mettupalaiyam RKM: 33

Gr.No. 169 PDC-Jun'14 As on 30.05.2014

OFC6

Quad

Total

(Km)

Comp.

(Km)

At

Stns.

At

SP/SSP/

TSS

1Coimbatore North

Jn. (CBF)SSP

Periyanaikanpalaiy

am (H)

2 Karaimadai (KAY) SSP

3Mettupalaiyam

(MTP)

SP/SSP/

TSS

Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

REPCRemark/

Status

Exis

ting

Exis

ting

Exis

ting

To be

provided

Su

rvey c

ha

rge

s

pa

ym

en

t

sa

nctio

ne

d.

SP/SSP/

TSS Bldg

Location

Status of Telecom Works for Railway Electrification targetted in 2014-15

Main Section: Coimbatore (Excl)-Mettupalaiyam (Excl)

Agency :- Tender to be floated

TELECOM

Sl.

NoStations

C/H

Bldg.

MainAddnl

MUX

By RE

2.2 to 25 KV Targeted Section: Coimbatore North - Mettupalaiyam

Project:JP RKM: 231

25 KV Targeted Section: NIL RKM: 0

RKM: 10

RKM : 10

Gr.No. 148 PDC-May'14 As on 30.05.2014

Total

(Km)

Comp

(Km)Total Comp. At Stns.

At

SP/SSP/

TSS

1 Jhansi (JHS) Exist SP

2 Mustra TSS 0.6

3 Garhmau (GRN)

4 Parichha (PIC) SSP 1.1

5Parichha Thermal

Siding (PTSC)

6 Chirgaon (CGN) SP 1.6

7 Nand Khas (NDK) SSP 0.8

8 Moth (MOTH) TSS 0.8

MainStatus of TPC

phone

REPC Remark/ Status

CR

S o

bta

ine

d.

Provided

SP/SSP/

TSS Bldg

Location

Status of Telecom Works for Railway Electrification targetted in 2014-15

Jhansi-Kanpur Including Ait-Konch

2.2 to 25 KV Targeted Section: Kanpur Anwarganj-Kalyanpur

Main Section:

JHS to Moth

(55RKM)-CRS

sanction received

on 24.09.12

Provided

Indoor- M/s Webfil

Manas-09830792026

LOA-10.10.11,DOC-31.06.14

TELECOM

Sl.

No.Stations

C/H

Bldg.

CRS Targeted Section : Kanpur Anwarganj-Kalyanpur

CompComp

Comp

Exis

ting

Comp Comp.

Agency :-

Outdoor- M/s Karan Singh

Sant Singh-09452023321

LOA-10.08.11,DOC-31.05.14

SP/SSP/

TSS

Bldg

status

Cable laying for

SP/SSP/TSS6

Quad

Total

(Km)

Comp

(Km)Total Comp. At Stns.

At

SP/SSP/

TSS

MainStatus of TPC

phone

REPC Remark/ Status

SP/SSP/

TSS Bldg

Location

Sl.

No.Stations

C/H

Bldg.

SP/SSP/

TSS

Bldg

status

Cable laying for

SP/SSP/TSS6

Quad

9 Erich Road (ERC) SSP 1.0

10 Parauna (PRN) SSP 0.8

11 Ait Jn. (AIT) SP 2.1

12 Bhua (BHUA) 80% SSP 0.6

13 Orai (ORAI) TSS - 6.0

14 Ata (Ata) SSP 0.7

15 Kalpi (KPI)

16 Chaurah (TNH) SP 2.7

17 Pukhrayan (PHN) SSP 0.8

18 Lalpur (LLR) TSS 0.8

19 Pama (PMN) 80% SSP 1

20 Bhimsen (BZM) 95% SP 6.2

21 Govindpuri (GOY) Exist Exist Exist

22Kanpur Central

(CNB)Exist Exist Exist

25

KV

Dyn

am

ic c

lea

ran

ce

rece

ived

.

CRS inspection

of Moth - Goy

done on

16/17.09.13

Provided Provided

Provided Provided

Comp.

Comp.

Comp

Comp

Exis

ting

CompCompComp

Comp

Comp Comp

Total

(Km)

Comp

(Km)Total Comp. At Stns.

At

SP/SSP/

TSS

MainStatus of TPC

phone

REPC Remark/ Status

SP/SSP/

TSS Bldg

Location

Sl.

No.Stations

C/H

Bldg.

SP/SSP/

TSS

Bldg

status

Cable laying for

SP/SSP/TSS6

Quad

23 Kalyanpur

24 Anwarganj SSP 0% 2.9

25Kanpur Central

(CNB)

26 Ait Jn. (AIT) Comp SP Comp 2.1 Comp.

27 Konch Jn. (KNH) 95%

1.OFC blowing comp.

2. Jhansi to Kanpur OFC commissioned & handed over to RCIL .

3. OFC Building work in progress at three stations - Bhua, Pama, Bhimsen.

4. Kalyanpur, Anwarganj indoor OFC equipment to be installed.

5. OFC splicing 6 Nos. to be done in Ait-Konch.

Not

Provided

Not

Provided

Provided ProvidedComp Comp

Exist

Mu

x

Pro

vid

ed

.

Comp

Exist

Exis

t

Project: JP RKM: 72

25 KV Targeted Section: NIL RKM: 0

RKM: 72

RKM : 72

Gr.No. 165 PDC-Feb'15 As on 30.05.2014

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

1 Rewari (RE) SP 0%

2Rewari Anajmandi

(ANAI)

3 Karnawas (KNGT) SSP 0%

4 Bhrawas

5 Bawal (BWL) SSP 0%

6Majri Nangal

(MJNL)SSP 0%

7 Ajerka (AIA) SSP 0%

8 Khanpur-Ahir SSP 0%

9 Harsauli (HIS)

10 Khairthal (KRH) TSS 0%

11 Ghatla (GAL) SSP 0%

12 Parisal (PSL) SSP 0%

13 Alwar (AWR) SP 0%

2.2

KV

anti t

heft

cle

ara

nce

re

ceiv

ed.

Additonal

MUX has

been

provided at

all stations.

Work in

progress

SP/SSP/

TSS Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

Not

Provided

Main Section:

Exis

tin

g

Exis

tin

g

Exis

tin

g

Not

ProvidedProvided

Sl.

NoStations

C/H

Bldg.

Main

Status of Telecom Works for Railway Electrification targetted in 2014-15

Alwar-Rewari

Agency :-

M/s Kandelwal

Khandelwal-09414050260

LOA-16.08.12,DOC-31.08.14

TELECOM

2.2 to 25 KV Targeted Section: Alwar-Rewari

CRS Targeted Section : Alwar-Rewari

REPCRemark/

Status

Addnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

Project: JP RKM: 123

25 KV Targeted Section: NIL RKM: 0

RKM: 123

RKM : 123

Gr.No. 163 PDC-Oct'14 As on 30.05.2014

Total HDPEOFC

Blow

6

QuadTotal Comp.

At

Stns.

At

SP/SS

P/ TSS

1 Mathura

(MTJ)0

2 Bhuteshwar Mathura-

Bhuteshwar2.41 0 SP 100% 1.4 1.4

3 Mora 10%Bhuteswar-

Mora9.33 9.3 9.33 SSP 0%

4 Radha Kund SSP 95% 7.7 7.7

5Govardhan

(GDO)Porta

Mora -

Govardhan14.04 14.0 14 SSP 80% 1.7 1.7

6 Vehaj SSP 10% 7.4 7.0

7 Deeg (DEEG) 95%Govardhan -

Deeg15.18 15.0 15 TSS 0% 0.8 0.8

8Bedham

(BEDM)90%

Deeg -

Bedham12.01 11.8 10 SSP 60% 0.7 0.7

9 Barsana SSP 0% 7.0 6.8

10 Brijnagar 30%Bedham-

Brijnagar12.24 12.0 12 SP 0% 1.9 1.9

To be

Provide

d

Not

Prov

Not

Prov

Main Section:

STM

& MUX

By RE

Main

CRS Targeted Section : Mathura-Alwar

Exist

SP/SSP

/ TSS

Bldg

Locatio

n

SP/SSP/

TSS

Bldg

status

Cable laying

for

SP/SSP/TSS

Status of TPC

phoneRemark/

Status

TELECOM

Sl.

NoStations

C/H

Bldg.REPC

Block

Section

Exis

ting

25 K

V D

ynam

ic c

leara

nce r

eceiv

ed

Status of Telecom Works for Railway Electrification targetted in 2014-15Mathura (Excl) - Alwar

2.2 to 25 KV Targeted Section: Mathura-Alwar

Agency :-M/s Micromap,LKO

LOA-22.02.13,DOC-30.06.14

Total HDPEOFC

Blow

6

QuadTotal Comp.

At

Stns.

At

SP/SS

P/ TSS

STM

& MUX

By RE

Main SP/SSP

/ TSS

Bldg

Locatio

n

SP/SSP/

TSS

Bldg

status

Cable laying

for

SP/SSP/TSS

Status of TPC

phoneRemark/

Status

Sl.

NoStations

C/H

Bldg.REPC

Block

Section

11 Jhareda SSP 0% 6.5 6.0

12Govindgarh

(GVH)Porta

Brijnagar -

Govindgarh12.2 11.6 SSP 0% 0.8 0.7

13Jadali Ka Bas

(JBS)Porta

Govindgarh -

Jadoli ka

Bas

11.49 10.4 SSP 0% 0.7 0.6

14Ramgarh

(RAH)95%

Jadoli Ka

Bas-

Ramgarh

8.46 7.2 TSS 60% 0.5

15 Ootwar (OTO) PortaRamgarh -

Ootward11.09 8.0 SSP 0% 0.6

16 Gazika SP 0% 7.5

17 Alwar (AWR) ExistOotward-

Alwar14.73 2.0 4.0

123.2 101.4 60.33 49.15 35.3

25 K

V D

ynam

ic c

leara

nce r

eceiv

ed

Exis

ting

To be

provide

d

Not

Prov

Not

Prov

Project: JBP RKM: 209

25 KV Targeted Section: Cheoki - Manikpur RKM: 92

Gr.No. 173 A PDC-Mar'15 As on 30.05.2014

OFC4

QuadTotal Comp.

At

Stns.

At

SP/SSP/

TSS

1 Naini (NYN)

2 Link Jn. (LKJN)

3 Iradatganj (IDGJ) SSP

4 Jasra (JSR)

5 Lohgara (LOG) SP

6Shankargarh

(SRJ)

7 Majhiari (MJHR) SSP

8 Bargarh (BRG)

9Kataiya Dandi

(KTDD)TSS

10 Dabhaura (DBR)

11 Panhai (PNHI) SSP

12Manikpur Jn.

(MKP)

SP/SSP/

TSS Bldg

Location

Status of Telecom Works for Railway Electrification targetted in 2014-15

Main Section: Cheoki-Manikpur including Satna- Rewa

Agency :- Tender to be floated.

TELECOM

Sl.

NoStations

C/H

Bldg.

MainAddnl

MUX

By RE

Not

Provided

Tender to

be floated.

SP/SSP/

TSS Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

REPCRemark/

Status

To b

e r

ep

lace

by 6

Qu

ad

Exis

ting

Exis

ting

To be

provided

Not

Provided

Project: JBP RKM: 209

25 KV Targeted Section: Satna- Rewa & Satna- Jaitwar RKM: 70

Gr.No. 173B PDC-Mar'15 As on 30.05.2014

OFC4

QuadTotal Comp. At Stns.

At

SP/SSP/

TSS

1 Satna (STA)

2 Kaima (KMA)

3 Sakaria (SAKR) SSP

4Hinauta Ramban

(HNM)

5Baghai Road

(BGHI)SP

6 Turki (TZR)

7 Rewa (REWA) SSP

8 Jaitwar (JTW)

9 Hati (HATI) TSS

10 Sagma (SAGM)

Not

Provided

Remark/

StatusREPC

Exis

ting

Exis

ting

To b

e r

ep

lace

by 6

Qu

ad

To be

provided

Not

Provided

Status of Telecom Works for Railway Electrification targetted in 2014-15

Cheoki-Manikpur including Satna- Rewa

Agency :-

TELECOM

Sl.

NoStations

C/H

Bldg.

MainCable laying for

SP/SSP/TSS

Status of TPC

phone

Main Section:

Tender to be floated

Addnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS Bldg

status

Project: JBP RKM: 485

25 KV Targeted Section: Katni-Maihar RKM: 60

Gr.No. 174 PDC-Mar'15 As on 30.05.2014

OFC4

QuadTotal Comp. At Stns.

At

SP/SSP/

TSS

1 Satna Jn. (STA)

2Lagargawan

(LGCE)

3 Unchehara (UHR) SSP

4 Maihar (MYR)

5 Bhadanpur (BUU) SP

6 Amdara (UDR)

7Pakariya Rd

(PKRD)SSP

8 Jukehi (JKE)

9 Patwara (PTWA) TSS

10 Katni Jn. (KTE)

11Katni South (KTE-

S)SSP

12Madhavnagar

(MDVR)

TELECOM

Status of Telecom Works for Railway Electrification targetted in 2014-15

Main Section: Satna-Jabalpur

Agency :- Tender to be floated.

Sl.

NoStations

C/H

Bldg.

MainAddnl

MUX

By RE

Not

Provided

SP/SSP/

TSS

Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

REPCRemark/

Status

SP/SSP/

TSS Bldg

Location

Exis

ting

Exis

ting

To b

e r

ep

lace

by 6

Qu

ad

To be

provided

Not

Provided

OFC4

QuadTotal Comp. At Stns.

At

SP/SSP/

TSS

Sl.

NoStations

C/H

Bldg.

MainAddnl

MUX

By RE

SP/SSP/

TSS

Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

REPCRemark/

Status

SP/SSP/

TSS Bldg

Location

13Sleemnabad

(SBD)14 Dundi (DDCE)

15Sihora Road

(SHR) 16 Gosalpur (GSPR) SSP

17 Deori (DOE)

18 Adhartal (ADTL)

19Jabalpur Jn. (JBP)

Project: LKO RKM: 207

25 KV Targeted Section: NIL RKM: 0

RKM: 207

Gr.No. 153 PDC-Oct'14 As on 30.05.2014

Total

(Km)

Comp

(Km)

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

1Varanasi Jn.

(BSB)

2 Lohata (LOT) BSB-LOT 6.5 SSP Comp 0.9

3Chaukhandi

(CHH)LOT-CHH 11 SP Comp 2

4 Sewapuri (SWPR)CHH-

SWPR7

5 Kapsethi (KEH)SWPR-

KEH5.5 SSP Comp 0.6

6 Parsipur (PRF) KEH-PRF 8.5

7 Bhadohi (BOY) PRF-BOY 8.5 TSS Comp 0.5

8 Mondh (MOF) BOY-MOF 8.2

9 Suriawan (SAW) MOF-SAW 7.4 SSP 90% 0.5

Comp

Comp

REPCRemark/

Status

Exis

ting

ProvidedNot

Provided

25

KV

Dyn

am

ic c

lea

ran

ce

rece

ived

6

Quad

SP/SSP/

TSS

Bldg

Location

SP/SSP

/ TSS

Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

Status of Telecom Works for Railway Electrification targetted in 2014-15

Varanasi-Phaphamau-Unchahar-ALD

Agency :-

Outdoor -M/s Purvanchal,Jaunpur

Sanjay Singh-09415207132

LOA-23.07.10,DOC-30.06.14

Indoor- M/s Micromap,LKO

Jagdish Singh-09838078055

LOA-09.11.12,DOC-31.07.14

Main Section:

CRS Targeted Section : NIL RKM: 0

2.2 to 25 KV Targeted Section: BSB-Phaphamau incl ALD-Prayag-Phaphamau-Unchahar

TELECOM

Sl.

NoStations

C/H

Bldg.

OFC Main

Comp

Block

Section

Total

(Km)

Comp

(Km)

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

REPCRemark/

Status

6

Quad

SP/SSP/

TSS

Bldg

Location

SP/SSP

/ TSS

Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phoneSl.

NoStations

C/H

Bldg.

OFC Main

Block

Section

10Sarai Kansari

(SON)95% SAW-SQN 10

11 Janghai Jn. (JNH) 80% SQN-JNH 5.5 SP 90% 2.0 Comp

78.1 78.1

12Baryarampur

(BYHA)SSP 80% 0.3 0.0

13Ugrasenpur

(URPR)

14 Phulpur (PLP) SSP 50% 0.7 0.0

15Saraichandi

(SYC)TSS 80% 0.6 0.0

16 Tharwai (THW)

17Phaphamau Jn.

(PFM)

18Allahabad Jn.

(ALD)SP 100% 1.5 0.0

19 Prayag (PRG) SP 70% 1.5 0.0

20Phaphamau Jn.

(PFM)80% SSP 90% 1.0 Comp

21 Atrampur (ARP) PFM-ARP 14 SP 60% 1.7 Comp.

22Ramchaura Road

(RMC)ARP-RMC 7

23Lalgopalganj

(LGO)RMC-LGO 7.5 SSP 65% 0.7 Comp

24 Bhadri (BHDR) LGO-BHDR 7

25Kunda H. Ganj

(KHNM)90%

BHDR-

KHNM7.2 7.2 SSP 70% 0.7 0

Comp

25

KV

Dyn

am

ic c

lea

ran

ce

rece

ived

ProvidedNot

Provided

Exis

ting

Comp

BSB to JNH

Comp

Commissioned by NR

Total

(Km)

Comp

(Km)

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

REPCRemark/

Status

6

Quad

SP/SSP/

TSS

Bldg

Location

SP/SSP

/ TSS

Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phoneSl.

NoStations

C/H

Bldg.

OFC Main

Block

Section

26Garhi Manakpur

(GRMR)90%

KHNM-

GRMR11.8 5.4 TSS 70% 0.7 Comp

27Pariawan Road

(PON)85%

GRMR-

PQN7.2 0.0 SSP 60% 0.9 Comp

28 Arkha (ARKA) 70%PQN-

ARKHA8.8 0.0 SSP 70% 0.6 Comp

29Unchahar Jn.

(UCR)80%

ARKHA-

UCR2.5 0.0

73 47.0PFM-UCR

Outdoor:

Total OFC blowing done - 125/151Km.

OFC blowing & splicing completed from BSB to Janghai. (78/78 RKM)

OFC blowing from Phaphamau to Kunda Ganj completed.(47/73 RKM)

Total Splicing done-37/61 Nos.

Splicing from BSB to Jangahai done. (37/37 Nos.)

Splicing from Phaphamau to Unchahar to be done. (0/24 Nos.)

Indoor:

Commissioning of MUX & STM done from BSB to Janghai . Mux & STM installed from PFM to Bhadri.

Cable laying for SP/SSP/TSS completed at Lohta,Chaukhandi, Kapsethi,Bhadoi & Jangahi,Garhi Manikpur,Pariawan & Arkha.

Jointing completed at BSB to Atrampur.

TPC commissioned from BSB-PFM ,Prayag.

Project: LKO RKM: 181

25 KV Targeted Section: Sitapur Cantt-Rosa RKM: 86

RKM: 95

Gr.No. 164 PDC-Mar'15 As on 30.05.2014

Total HDPEOFC

Blow

6

Quad

Total

(Km)

Comp.

(Km)

At

Stns.

At

SP/SSP/

TSS1 ROSA (RAC) 5% SSP

2 Bantara (BRTA) 25%RAC-

BRTA8.0 0.00

3 Unchaulia (UCH) 75%BRTA-

UCH5.0 2.00 SSP 0%

4Jangbahadur

ganj (JBG)75%

UCH-

JBG11.3 8.00 SP 0%

5Jahani Khera

(JKH)60%

JBG-

JKH7.1 3.50

6Mahgal Ganj

(MING)Comp

JKH-

MING10.5 7.30 SSP 0%

8 Maholi (MAHO) 85%MING-

MAHO15.7 10.40 SSP 0%

9 Hempur (HMP) 85%MAHO-

HMP9.9 6.20 TSS 60%

10Sitapur City

(SPC)

HMP-

SPC11.9 8.00 SP 0%

12Sitapur Cantt

(SCC)

SXK-

SCC4.4 0.00 SP 0%

83.5 45.3

Not

Provided

Exis

ting

RAC to SCC

TELECOM

Sl.

NoStations

C/H

Bldg.

MainBlock

Section

Rosa-Sitapur-Burhwal

Status of Telecom Works for Railway Electrification targetted in 2014-15

Agency:- M/s Micromap,LKO

LOA-15.03.12,DOC-30.06.14

Main Section:

2.2 to 25 KV Targeted Section: Burhwal-Sitapur Cantt

REPCRemark/

Status

Status of TPC

phone

Not

Provide

d

Not

Provided

2.2

KV

an

ti-t

he

ft c

lea

ran

ce

ob

tain

ed

.

STM &

MUX

By RE

SP/SSP

/ TSS

Bldg

Locatio

n

SP/SSP

/ TSS

Bldg

status

Cable laying for

SP/SSP/TSS

Total HDPEOFC

Blow

6

Quad

Total

(Km)

Comp.

(Km)

At

Stns.

At

SP/SSP/

TSS

Sl.

NoStations

C/H

Bldg.

MainBlock

SectionREPC

Remark/

Status

Status of TPC

phoneSTM &

MUX

By RE

SP/SSP

/ TSS

Bldg

Locatio

n

SP/SSP

/ TSS

Bldg

status

Cable laying for

SP/SSP/TSS

13Tappakhajuria

Halt (TKUR)SP 0%

14 Parsendi (PSN) SSP 0% 0.8 Comp

15 Viswan (BVN) Comp TSS 20%

16 Sarayan (SYU) 64% SSP 0%

17Mahmudabad

(MMB)SSP 0%

18Mundagopal

Ashram (MGPA)

19Tahsil Fatehpur

(TSF)SP 0%

20Sundhiamau

(SDAM)SSP 0%

21 Burhwal (BUW) 51% TSS 0%

1. Main OFC work of 83.0 Km from ROSA to Sitapur Cantt of NR is to be done by RE.

2. HDPE Duct laying in progress. Total Duct laid 45.4 RKM, OFC blowing yet to start.

3. Sitapur Cantt to Burhwal OFC work commissioned by NER.

Exis

tin

g To be

provided

by RE

Exis

tin

g

At Parsendi

Stn to SSP

PIJF 10 Pr

800mtrs laid.C

om

mis

sio

ne

d b

y N

ER

Not

Provide

d

Not

Provided

2.2

KV

an

ti-t

he

ft c

lea

ran

ce

ob

tain

ed

.

Project: GKP RKM: 245

25 KV Targeted Section: NIL RKM: 0

RKM: 147

RKM: 245

Gr.No. 142 PDC-Oct'14 As on 30.05.2014

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

1 Barabanki (BBK) SP 2.2

2Jahangirabad

(JBR)

3 Rafi Nagar (RFR)

4 Bindaura (BUR) SSP 1.3

5 Burhwal (BUW) TSS 0.7

6Chowka Ghat

(CKG)

7Ghaghra Ghat

(GHT)

8 Jarwal Rd (JLD) SSP 0.3

9 Sarju (SUJ)

10 Colonelganj (CLJ) SP 1.2

11 Kasturi (KSR)

12 Maijapur (MIR) SSP 1.3

Exis

ting

Exis

ting

Comp

Cable laying for

SP/SSP/TSSAddnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS Bldg

status

Provided ProvidedComp

Work

completed in

BBK-Maijapur

section

Provided

25

KV

Dya

na

mic

cle

ara

nce

ob

tain

ed

.

Main

Status of Telecom Works for Railway Electrification targetted in 2014-15

Barabanki (Excl)-Gorakphpur Cantt (Excl)

2.2 to 25 KV Targeted Section: Baruachak-Govindnagar-GKP Cantt

Agency :-

Outdoor- M/s ITI, LKO

Adip Sinha -09450453520

LOA-28.05.08,DOC-31.3.14

Indoor- M/s Fibcom

LOA-15.01.08,DOC-14.01.09

Main Section:

CRS targeted Section : Barabanki-Gonda-GKP Cantt

Remark/

Status

Status of TPC

phone

REPC

TELECOM

Sl.

NoStations

C/H

Bldg.

Exis

ting

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

Cable laying for

SP/SSP/TSSAddnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS Bldg

status

Main

Remark/

Status

Status of TPC

phone

REPCSl.

NoStations

C/H

Bldg.

13 Kathola (KTHL)

14Gonda Kacheri

(GDK)

15 Gonda (GD) SSP Comp 0.7

16 Baruachak (BRCK) TSS Comp 0.5 Comp Provided

17 Motiganj (MOTG)

18 Jhilahi (JLHI) SSP Comp 0.7

19 Mankapur (MUR)

20Lakhpatnagar

(LKNR)SSP 0% 0.6

21 Maskanwa (MSW)

22Swaminarayan

(SNC)SP 0% 1

23 Babhan Jyotiya

24 Babhnan (BV) SSP 0% 0.6

25 Gaur (GAU) SSP Comp 0.8

26 Tinich (TH)

27Govind Nagar

(GOVR)TSS Comp 0.7 Comp Provided

28 Basti (BST)

29 Orwara (ORW) SSP 0% 0.7

30 Munderwa (MND)

31 Chureb (CRV) SSP 0% 1

32 Khalilabad (KLD) SP 0% 1.6

Exis

tin

g

Exis

tin

g

Provided Provided

SSP/TSS/SP

building not

ready.

Not

Provided

Not

Provided

25

KV

Dya

na

mic

cle

ara

nce

ob

tain

ed

.

Not

Provided

Exis

tin

g

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

Cable laying for

SP/SSP/TSSAddnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS Bldg

status

Main

Remark/

Status

Status of TPC

phone

REPCSl.

NoStations

C/H

Bldg.

33 Maghar (MHH) SSP 0% 3.5

34 Sihapar (SIPR)

35 Sahjanwa (SWA)

36 Jagat Bela (JTB) SSP 0% 1.2

37Domingarh (DMG)

38Gorakhpur City

(GKY)

39 Gorahkpur (GKP) SSP 0% 1.3

40Gorakpur Cantt

(GKC)TSS 80% 1.5 Comp Provided

Exis

tin

g

Exis

tin

g

Provided

Not

Provided

Provided

SSP/TSS/SP

building not

ready.

Not

Provided

25

KV

Dya

na

mic

cle

ara

nce

ob

tain

ed

.

Exis

tin

g

Project: GKP RKM: 203

25 KV Targeted Section: Chaurichaura-Gauribazar RKM: 8

RKM: 77

RKM : 203

Gr.No. 141 PDC-Oct'14 As on 30.05.2014

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

1Gorakpur Cantt

(GKC)

Not

Provided

2 Kausambi (KHM)

3Sardar Nagar

(SANR)SSP

4Chauri Chaura

(CC)

5 Gauri Bazar (GB) SP

6 Baitalpur (BALR)

7Deoria Sadar

(DEOS)SSP

8 Ahilyapur (AHLR)

9 Nunkhar (NRA) TSS Comp

Stations

Main

0%

Provided

Not

Provided

REPCRemark/

Status

Exis

ting

Exis

ting

Exis

ting

ProvidedNot

Provided

25

KV

Dyn

am

ic c

lea

ran

ce

rece

ived

SP/SSP/TSS

building not

ready.

C/H

Bldg.

Status of Telecom Works for Railway Electrification targtted in 2014-15

Gorakhpur Cantt (Incl)-Chapra Katchery (Incl)

Addnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS Bldg

status

Cable laying for

SP/SSP/TSS

2.2 to 25 KV Targeted Section: Bhatpar Rani - Chaurichaura- Gorakpur Cantt

Agency :-

Outdoor- M/s ITI, LKO

Adip Sinha -09450453520

LOA-28.05.08,DOC-31.3.14

Indoor- M/s Fibcom

LOA-15.01.08,DOC-14.01.09

Status of TPC

phone

Main Section:

CRS Targetted section : Siwan- GKC & CPR-SV-Thawe

TELECOM

Sl.

No

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

Stations

Main

REPCRemark/

Status

C/H

Bldg.

Addnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phoneSl.

No

10 Bhatni (BTT) SSP

11 Nonapur (NNPR)

12Bhatpar rani

(BHTR)SSP

13 Bankata (BTK)

14 Mairwa (MW) SP

15 Karchhue (KYW)

16 Jiradai (ZRDE) SSP

17 Siwan (SV) SSP 0.9

18 Pachrukhi (PCR) TSS 0.3

19 Duraundha (DDA)

20 Chainwa (CW) SSP 0.7

21Mahendra Nath

(MHRM)

22 Ekma (EM) SP 1.86

23 Daudpur (DDP)

24Kopa Samhota

(KPS)SSP 0.71

25 Tekniwas (TKV)

26 Chappra (CPR) SSP 0.68

27Chappra Kacheri

(CI)TSS 3.28

Comp

0%

Comp

Exis

ting

Exis

ting

Exis

ting

Provided

25

KV

Dyn

am

ic c

lea

ran

ce

rece

ived

SP/SSP/TSS

building not

ready.

Provided

Provided

Not

Provided

Provided

Project: DNR RKM: 157

RKM: 60

RKM : 142

Gr.No. 140A PDC-Jun'14 As on 30.05.2014

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

1 Hajipur (HJP)

2 Sarai (SAI) SSP 2

3 Bithauli (BTHL)

4Bhagwanpur

(BNR)SP 1.7

5 Benipatti (BNPT)

6 Goraul (GRL)

7 Kurhani (KHI) SSP 0.8

8 Turki (TUR) TSS 2.0

9Ramdyalu Nagar

(RD)

10Muzaffarpur

(MFP)

RC not

commissioned

due to RTU not

provided by

electrical

Provided Provided

25

KV

Sta

tic C

lea

ran

ce

ob

tain

ed

Comp. Comp.

Exis

ting

Exis

ting

Exis

ting

Provided

Remark/

Status

TELECOM

Sl.

NoStations

C/H

Bldg.

MainAddnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

REPC

Status of Telecom Works for Railway Electrification targetted in 2014-15

HJP (Excl)-BJU (Excl) via Muzaffarpur

2.2 to 25 KV Targeted Section: MFP-Samastipur

Agency :-

Outdoor- M/s ITI, LKO

Adip Sinha -09450453520

LOA-28.05.08,DOC-30.06.14

Indoor- M/s Fibcom

LOA-15.01.08,DOC-14.01.09

Main Section:

CRS Targeted section : HJP-MFP-Bachwara

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

Remark/

Status

Sl.

NoStations

C/H

Bldg.

MainAddnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

REPC

11Narayanpur

Anant (NRPA)SSP 0.6

12 Silaut (SLT) SSP 1.6

13 Siho

14 Dholi (DOL) SP 1.1

15 Dubaha (DUBH)

16Khudiram Bose

(KRBP)SSP 2.0

17KarpuriGaram

(KPGM)

18 Samastipur (SPJ) TSS 1.5

19 Ujjiarpur (UJP) SSP 0.9

20 Nazirgang (NAZJ)

21Dalsingh Sarai

(DSS)SP 1.6

22Sadajagat (SDJT)

23 Bachwara (BCA) TSS 0.8

24 Teghra (TGA)

25Barauni Flag

(BUJ)SP 2

26 Barauni (BJU)

RC not

commissioned

due to RTU not

provided by

electrical

Provided Provided

25

KV

Sta

tic C

lea

ran

ce

ob

tain

ed

Comp. Comp.Provided

Exis

tin

g

Exis

tin

g

Exis

tin

g

Project: DNR RKM: 187

25 KV Targeted Section: Karhagola Road-Katareah RKM: 2

RKM: 177

RKM : 177

Gr.No. 149 PDC-Dec'14 As on 30.05.2014

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

1 Barauni (BJU) SP 85% 3.6

2 Bihat (BEHT)

3 Tilrath (TIL)

4 Begusarai (BGS) SSP 85% 0.5

5 Lakho (LAK)

6 Danawli (DPL) SSP 85% 0.7

7 Lakhminia (LKN)

8Santha Halt

(SANH)

9Sahibpur Kamal

(SKJ)SSP 85% 0.6

Status of TPC

phone

REPCRemark/

Status

Exis

ting

Exis

ting

Exis

ting

Not Req ProvidedNot

Provided

25

KV

Dyn

am

ic c

lea

ran

ce

rece

ive

d

Eqpt wiring in

progress.

Addnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS Bldg

status

Cable laying for

SP/SSP/TSS

Comp

TELECOM

Sl.

NoStations

C/H

Bldg.

Main

Status of Telecom Works for Railway Electrification targetted in 2014-15

Barauni (Excl)-Katihar (Excl)

2.2 to 25 KV Targeted Section: BJU-Mansi & Mansi - Katihar

Agency :-

M/s ITI

Adip Sinha-09450453520

LOA-24.06.11,DOC-31.03.14

Main Section:

CRS Targeted section : Barauni - Katihar

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

Status of TPC

phone

REPCRemark/

Status

Addnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS Bldg

status

Cable laying for

SP/SSP/TSSSl.

NoStations

C/H

Bldg.

Main

10Umesh Nagar

(UMNR)

11 Khagaria (KGG) TSS 85% 1.2

12 Man Singh (MNE) SSP 85% 0.3

13Mahesh Kunt

(MSK)SP 50% 1.3

14 Gauchhari(GAI)

15 Pasraha (PSR) SP 0% 0.6

16Narayanpur

(NNP)SSP 85% 0.4

17Thanabihpur

(THB)

18 Kharik (KHU) SSP 0% 1.0

19Naughachia

(NNA)TSS 0% 1.5

20 Katareah (KTRH) SSP 0% 0.3

21 Kursela (KUE)

22 Bakhri (BKHR) SP 0% 1.6

23Karhagola Road

(CRR)SSP 0% 0.8

24 Semapur (SMO) SSP 0% 0.4

25 Katihar (KIR)

Not

Provided

25

KV

Dyn

am

ic c

lea

ran

ce

rece

ived

Trenching

work in

progressExis

ting

Exis

ting

Exis

ting

Not ReqNot

Provided

Comp

Project: DNR RKM: 257

25 KV Targeted Section: Garwa Rd-Renukut-Chopan RKM: 140

Gr.No. 176 PDC-Mar'15 As on 30.05.2014

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

1Garwa Road

(GHD)TSS 0%

2 Garhwa (GHQ) SSP 0%

3 Meralgram(MQX) SP 0%

4 Ramna(RMF) SSP 0%

5 Nagaruntari (NUQ) TSS 0%

6Wyndhamganj

(WDM)SSP 0%

7 Mahuariya(MXY) SP 0%

8Dudhinagar

( DXN)SSP 0%

9 Jharokhas (JRQ) SSP 0%

10Muirpur Road

(MPF)

Tender

floated.

Not

Provided

Not

Provided

Exis

ting

Exis

ting

Exis

ting

To be

Provided

Status of TPC

phone

REPCRemark/

Status

Addnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS Bldg

status

Cable laying for

SP/SSP/TSS

TELECOM

Sl.

NoStations

C/H

Bldg.

Main

Status of Telecom Works for Railway Electrification targetted in 2014-15

Garwa Rd-Chopan-Singrauli (incl)

Agency :- Tender opening on 19.05.14

Main Section:

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

Status of TPC

phone

REPCRemark/

Status

Addnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS Bldg

status

Cable laying for

SP/SSP/TSSSl.

NoStations

C/H

Bldg.

Main

11 Renukut (RNQ) TSS 0%

12 Jogidih (JGF) SSP 0%

13 Gurmur (GMX) SSP 0%

14 Paraspa

15Salai Banwa

(SLBN)SP 0%

16 Billi (BXLL) SSP 0%

17 Chopan (CPU) TSS 0%

18 Magardah (MWF) SSP 0%

19Khuldil Road

(KDRD)

20Mirchandhori

(MCQ)SP 0%

21KaraIla Road

(KRLR)SSP 0%

22 Singarauli(SGRL) SSP 0%

23 Mahadiya (MHDA)

24Karala Road

(KRLR)

25 Anpara (ANPR) SP 0%

26Krishnashilla

(KRSL)

27Shaktinagar

(SKTN)

Not

Provided

Tender

floated.

Exis

tin

g

Exis

tin

g

Exis

tin

g

To be

Provided

Not

Provided

Project: NJP RKM: 87

25 KV Targeted Section: Kumedpur-Adina RKM: 39

Gr.No. 171 PDC-Dec'14 As on 30.05.2014

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

1Kumedpur Jn.

(KDPR)SP 0%

2Harishchandrapur

(HCR)

3 Milangarh SSP 0%

4Bhaluka Road

(BKRD)

5 Samsi (SM) TSS 0%

6 Kumarganj

7 Eklakhi (EKI) SSP 0%

8 Adina (ADF)

9 Old Malda (OMLF) SP 0%

10Malda Town

(MLDT)

11 Old Malda (OMLF)

12Bulbul Chandi

(BBCE)

13 Singhabad (SQB)

Cable laying for

SP/SSP/TSS

Status of TPC

phone

REPC Remark/ Status

Not

Provided

Not

Provided

Total 36 Km of

OFC from Old

Malda to

Singhabad to be

provided.

Tender to be

floated.

Status of Telecom Works for Railway Electrification targetted in 2014-15

Kumedpur-Malda Town incl Old Malda-Singhabad

Agency :- Tender to be floated.

TELECOM

Sl.

NoStations

C/H

Bldg.

MainAddnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS Bldg

status

Main Section:

Exis

ting

Exis

ting

To be

Provided

Exis

ting

To b

e

Pro

vid

ed

Project: NJP RKM: 267

RKM: 62

RKM: 90

Gr.No. 150 PDC-Mar'15 As on 30.05.2014

OFC6

Quad

Total

(Km)

Comp.

(By RE)

At

Stns.

At

SP/SSP/

TSS

1 Katihar Jn. (KIR) TSS 0%

2 Nayatola (NYT)

3 Dandkhora (DNQ)

4 Gorphar (GRR)

5 Sonaili (SI) SP 0%

6 Jhaua(JAU)

7 Meenapur (MENP)

8 Salmari (SRI)

9 Mukuria Jn. (MFA)

10 Barsoi Jn. (BOE) SSP 0%

11Sanjay Gram

(SJGN)

12 Sudhani (SUD) SSP 0%

13 Ajharail (AHL)

14 Telta (TETA)

15 Dalkhola (DLK) TSS 0%

16 Surjakamal (SJKL)

Status of Telecom Works for Railway Electrification targetted in 2014-15

Katihar-Barsoi-Raninagar

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS Bldg

status

Cable laying for

SP/SSP/TSS

2.2 to 25 KV Targeted Section: KIR-Kumedpur-Mukeria & KIR-Mukeria

TELECOM

Sl.

NoStations

C/H

Bldg.

MainAddnl

MUX

By RE

Status of TPC

phone

Main Section:

25 KV Targeted Section: Dumadangi-NJP-Raninagar Jalpaiguri & Katihar Yard

M/s ECI-SPIC-SMO-McML,

Ratnam-09866760008Agency :-

Exis

ting

Not

Req.

2.2

KV

an

ti t

he

ft c

lea

ran

ce

rece

ived

REPCRemark/

Status

Exis

ting

Exis

ting

Work yet to startNot

Provided

Not

Provided

OFC6

Quad

Total

(Km)

Comp.

(By RE)

At

Stns.

At

SP/SSP/

TSS

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS Bldg

status

Cable laying for

SP/SSP/TSSSl.

NoStations

C/H

Bldg.

MainAddnl

MUX

By RE

Status of TPC

phone

REPCRemark/

Status

17 Kanki (KKA) SSP 0%

18 Hatwar (HWR)

19 Kishanganj (KNE) SP 0%

20 Pangipara (PJP)

21 Gaisal (GIL) SSP 0%

22 Gunjaria (GEDR) TSS 0%

23 Aluabari Road

24 Dhulabari (DBQ)

25 Mangurjan (MXJ)

26 Tinmilehat (TMH) SSP 0%

27 Dumdangi (DMZ) SP 0%

28 Chatterhat (CAT)

29 Nijbari (NJB) SSP 0%

30 Rangapani (RNI) TSS 0%

31New Jalpaiguri

(NJP)

32Ambari Falakata

(ABFC)SSP 0%

33 Belakoba (BLK)

34Raninagar

Jalpaiguri (RQJ)SSP 0%

Exis

ting

Exis

ting

Exis

ting

Work yet to startNot

Provided

Not

Provided

Not

Req.

2.2

KV

an

ti t

he

ft c

lea

ran

ce

rece

ived

OFC6

Quad

Total

(Km)

Comp.

(By RE)

At

Stns.

At

SP/SSP/

TSS

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS Bldg

status

Cable laying for

SP/SSP/TSSSl.

NoStations

C/H

Bldg.

MainAddnl

MUX

By RE

Status of TPC

phone

REPCRemark/

Status

35 Katihar Jn. (KIR) TSS 0%

36 Kuretha (KUQ)

37 Sahja Halt (SAJH)

38Pranpur Road

(PQD)SSP 0%

39 Labha (LAV)

40Dillidewanganj

(DVJ)

41Kumedpur Jn.

(KDPR)SSP 0%

42Babhangaon-

H(BAHN)43 Khurail (KWE)

44Azamnagar

Road(AZR)SP 0%

45Bhawanipur

Bihar(BWPB)46 Mukuria Jn.(MFA)

Exis

tin

g

Exis

tin

g

Exis

tin

g

2.2

KV

anti t

heft

cle

ara

nce

re

ceiv

ed

Work yet to

start

Not

Req.

Not

Provided

Not

Provided

Project:SC RKM: 125

25 KV Targeted Section: Settihalli-Yeliyur RKM: 35

RKM: 0

RKM: 30

Agency:-

Gr.No. 156 PDC-Mar'15 As on 30.05.2014

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

1 Bangalore City

(SBC)

2Nayanadahalli

(NYH)

3Jnanabharati

(GNB)

4 Kengeri (KGI) SP comp 2.6

5 Hejjala (HJL) SSP comp 1.9

6 Bidadi (BID) TSS comp 3.0

7 Ketohalli (KHLL)

8Ramanagaram

(RMGM)SSP comp

9Channapatna

(CPT)SSP 0%

10 Sethihalli (SET)

TELECOM

Sl.

NoStations

C/H

Bldg.

Main

Status of Telecom Works for Railway Electrification targetted in 2014-15

Banglore-Kengri-Mysore

2.2 to 25 KV Targeted Section: NIL

CRS Targeted Section: Kangeri - Ramnagram

Main Section:

Status of TPC

phoneAddnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS

Bldg

status

Cable laying for

SP/SSP/TSS

M/s Soma,SC

Madhu-09908769690

LOA-14.08.12,DOC- 13.01.14

Exis

tin

g

Exis

tin

g

Exis

tin

g

Not

Req

REPC Remark/ Status

Comp

Provided

25 K

V D

yn

am

ic c

leara

nce

re

ceiv

ed

Electrified

Work under progress

Provided

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

Sl.

NoStations

C/H

Bldg.

MainStatus of TPC

phoneAddnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS

Bldg

status

Cable laying for

SP/SSP/TSS

REPC Remark/ Status

11 Nidaghatta (NZH)

12 Maddur (MAD) SSP 0%

13 Hanakeri (HNK)

14 Mandya (MYA)

15 Yeliyur (Y) TSS 0%

16 Byadrahalli (BDRL)

17Chandragirikoppal

(CGKR)SP 0%

18Pandavapura

(PANP)

19 Shrirangapattana SSP 0%

20 Naganahalli (NHY) TSS 0%

21 Mysore New Goods

Terminal (MNGT)22 Mysore Jn. (MYS)

Exis

tin

g

Exis

tin

g

Exis

tin

g

Not ReqNot

ProvidedWork under progress

Not

Provided

25 K

V D

yn

am

ic c

leara

nce

re

ceiv

ed

Project: SC RKM: 213

25 KV Targeted Section: Nallapadu-Vinukonda RKM: 75

Gr.No. 177 PDC-Mar'15 As on 30.05.2014

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

1 Nallapadu (NLPD) TSS

2 Perecherla (PRCA)

3Phirangipuram

(PPM)SSP

4 Nudurupadu (NDPU)

5 Satulur (STUR) SSP

6 Narasaraopet (NRT)

7 Munumaka (MUK)

8 Santamagulur (SAB) SSP

9 Vellalacheruvu (VEP)

Status of Telecom Works for Railway Electrification targetted in 2014-15

Nallapadu - Diguvametta

TELECOM

Sl.

NoStations

C/H

Bldg.

MainAddnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS

Bldg

status

Cable laying for

SP/SSP/TSS

Main Section:

Agency:-

Status of TPC

phone

REPC Remark/ Status

Exis

tin

g

Exis

tin

g

Exis

tin

g

To be

Provided

Not

Provided

Not

Provided

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

Sl.

NoStations

C/H

Bldg.

MainAddnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS

Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

REPC Remark/ Status

10 Savalyapuram (SYM) SSP

11 Vinukonda (VKN) TSS

12Cheekateegala

Palem (CEM)

13Gundlakamma

(GKM)SSP

14 Kurichedu (KCD) SP

15 Potlapadu (POO)

16 Donakonda (DKD) SSP

17 Gajjelakonda (GJJ) SSP

18Markapur Road

(MRK)TSS

19 Tarlupadu (TLU) SSP

20 Cumbum (CBM) SP

21 Jaggambhotla (JBK)

22 Somidevipalle (SDV) SSP

23 Gudimetta (GMA)

24 Giddalur (GID) TSS

25Kistamasettipalli

(KSTE)26 Diguvametta (DMT) SSP

Exis

tin

g

Exis

tin

g

Exis

tin

g

To be

Provided

Not

Provided

Not

Provided

Project:SC RKM: 8

25 KV Targeted Section : NIL RKM:0

RKM: 8

RKM: 8

Gr.No. 126 PDC-Mar'14 As on 30.05.2014

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

1 Chikbanvar Yard

Exis

t

Exis

t

Exis

t

Not

ReqProvided Not Req

Note: All Telecom work completed.

Agency :- -

Cable laying for

SP/SSP/TSS

Status of TPC

phone

REPC Remark/ Status

Status of Telecom Works for Railway Electrification targetted in 2014-15

Banglore Circular

CRS Tageted Section : Yaswantpur-Chikbanvar

Main Section:

2.2 to 25 KV Targeted Section: Yaswantpur-Chikbanvar

MainAddnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS

Bldg

status

TELECOM

Sl.

NoStations

C/H

Bldg

Project:SC RKM: 250

25 KV Targeted Section: Sondad-Rajoli RKM: 111

RKM: 0

Gr.No. 161 PDC-Mar'15 As on 30.05.2014

OFC6

Quad

Total

(Km)

Comp.

(Km)

At

Stns.

At

SP/SSP/

TSS

1 Gondia Jn.(G)(Excl) SP 0%

2 Gankhera (GKT)

3 Hirdamali (HDM) SSP 0%

4 Pindkepar (PQH)

5 Gonglee (GNL) TSS 0%

6 Khodseoni (KSIH)

7 Sondad (SNV) SSP 0%

8 Gondumri (GMI)

9 Dewalgaon (DEW) SP 0%

10 Barabati (BFF)11 Arjuni (AJU) SSP 0%

12 Wadegaon (WDG) SSP 0%

13 Arun Nagar (ARNG)

14 Wadsa (WSA) TSS 0%

25

KV

dyn

am

ic c

lea

ran

ce

ob

tain

ed

.

Work yet to start

SP/SSP/TSS

building not ready

Status of Telecom Works for Railway Electrification targetted in 2014-15

Gondia-Ballarshah

2.2 to 25 KV Targeted Section: NIL

TELECOM

Sl.

NoStations

C/H

Bldg.

MainAddnl

MUX

By RE

SP/SSP/

TSS

Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

REPC Remark/ Status

Main Section:

M/s Kalindee,Gurgaon

LOA-18.07.12,DOC-17.03.14Agency :-

SP/SSP/

TSS Bldg

Location

Exis

ting

Exis

ting

Exis

ting

Not

Re

qu

ire

d

Not

Provided

Not

Provided

OFC6

Quad

Total

(Km)

Comp.

(Km)

At

Stns.

At

SP/SSP/

TSS

Sl.

NoStations

C/H

Bldg.

MainAddnl

MUX

By RE

SP/SSP/

TSS

Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

REPC Remark/ Status

SP/SSP/

TSS Bldg

Location

15Chicholi Buzurg

(CCBZ)

16 Brahmapuri (BMP) SSP 0%

17 Kirtimenda (KMME) SP 0%

18 Nagbhir Jn (NAB) SSP 0%

19 Meodala (MGW)

20 Talodi Road (TUD) TSS 0%

21 Alewahi (AWH) SSP 0%

22 Sindewahi (SYE) SP 0%

23 Rajoli (ROL) SSP 0%

24 Mulmarora (MME) TSS 0%

25 Talewahi (TWI)

26 Kelzhar (KEZ) SSP 0%

27 Chanda Fort (CAF) SP 0%

28 Babupet (BUPH)

29 Ballarshah (BPQ)

Work yet to start

SP/SSP/TSS

building not readyExis

ting

Exis

ting

Exis

ting

Not

Re

qu

ire

dNot

Provided

Not

Provided

Project:SC RKM: 161

RKM: 0

RKM: 2

Gr.No. 132 PDC-Mar'14 As on 30.05.2014

OFC6

Quad

Total

(Km)

Comp.

(Km)

At

Stns.

At

SP/SSP/

TSS

1 Wadi Jn. (WADI) SP

2 Halkatta

3 Sulehalli (SUH) SSP

4 Chittapur (CT)

5Malkhaid Road

(MQR)TSS

6 Seram (SEM)

7 Kurgunta (KQT) SSP

8 Nawandgi (NAW)

9 Mantatti (MVH) SP

10 Tandur (TDU)11 Rukmapur (RMY) SSP

12 Dharur (DRR) SSP

13 Mailaram (MWY)

14 Godamgura ((GDQ) TSS

Agency :- Work By South Central Railway

CRS Tageted Section : Wadi Yard

Status of Telecom Works for Railway Electrification targetted in 2014-15

Main Section: Wadi (Excl)-Lingapalli (Excl)

2.2 to 25 KV Targeted Section: NIL

REPC Remark/ Status

TELECOM

Sl.

NoStations

C/H

Bldg

MainAddnl

MUX

By RE

Provided ProvidedCompWork

Comp

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS

Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

25

KV

Dyn

am

ic c

lea

ran

ce

rece

ived

Work Completed .

Exis

ting

Exis

ting

Exis

ting

Not

Re

qu

ire

d

OFC6

Quad

Total

(Km)

Comp.

(Km)

At

Stns.

At

SP/SSP/

TSS

REPC Remark/ StatusSl.

NoStations

C/H

Bldg

MainAddnl

MUX

By RE

SP/SSP/

TSS Bldg

Location

SP/SSP/

TSS

Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

15 Vikrabad Jn. (VKB)

16 Chitgidda (CTF) SSP

17 Gullaguda (GGD) SP

18Ravalapalli Kalan

(RPK)SSP

19 Shankarpalli (SKP)

20 Nagalapalli (NPL) TSS

21 Lingampalli (LPI) SSP

CompWork

Comp

Exis

ting

Exis

ting

Exis

ting

Not

Re

qu

ire

d

Provided Provided

25

KV

Dyn

am

ic c

lea

ran

ce

rece

ived

Work Completed .

Project: SC RKM: 365

25 KV Targeted Section: Guntakal-Dhone RKM: 77

Gr.No. 178 PDC-Mar'15 As on 30.05.2014

OFC6

Quad

Total

(Km)

Comp.

(Km)At Stns.

At

SP/SSP/

TSS

1 Guntakal Jn. (GTL) TSS

2 Maddikera (MKR)

3 Tuggali (TGL) SSP

4 Edduladoddi (EDD)

5 Gootyi (GV) SSP

6 Pagidiral (PGDI)

7 Pendekallu (PDL)

8 Lingandoddi (LMD) SSP

9 Nalliya (NYL)

10 Dhone Jn. (DHNE) SSP

SP/SSP/

TSS Bldg

Location

Status of Telecom Works for Railway Electrification targetted in 2014-15

Main Section: Guntur- Nallapadu- Guntkal

Agency:-

TELECOM

Sl.

NoStations

C/H

Bldg.

MainAddnl

MUX

By RE

Not

Provided

SP/SSP/

TSS

Bldg

status

Cable laying for

SP/SSP/TSS

Status of TPC

phone

REPCRemark/

StatusE

xis

ting

Exis

ting

Exis

ting

To be

Provided

Not

Provided