Status of SVD2 upgrade
Koji Ueno
National Taiwan U.
2003/2/13 @PSROC
![Page 2: Status of SVD2 upgrade](https://reader030.fdocuments.us/reader030/viewer/2022013108/5681338f550346895d9a980e/html5/thumbnails/2.jpg)
Outline
Features of SVD2 Smaller beam pipe & more Si layers TTM( see Jerry’s talk) & Flex: done by NTU.
Flex saga Low yield & spares
Schedule & accident Beam pipe was broken
Conclusion
![Page 3: Status of SVD2 upgrade](https://reader030.fdocuments.us/reader030/viewer/2022013108/5681338f550346895d9a980e/html5/thumbnails/3.jpg)
Features of SVD2
Smaller beam pipe R = 2 cm --> 1.5 cm.Originally 1 cm was planed.
More silicon layers 3 --> 4.Originally 5 layers were planed.
Radiation-hard front-end electronics.Up to 10 MRad is tested OK.
Z trigger.Necessary to remove a beam-gas event.
![Page 4: Status of SVD2 upgrade](https://reader030.fdocuments.us/reader030/viewer/2022013108/5681338f550346895d9a980e/html5/thumbnails/4.jpg)
246 Double-sided Silicon Strip Detectors (DSSDs).
Each DSSD has 512 z strips and512 phi strips.
Total no. read out is 250 k.It is reduced to 110 k by ‘ganging’.
Ganging is done by FLEX.
Belle SVD2
![Page 5: Status of SVD2 upgrade](https://reader030.fdocuments.us/reader030/viewer/2022013108/5681338f550346895d9a980e/html5/thumbnails/5.jpg)
SVD2 system
![Page 6: Status of SVD2 upgrade](https://reader030.fdocuments.us/reader030/viewer/2022013108/5681338f550346895d9a980e/html5/thumbnails/6.jpg)
SVD1.x dose
![Page 7: Status of SVD2 upgrade](https://reader030.fdocuments.us/reader030/viewer/2022013108/5681338f550346895d9a980e/html5/thumbnails/7.jpg)
TTM & Flex
NTU is responsible for TTM & Flex. TTM see Jerry’s talk. We finished them in spring, 2002. They are now used in 1/10 system without
a problem. We need a spare Flex and SVD to prepare
for an “accident”.
![Page 8: Status of SVD2 upgrade](https://reader030.fdocuments.us/reader030/viewer/2022013108/5681338f550346895d9a980e/html5/thumbnails/8.jpg)
Z-R trigger
![Page 9: Status of SVD2 upgrade](https://reader030.fdocuments.us/reader030/viewer/2022013108/5681338f550346895d9a980e/html5/thumbnails/9.jpg)
Efficiency for 3-out-of-4 layers
![Page 10: Status of SVD2 upgrade](https://reader030.fdocuments.us/reader030/viewer/2022013108/5681338f550346895d9a980e/html5/thumbnails/10.jpg)
Ganging in FLEX.
Z strip
DSSD
FLEX
Read outSignal Signal
Wire-bonding onSi and FLEX pads.
![Page 11: Status of SVD2 upgrade](https://reader030.fdocuments.us/reader030/viewer/2022013108/5681338f550346895d9a980e/html5/thumbnails/11.jpg)
Ghost track due to ganging
![Page 12: Status of SVD2 upgrade](https://reader030.fdocuments.us/reader030/viewer/2022013108/5681338f550346895d9a980e/html5/thumbnails/12.jpg)
Flex saga
Flex task was supposedly easy. Flex was in a crisis a year ago: low yield, bad
wire-bonding, repair etc. Laser beam was used to repair shorted lines to
meet a deadline. Only small no. of companies can make a Flex in
the world. Exchange of Flex info. among Belle, D0 and CDF.
![Page 13: Status of SVD2 upgrade](https://reader030.fdocuments.us/reader030/viewer/2022013108/5681338f550346895d9a980e/html5/thumbnails/13.jpg)
Laser surgery of shorted wire
The shorted wire is fixed by laser.
![Page 14: Status of SVD2 upgrade](https://reader030.fdocuments.us/reader030/viewer/2022013108/5681338f550346895d9a980e/html5/thumbnails/14.jpg)
Wire-bonding
25 m wire for bonding.
![Page 15: Status of SVD2 upgrade](https://reader030.fdocuments.us/reader030/viewer/2022013108/5681338f550346895d9a980e/html5/thumbnails/15.jpg)
SVD2 schedule
![Page 16: Status of SVD2 upgrade](https://reader030.fdocuments.us/reader030/viewer/2022013108/5681338f550346895d9a980e/html5/thumbnails/16.jpg)
Integrated luminosity
![Page 17: Status of SVD2 upgrade](https://reader030.fdocuments.us/reader030/viewer/2022013108/5681338f550346895d9a980e/html5/thumbnails/17.jpg)
Peak luminosity of Belle & BaBar
![Page 18: Status of SVD2 upgrade](https://reader030.fdocuments.us/reader030/viewer/2022013108/5681338f550346895d9a980e/html5/thumbnails/18.jpg)
Space Shuttle Columbia accident
![Page 19: Status of SVD2 upgrade](https://reader030.fdocuments.us/reader030/viewer/2022013108/5681338f550346895d9a980e/html5/thumbnails/19.jpg)
SuperKamioka in repair
![Page 20: Status of SVD2 upgrade](https://reader030.fdocuments.us/reader030/viewer/2022013108/5681338f550346895d9a980e/html5/thumbnails/20.jpg)
Broken beam pipe
![Page 21: Status of SVD2 upgrade](https://reader030.fdocuments.us/reader030/viewer/2022013108/5681338f550346895d9a980e/html5/thumbnails/21.jpg)
Installation of 1.2 SVD
Installation of 1.4 SVDHOM resonant heating
Trouble of He cooling system
![Page 22: Status of SVD2 upgrade](https://reader030.fdocuments.us/reader030/viewer/2022013108/5681338f550346895d9a980e/html5/thumbnails/22.jpg)
The SVD2 first cosmic ray muon event
Nov. 15, 2002
![Page 23: Status of SVD2 upgrade](https://reader030.fdocuments.us/reader030/viewer/2022013108/5681338f550346895d9a980e/html5/thumbnails/23.jpg)
Conclusion
SVD2 upgrade has a successful 1/10 system test. Has seen the 1st CR event.
It is likely installed in summer, 2003. It aims for a higher luminosity. We have to prepare a spare SVD and a
spare Flex for an accident.