Status of HIPPI – September 2006
description
Transcript of Status of HIPPI – September 2006
1 CSC, 13.9.2006
Status of HIPPI – September 2006Status of HIPPI – September 2006
Maurizio Vretenar Alessandra Lombardi
2 CSC, 13.9.2006
HIPPI in 2006HIPPI in 2006
- Exactly mid-way through the project - 8 deliverables and 4 milestones in
2006: large # of deliverables
0
2
4
6
8
10
12
14
16
18
2004 2005 2006 2007 2008
DeliverablesMilestones
Milestones Deliverables Total2004 1 0 12005 16 1 172006 4 8 122007 5 9 142008 1 13 14
58
3 CSC, 13.9.2006
2006 Milestones and Deliverables2006 Milestones and DeliverablesWP2 CCDTL Prototype design, constr., test Jun-06: Prototype ready H-DTL Prototype design, constr., tests Dec-06: Prototype ready CCDTL Prototype design, constr., test Dec-06: Design report
WP3 Cavity B ready Jun-06: Cavity B ready
WP4 Chopper B Prototype design and constr. Jun-06: Design report Chopper A Prototype ready Aug-06: Prototype ready
WP5 Code preparation for 3 MeV test stand Jun-06: Intermediate report Profile measurement by fluorescence Jul-06: Final report Simulations and experiment at UNILAC Dec-06: Final report Non-interceptive bunch measurement Dec-06: Final report Collimators design Dec-06: Prototype ready Collimators design Dec-06: Final report
DELAYED 2005 MILESTONES 2.4.1 Construction of CCDTL pre-prototype, Jun 2005 Dec 2005 in prep.
intermediate report
3.3.1 Report on CH tuners Jun 2005 Sept 2005 Jun 2006
4.1.1 Chopper A Design Report Jun 2005 Dec 2005 with 4.1.2
4.1.2 Chopper intermediate test report Mar 2005 Mar 2006 Jun 2006
4.2.2 Dump design report Jun 2005 Oct 2005 in prep.
Dec. 06
Dec. 06
OK
Feb. 07Dec. 06
Oct. 06
?Oct. 06OKOK
4 CSC, 13.9.2006
Status of Milestones - DeliverablesStatus of Milestones - Deliverables
List prepared by AL with links:WP2: NORMAL CONDUCTING STRUCTURES
Milestones Deliverables
Comments Contact person
1.1Drift Tube Linac CEA,CERN, lpsc 1.1.1 DTL design t Jun-07: Intermediate repor CEA -Bernaudin
1.1.2 Development of critical DTL components Jan-07: Intermediate report Jan-07: Prototy pe ready RAL-Plostinar 1.1.3 DTL beam dynamics design Jun-08: Intermediate report
1.1.4 Optimised DTL design Dec-08: Final report 1.2 H-mode Drift Tube Linac
1.2.1 CH model cav ity construction, tests Dec-05: Intermediate report Mailed 11sep06
IAP-FR RAtzinger
1.2.2 Prototype design, construction, tests Dec-06: Prototype ready IAP-FR RAtzinger
1.2.3 H-DTL beam dynamics Jun-05: Design report 1.2.4 H-DTL design finished Dec-08: Final report
1.3 Side Coupled Linac 1.3.1 RF cold model prototy pe design, test Dec-07: Final report Cern lpsc
1.4 Cell Coupled Dri ft Tube Linac 1.4.1 Pre-prototype testing Jun-05: Intermediate report Delayed OCT06 CERn CEA LPSC
1.4.2 Prototype design, construction, test Jun-06: Prototype ready Dec-06: Design report Delayed dec06 1.4.3 CCDTL design finished Jun-08: Final report
1.5 Comparative assessment of NC structures Dec-08: Final repor WP3: SUPERCONDUCTING STRUCTURES
2.1 Elliptical cavities 2.1.1 Cav ity A vertical tests Dec-04: Intermediate report INFN-pierini
2.1.2 Tuner design construction & test Dec-05: Intermediate report INFN-pierini 2.1.3 Cavity A assembly
2.1.4 Cav ity A ready in CRYOLAB Mar-07: Cavity A ready INFN-pierini 2.1.5 RF Coupler design and test CEA Chel
2.1.6 Design, construction assembly cav ity B CEA Chel
5 CSC, 13.9.2006
Dissemination & ReportsDissemination & Reports
(info from Alessandra):- 17 CONF papers (EPAC and LINAC Conferences in 2006). - 7 CARE Notes (some HIPPI-DOC have been promoted to
CARE Notes). - 2 CARE Reports- 1 HIPPI-DOCument
2nd Quarterly Report 2006 completed (6.9.06).
6 CSC, 13.9.2006
HIPPI06 Meeting in JHIPPI06 Meeting in Jüülichlich- JRA Meeting on September 27th – 29th in Julich (FZJ, financial
contribution from the Direction will cover banquet and internal transportation).
- Expected 30 – 40 participants from all contributing institutes + 1 or 2 external.
- Confirmed participation of the 3 members of the ESAC: J. Stovall (LANL-SNS), Y. Yamazaki (KEK-JPARC), A. Pisent (LNL).
- Some modifications to the structure of the meeting:4 sessions of 3 hours for each of the 4 Work Packages
(programme under responsibility of the WP Coordinator)1 general session covering topics between WP’s (resp.
Coordinator)2 talks on the status of the linac projects covered by HIPPI (GSI
and CERN).More time for the ESAC
7 CSC, 13.9.2006
HIPPI06 Preliminary ProgrammeHIPPI06 Preliminary ProgrammeWednesday 27, September, morning
9h00-9h30 9h30-12h00 12h00-12h30
Welcoming address and Introduction
WORK PACKAGE 4 (Chopper) General: Review of HIPPI Prototypes and
alternative designs
R. Tölle, M. Vretenar A. Lombardi (conv.)
Wednesday 27, September, afternoon
14h00-14h30 14h30-15h00 15h00-18h00
General: Status of GSI linac design Status of CERN linac design
WORK PACKAGE 2 (NC Structures)
J.M. De Conto (conv.)
Thursday 28, September, morning
8h30-12h00 12h00-12h30
WORK PACKAGE 3 (SC RF structures) General: Comparison NC/SC designs (>90 MeV)
S. Chel (conv.)
Thursday 28, September, afternoon
14h00-17h00 17h00-19h00 17h00-19h00
WORK PACKAGE 5 (Beam Dynamics) First meeting of the ESAC Visit of FZJ accelerator laboratory (in parallel)
I. Hofmann (conv.)
Thursday 28, September, evening: Social event (t.b.c.)
Friday 29, September, morning
9h00-11h00 9h00-11h00 11h00-12h00
HIPPI administrative meeting (deliverables, planning, budget) Second meeting of the ESAC (in parallel) Plenary meeting, ESAC preliminary assessment
Programme will be finalised on Sept. 15th.
Slides on the web (for the ESAC) one week before the meeting.
8 CSC, 13.9.2006
Status of HIPPI – Technical InfoStatus of HIPPI – Technical Info
- A negative point for the coordination between EU project: GSI has chosen for the FAIR Linac the frequency of 324 MHz (Toshiba klystrons), as RAL did already a year ago. Arguments: Toshiba is becoming leader on the market (JPARC, China) + have a common frequency with a possible UNILAC upgrade (324=3*108).
- CERN remains alone in the choice of 352 MHz for Linac4, imposed by the available LEP klystrons (8 MEUR value for the project) and other RF equipment and by the frequency of the IPHI RFQ.
- A common frequency would have allowed to gain more weight towards the klystron manufacturers, via competition between Thales and Toshiba.
- The choice of 324 MHz gives a clear preference to a non-EU company (Toshiba) and could definitely cut out of the market Thales.
9 CSC, 13.9.2006
Status of Linac4 & GSI FAIR linacStatus of Linac4 & GSI FAIR linac
- Linac4 included in the Medium Term Plan submitted to the Council at the end of the year. Upon demand by R. Aymar, minimum funding in 2007 (1.3 MCHF, but 6 additional posts). Real funding from 2008, first injections in PSB from 2011.
- Technical Design Report in preparation (draft 15.10.06), big step forward in the machine design.
- New options under consideration: single frequency (352 MHz only), new position in an extension of the Linac2 tunnel.
- GSI will start ordering a klystron prototype already in 2006. The accelerating cavities (CH) have modified by adding a coupling cell that allows reducing splitting from klystrons.
10 CSC, 13.9.2006
Highlights WP 2 – Normal Highlights WP 2 – Normal Conducting StructuresConducting Structures
The Russian ISTC DTL Prototype is late by 5 months (and some technical points are not clear yet): will be delivered to CERN at best in August 2007, quite late for the decision on Linac4 DTL.
New layout (with coupling cell) of the CH cavities made at Frankfurt for GSI
One cell of cold model of SCL for Linac4 finally made at LPSC – activity about 1 year late, concerns for Linac4.
CCDTL prototype (Linac4) finally under high power RF testing at CERN (1yr late).
CCDTL prototype made in Russia waiting for some brazed parts (priority to LHC).
11 CSC, 13.9.2006
Highlights WP 3 – Highlights WP 3 – Superconducting StructuresSuperconducting Structures
Progress in the design of spoke cavities + definition of a spoke layout in competition with NC designs.
Preparation of 704 MHz test stand in Saclay:-klystron (CPI) on schedule, should be delivered before end 2006.-HV power supply to be assembled before end of 2006
12 CSC, 13.9.2006
Highlights WP 4 – Beam Highlights WP 4 – Beam choppingchopping
The CERN chopper line as it will be mounted on the IPHI RFQ support at Saclay.
Chopper tests at Saclay:The persisting delays in the IPHI RFQ (machining+brazing) would put at risk the HIPPI chopper tests: delivery of the RFQ at CERN foreseen only at end 2008.A temporary set-up has been defined to allow testing of CERN chopper at Saclay in 2nd half 2008.
13 CSC, 13.9.2006
WP 4 – Beam choppingWP 4 – Beam chopping
Vacuum test of CERN chopper made (2 E-9 mbar reached last Monday).Driver prototype should arrive mid-September and power tests can start soon.
14 CSC, 13.9.2006
WP 5 – Beam dynamicsWP 5 – Beam dynamics
The first bloc of the UNILAC beam dynamics experiment planned for HIPPI was successfully conducted end of May.
The experimental data are in the process of being compared with different simulation codes (Parmila, Dynamion and Path).
15 CSC, 13.9.2006
HIPPI Detailed PlanningHIPPI Detailed PlanningID Task Name
1 WP2: NORMAL CONDUCTING STRUCTURES2 2.1 Drift Tube Linac3 2.1.1 DTL design6 2.1.5 DTL coupler prototype construction and testing7 2.1.4 DTL beam dynamics design8 2.2 H-mode Drift Tube Linac10 2.2.2 RF cold model design & construction11 2.2.3 RF model construction13 2.2.5 CH model cavity tests 15 2.2.7 CH-prototype construction, tests17 2.3 Side Coupled Linac18 2.3.1 RF model RF design19 2.3.2 RF model mechanical design20 2.3.4 RF model construction24 2.4 Cell Coupled Drift Tube Linac26 2.4.2 Pre-prototype high-power RF tests28 2.4.4 Revision of design after prototype testing30 WP3: SUPERCONDUCTING STRUCTURES31 3.1 ELLIPTICAL CAVITIES35 3.1.4 Tuner construction38 3.1.6 Construction cavity B40 3.1.7 Power coupler design & engineering42 3.1.8 RF source order & construction43 3.1.10 Modulator preparation for 700 MHz test stand46 3.2 SPOKE CAVITIES51 3.2.5 Construction of coupler prototype55 3.2.8 Final design of 352 MHz multi-gap prototype56 3.2.10 Manufacturing of 352MHz multi-gap prototype58 3.3 CH RESONATOR59 3.3.1 Design of tuning system
CEA,CERN,LPSCCEA,LPSC
RAL
IAP-FU
IAP-FUIAP-FU
LPSC,CERNLPSC
LPSC
CERN,LPSC,CEACERN
INFN-MICEA
CEACEACEA
IN2P3-OrsayFZJ,IN2P3-Orsay
FZJ
IAP-FU
01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 102006 2007
16 CSC, 13.9.2006
Planning - 2Planning - 2ID Task Name
62 WP4: CHOPPING63 4.1 CHOPPER STRUCTURE A66 4.1.3 Driver construction, testing69 4.1.6 Prototype testing w/o beam70 4.2 CHOPPER LINE72 4.2.2 Dump construction74 4.3 CHOPPER STRUCTURE B76 4.3.2 Prototype design78 WP5: BEAM DYNAMICS79 5.1 Code development80 5.1.1 3D space charge routines development, testing82 5.1.3 Neutralization and ECR source modelization study83 5.1.4 Improvement, model l ing high current84 5.1.5 Code preparation for 3 MeV test stand85 5.1.6 Code preparation and analysis for SC linacs86 5.1.7 Code comparison and benchmarking88 5.2 Experiment at UNILAC89 5.2.1 Preparation, simulations92 5.3 Diagnostics and collimation94 5.3.2 Profi le measurement testing96 5.3.4 Non-interceptive bunch measurement const., testing98 5.3.9 Test and improvement of halo monitor99 5.3.6 On-line transmission control
100 5.3.7 Beam profi le monitor design
CERN
CERN,CEA,LPSC
RAL
RALCEA
GSICERN
FZJGSI,RAL,IAP-FU,CEA,CERN,LPSC
GSI
GSIGSI
GSIFZJ
01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 102006 2007