Status of Construction and Commissioning of the GSI HITRAP Decelerator

download Status of Construction and Commissioning of the GSI HITRAP Decelerator

If you can't read please download the document

description

Status of Construction and Commissioning of the GSI HITRAP Decelerator. Outline: Introduction and motivation Beam dynamics issues of the decelerator Status of the linac, trap and of the commissioning efforts. HITRAP. Charge state breeding. Production of multi-charged ions. - PowerPoint PPT Presentation