Status of Activities WP1 – Case Leuven
Johan Van Assel, Aquafin
November 17, 2011
Leuven Radar
• Current activities– Preparation of maintenance contract with DHI– Soft- and hardware updates necessary
• some technical problems occurring at this moment
– Identification of options for continous data downloading
• Planning– Aiming to have new setup and maintenance up
and running by end of this year.
Leuven rain gauges
• Current activities– Identification of potential new locations (4
additional gauges)– Identification of potential communication
options (realtime downloading) at existing and new locations
– Contact with potential suppliers
• Planning– Aiming to have everything up and running
around February.
Status of Activities WP2 – Case Leuven
Johan Van Assel, Aquafin
November 17, 2011
Leuven Radar and rain gauges
• Current activities– Cleanup and structured processing of all
rainfall data from previous years (90% done)
• Planning– Data processing done by end of 2011– Investigate wind effects on existing rain
gauges by comparing with RMI data• Planned January-February 2012
Status of Activities WP3 – Case Leuven
Johan Van Assel, Aquafin
November 17, 2011
Soft- and hardware
• InfoWorks CS 2D + FloodWorks purchased
• Procurement procedure for simulation PC to be started (purchase beginning 2012 ?)
Data
• Models to be updated and refined (starting January 2012)
• Details on DHM to be investigated (January 2012)
Status of Activities WP4 – Case Leuven
Johan Van Assel, Aquafin
November 17, 2011
Involvement of third parties
• Meetings with municipalities of Leuven and Herent planned (December)