Transcript of Status at Glasgow. Pre-qualification Last Thursday pre-qualified 2 modules M-O-040 and M-O-044 Time...
![Page 1: Status at Glasgow. Pre-qualification Last Thursday pre-qualified 2 modules M-O-040 and M-O-044 Time table to qualification Visual Inspection and conformation.](https://reader033.fdocuments.us/reader033/viewer/2022060206/5a4d1bae7f8b9ab0599cba0b/html5/thumbnails/1.jpg)
Status at Glasgow
![Page 2: Status at Glasgow. Pre-qualification Last Thursday pre-qualified 2 modules M-O-040 and M-O-044 Time table to qualification Visual Inspection and conformation.](https://reader033.fdocuments.us/reader033/viewer/2022060206/5a4d1bae7f8b9ab0599cba0b/html5/thumbnails/2.jpg)
Pre-qualification
• Last Thursday pre-qualified• 2 modules M-O-040 and M-O-044• Time table to qualification
– Visual Inspection and conformation scans done on both– This week bond and test 1st qualification module– 2nd module bond after 1st module fully electrically
• Perl scripts– running for data archiving– Cgi script for Web access to be edited
![Page 3: Status at Glasgow. Pre-qualification Last Thursday pre-qualified 2 modules M-O-040 and M-O-044 Time table to qualification Visual Inspection and conformation.](https://reader033.fdocuments.us/reader033/viewer/2022060206/5a4d1bae7f8b9ab0599cba0b/html5/thumbnails/3.jpg)
M-O-40• 19 band channels warm (35C)• 23 band channels cold (11C)• 23C
– Average input noise: Link0 = 1387e, Link1 = 1353e, Module = 1370e; – Average gain, Link0 = 53.6 mV/fC, Link1 = 55.6 mV/fC, Module =
54.6 mV/fC; – Average threshold variation (for TrimRange 0), Link0 = 1.48 mV,
Link1 = 1.71 mV – Noise Occupancy, Link0 = 1.08x 10-5, Link1 = 4.43x 10-6, Module =
7.63x 10-6 – Average front-end input noise from Noise Occupancy, Link0 = 1416e,
Link1 = 1369e, Module = 1393;
![Page 4: Status at Glasgow. Pre-qualification Last Thursday pre-qualified 2 modules M-O-040 and M-O-044 Time table to qualification Visual Inspection and conformation.](https://reader033.fdocuments.us/reader033/viewer/2022060206/5a4d1bae7f8b9ab0599cba0b/html5/thumbnails/4.jpg)
M-O-44• 35C 19 bad channels• 14C 23 bad channels• Average threshold variation (for TrimRange -1), Link0 = 1.68 mV, Link1
= 1.36 mV, Module= 1.52 mV • Average front-end input noise, from 10pt ResponseCurve without fan-in
problem channels, Link0 = 1393e, Link1 = 1421e, Module = 1407e; • Average gain, from 10pt ResponseCurve without fan-in problem channels,
Link0 = 54.4 mV/fC, Link1 = 54.7 mV/fC, Module = 54.5mV/fC; • Noise Occupancy,Link0 = 9.59x10-6, Link1 =1.95x10-5, Module =
1.45x10-5 • Average front-end input noise from Noise Occupancy,Link0 =1413e,
Link1 =1444e ,Module =1428e • Average Timewalk,Link0 =6ns, Link1 =6ns ,Module =6ns
![Page 5: Status at Glasgow. Pre-qualification Last Thursday pre-qualified 2 modules M-O-040 and M-O-044 Time table to qualification Visual Inspection and conformation.](https://reader033.fdocuments.us/reader033/viewer/2022060206/5a4d1bae7f8b9ab0599cba0b/html5/thumbnails/5.jpg)
NO M-O-040 - cold
![Page 6: Status at Glasgow. Pre-qualification Last Thursday pre-qualified 2 modules M-O-040 and M-O-044 Time table to qualification Visual Inspection and conformation.](https://reader033.fdocuments.us/reader033/viewer/2022060206/5a4d1bae7f8b9ab0599cba0b/html5/thumbnails/6.jpg)
NO M-O-40 warm
![Page 7: Status at Glasgow. Pre-qualification Last Thursday pre-qualified 2 modules M-O-040 and M-O-044 Time table to qualification Visual Inspection and conformation.](https://reader033.fdocuments.us/reader033/viewer/2022060206/5a4d1bae7f8b9ab0599cba0b/html5/thumbnails/7.jpg)
NO M-O-44 cold
![Page 8: Status at Glasgow. Pre-qualification Last Thursday pre-qualified 2 modules M-O-040 and M-O-044 Time table to qualification Visual Inspection and conformation.](https://reader033.fdocuments.us/reader033/viewer/2022060206/5a4d1bae7f8b9ab0599cba0b/html5/thumbnails/8.jpg)
IV M-O-044 24C
![Page 9: Status at Glasgow. Pre-qualification Last Thursday pre-qualified 2 modules M-O-040 and M-O-044 Time table to qualification Visual Inspection and conformation.](https://reader033.fdocuments.us/reader033/viewer/2022060206/5a4d1bae7f8b9ab0599cba0b/html5/thumbnails/9.jpg)
M-O-044
![Page 10: Status at Glasgow. Pre-qualification Last Thursday pre-qualified 2 modules M-O-040 and M-O-044 Time table to qualification Visual Inspection and conformation.](https://reader033.fdocuments.us/reader033/viewer/2022060206/5a4d1bae7f8b9ab0599cba0b/html5/thumbnails/10.jpg)
M-O-044
![Page 11: Status at Glasgow. Pre-qualification Last Thursday pre-qualified 2 modules M-O-040 and M-O-044 Time table to qualification Visual Inspection and conformation.](https://reader033.fdocuments.us/reader033/viewer/2022060206/5a4d1bae7f8b9ab0599cba0b/html5/thumbnails/11.jpg)
![Page 12: Status at Glasgow. Pre-qualification Last Thursday pre-qualified 2 modules M-O-040 and M-O-044 Time table to qualification Visual Inspection and conformation.](https://reader033.fdocuments.us/reader033/viewer/2022060206/5a4d1bae7f8b9ab0599cba0b/html5/thumbnails/12.jpg)
![Page 13: Status at Glasgow. Pre-qualification Last Thursday pre-qualified 2 modules M-O-040 and M-O-044 Time table to qualification Visual Inspection and conformation.](https://reader033.fdocuments.us/reader033/viewer/2022060206/5a4d1bae7f8b9ab0599cba0b/html5/thumbnails/13.jpg)