This consultation will cover preliminary station and stop designs from Laird Drive to Wynford Drive, as well as information on the future construction of a tunnel boring machine launch shaft that will be located east of Brentcliffe Road. - See more at: http://thecrosstown.ca/news-media/whats-new/station-design-update-meeting-east-open-house#sthash.EPZLP0rl.dpuf

Transcript of Station Design Update Meeting: East Open House

Page 1: Station Design Update Meeting: East Open House

1

East Open HouseLaird Drive to Wynford Drive

Page 2: Station Design Update Meeting: East Open House

2

East Tunnel Construction Timeline

Contract award Construction of launch shaft – 1 year Utility relocation at headwalls Construction of headwalls – 6 to 8 months Construction of extraction shaft at Yonge Street

Page 3: Station Design Update Meeting: East Open House

3

Tunnel Boring Machine

The construction of new tunnels under Eglinton Avenue is done by tunnel boring machines (TBMs).

Each TBM moves forward by pushing off against concrete segments. The operator advances the machine as soil is removed from the TBM face through

a conveyor system. The launch pit remains active for

removal of muck/spoils.

Page 4: Station Design Update Meeting: East Open House

4

Launch of the Tunnel Boring Machine

The Eglinton Crosstown tunnel will consist of side-by-side or twin tunnels.

Each tunnel will be 6.75 metres internal diameter.

Initially, one machine will begin excavation; the other will follow on a parallel course soon after.

Page 5: Station Design Update Meeting: East Open House

5

Launch Shaft Operations

To keep the tunnel safe for the crew a ventilation system pumps fresh air into the tunnel and exhaust air is moved out of the tunnel.

Cranes remain in position during the mining operation; muck will be hauled out and new concrete tunnel segments will be delivered.

Page 6: Station Design Update Meeting: East Open House

6

Tunnelling Begins

Tunnel boring machines work beneath Eglinton Avenue. Business activities and traffic will continue with this method. A single TBM will tunnel 75 metres per week. Each machine is capable of moving 500 cubic metres of earth per day. The machines are made in Toronto by Caterpillar Tunneling Canada Corporation,

formerly LOVAT, a world leader in tunnel boring machine manufacturing.

Page 7: Station Design Update Meeting: East Open House

7

East Tunnels Launch Shaft

To Brentcliffe To Leslie

Page 8: Station Design Update Meeting: East Open House

8

Overview: Design Excellence at Metrolinx

Design excellence at Metrolinx refers to the successful interplay between:

Functionality Durability Beauty Value

Page 9: Station Design Update Meeting: East Open House

9

Crosstown Principles of Design Excellence

1. A strong conceptual narrative vision across the system

2. Design that elevates the quality of the public transit experience

3. Civic caliber and scale of built form and materials

4. Clarity and simplicity of architectural expression through integrated design of building systems and elements

5. Responsiveness to contextual, local and future conditions

Page 10: Station Design Update Meeting: East Open House

10

1. A Strong Conceptual Narrative Vision across the System

A coherent and unified architectural strategy for the

entire Crosstown line

Clear strategy for consistent and variable elements

Page 11: Station Design Update Meeting: East Open House

11

Openness through optimal spatial penetration

2. Design that Elevates the Quality of the Public Transit Experience

Optimized daylight penetration

Page 12: Station Design Update Meeting: East Open House

12

Unified ground plane inside and outside stations and at stops

3. Civic Calibre and Scale of Built Form and Materials

Civic materials and character of open spaces

Page 13: Station Design Update Meeting: East Open House

13

Integrated structural, mechanical, and electrical systems

4. Clarity and Simplicity of Architectural Expression through Integrated Building Systems and Elements

A clear hierarchy and plan for user-centred integrated information

Page 14: Station Design Update Meeting: East Open House

14

Integration with historic elements

5. Responsiveness to Contextual, Local and future Conditions

Sustainability measures

Page 15: Station Design Update Meeting: East Open House

15

Crosstown Accessible Features: Stations Accessible path from street to platform Accessible routes identified Station attendant Platform edge tactile strip Wayfinding tiles on platforms Near level boarding of trains Platform edge illumination Audible messages throughout stations Signage with accessible features Designated Waiting Area Colour contrast between station walls and floors Equipment mounted at accessible heights Benches

Page 16: Station Design Update Meeting: East Open House

16

Crosstown Accessibility Features: Stops

Platform edge tactile strip Platform edge illumination Colour contrast at between walls and platform Equipment mounted at accessible heights Sheltered benches Sheltered wheelchair area Passenger assistance intercom Ramp access to platforms Signage with accessible features

Page 17: Station Design Update Meeting: East Open House

17

Laird StationLocal Context: Demand

Page 18: Station Design Update Meeting: East Open House

18

Laird StationLocal Context: Land Use

Page 19: Station Design Update Meeting: East Open House

19

Laird StationProfile View

Page 20: Station Design Update Meeting: East Open House

20

Laird StationLongitudinal Section

Page 21: Station Design Update Meeting: East Open House

21

Laird StationMain Entrance

Page 22: Station Design Update Meeting: East Open House

22

Laird StationSecondary Entrance

Page 23: Station Design Update Meeting: East Open House

23

Brentcliffe Portal

Page 24: Station Design Update Meeting: East Open House

24

East Portal and Don West Bridge

TPSS 13

East Portal Don West River Bridge

Page 25: Station Design Update Meeting: East Open House

25

Leslie Stop

Ferrand Stop

Wynford Stop

Laird Station

Don Mills Station

Leslie StopLocal Context: Demand

Page 26: Station Design Update Meeting: East Open House

26

Leslie StopLocal Context: Pedestrian Flow

Page 27: Station Design Update Meeting: East Open House

27

CP Rail bridge

Page 28: Station Design Update Meeting: East Open House

28

Don Mills StationLocal Context: Demand

Page 29: Station Design Update Meeting: East Open House

29

Don Mills StationLocal Context: Land Use

Page 30: Station Design Update Meeting: East Open House

30

Don Mills StationPrimary Entrance

Page 31: Station Design Update Meeting: East Open House

31

Don Mills StationSecondary Entrance

Page 32: Station Design Update Meeting: East Open House

32

Don Mills StationLongitudinal Section

Page 33: Station Design Update Meeting: East Open House

33

Ferrand Portal

Portal

Page 34: Station Design Update Meeting: East Open House

34

Wynford StopLocal Context: Pedestrian Flow

Page 35: Station Design Update Meeting: East Open House

35

Wynford

Wynford Stop as Proposed in the RCD

Final Stop Configuration to be determined during Detail Design

Wynford Stop as Proposed in the EA

Page 36: Station Design Update Meeting: East Open House

36

New Approach: Alternative Financing and Procurement (AFP)Public Private Partnership models have been underway in Canada for 20 years165 projects21 transportation projects$51 billion total project value

Canada-wide examplesCanada Line rapid transit project (Vancouver)Autoroute 25 (Montréal)Trans-Canada Highway (Atlantic Canada)

Ontario examplesPan Am games athletes villageOttawa Light Rail TransitHighway 407 East Phase 1The Rt. Hon. Herb Gray Parkway (Formerly the Windsor Essex Parkway

Page 37: Station Design Update Meeting: East Open House

37

Owner’s Role Changes with AFP

Page 38: Station Design Update Meeting: East Open House

38

New Approach: Advantages of (AFP)

Increased capacity to bring projects to market Transfer of risk Appropriate risks transferred to private sector to ensure “on time, on budget” delivery

and offer value for money Design, construction, cost escalation, schedule delays, operations, maintenance, life

cycle, financial risk Cost certainty Optimal cost combination: combines capital, maintenance and life cycle costs Integration of design and construction

Page 39: Station Design Update Meeting: East Open House

39

New Approach: Roles and Responsibilities in the Design Build Finance Maintain model

DesignOverall scope (inclusion of maintenance, operations, etc.)Project-Specific Output Specifications (with Consultant team)Real Estate Acquisition (with City of Toronto)

BuildOversee Construction PhaseQuality Assurance

FinanceProject Budget With Infrastructure Ontario run a competitive procurement process; select the winning contractor

MaintainTesting & Commissioning (with Toronto Transit Commission)Safety Certification and Project Acceptance

TTC to operateIntegrated with existing TTC system

Metrolinx Role: