Public Hearing Testimony for the
2011 Twelve Year Program
Revised December 28, 2009
Summary of Public Participation
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009
i
Sample Report and Format Instructions This list reflects project requests or comments regarding the 2011 Twelve Year Program submitted at public hearings and through other written and electronic submissions to the State Transportation Commission during the fall of 2009. This list is sorted alphabetically by Planning Organization. Below is a sample of the State Transportation Commission Public Hearing Testimony list. Requested Presented Project PE FD UTL ROW CON Total Total Action ID Program Estimated $000 $000 DVRPC MPO Chester Ms. Judy L. DiFilippo, Chairman Chester County Planning Commission French Creek Parkway Support 57659 1 1 2 2 $23,850 $45,300 Stated in the upper left corner of every page is the name of the Planning Partner. The County for which the testimony pertains is located along the left side of the page. The next line in the body of the report contains the name and organization of the testifier. After each testifier are a specific project(s) requests or comments. Each project is listed with six pieces of information placed in separate columns on the report. These are:
REQUESTED ACTION – Is the action that the testifier would like to see happen to the project regarding its status in the Twelve Year Program. General categories of action are added, retain, advance, oppose, delete, and support.
PRESENTED - If the Project was presented at a Scheduled Public Hearing a check is printed.
PROJECT ID - Is a unique number given to a project list in the currently approved Twelve Year Program and the applicable project inventory system.
CURRENT TYP PERIOD/ PE, FD, UTL, ROW, CON – Columns representing the following: PE= Preliminary Engineering, FD= Final Design, UTL= Utilities, ROW= Right-of-Way, CON= Construction phases of the project displayed in which period 1st , 2nd or 3rd four years of the currently approved Twelve Year Program the phase is scheduled (if applicable).
TOTAL PROGRAM $(000) -The total cost in thousands of the project in the current approved Twelve Year Program.
TOTAL ESTIMATED $(000) -The total estimated cost in thousands of the project as provided by the Testifier or from PennDOT’s Multi-Modal Project Management System
Table of Contents Adams RPO ‐‐‐ 1Altoona MPO ‐‐‐ 2Centre MPO ‐‐‐ 3DVRPC MPO ‐‐‐ 5Erie MPO ‐‐‐ 18Franklin RPO ‐‐‐ 20Harrisburg MPO ‐‐‐ 21Johnstown MPO ‐‐‐ 23Lancaster MPO ‐‐‐ 24Lebanon MPO ‐‐‐ 25Lehigh Valley MPO ‐‐‐ 25NEPA RPO ‐‐‐ 26North Central RPO ‐‐‐ 31Northern Tier RPO ‐‐‐ 32Northwest RPO ‐‐‐ 33Reading MPO ‐‐‐ 37Scranton ‐ Wilkes Barre MPO ‐‐‐ 39SEDA COG RPO ‐‐‐ 41Shenango Valley MPO ‐‐‐ 45Southern Alleghenies RPO ‐‐‐ 46SPC MPO ‐‐‐ 47Williamsport MPO ‐‐‐ 53York MPO ‐‐‐ 54
Revised 12/28/2009
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Adams RPO
AdamsMr. John Lawver, Borough Manager Borough of GettysburgGettysburg Gateway Transportation Improvements
Support $7,000
Mr. John Lerew, Chairman Adams County Planning CommissionPriority Projects for Adams County Support
PA 116 Corridor Support
US 15/30 Interchange Support
US Route 15 Corridor Support
US Route 30 Corridor Support
Mr. Richard Schmoyer, AICP, Director Office of Planning and DevelopmentRegional Overview Support
Mr. George A. Weikert, Commissioner Adams CountyReplace an orphan bridge (Belmont Road Bridge) Support $1,200
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 1 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Altoona MPO
BlairSenator John H. Eichelberger, Jr., State Senator 30th Senatorial District30th Senatorial District Transportation Priorities Support
Mr. Joe Hurd, President/CEO Blair County Chamber CommerceAltoona Transportation Improvement Project Support
Park Avenue Connector Support
Plank Road Interchange Support
Mr. Karl R. King, Greenway Coordinator Allegheny Ridge Corp. For Allegheny Ridge Corp.Enhancement Program Restoration Support
Ms. Bonnie T. Lewis, Township Manager Logan Township For Logan TownshipPark Avenue Connector Support 22150 1 $7,410 $25,122
Mr. David McFarland, III, AICP,GISP, Interim Director Blair County Planning CommissionPriority Projects Support
Mr. Patrick M. Miller, Executive VP Altoona‐Blair County Development Corp.Downtown Altoona Parking Garage Support $7,000
Hollidaysburg Car Shop Access Improvement Project
Support $5,000
Mr. Eric B. Prendergast, Supervisor/Roadmaster Blair TownshipNewry Lane Bike/Pedestrian Path Support $35
Mr. Phillip D. Sipes, Vice President Innovative Consulting Group For Blair Co Chamber of CommerceAltoona Pedestrian Facility Improvements Support $250
Altoona Transportation Improvement Project Support 62166 1 $100 $67,306
Park Avenue Connector Support 70035 1 11 $824 $20,964
Plank Road Interchange Support 22146 1 $12,897 $16,699
Mr. Eric Wolf, General Manager AMTRANAltoona Blair County Dev Corp & Blair County Chamber Commerce
Support
Statewide Continuation of Act 44 Support
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 2 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Centre MPO
Mr. Thomas P. Zilla, Senior Transportation Planner Centre County MPOState of the Transportation System
CentreMr. Dan Abruzzo, P.E., VP of Government Affairs CBICCAirport Connector Road ‐ From I‐99 Support
Rt 322 between Seven Mountains and Mount Nittany
Support
Mr. Adam Brumbaugh, Township Manager College TownshipMillbrook Marsh Bikeway Support
Park Avenue Corridor Improvements Support
Mr. Douglas J. Erickson, Township Manager Patton Township For Patton TownshipWaddle Road Support 83541 1 $3,000 $18,250
Ms. Elizabeth A. Goreham, Council President Borough of State CollegeIntermodal Transportation Center Support
Mr. Ray Gutshall, Supervisor/Head Roadmaster Marion Township For Marion TownshipRoute 26 Lick Run Bridge Support $1,800
Route 26 Section 147(Jacksonville Road) Betterment
Support 85965 1 $250 $250
RT 26 (Jacksonville Road/Walnut Street) Betterment
Support
SR 80 Section B18 I‐99/I‐80 Support 3142 $131,874
SR80 Section A18‐I‐80/Rt 26 (Exit 163) Oppose 51466 $50,310
Mr. Albert G. Horvath, Senior VP for Finance Pennsylvania State UniversityI‐80/I‐99 Interchange Support
Keystone West Corridor Support
Millbrook Marsh Bikeway Support $3,400
Park Avenue Corridor Improvements Support
Public Transportation Improvements Support
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 3 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ Centre MPO
CentreMr. Albert G. Horvath, Senior VP for Finance Pennsylvania State UniversityU.S. 322 from Seven Mtns to Mt. Nittany Expressway
Support
University Park Airport Access Support
Ms. Betsey Howell, Executive Director Central PA Convention & VisitorsPark Avenue Corridor Improvements Support
Mr. James Meyer, Director Centre County Airport AuthorityAirport Connector Road Support
Mr. John C. Spychalski, Chairman Centre Area Transp. AuthorityPublic Transportation Funding Support
Mr. Richard J. Wisniewski, President/CEO Mount Nittany Medical CenterWidening of Park Avenue Support
Mr. Ronald J. Woodhead, Director Centre Region Parks & RecreationMillbrook Marsh Bikeway Support
Mr. Thomas P. Zilla, Senior Transportation Planner Centre County MPORoute 322 Corridor Safety Improvements Support 78994 1 1 11 1 $2,537 $2,475
SR 80 Sec A18 I‐80/SR 26 Local Access Interchange
Support 51466 $50,310
SR 80 Sec B18 I‐99/I‐80 High Speed Interchange Support 3142 $131,874
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 4 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
DVRPC MPO
BucksMr. Jeff Bartlett, Managing Director Bristol TownshipUS Route 13 Redevelopment Phase 2 Support $2,300
Ms. Marilyn J. Becker, Mayor Chalfont Borough CouncilBristol Road Extension Support 12923 1 2 22 2 $17,750 $16,900
Ms. Eileen M. Bradley, Township Manager New Britain Township For New Britain TownshipBristol Road Extension Support 12923 1 2 22 2 $17,750 $16,900
Ms. Lynn T. Bush, Executive Director Bucks County Planning Commission For Bucks CountyBristol Road Extension Project Support 12923 1 2 22 2 $17,750 $16,900
PA Turnpike / I‐95 Interchange Support 13347 1 $6,129 $1,126,880
Route 13 Project Support 47392 1 11 2 $31,045 $35,100
Mr. Joseph Czajkowski, Township Manager Newtown TownshipNewtown‐Yardley Road Support 57639 $1,000
Ms. Brandi Eng‐Rohrbach,Bethlehem & Stony Creek Branch Rail Restoration
Support $200,000
Mr. Jon P. Frey,SEPTA R8 Newtown Commuter Rail reactivation Support $100,000
Mr. Paul R. Iverson,SEPTA R8 FOX CHASE‐NEWTOWN RAIL SERVICE Support $150,000
Ms. Marilyn Jacobson, Council Member Chalfont Borough CouncilBristol Road Extension Support 12923 1 2 22 2 $17,750 $16,900
Mr. Peter LaMontagne, Council Member New Britain Borough For New Britain BoroughBristol Road Extension Project Support 12923 1 2 22 2 $17,750 $16,900
Ms. Stephanie J. Mason, Township Manager Doylestown TownshipEaston Road / South Main Street (SR 1001) Support $725
Lower State Road (SR 3003) & Wells Road Support $1,000
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 5 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ DVRPC MPO
BucksMs. Stephanie J. Mason, Township Manager Doylestown TownshipLower State Road (SR 3003) Safety Improvements
Support $2,200
Senator Robert M. Tomlinson, 6th District Senate of PennsylvaniaClosing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose
PA Turnpike / I‐95 Interchange Support
Rt. 13 Bristol Pike Traffic Calming Support 47392 1 11 2 $31,045 $35,100
Street Road and I‐95 Interchange Support
ChesterMr. James M. Bruton, Borough Council Vice President Borough of Downingtown For Borough of DowningtownBoot Road Extension Bridge over Brandywine Creek
Support 83710 1 11 1 $3,279 $3,539
Mr. Barry Cassidy, Director Main Street CDC For Borough of PhoenixvilleGreenline rail project Support $300
Ms. Barbara H. Cohen, Vice‐Chair Schuylkill Twp Board of SupervisorsToonerville Trolley Trail Support $4,000
Ms. Judy L. DiFilippo, Chairman Chester County Planning CommissionRoute 3 Transit Signal Priority Support $3,000
Chester Valley Trail Support 14675 1 $18,489 $19,033
Coatesville Train Station Support 71195 $350
Downingtown Revitalization/Boot Rd. Extension Support 83710 1 11 1 $3,279 $3,539
Downingtown Train Station Support $10,000
French Creek Parkway Support 57659 1 1 2 2 $23,850 $45,300
Keystone/R5 Rail Station Upgrades Support
Northern Relief Route/Fillmore Street Extension Support $2,800
PA 10 Corridor Safety Improvements Support $7,000
PA 100 Corridor Safety Improvements Support 80042 1 $90 $1,800
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 6 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ DVRPC MPO
ChesterMs. Judy L. DiFilippo, Chairman Chester County Planning CommissionPA 100: Exton to Lionville Support 14580 $65,050
PA 100: Ludwig’s Corner Support 47978 $4,100
PA 252 Underpass at U.S. 30 Support 85062 1 $150 $150
PA 41 Corridor Safety Improvements Support 14484 1 1 $10,000 $58,196
PA 896 Corridor Safety Improvements Support 85949 1 11 1 $3,875 $3,875
Paoli Transportation Center Support 60574 1 $8,253 $50,000
R6 Extension: Norristown to Wyomissing Support $500,000
Schuylkill River Trail Support 59434 1 1 2 $12,750 $5,830
SEPTA R5 Rail Extension: Thorndale to Atglen Support $30,000
U.S. 1 Partnership: Longwood to Kennett Bypass Support 14541 1 $3,800 $4,250
U.S. 1 Reconstruction: Maryland to Schoolhouse Road
Support 14580 $65,050
U.S. 202 Section 100 Support 15385 1 $10,000 $288,836
U.S. 202 Section 300 Support 64494 1 $102,200 $102,200
U.S. 30 Coatesville‐Downingtown Bypass Interchanges
Support 14532 1 $4,250 $256,200
U.S. 422 Reconstruction (North Coventry) Support 64222 11 2 $70,255 $68,429
U.S. 422 Valley Forge (River Crossing Complex) Support 70197 1 $4,000 $115,200
Various Critical Bridges Support
Various Critical Intersections Support
Mr. Brian DiSabatino, Vice President Chamber of Business and IndustryConstruction and Widening of U.S. 202 Section 300
Support
Ms. Dee Durham, Executive Director S.A.V.E.Route 41 SAMI Roundabout at Old Baltimore Pike
Support 14613 1 11 1 $4,750 $5,136
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 7 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ DVRPC MPO
ChesterMs. Dee Durham, Executive Director S.A.V.E. For Chandler Mill Bridge ConsortiumChandler Mill Bridge Support
Mr. Jeffrey T. Goggins, Senior Managing Director Trammell Crow CompanySR 29 Section AL2 Project Support 70227 1 $10,740 $7,230
Mr. Richard Heany, Exec. Vice President O'Neill PropertiesChester County Priorities Support
Mr. Mike Herron, Executive Director TMACCChester County Improvements Support
Mr. P. Timothy Phelps, President Tri County Chamber of CommerceChester County 's Priority Projects. Support
DelawareMs. Jane Billings, Borough Manager Borough of Swarthmore For Swarthmore Town Center WestSwarthmore Town Center West Support $2,416
Mr. John E. Pickett, Planning Director Delaware County CouncilDelaware County Council Transportation Priorities
Support
Adoption of a Complete Streets Policy Support
Elimination of Hwy Occupancy Permit for Bike Lanes
Support
MontgomeryMs. Caren Andrews, Borough Manager Borough of West ConshohockenFront Street/Balligomingo Road Realignment Support 16688 1 $5,225 $6,095
Matsonford Road Phase II Project Support
Montgomery County Planning Commission/SVTC Support
Schuylkill Expressway (I‐76)/Matsonford Road Inter
Support
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 8 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ DVRPC MPO
MontgomeryMr. Leo D. Bagley, Assistant Director Montgomery County Planning CommissionMontgomery County Funding Initiatives Support
Mr. Donald E. Berger, Jr. , Township Manager The Township of SpringfieldSpringfield Township Priority Projects Support
Representative Tim Briggs, 149th Legislative District PA House of RepresentativesU.S. 422 Corridor Coalition Support
Mr. Mike Caldwell, Superintendent National Park Svc Valley ForgeU.S. 422 Corridor Coalition Support
Mr. Douglas C. Cleland, Township Manager Township of Lower MerionArdmore Transit Center Support
Conshohocken State Road/Mill Creek Road Reconstruction
Support
Montgomery Ave Closed‐Loop Signal System Support
Montgomery County Planning Commission Projects
Support
Pennswood Road Bridge and Union Avenue Bridge
Support
Rock Hill Road/Belmont Avenue Corridor Improvement
Support
Mr. Donald D. Delamater, Township Manager East Norriton TownshipEast Norriton Township Priority Projects Support
Germantown Pike Widening Support
Senator Andrew E. Dinniman, 19th District Senate of PennsylvaniaU.S. 422 Corridor Coalition Support
Mr. David Dodies, Manager Upper Moreland Township For Upper Moreland TownshipPA Turnpike Ramp under PA RT 611 Support $3,500
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 9 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ DVRPC MPO
MontgomeryRepresentative Paul J. Drucker, 157th Legislative District PA House of RepresentativesU.S. 422 Corridor Coalition Support
Mr. Robert A. Fieo, Supervisor Upper Providence Township For Upper Providence TownshipU.S. Route 422/Oaks Interchange Improvements Support $2,913
Mr. Robert A. Ford, Township Manager Towamencin TownshipBustard Road Realignment Support $5,270
PA 363, Valley Forge Road Support $15,000
Mr. David Forrest, SVTC For SVTCSVTC Priority Projects Support
Mr. David R. Forrest, Municipal Administrator Municipality of NorristownChester Valley Trail Extension Support 16705 1 1 1 $9,826 $10,545
Lafayette Street Extension Support 57858 1 $2,400 $21,635
Lafayette Street‐Ford to Conshohocken Road Support 79863 $24,000
Lafayette Street‐US 202 Dannehower Bridge Interchange
Support 79864 1 $2,405 $13,400
Lower Farm Road/Hospital Bridge (Over Stony Creek)
Support 16631 $1,440
Ridge Pike, Norristown Municipality to Butler Pike
Support 48175 1 1 3 $10,612 $37,376
US 202, Section 500 Support 16665 1 11 $2,400 $8,616
Mr. James E. Gardner, Borough Manager/Police Chief Borough of HatboroNorth York Road (Rt 263) Northern Gateway Support $927
Mr. Andrew Haines, Manager Hatfield Township For Hatfield TownshipCounty Line Road at Bethlehem Pike Intersection Realignment
Support $7,500
Ms. Kathy A. Hampton, For CommunityBike and Walking Trails Support
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 10 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ DVRPC MPO
MontgomeryMr. Trevor Hart, Chairman Perkiomen Valley Chamber CommerceGermantown Pike to Ridge Pike (SR 4031) to PA 29
Support
Northern Relief Route/Fillmore Street Extension Support
S. Park Ave/Eagleville Rd/Crawford Rd in Lower Providence
Support
Toonerville Trolley Trail Support
U.S. 422 Corridor Coalition Support
Mr. Bryan T. Havir, Assistant Township Manger Cheltenham TownshipGlenside Revitalization and Circulation Study Support $600
Mr. Rob Henry, Executive Director GVF TransportationU.S. 422 River Crossing Complex Support
Ms. Carmen S. Italia, Jr. , President MCEDCTransportation Projects in Montgomery County Support
Mr. Brian Keaveney, Township Engineer Pennoni Associates Inc. For Lower Merion TownshipArdmore Transit Center Support 73214 1 $6,756 $41,000
Conshohocken State Road/Mill Creek Road Reconstruction
Support $1,200
Rock Hill Road/Belmont Avenue Corridor Improvement
Support 64795 1 2 2 $19,700 $18,700
Mr. Daniel K. Kerr, Township Manager Limerick TownshipSanatoga Interchange / Airport Road Improvements
Support $13,900
Mr. David G. Kraynik, SMTC Township of CheltenhamBethlehem Pike Roadway and Streetscape Improvements
Support
Fort Washington Office Park Reconstruction Support
Glenside Commercial District/Arcadia University Support
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 11 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ DVRPC MPO
MontgomeryMr. David G. Kraynik, SMTC Township of CheltenhamGlenside Streetscape & Traffic Calming, Ph. III Support
SMTC Transportation Improvement Update Support
Senator Daylin Leach, 17th District Senate of PennsylvaniaProjects in Delaware & Montgomery Counties Support
Mr. Paul A. Leonard, Chairman SE Montgomery County Trans CoalitionSE Montco Trans. Coalition Priority Projects Support
Bethlehem Pike Roadway and Streetscape Improvements
Support $555
Bethlehem Pike Roadway and Streetscape Improvements
Support
Fort Washington Office Park Reconstruction Support
Glenside Commercial District/Arcadia University Support
Glenside Streetscape & Traffic Calming, Ph. III Support
SMTC Improvement Project Update Support
Mr. Paul A. Leonard, Township Manager Upper Dublin TownshipFort Washington Office Park Reconstruction Support $38,700
Upper Dublin Twp Priority Projects Support
SMTC Projects Support
Welsh Road ‐ Twining to Blair Mill Support $5,500
Mr. Stephen B. Lester, President GVF Transportation For GVF TransportationGVF Transportation Priority Projects Support
Ms. Phyllis C. Lieberman, Township Manager Whitpain TownshipMontgomery County Priority Projects Support
Mr. Christopher J. Loschiavo, Director of Public Works Plymouth TownshipBrook Road Bridge Project Support
Butler Pike Bypass Support
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 12 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ DVRPC MPO
MontgomeryMr. Christopher J. Loschiavo, Director of Public Works Plymouth TownshipLafayette Street Corridor Project Support
Montgomery County Planning Commission/Greater Valley Forge
Support
Ridge Pike Improvement Project Support
Turnpike Projects Support
Ms. Karen E. Madden, Township Manager West Norriton TownshipPA 363 Interchange Reconstruction Support 64796 1 11 1 $14,955 $15,000
Schuylkill River Trail Bridge o/ the Schuylkill River Support 16703 1 1 11 1 $7,538 $2,000
U.S. 422 Bridge over the Schuylkill River Support 70197 1 $4,000 $115,200
U.S. 422/PA 23 Interchange & North Gulph Rd. Improvement
Support 66952 1 11 1 $12,153 $19,350
Mr. F. Lee Mangan, Borough Manager Lansdale BoroughLansdale Station Pedestrian Tunnel Support $4,000
Mr. Thomas K. McHugh,Reactivation of R8 Commuter Rail Service Support
Mr. Richard Mellor, Manager Lower Moreland Township For Lower Moreland TownshipRed Lion and Philmont Avenue Support $2,500
Ms. Patricia A. Moir, Executive Director Suburban Transit Network, Inc.Chester & Montgomery County Support Improvements
Support
Mr. John B. Nagel, Township Manager Montgomery TownshipCounty Line Road Widening Support 64779 1 11 $4,700 $16,760
Limekiln Pike Bridge Support 15769 11 1 $4,955 $5,505
U.S. 202, 5‐Points Intersection (Sec. 71A) Support 63493 2 $3,994 $6,100
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 13 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ DVRPC MPO
MontgomeryMr. P. Timothy Phelps, President Tri County Chamber of CommerceGermantown Pike to Ridge Pike (SR 4031) to PA 29
Support
S. Park Ave/Eagleville Rd/Crawford Rd in Lower Providence
Support
Sanatoga Interchange Ramps Support
Toonerville Trolley Trail Support
U.S. Route 422 Corridor Coalition Support
Mr. Delton Plank, Manager Lower Salford Township For Lower Salford TownshipOak Drive Extension Support $3,500
Senator John C. Rafferty, Jr., 44th District Senate of PennsylvaniaU.S. 422 Corridor Coalition Support
Ms. Marcene W. Rogovin, Chairman Schuylkill Valley Trans CoalitionBrook Road Bridge Project Support
Butler Pike Bypass Support
Conshohocken State Road/Mill Creek Road Reconstruction
Support
Germantown Pike Widening & Intersection Improvements
Support
I‐76/Matsonford Road Phase 2 Improvements Support
PA 73, Skippack Pike (US 202 to Butler Pike) Support
Schuylkill Valley Transportation Coalition Support
Mr. Stuart J. Rubin,SEPTA Parking Garage Oppose
Mr. Mike Santillo, Chairman Upper Merion Trans Authority422 Corridor Coalition Support
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 14 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ DVRPC MPO
MontgomeryMr. Piero A. Sassu, Board of Supervisors Chairman Lower Providence TownshipGermantown Pike to Ridge Pike (SR 4031) to PA 29
Support
S. Park Ave/Eagleville Rd/Crawford Rd Improvement
Support
U.S. 422 Corridor Coalition Support
Mr. Scott Sibley, Chairman Upper Merion TownshipU.S. 422 Corridor Coalition Support
Mr. Christopher R. Van de Velde, Township Manager Whitemarsh TownshipRidge Pike‐Butler Pike to Philadelphia/Montgomery County Line
Support 16577 22 2 $30,900 $23,146
Schuylkill Valley Transportation Coalition Project Support
Mr. Ronald G. Wagenmann, Chairman US 422 Corridor Coalition For US 422 Corridor CoalitionU.S. 422 Corridor Coalition Priority Projects Support
PhiladelphiaMs. C Blazic,SEPTA Projects‐Parking garage at the Jenkintown Oppose
Mr. Lawrence & Carolyn Brick,Issues with Public Transportation Support
Mr. Richard G. Burnfield, CFO/Treasurer SEPTAVarious SEPTA Projects Support $990,000
Mr. Dave Campbell,SEPTA Frankford Junction Station EI & R‐7 Lines Support
Mr. William Q. Cellini Jr.,R1 Glenside SEPTA Regional Rail Line Support
Ms. Barbara Cicalese,Rt. 23 Repair Support
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 15 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ DVRPC MPO
PhiladelphiaMs. Rina Cutler, Deputy Mayor Trans & Utl City of PhiladelphiaAddressing high cost‐high impact projects Support
Investing in livability Support
Proposed Statewide use of Red Light Enforcement System Revenues
Oppose
Supporting Transit Support
Mr. Chris Erb,Improve Capacity on I‐76. Support
Link Roosevelt Blvd to the Betsy Ross Bridge Support
Senator Lawrence M. Farnese, Jr., 1st District Senate of PennsylvaniaBroad Street Line to the Navy Yard Support
Light‐Rail Line along Columbus Boulevard Support
Trackless Trolley Service Routes 29 & 79 S Phila Support
Mr. Kevin Haney,Roosevelt Boulevard U.S. ‐1, Philadelphia Support
Mr. Mark F. Harris, Community Liaison Cathedral Park AssociationIntersection of 52nd & Lancaster (Cathedral Park) Support 57898 1 $2,980 $2,995
Mr. Paul R. Iverson,SEPTA Project Support
Mr. Rob Kettell, Citizen1‐95 Interchange Improvement Support
Modes of Transportation Support
Mr. Paul Kuzma, CitizenUpper Peach Street at I 90 Support
Mr. Paul R. Levy, President & CEO Center City DistrictDilworth Plaza Improvements Support $45,000
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 16 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ DVRPC MPO
PhiladelphiaMs. Susan Patrone, Passyunk Square Civic Assoc.Trackless Trolley Restoration Support
Dr. Don Shanis, Deputy Executive Director DVRPCRegional Overview Support
Mr. Joseph R. Syrnick, President & CEO Schuylkill River Development Corp.Schuylkill River Trail Support
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 17 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Erie MPO
ErieMr. David L. Anthony, Manager Washington Township For Washington TownshipUpgrades to the U.S. 6N corridor Support $8,000
Mr. Mark J. Corey, Township Engineer Mark J. Corey & Associates For Harborcreek TownshipAshton Road Bridge Replacement Project Support $1,000
Bartlett Road Bridge Replacement Project Support $750
Brickyard Road Bridge Replacement Project Support $750
Carbury Road Bridge Replacement Project Support $750
Depot Street Bridge Replacement Project Support $750
Dewey Road Bridge Replacement Project Support $1,500
Elmwood Road Bridge Replacement Project Support $750
Hardscrabble Road Bridge Replacement Project Support $750
Kane Hill Road Bridge Replacement Project Support $750
Leet Road Bridge Replacement Project Support $1,000
Malbett Place Bridge Replacement Project Support $1,000
Mill Run Bridge Replacement Support $1,000
Old Ridge Road Bridge Removal Project Support $500
Old Route 89 Bridge Replacement Project Support $750
Old Sterrettania Road Bridge Replacement Project
Support $1,000
Pleasant Street Bridge Replacement Project Support $750
Sherrod Hill Road Bridge Replacement Project Support $1,000
South Hazel Street Bridge Replacement Project Support $1,000
Wilson Road Bridge Replacement Project Support $750
Mr. Mark J. Corey, Township Engineer Mark J. Corey & Associates For Troy TownshipBort Road Bridge Replacement Project Support $1,500
North Mill Street Bridge Replacement Project Support $1,000
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 18 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ Erie MPO
ErieMr. Jim Dible, President/CEO Erie Regional, ChamberPriority Projects
Mr. John Elliot, Executive Director ECO Dep. Corp. Erie CountyPriority Projects Support
Mr. Thomas Hoffman, Chairman Erie Metropolitan Planning OrgRegional Overview Support
Mr. Taras (TJ) Jemetz, Borough Manager Home Rule Borough of Edinboro For Edinboro Borough CouncilU.S. 6N Corridor Improvements, Edinboro Area Support $6,750
Mr. Mark Kiddo, Township Commissioner Lawrence Park TownshipTraffic Light and School Crossing Sign Replacement
Support $1,200
Mr. Chris Rodgers, Executive Director Erie Reg. Airport Auth.Airport Authority Priority Projects Support
Mr. Ray Schreckengost, Executive Director E‐W Port AuthorityPort Authority ‐ Priority Projects Support
Honorable Joseph E. Sinnott, Mayor City ErieSmart Transportation/Maintenance Needs Support
Mr. Dennis G. Solensky, Executive Director Erie Metro Transit AuthorityAutomated Vehicle Location System Deployment Support 77115 $1,400
Construct Transit Operating Facility Support 77136 1 $21,933 $30,000
Highway Transit Corridor Real Time LCD Monitors Support 87067 1 1 11 1 $5,000 $5,000
Mr. Dennis J. Tomczak,Convention Center‐ RR Tracks to Lane for BFH Support
Develop Downtown using Streetscape Program Support
G.E. Bottleneck Rts. 20 & 5 Extend and Improve Support
Improve Access to Presque Isle Support
Update or Eliminate Outdated Traffic Signals Support
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 19 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ Erie MPO
ErieMr. Jon Tushak, City Engineer City of Erie EngineeringWest 8th Street Rehabilitation Support $4,100
Mr. Jake Welsh, Director Erie County Dep. PlanningRegional overview Support
Mr. Gary L. White, Chairman Waterford Township For Waterford Township (Erie MPO)Niemeyer Road (T463) Covered Bridge Support $985
Franklin RPO
FranklinMr. Geoff Lilja, Partner Antrim Business Park, LPExit 3 Interchange Improvements Support 87201 1 $4,250 $4,250
Mr. Phil Tarquino, Director County Planning CommissionRegional Overview Support
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 20 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Harrisburg MPO
CumberlandMs. Stephanie J. Williams, Greenway/Open Space Coordinator. Cumberland County Planning Dept.Cumberland Valley Rail Trail, Shippensburg Connect
Support $1,250
Cumberland Valley Trail ‐ Carlisle Extension Support $1,700
DauphinMr. Gary Bootay, Acting Executive Director PA Society. Advancement/DeafIssues for the Deaf on Public Transit Support
Mr. Joseph Gerdes, Executive Director Keystone State Railroad Assoc.Keystone State Railroad Association Support
Ms. Ada Gil,Massive transportation to NYC Support
Mr. Albert G. Horvath, Senior VP for Finance Pennsylvania State University5th Street/University Drive Support 76161 1 $4,956 $7,237
Mr. Mark K. Keller, Chairman HATS For HATSRegional Overview for HATS MPO Support
Mr. Chauncey D. Knopp, Chair, Planning Commission Lower Swatara TownshipState Route 441 Corridor Improvements Support $7,624
Mr. David J. Morrison, Assistant to the President Harrisburg Area Community CollegeWalnut Street Bridge Support $6,000
Mr. Gary Myers, Township Manager Susquehanna TownshipU.S. 22 (Walnut St.)/Progress Ave. Support $15,490
Mr. Ronald J. Paul, Township Manager Lower Swatara TownshipMeade Avenue (Formerly 5th St./University Dr.) Support 76161 1 $4,956 $7,237
Representative John D. Payne, 106th Legislative District PA House of RepresentativesAdditional Lanes North and South of Rudy Dininni bridge.
Support
Milroy Road Underpass improvements Support
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 21 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ Harrisburg MPO
DauphinRepresentative John D. Payne, 106th Legislative District PA House of RepresentativesRight‐turn lane from Middletown Road (SR2003) onto Service Connector Road (SR2034); Derry Twp
Support
Route 322 Ramp Extensions (SR2003); Derry Twp Support
Mr. Michael Pries, Chairman, Board of Supervisors Derry TownshipSR 743 Relocation Project Support 63284 1 $8,000 $9,640
Mr. John Quigley, Acting Secretary Dept. Conservation & Natural ResourcesBike Ped/Transportation Enhancements Support
County Greenway Plans Support
Historic Bridge Program Support
Pennsylvania Greenways Support
Regional/Statewide TIP for Trails Support
Smart Transportation Support
Transportation Enhancements Support
Ms. Judith L. Schwank, President/CEO 10 Thousand FriendsExpand Community Transportation Initiatives Support
Extend Smart Transportation Principles Support
Funding Formulas for Community & Surface Transport
Support
Mobility and Connection between Metropolitan Markets
Support
Mr. James Szymboski, AICP, Executive Director Tri‐County RPCRegional Overview Support
PerryMr. Daniel Rapp, Borough Manager Borough of Duncannon For Borough of DuncannonApple Tree Alley Walk Support $650
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 22 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Johnstown MPO
CambriaMr. Chris Allison, Transportation Planner Cambria County Planning CommissionPriority Projects Support
Red Mill Bridge Replacement Support
US 22 CCIP. U.S. 219 Interchange to SR 4031 Interchange
Support
Dean Bridge #11 over Clearfield Creek Support
Gillespie Ave Bridge over Trout Run, Portage Boro
Support
HAIDA Industrial Park Access Road East, Elder Twp
Support
Haynes Street Bridge Replacement Support
Industrial Park Rd Elton Rd (PA 756) Galleria Mall Support
Iron St/Benshoff Hill Road, Middle Taylor Twp. Support
Jamestown Arch Tunnel, Portage Twp Support
Lorraine Road Nanty Glo Borough Support
New Germany (Tower Road) Interchange Croyle Twp
Support
PA 756 Elton Road Intersection Support
Pine Street Bridge over Little Conemaugh River Support
Portage St (PA 53) at Norfolk Southern Underpass
Support
Sonman Ave Bridge over Trout Run, Portage Boro Support
Troy Street Bridge over Emeigh Run, Susq. Twp Support
Ms. Rose M. Lucey‐Noll, Executive Director Cambria County Transit AuthorityAct 44 Support
Bus Replacements Support
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 23 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Lancaster MPO
LancasterMr. Ray D'Agostino, Chairman Lancaster County TTACRegional Overview Support
Mr. Fred D. Daum, LAND For Lancaster Alliance New DirectionRt. 23 and Road System of Eastern Lancaster County
Oppose
Ms. Monica Forte,The Forgotten Fruitville Pike Support
Mr. David G. Greineder, Advocacy Director The Lancaster Chamber CommerceCapital Red Rose Corridor (Corridor One) Support
Elizabethtown Train Station Renovation Project Support $9,300
Keystone Corridor High Speed Rail Line Support
Lancaster Train Station Renovation Project Support $12,000
Route 23 DEIS Support
Stimulus Funds Support
TIGER App‐Harrisburg Pike Corridor Support
Ms. Nancy Kingsley, Hearing Loss Association/PANeed for Digital Signs Announcing Stops Support
Honorable Scott Martin, Commissioner Lancaster CountyRegional Overview Support
Mr. Douglas W. Plank, ELA Group For Lancaster Chamber of CommerceRoute 23 Support
Solutions for Transportation Funding Support
Ms. Nancy Santaniello,The Forgotten Fruitville Pike Support
Mr. Daniel S. Sweigart, Senior Advisory Council Member Lancaster Farmland TrustRoute 23 Improvement Project Oppose $250,000
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 24 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Lebanon MPO
LebanonMr. Jonathan W. Fitzkee, Transportation Planner Lebanon County Planning Dept. For LEBCO MPOPA Route 72/ PA Route 419 Intersection Project Support $2,000
Mr. Robert Sentz, Acting Director Lebanon County Planning Dept.Regional Overview Support
Lehigh Valley MPO
LehighSenator David G. Argall, 29th District Senate of PennsylvaniaLehigh County Bridges Support
Lehigh County Route 100/309 Intersection Support
Northampton County Bridges Support
Mr. Armand V. Greco, Executive Director Lehigh & Northampton Transport For LANTALANTA Capital Improvement Plan 2011‐2014 Support $50,775
Mr. Joseph Gurinko, AICP, Chief Transportation Planner Lehigh Valley Planning CommissionRegional Overview ‐ Lehigh and Northampton Counties
Support
Ms. Anita Kingsbauer,St. Luke's Riverside Access Drive Project Support $8,211
Mr. Mark Witt,Issues with I‐79 and Land Use. Oppose
Mr. Richard A. Young, Director of Public Works City of Allentown For City of AllentownAllen Street Safety Improvements Support $900
American Parkway Support 11443 1 11 1 $68,381 $62,709
Chapel Avenue Safety/Traffic Calming Improvements
Support $1,000
Gordon Street Bridge Support $4,500
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 25 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
NEPA RPO
CarbonSenator David G. Argall, 29th District Senate of PennsylvaniaCarbon County Programmed Projects Support
Ms. Judy Borger, Director Carbon County Planning & DevelopmentPackerton Business Park ‐ SR 209 Entrance Support $13,270
Replace Thomas J. McCall Memorial Bridge Support
SR 443 Corridor Preliminary Engineer Study Support
Mr. Jeffrey Box, President and CEO NEPARegional Overview Support
Mr. Armand V. Greco, Executive Director Lehigh & Northampton Transport For Carbon CountyCarbon County Transit Cap Improve Plan 2011‐2014
Support $5,305
Representative Paul E. Kanjorski, 11th District Congress of the United StatesHauto Industrial Park Rd/Rt 54 Realignment/Relocate
Support
Mr. Larry Malski Esq.,PA NE Reg. Railroad Authority Support
MonroeMs. Peggy A. Howarth, Executive Director Monroe County Transp. Auth.Monroe County Transit Authority Priorities Support
Act 44= Access for 393,725 in Monroe County Support $2,000
Representative Paul E. Kanjorski, 11th District Congress of the United StatesMarshalls Creek Traffic Relief Project Support
Northampton Community College Access Road Support
Mr. Henry D. Pyatt, Downtown Manager EastBurg Community AllianceLackawanna Cutoff Passenger Rail Restoration Support $551
Representative John J. Siptroth, 189th Legislative District PA House of RepresentativesProjects in Monroe and Pike Counties Support
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 26 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ NEPA RPO
MonroeMr. John Woodling, Director Monroe County Planning Commission7th Street Over I‐80 Project Support $5,000
Bridge over Pocono Cr. Replacement Support $750
Clearance Increase on I‐80 Support
County Bridge #9 Replacement Support $750
Five Points Intersection Support $3,450
Foundry Road/ County Bridge 8 Replacements Support $750
Hypsy Gap Road Bridge Replacement Support $500
I‐80 Traffic Relief Project Support
Marshalls Creek Traffic Relief Project Support $23,800
Metzgar Road Bridge Project Support $750
PA 115/Weir Lake Road Project Support $4,500
PA 611 Improvements Support $15,920
PA 611 Improvements (2) Support $21,150
Pedestrian Crossing at Franklin Hill Road Support $150
Route 115 Astolat Rd. Project Support $500
Silver Valley Rd. Bridge Replacement Support $95
SR 191‐Stokes Avenue Intersection Realignment Support $1,600
SR 196 Improvements Support $500
SR 2024 Bridge Replacement Support $1,100
SR 4008 Shoulder Project Support $50
T‐221 Bridge Replacement Support $750
T‐381/Lake Mineola Road Support
T‐410 Bridge Replacement Support $250
T‐420 Bridge Replacement Support $250
T‐518 over Cranberry Creek Support $750
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 27 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ NEPA RPO
MonroeMr. John Woodling, Director Monroe County Planning CommissionT‐591 over Paradise Creek Support $750
T‐610 over Broadhead Creek Support $750
T‐850 Bridge Replacement Support $750
U.S. 209/PA 115 & U.S. 209/PA 715 Intersection Improve
Support $2,000
PikeMr. Mike Mrozinski, Assistant Planning Director Pike County Community PlanningI‐84 Emergency Access Support
I‐84 Interchange Support
Matamoras Borough Traffic Study Support
Roemerville Road Traffic Study Support
Route 402 Project Support
Route 434 Well Road Project Support 47968 $4,270
Route 590 Project Support
Route 6 in Milford Borough Support
Route 739 Traffic Study Support
Rt. 390 Project Support
SR 1005‐ Twin Lakes Road Support
SR 1013 Project Support
SR 1017 Project Support
SR 2001 Support 9397 1 3 $20,488 $27,828
SR 2003 Support
SR 2006 Project Support
SR 2017 Project Support
SR 4001 Project Support
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 28 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ NEPA RPO
PikeMr. Mike Mrozinski, Assistant Planning Director Pike County Community PlanningSR 4006 Project Support
Towpath Road Traffic Study Support
U.S. 209 Traffic Study Support
Mr. Edward H. Sinon, Supervisor Greene Township, Pike CountyDitch Work Along Brinkhill Road Support $100
Ditch Work Along Hemlock Grove Road Support $100
Rebuild Ledgedale Road Support $900
Resurface & Drainage Instillation Roemerville Road
Support $800
Resurface & Shoulder Work Route 390 Support $1,000
SchuylkillMr. Richard Carl, Executive Director Schuylkill Chamber of CommercePA 309 Improvements Support
PA 54 Resurfacing Support
PA 61 and Darkwater Road Intersection Support
PA 61 and Liberty Street Improvements Support
PA 61 Improvements Support
PA 61 Restoration Support
PA 924 Resurfacing Support
Schuylkill ADA Ramp Installation Support
SR 209 Betterment Improvements Support
Widening of PA 61 Support
Mr. Charles M. Ross, Director Schuylkill County Planning CommissionCollins Street Bridge Support 57689 1 1 11 2 $3,983 $3,200
Deer Lake North Support 12613 1 $38,745 $56,161
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 29 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ NEPA RPO
SchuylkillMr. Charles M. Ross, Director Schuylkill County Planning CommissionLiberty Street‐Sr 61 Safety Improvements Support $17,000
Market Street Bridge Support $2,000
Mush‐Dahl Road Intersection Improvements. Support $2,000
Pottsville PA 61 Intersection Improvements. Support $2,000
Red Ridge Road Bridge Support $2,000
Schuylkill Haven PA 61 Safety Improvements Support 72451 1 1 11 1 $11,600 $10,850
Sr 61 & Darkwater Road North to I‐81 Support $500
SR. 209 Betterment‐Porter/Frailey Townships Support $5,000
Tamaqua CBD Improvements Support 12443 1 1 1 $2,995 $6,195
WayneMr. Kurt Bauman, Government Services Manager NEPA AllianceSR 191 / SR 3004 Intersection Improvements Support $995
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 30 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
North Central RPO
Ms. Amy Kessler, Transportation Planning Director SchuylkillState of the Transportation System
Ms. Amy Kessler, Transportation Planning Director North CentralPriority Projects Support
CameronMr. Larry A. DeYoung, V.P. Gov't Relations Western N.Y. & Pennsylvania RRBuffalo Line Tie & Surface project Support $4,000
ElkMr. David J. Greene, Manager City of St. MarysSR 120 State Street Extension‐City of St Marys Support $3,900
Mr. Matthew G. Quesenberry, Director Elk County Planning Dept.Reopening of the Transportation Enhancement Program
Support
McKeanMr. Martin M. Glesk, Executive Director Bradford Area Alliance For Continental 1Continental 1 Support $650,000
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 31 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Northern Tier RPO
BradfordMr. Rick Biery, Regional Planner Northern Tier RegionalRegional Overview Support
SusquehannaMr. Rexford O. Catlin, CEO Endless Mountains Health Sys For Endless Mountains Health SysEndless Mountains Replacement Hospital Access Road
Support $4,020
Mr. Stephen A. Fisk, Sr. Mgr. Business Development Canadian Pacific Rwy.Centralized Traffic Control System Support $10,000
Positive Train Control System Support $15,000
WyomingMr. Stephen A. Fisk, Sr. Mgr. Business Development Canadian Pacific Rwy.Nicholson Viaduct Rehabilitation Support $30,000
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 32 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Northwest RPO
ClarionMs. Christie Burkett, Township Secretary Millcreek Township Supervisors For Millcreek Township SupervisorsT‐561 Asbury Road Bridge over Little Millcreek Support $835
Ms. Janey Corle, Borough Secretary Sligo Borough Council For Sligo Borough CouncilBlinking Traffic Signals Replacement Support $8
Limestone Road Widening and Paving Support $74
Madison Street Bridge Replacement Support $775
Penn Street Ext. and Cul‐de‐Sac Support $32
School Speed Limit Beacons Replacement Support $7
Mr. John A. Corsini, Business Manager Union School District For Route 68 Improvement CommitteeReidsburg Bridge Support $10,500
Route 68 Congestion Project Support $19,500
Ms. Nancy K. Freenock, Borough Manager Clarion Borough For Clarion Borough CouncilCorbett Street Intersection Support $150
Greenville Avenue Sidewalk Support $250
South Sheridan Road Support $55
Ms. Sharon K. Heeter, Borough Secretary Knox Borough For Knox Borough CouncilRoute 208 Retaining Wall Support $1,500
Mr. Bill John, Rte. 68 CommitteePriority Projects Support
Mr. Richard McGarrity, Borough Secretary New Bethlehem Borough Council For New Bethlehem Borough CouncilPenn Street Project Support
Smuckers Route 28 Access Project Support
Wood Street Retaining Wall Support
CrawfordDr. Roy Brant, Chairman CCPC Transportation CommitteePriority Projects Support
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 33 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ Northwest RPO
CrawfordMr. Mark J. Corey, Township Engineer Mark J. Corey & Associates For Cussewago TownshipCrowther Road Bridge Replacement Project Support $750
Fry Road Bridge Replacement Project Support $750
Jay Road Bridge No. 2 Replacement Project Support $750
Lake Road Bridge Replacement Project Support $750
Middle Road Bridge Replacement Project Support $750
Mr. Mark J. Corey, Township Engineer Mark J. Corey & Associates For Troy TownshipDeeter Hill Road Bridge Replacement Support $750
Mr. Larry A. DeYoung, V.P. Gov't Relations Western N.Y. & Pennsylvania RRCrossing and drainage repairs Support $1,000
Mr. Mike Forbes, Chairman Union Township BoardUnion Township Priority Projects Support
Mr. Matt Gilara, GISP, ManagerRegional Overview Support
Mr. Jack P. Lynch, Planning Director Crawford County Planning Commission For Crawford CountyCenter Road Bridge Replacement Support $150
Deeter Hill Road Bridge Replacement Support $150
Dotyville Bridge Replacement Project Support $100
Hamilton Road Bridge Replacement Project Support $100
Hogback Road Bridge Replacement Project Support
Jay Road Bridge No. 2 Replacement Project Support $100
Lake Road Bridge Replacement Project Support $100
Plank Road Bridge Replacement Support $150
Shermansville Road Bridge Replacement Support $250
SR 408 Bridge over Thompson Run Support $100
SR 408/Main St/ Walnut St Intersection Realign Support $150
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 34 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ Northwest RPO
CrawfordMr. Jack P. Lynch, Planning Director Crawford County Planning Commission For Port Meadville AirportConstruct Airport Access Road Support $600
Mr. B J Smith,Route 198/North Street Safety View Oppose $12,300
Ms. C.J. Tisi, Transp. Committee Member Titusville Chamber of CommerceTitusville Intersections Project Support $5,200,000
Trans Loading Facility Support $2,100,000
Honorable Morris Waid, Commissioner Crawford CountyCrawford County ‐ Priority Projects Support
ErieSenator Jane M. Earll, 49th District Senate of PennsylvaniaErie Priorities Support
Representative John R. Evans, 5th Legislative District PA House of Representatives5th Legislative District Priorities ‐Erie Crawford Support
VenangoMs. Judith Downs, Executive Director Venango County Regional PlanningVenango County Priority Projects Support
Ms. Barbara E. Gross,Emlenton Hill Reconstruction Support
Mr. John Phillips, Senior VP Oil Region AlliancePriority Projects Support
Ms. Diane Prusaczyk, Secretary and Treasurer Utica Borough For Utica BoroughMill Creek Utica Bridge Support
Ms. C.J. Tisi, Transp. Committee Member Titusville Chamber of CommerceJersey Railroad Bridge Project Support $1,000,000
Rouseville, PA to Sportsman Curve Project on SR 8
Support 2277 1 1 1 2 $4,545 $4,550
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 35 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ Northwest RPO
VenangoMs. C.J. Tisi, Transp. Committee Member Titusville Chamber of CommerceSportsman's Curve Project Support 2277 1 1 1 2 $4,545 $4,550
Vertical Curves at Kaneville, PA Support $4,000,000
Ms. Barbara S. Warden, President Scrubgrass Grange #1705 For Scrubgrass GrangeEmlenton Hill Improvement Support 2226 1 1 11 2 $10,270 $12,340
Mr. Troy A. Wood, Commissioner Venango CountyJackson Twp. Bridge Replacement Bridge 0503 Support $9,000
Jackson Twp. Bridge Replacement Bridge 0803 Support $550
Oil City Intersection Improvement Project Support
Oilcreek Twp. Bridge Replacement Support $1,045
Plum Twp. Bridge Replacement Support $1,280
Plummer/Grandview Surface Improvement Project
Support
Rouseville Intersection Turing Radius Support
Sugarcreek Smart Growth Connectivity Project Support
WarrenMr. Daniel Glotz, Director Warren County Planning CommissionRetention of Enhancement Program Support
North Road Bridge Replacement Support
Stillwater Creek Bridge Replacement Support
Tidioute Creek Bridge Replacement Support
Way Road Bridge Replacement Support $600
Widdlefield Run Bridge Replacement Support $300
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 36 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Reading MPO
BerksSenator David G. Argall, 29th District Senate of PennsylvaniaBerks County Programmed Projects Support
Berks County Projects‐ Not Programmed Support
Mr. Troy S. Bingaman, Township Manager Township of Exeter For Township of ExeterShelbourne Road & SR 562 Support $1,600
Mr. J. Karl Hilgendorf, Citizen Boro Planning Commission/BOSS 2020422 Congestion Relief/Downtown Revitalization Support
Mr. Christian Y. Leinbach, Commissioner County of BerksRoute 222 North Support
US 422 Corridor Improvement Project Support
Mr. Dennis D. Louwerse, BARTABARTA Overview and Act 44 Support
Mr. Robert B. Ludgate, Borough Engineer Ludgate Engineering Corp For Borough of Sinking Spring422 Congestion Relief/Downtown Revitalization Support $20,000
Mr. David Meas, Business/Property Owner Hair on the Avenue422 Congestion Relief/Downtown Revitalization Support
Senator Michael A. O'Pake, 11th District Senate of PennsylvaniaIntersections at SR 73 and 662 Support
SR 222 Berks County between Reading/Allentown
Support
Mr. Alan Piper, Berks County Planning CommissionRegional Overview ‐ Berks County Support
Mr. Mike Santillo, Chairman Upper Merion Trans AuthorityChester Valley Trail Extension Support 14675 1 $18,489 $19,033
US 422 Berks County to Schuylkill River Support 14698 1 2 $13,295 $65,284
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 37 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ Reading MPO
BerksMr. Randall W. Swan, Chairman, 222 North Task Force Berks Economic Partnership222 North; Berks County and portions of Lehigh County
Support 77027 1 $6,579 $183,000
Ms. Carolyn Williams, Borough Manager New Morgan BoroughSR 10 Widening Project Support 10331 1 1 11 1 $10,525 $12,425
Mr. James E. Yarger, Borough Resident Borough Planning Commission For Borough of Sinking Spring422 Congestion Relief/Downtown Revitalization Support $20,000
Ms. Diane T. Yarger, Borough Resident Borough Zoning Board For Borough of Sinking Spring422 Congestion Relief/Downtown Revitalization Support $20,000
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 38 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Scranton‐Wilkes Barre MPO
LackawannaRepresentative Paul E. Kanjorski, 11th District Congress of the United StatesExpansion of Interstates 80 & 81 Support
Lackawanna Cut‐Off Passenger Rail Service Restoration
Support
Mr. Karl F. Pfeiffenberger Jr., Transportation Liaison Scranton Chamber of Commerce For Valley View Business ParkValley View Business Park Access Road Support 77544 $20,410
LuzerneSenator Lisa Baker, PA SenatePA Senate D20 Support
Representative Karen Boback, 117th Legislative District PA House of RepresentativesRt 239 Wading at RR Tracks Support 9214 1 2 $1,905 $1,950
Representative Mike Carroll, 118th Legislative District PA House of RepresentativesPriorities for Legislative District 118 Support
Representative Paul E. Kanjorski, 11th District Congress of the United StatesBartoli Lane Bridge Support
Extension of Route 424 Support
Glen Avenue (Bridge) Replacement Support
Nanticoke & Plymouth Township Bridge Preservation
Support
Plymouth Township Bridge Replacement Support
South Valley Parkway Project Support
Water Street Bridge (Replacement) ‐City of Pittston
Support
Widening of Route 93 Support
Wilkes‐Barre/Scranton Int. Airport Intermodal Center
Support
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 39 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ Scranton‐Wilkes Barre MPO
LuzerneMs. Mary M. Loughlin, Regional Coordinator Epilepsy Foundation of E. PATransportation for Epilepsy Sufferers Support
Mr. Albert Mertz, President Operation OvercomeTransportation for People w/ Disabilities Support
Ms. Donna Palermo, President Greater Hazleton C/CRt. 424 Beltway Extension Support 70457 $7,700
Rt. 924 Widening Support 73576 1 $15,154 $12,717
Ms. Donna Palermo, President Greater Hazleton C/C For Route 424 Beltway ExtensionI‐81/RT. 924 Interchange Support 9068 $7,100
Representative John J. Siptroth, 189th Legislative District PA House of RepresentativesProjects in Luzerne County Support
Ms. Nancy Snee, Transportation Planner Luzerne County PlanningRegional Overview Support
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 40 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
SEDA COG RPO
Mr. Vern Foreman, Supervisor Jackson TownshipPriority Projects Support
Mr. Jim Saylor, PE, Transportation Planning Director Program Director SEDA‐COGState of the Transportation System
Mr. Jim Saylor, PE, Transportation Planning Program Director SEDA‐COGPriority Projects
ClintonMr. Dan Harger, Transport Committee Chair Clinton County Economic PartnershipOverview Priority Projects for CCEP Support
Beaver Dam Run Bridge Support 81409 1 1 11 1 $1,301 $1,159
Big Fishing Creek Bridge ‐ Section A05 Support 3864 1 2 22 2 $2,459 $1,984
Big Fishing Creek Bridge ‐ segment 0020/1020 Support 81393 1 2 22 2 $2,740 $2,805
Chatham Run Bridge on SR 1002 Support 3863 1 2 22 2 $1,503 $1,590
Engineering Study of SR 0120 Retaining Walls Support
First Quality Products Tissue Plant Access Support
Fishing Creek Bridge Decking SR 2004 (seg 82) Support
Fishing Creek Bridge II Cedar Springs Support 3829 1 1 11 1 $2,940 $3,281
Fishing Creek Bridge Mill Hall Support 3821 1 2 22 2 $2,832 $2,360
Fishing Creek Bridge SR 477 Loganton Support
Fishing Creek Deck Replacement Support 83018 1 1 $747 $1,062
Fishing Creek to Bald Eagle Creek Safety Improvement
Support 68723 1 $4,493 $5,806
Halls Run Bridge Replacement Support 69039 1 1 11 2 $2,009 $2,100
Hammersley Fork SR 144 Superstructure Support 83786 1 $1,773 $1,747
High Speed Interchange SR 220 & I‐80 Support $6,500
Kettle Creek Deck Replacement Support 3854 1 1 $1,670 $1,426
Kettle Creek Road Retaining Wall Support
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 41 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ SEDA COG RPO
ClintonMr. Dan Harger, Transport Committee Chair Clinton County Economic PartnershipKeystone Central Traffic Safety Study Support
Lick Run One‐Lane Bridge Replacement Support
Long Run Bridge Replacement SR 477 (40) Support 69041 1 11 1 $2,461 $2,620
Long Run Bridge SR 477 segment 30 Support
Long Run Bridge SR 477 segment 80 Support
Mill Run Bridge Replacement Support
Montour Run Bridge Replacement Support
Old Hill Road Bridge Support
Rock Point Removal Kettle Creek Road Support
Rote One‐Lane Bridge Replacement Support
South Avis Access Road Support $4,000
SR 1001 Safety Improvements Support 3850 1 $800 $12,278
SR 1008 (Cider Press Rd) Bridge Replacement Support
SR 1024 N. Fairview Street Betterment Support
SR 120 Red Hill Over Vertical Support
SR 150 High / Bellefonte Ave Betterment Support
SR 2004 Closed Fishing Creek Bridge Replacement
Support
SR 2012 Love Run Box Support 73220 1 $151 $233
SR 220 & Auction Rd Intersection Bridge Support 76150 1 11 1 $7,981 $8,261
SR 477 Bridge over Dry Run ‐segment 50 Support 69042 1 1 11 1 $1,586 $1,393
SR 64 Widen & Straighten Curve Support
Sugar Run Road Betterment Support
Trout Run Bridge Alignment SR 4001 Support
Two‐Mile Bridge & Road Alignment Support
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 42 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ SEDA COG RPO
ClintonMr. Dan Harger, Transport Committee Chair Clinton County Economic PartnershipWest Branch Susquehanna Bridge Decking Support
Young Women's Creek Bridge Decking ‐SR 120 Support
ColumbiaRepresentative Paul E. Kanjorski, 11th District Congress of the United StatesPine Township Bridge Replacement Support
JuniataMr. Don R. Woodward,Safety Improvement SR 35 & Black Log Road Support
MifflinMr. Robert E. Dauer, Meyer, Unkovic & Scott, LLP For Burnham Properties, LPU.S. 322 Burnham Interchange Improvements Support $5,000
Mr. William A. Gomes, Director Mifflin County PlanningGeneral Studies Support
SR4013 Winding Lane/Ferguson Valley Rd Intersection (Derry Twp)
Support
T‐342 Knepp Road Bridge Repair (Menno Twp) Support
T‐448 Havice Valley Road Bridge (Armagh Twp) Support
T‐737 Alfarata Road Bridges (Decatur Twp) Support
T‐738 Nolan Drive Bridge Support
Mr. Nicholas Moraitis, President Moraitis PropertiesRt. 322‐‐Burnham interchange Support
MontourMs. Amanda Boyer, Director Montour County TransitMontour County Bridges Support
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 43 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ SEDA COG RPO
NorthumberlandMr. Ronald Smith, Chairman Northumberland County AirportProposed Extension of Runway 8‐26 Support $4,060
Proposed Extension of Runway 8‐26 Support $921
SnyderMs. Virginia A. Zeiber, Administrator Middleburg BoroughCemetery Road Bridge Replacement Support $600
UnionMr. John J. Del Vecchio, Community Planner Union County For Union CountyCentral Susquehanna Valley Throughway Support $490,000
Dice Bridge Support $750
Iddings Bridge Support 7500 1 1 1 $1,165 $1,270
Nogle Bridge Support 7540 1 $187 $556
Route 15 Route 44 Improvements Support
T‐405 Bridge over Little Buffalo Creek Support 7469 $480
Mr. William J. Metzger, Sr.,Safety Improvements Rt 15 & Colonel John Kelly Rd.
Support
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 44 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Shenango Valley MPO
MercerMr. Mark J. Corey, Township Engineer Mark J. Corey & Associates For Harborcreek TownshipBroadway Ave (Sr60) Improvements Phase I Support 1486 1 11 1 $12,597 $17,300
State St/Dutch Ln/Maple Dr Intersection Support 79932 1 $625 $788
Mr. Jeremy P. Coxe, Community Planner City Of HermitageBroadway Avenue (Sr60) Improvements ‐ Phase III
Support $10,000
Shenango Valley Industrial Corridor ‐ Phase II Support 69966 22 2 $12,380 $10,500
State St (SR 3008) Intersection Improvements Support $3,500
Mr. Dan Gracenin, Executive Director Mercer County Regional Planning CommissionRegional Overview Support
Mr. Mark A. Miller, Engineer Mercer County Bridge For Mercer CountyKelly Road Bridge (Dual) Support 1671 1 1 11 2 $3,866 $3,430
Mill Run Bridge Replacement Support 1692 1 1 11 2 $1,837 $1,646
Oak Hill Road Bridge Support 1887 1 11 2 $670 $570
Ohl Street Bridge Support 1745 1 1 11 2 $3,843 $3,610
Parker Road Bridge Support $600
Race Street Bridge Support 1746 1 2 22 2 $2,867 $2,835
Redfoot Road Bridge Support 1938 1 11 1 $557 $515
Walnut Street Bridge Support 1694 1 11 1 $522 $480
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 45 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Southern Alleghenies RPO
Mr. Fred Querry, Transportation Program Manager Southern Alleghenies P&D CommissionRegional Overview Support
FultonMs. Bonnie Mellott Keefer, Chair County of FultonGem Curve Area Improvements Support
Intersection Improvement at SR 484 and SR 3001 Support
Licking Creek Bridge on U.S. 30 at Harrisonville Support
Runaway Truck Ramp on SR 16 Support
HuntingdonMr. William W. Hoover, Commissioner Huntingdon CountyUS 22 and PA 453 Transportation Study Support $300
Mr. Carl E. Lorence, Projects Manager Standing Stone Trail Club, Inc.Highway Underpass Route 22 Support
SomersetMr. Michael J. Farrell, CEO Somerset Hospital For Somerset Hospital StreetscapeBorough of Somerset ‐ Streetscape Enhancements
Support $708
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 46 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
SPC MPO
Representative Mike Turzai, 28th Legislative District PA House of RepresentativesOverview Support
AlleganyDr. James Hassinger, President/CEO SPCRegional Overview
AlleghenyMr. Chad Amond, President Monroeville Area Chamber of CommerceMon Valley/Fayette Expressway Support
Mr. Scott Anderson, Town Manager Township of PinePriority Projects For the Township of Pine Support
Mr. Dean E. Bastianini, Township Manager Richland Township For Richland TownshipWiden SR 0008 at Ewalt Road for Turn Lanes Support $2,550
Mr. Thomas E. Baxter IV, Executive Director Friends of the Riverfront For Friends of the RiverfrontWest Carson Street Viaduct Support 28126 1 1 11 1 $41,751 $23,300
Mr. Stephen S. Bland, Chief Executive Officer Port AuthorityImproved Public Transportation in Allegheny County
Support
Mr. Robert Borello, RT 286 CommitteeRoute 286 Project Corridor Support 80508 $34,000
Mr. Tobias M. Cordek, Town Manager Town of McCandless For Town of McCandlessRoute 19 @ Pine Creek Road Corridor Improvements
Support $2,250
Mr. Kevin M. Creagh, Township Engineer Shaler Township For Shaler TownshipRt. 8 , Old Butler Plank Intersection Improvement Support $1,885
Soose‐Parker Intersection Improvement Support $700
Mr. James Dodaro, Member Board of Directors Port Authority Allegheny CountyMon Valley/Fayette Expressway Support
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 47 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ SPC MPO
AlleghenyMr. Gerard Duke, Municipal Planner Municipality of Bethel ParkRoute 88 & Kings School Road/Logan Road (SR3010)
Support $3,420
Mr. Stephen Feller, Municipal Manager Municipality of Mount LebanonCochran Road/Beverly Road Signal Upgrade Support $1,310
Mr. Kevin M. Flannery, Borough Manager Borough of Sewickley For Borough of SewickleyOhio River Boulevard Signalization Project Support $1,529
Mr. Fred J. Gurney, President and CEO MAGLEV, Inc.Pennsylvania High Speed Maglev Support $5,250,000
Mr. Joseph Hoffman, Chief White Oak Police DepartmentLincoln Way Widening Project Support
Mr. Donald G. Hultberg, White Oak Engineering Rep. The EADS Group, Inc.SR 2013 Lincoln Way Widening Support
Mr. Joe P. Kirk, Coordinator Expressway Partnership InitiativeMon Valley/Fayette Expressway Rt 51 to I‐376 Support $3,800,000
Mr. Gary J. Klingman, Manager Township of FindlayAten Road Bridge Replacement Project Support $3,500
Ms. Lois Liberman,Mon‐Fayette Toll Road Oppose
North Bank Trail Support $2,100
Mr. Christopher Lochner, Municipal Manager Hampton TownshipRoute 8 & Duncan Road Support $3,480
Mr. David McGuirk, President Citizens For Alt. New Toll RoadsMon‐Fayette, Southern Beltway Projects Oppose
Mr. Adam J. McGurk, Executive Director Moon Transportation Authority For Moon Transportation AuthorityThorn Run Road Interchange Upgrade Support 86859 $118
University Boulevard Interchange Support $43,100
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 48 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ SPC MPO
AlleghenyRepresentative Daryl Metcalfe, 12th Legislative District PA House of RepresentativesRegional Overview Support
Representative Tim Murphy, Member, 18th District Congress of the United StatesAten Road Bridge Replacement Project Support $35,000
Representative Mark Mustio, 44th Legislative District PA House of RepresentativesAten Road Bridge Replacement Project Support $3,500
Mr. Geoff Nara, Chair, EconDev NAIOP For NAIOPSR 22/30 & SR 60 Interchange Support 65122 1 $16,025 $23,706
Mr. Dan Onorato, County Executive Allegheny CountyPriority Projects Support
6th, 7th & 9th St. Bridge Rehab Support 76388 1 1 2 $9,016 $7,240
Allegheny County Bridge Preservation Line Item Support $1,000
Allegheny County Bridge Repair Support 69839 1 $9,579 $19,000
Bower Hill Road Reconstruction Support $10,000
Brownsville at Broughton Intersection Support 26690 1 $10,500 $17,180
Campbells Run Road Support 27219 $33,911
Carrie Furnace Hot Metal Bridge Extension Support $10,000
Carrie Furnace Rail Fly‐Over project Support $15,000
Chartiers Creek No. 6 Bridge Support 80025 $1,352
Dooker's Hollow Bridge Support 76393 1 1 1 2 $13,782 $8,700
Greensburg Pike Bridge (TL06) Support 27742 1 1 $14,210 $16,190
Homeville Viaduct Thompson Run #5 Rehab Support 76447 1 1 2 $6,487 $5,200
Jacks Run Bridge No. 1 Support 27799 1 $9,912 $11,560
Levi Bird Duff Bridge Rehabilitation Support 83124 1 1 1 2 $11,999 $10,350
Mansfield Bridge Support 69203 1 1 $33,083 $36,555
Rankin Bridge Support 27727 1 1 $33,900 $54,745
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 49 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ SPC MPO
AlleghenyMr. Dan Onorato, County Executive Allegheny CountySouth 10th Street Bridge Support 79881 1 1 $22,497 $10,948
Mr. John Petro, Jr., President White Oak Borough CouncilLincoln Way Widening Project Support
Senator John Pippy, Member, Senate of PA 37th Senatorial DistrictAten Road Bridge Replacement Project Support $3,500
Ms. Joylette Portlock, W. PA Outreach Coordinator Citizens for PA's FutureTransportation priorities for the region Support
Mr. Henry Posner III, Chairman Railroad Development Corp.High Speed Rail in Pennsylvania Support
Ms. Kathryn L. Price,Mon‐Fayette, Southern Beltway Projects Oppose
Ms. Mary Ellen Ramage, Secretary‐Manager Borough of Etna For Borough of EtnaDewey Street Bridge Superstructure Replacement
Support $647
Mr. Luke Ravenstahl, Mayor City of Pittsburgh For City of PittsburghPittsburgh Comprehensive Transportation Plan Support $1,500
Mr. Wilbur A. Steger, President CONSAD Research Corp.Alternative Hi‐Speed Rail Service Support
Mr. John Stephen, Executive Director Allegheny River Towns EnterpriseEtna/Sharpsburg Industrial Park Support $350
Glenshaw Glass District (Route 8 Corridor) Support
Riverfront and Community Trail Network Support
Mr. Lisle Williams, P.E. EngineerMon Valley/Fayette Expressway Support
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 50 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ SPC MPO
ArmstrongMr. Rodney D. Ruddock, Chairman Indiana County Commissioners For Citizens of Indiana CountyU.S. Route 422 Safety Improvements Project Support 25560 1 1 11 $4,195 $5,665
ButlerMr. Jerry A. Andree, Township Manager Cranberry Township For Cranberry TownshipFreedom Road Transportation Improvement Project
Support $14,932
Mr. Duane A. McKee, Assistant Township Manager Cranberry Township For Cranberry TownshipFreedom Road Transportation Improvement Project
Support $14,932
Representative Daryl Metcalfe, 12th Legislative District PA House of RepresentativesFreedom Road Transportation Improvement Project
Support
I‐79/SR 3025 Seneca Missing Ramps Support
SR 228 Crider's Corner East Support
Mr. Ronald Olsen, Engineer Clinton Township, Butler CountySR0228/ SR 2005 Support 228 $62
Mr. Donald C. Pepe, Borough Manager Borough of Zelienople For Borough of ZelienopleZelienople Signal and Street Reconstruction Support $2,400
Zelienople Southwest Connector Support $23,000
FayetteMs. Pam Snyder, Chairman Greene County Commissioners For County of GreeneMasontown Bridge Support
Mr. Vincent A. Vicites, Commissioner Fayette CountyPriority Projects Support
Easy Street Intersection Support
Route 40 Improvement Project Support
State Route 21 Project Support
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 51 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ SPC MPO
GreeneMr. John Kendralla, PPP Co‐Chairman Greene County Planning Commission For County of GreeneAccess Road ‐ Greene County Airport Support
Mt Morris Support
Oak Forest Road Support $5,000
Signage and Beautification Support
Wisecarver Dam Access Improvements Support
Ms. Pam Snyder, Chairman Greene County Commissioners For County of GreeneGreene River Trail Support
Local Bridge Program Support
Morrisville Bridge Structures Support
SR 21 Improvements Support
Mr. Bruce Wermlinger, Borough Manager Waynesburg Borough For County of GreeneJackson Run Flood Control Project Support
SR 218/Morgan Street Grade‐Separated Crossing Support
Waynesburg Streetscape ‐ Phase 2 Support
IndianaMr. Rodney D. Ruddock, Chairman Indiana County Commissioners For Citizens of Indiana CountyLocal Bridge Projects Support
LawrenceMr. Anthony A. Mastrangelo, Mayor City of New Castle For City of New CastleBoyles Avenue Bridge Replacement Support $1,000
WashingtonMr. Joseph A. Cerenzia, Director of Public Relations CONSOL Energy Inc.New Interchange on I‐70 near Zediker Station Road
Support $18,000
Mr. James Prisk, P.E., Project Manager Trans AssociatesIntersection of SR 0088 & SR 0837 Support
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 52 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
Continued ‐ SPC MPO
WashingtonMr. Thomas Rapp, Chairman Carroll TownshipIntersection of SR 0088 & SR 0837, Carroll Twp Support
Mr. Ned Williams, E&C Committee Chairman Montour Trail CouncilIntersection Realignment SR 50 & SR 980 Support
WestmorelandMs. Susan E. Bortz, Mayor Derry Borough, Mayor's Office For Borough of Derry, PADerry Bridge (Route 217 Bridge) Support 74251 1 1 11 2 $22,885 $18,450
Mr. Christopher J. Bova, Senior Planner Westmoreland County Planning For Westmoreland Co. CommissionersBaldridge Bridge ‐ Westmoreland County Owned Support $3,800
Route 30 @ Jeannette Highway/Safety Improvements
Support 31872 1 1 $10,300 $14,900
Rt. 356/Freeport Bridge Support 31338 1 1 1 $60,987 $71,750
Slickville Road‐Local/Westmoreland County Support $3,000
SR 130 Corridor: Harrison City‐Export Rd to PA TP Support 32117 $8,900
SR 136 Corridor from Swede Hill Road to Toll 66 Support 31802 $7,100
SR 22 Section B10 Support 31478 1 $19,500 $46,175
SR 31 from PTC Toll Plaza to SR 711 Intersection Support 57452 $6,500
Mr. Terry Daughenbaugh, Westmoreland County PlanningLaurel Valley Transportation Project Support 31828 $10,525
Williamsport MPO
LycomingMr. Mark Murawski, Transportation Planner Lycoming County Planning CommissionRegional Overview Support
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 53 of 54
FDPE ROWUTL CON TotalProgram$000
TotalEstimated
$000
ProjectID
Requested Action
Presented:
York MPO
YorkMs. Felicia S. Dell, Director York County Planning Commission For York County/ York Area MPOBringing It All Together ‐Regional Overview Support
Mr. Joe Heffner, Assistant Director York County Planning Commission For Felicia Dell , York County and York Area MPORegional Overview
2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 54 of 54