    Land Degradation Scenario of India and Programmes/Schemes fordevelopment of degraded lands

    1. Introduction

    This decline in per capita land availability in the country is mostly on account ofrising population.

    Out of 328.7 million hectare of geographical area of India, about 141 millionhectares is Net Cultivated Area. Of this, about 57 million hectare (40%) is irrigatedand the remaining 85 million (60%) is rainfed. This area is generally subject to windand water erosion and is in different stages of degradation for subjecting to intensiveagricultural production. Therefore, it needs improvement in terms of its productivityper unit of land and per unit of water for optimum production. Rainfed agriculture ischaracterized by low levels of productivity and low input usage. Crop production issubjected to considerable instability from year to year due to its dependence onrainfall, which is slightly erratic and variant in space and time. More than 200 millionof the rural poor live in the rainfed regions. These risk prone areas exhibit a widevariation and instability in yields.

    Watershed Programme for Development of Degraded LandVarious Watershed Development Programmes are being implemented by

    mainly three ministries, namely, Ministry of Agriculture, Ministry of Rural

    1

  • 8/12/2019 Stat Nrm

    2/107

    Developm

    ent&Minis

    tryofEnvi

    ronment&F

    orestsfor

    d

  • 8/12/2019 Stat Nrm

    3/107

    evelopme

    ntofdegra

    dedlands.

    Theseprogr

    ammesaren

    a

  • 8/12/2019 Stat Nrm

    4/107

    mely,(i

    )National

    WatershedD

    evelopment

    Pro

    jectfor

  • 8/12/2019 Stat Nrm

    5/107

    Rainfed

    Areas(NWDP

    RA),(ii)S

    oilConserv

    ationinth

    e

  • 8/12/2019 Stat Nrm

    6/107

    Catchme

    ntsofRiver

    ValleyPro

    ject&Floo

    dProneRiv

    e

  • 8/12/2019 Stat Nrm

    7/107

    r(RVP&

    FPR),(iii

    )Reclamati

    on&Develo

    pmentofAl

    k

  • 8/12/2019 Stat Nrm

    8/107

    ali&Ac

    idSoil(RA

    DAS),(iv)

    WatershedD

    evelopment

    P

  • 8/12/2019 Stat Nrm

    9/107

    ro

    jecti

    nShifting

    Cultivation

    Areas(WDP

    SCA)(v)Dr

    o

  • 8/12/2019 Stat Nrm

    10/107

    ughtPro

    neAreaPro

    gramme(DPA

    P)(vii)In

    tegratedWa

    s

  • 8/12/2019 Stat Nrm

    11/107

  • 8/12/2019 Stat Nrm

    12/107

    restatio

    n&Eco

    D

    evelopment

    Pro

    ject(NA

    EP).Inadd

    i

  • 8/12/2019 Stat Nrm

    13/107

    tionto

    above,few

    Externally

    AidedPro

    je

    cts(EAPs)

    a

  • 8/12/2019 Stat Nrm

    14/107

    rebeing

    implemente

    dwithtech

    nicalandf

    inancialas

    s

  • 8/12/2019 Stat Nrm

    15/107

    istance

    ofexternal

    agencies.

    Sinceincep

    tionuptoT

    e

  • 8/12/2019 Stat Nrm

    16/107

    nthFive

    YearPlan,

    anareaof

    50.89mill

    ionha.has

  • 8/12/2019 Stat Nrm

    17/107

    beendev

    elopedwith

    anexpendi

    tureofRs.

    19251.22cr

    o

  • 8/12/2019 Stat Nrm

    18/107

  • 8/12/2019 Stat Nrm

    19/107

    toIXFi

    veYearPl

    an,during

    XPlanand

    sinceincep

    t

  • 8/12/2019 Stat Nrm

    20/107

    ionupto

    Xplanare

    giveninA

    nnexure

    I

    I.Partsof

  • 8/12/2019 Stat Nrm

    21/107

    suchdev

    elopedland

    sarebroug

    htundercu

    ltivationt

    o

  • 8/12/2019 Stat Nrm

    22/107

    maintai

    nbalancei

    ndifferent

    typesofl

    anduses.

    3

    .

  • 8/12/2019 Stat Nrm

    23/107

  • 8/12/2019 Stat Nrm

    24/107

    dsofMi

    nistryofAgriculture

    ,Departmen

    tofAgricu

  • 8/12/2019 Stat Nrm

    25/107

    lture&

    Cooperation:

    I. Schemes/Pr

    ogrammesofN

    RMDivision

    The

    N

  • 8/12/2019 Stat Nrm

    26/107

    aturalRe

    sourceManag

    ementDivision

    isimplementin

    gmainlythree

    C

  • 8/12/2019 Stat Nrm

    27/107

    entrallySp

    onsoredProg

    rammesandth

    reeCentralSe

    ctorSchemes

    w

  • 8/12/2019 Stat Nrm

    28/107

    ithma

    joro

    bjectivesofp

    reventionofl

    anddegradati

    onandrestor

    a

  • 8/12/2019 Stat Nrm

    29/107

    tionofpro

    ductivepoten

    tialofthedeg

    radedlandsi

    nthecountry.T

    h

  • 8/12/2019 Stat Nrm

    30/107

    eScheme-

    wisehighlight

    softheprogr

    amme

    /scheme

    are:

    (A) CentralSe

    c

  • 8/12/2019 Stat Nrm

    31/107

    torSchem

    e(Plan&NonP

    lan):1)

  • 8/12/2019 Stat Nrm

    32/107

  • 8/12/2019 Stat Nrm

    33/107

  • 8/12/2019 Stat Nrm

    34/107

    Thorgzatis aengedpreatioofdis-wi

    maof degdatThprosedtars 20009

    SLareun:

    (a) R(b) D(c) L(d) S

    n

    amnt Rs11crounPla& R1.4crofor

  • 8/12/2019 Stat Nrm

    35/107

    NoPlaisallotedforcoeti

    thetars.

    2)

  • 8/12/2019 Stat Nrm

    36/107

  • 8/12/2019 Stat Nrm

    37/107

  • 8/12/2019 Stat Nrm

    38/107

  • 8/12/2019 Stat Nrm

    39/107

  • 8/12/2019 Stat Nrm

    40/107

    20009amnt Rs0crois

    allo

  • 8/12/2019 Stat Nrm

    41/107

    tedforcoctivassh&

    memtrangcoes

    3) WDPSCA

    (Plan) AspecialCentralAs

    sistancetoStatePlanScheme

    onWatershedDevelopmentPr

  • 8/12/2019 Stat Nrm

    42/107

    ojectinShiftingCultiv

    ationAreas(WDPSCA)isbe

    ngimplementedinNorthEaste

    rnStateswith100%Speci

    al

    2

  • 8/12/2019 Stat Nrm

    43/107

    AssnceSatPlaUndthissche,

    are3.9lakhha.havbeetreasincinceonupt

    PlaDur20009,abo0.4lakhha.arebetrea

    at estied of 40.cro

    (B) Cent

    rallySpons

    o

  • 8/12/2019 Stat Nrm

    44/107

    redProg

    ramme-(Plan

    -Subsumed

    underMMA)

    :

    RVP &FPR:Un

    d

  • 8/12/2019 Stat Nrm

    45/107

    erSoil

    Conservatio

    nintheCa

    tchmentsof

    RiverVall

    e

  • 8/12/2019 Stat Nrm

    46/107

    y&Floo

    dProneRiv

    er(RVP&F

    PR),since

    inception

    u

  • 8/12/2019 Stat Nrm

    47/107

    ptoXPl

    an,anarea

    of65.27l

    akhha.hav

    ebeentrea

    t

  • 8/12/2019 Stat Nrm

    48/107

    ed.Duri

    ng2008-09,

    about2.90

    lakhha.a

    reaistarg

    e

  • 8/12/2019 Stat Nrm

    49/107

    tedfor

    treatmentw

    ithestimat

    edcostof

    Rs.251.00

    c

  • 8/12/2019 Stat Nrm

    50/107

    rore.

    RADAS

    :TheProgra

    mmeforRec

    lamationof

    AlkaliSoil

    (

  • 8/12/2019 Stat Nrm

    51/107

    RAS)now

    namedasR

    eclamation

    andDevelop

    mentofAlk

    a

  • 8/12/2019 Stat Nrm

    52/107

  • 8/12/2019 Stat Nrm

    53/107

    es;wher

    ealkalinit

    yexists.S

    inceincept

    ionuptoXPla

    an

  • 8/12/2019 Stat Nrm

    54/107

    are6.5lakhha.hasbeereced.

    Dur20009,abo0.5lakhha.arehasbeetarg

    d recatiowiththeestied ofRs.00cro

    SLUB:TheStat

    eLandUse

    B

  • 8/12/2019 Stat Nrm

    55/107

    oard(SL

    UB)isast

    afforiente

    dprogramme

    andisbei

    n

  • 8/12/2019 Stat Nrm

    56/107

    gimplem

    entedinth

    eallStates

    &UTs.Und

    erthispro

    g

  • 8/12/2019 Stat Nrm

    57/107

    rammesi

    nceincepti

    onuptoXP

    lananamou

    ntofRs38

    .

  • 8/12/2019 Stat Nrm

    58/107

    11crore

    hasbeenu

    tilized.Dur20009,

    3.5croisliketo butilforundtakivars

    actiesundSLU

    II. Schemes

    /

  • 8/12/2019 Stat Nrm

    59/107

    Programme

    sofRFSDivisi

    onfordevelop

    mentofdegrad

    edlands

    TheRFSDivon also

  • 8/12/2019 Stat Nrm

    60/107

    impmengfewproames fdev

    opmnt o

    degradedl

    andsincludingrainfedare

    as.Themains

    c

  • 8/12/2019 Stat Nrm

    61/107

    hemesand

    programmeso

    fRFSDivisio

    nare:

    (a) National

    WatershedDevel

  • 8/12/2019 Stat Nrm

    62/107

    opmentProje

    ctforRainfedArea

    s(NWDPRA)

    T

    heNationalWaters

    hedDevelopme

  • 8/12/2019 Stat Nrm

    63/107

  • 8/12/2019 Stat Nrm

    64/107

    94.lakhha.havbeedevpedund

    theprommDurthePlaisproed devp

    abo30.lakhha.covgabo535micwathedFor

    yea20009,hasbeetargd covabo4.0lakh

    ha.withestied ofRs..53cro

    (b) Natio

    n

  • 8/12/2019 Stat Nrm

    65/107

    alRainfedAre

    aAuthority(NRA

    A) -TheUnionGo

    vernmenthavec

    onstitutedaNation

    al

  • 8/12/2019 Stat Nrm

    66/107

    RainfedArea

    Authority(NRAA)o

    n03-11-2006togi

    vefocusedattent

    iontotheproblemof

    th

  • 8/12/2019 Stat Nrm

    67/107

  • 8/12/2019 Stat Nrm

    68/107

    bodycharg

    edwiththeroleofex

    aminingguideline

    sinvariousexistin

    gschemesandin

    th

  • 8/12/2019 Stat Nrm

    69/107

  • 8/12/2019 Stat Nrm

    70/107

    eiswiderthan

    merewaterconser

    vationandwillco

    verallaspectsofs

    ustainableandh

    oli

  • 8/12/2019 Stat Nrm

    71/107

    sticdevelop

    mentofrainfedarea

    s,includingappro

    priatefarmingand

    livelihoodsystema

    p

  • 8/12/2019 Stat Nrm

    72/107

    proaches.It

    wouldalsofocus

    onissuespertaini

    ngtolandlessand

    marginalfarmers,si

    n

  • 8/12/2019 Stat Nrm

    73/107

    cetheycon

    stitutethelargemajor

    ityofinhabitantsofra

    infedareas.

    RAhas

    twostrure. firsttiertheGovningBoathatwillpro

  • 8/12/2019 Stat Nrm

    74/107

    enecaryleadshipandappriat

    coonatinimpentn prommTheGovning

    Boaischad theUniAgrtureMinr co-cha

    d theUniRurDevpm

    3

  • 8/12/2019 Stat Nrm

    75/107

    Minr. secd is ExeiveCo

    tteeconingtecalexps repentesfrom

    staoldMines.TheExeiveCotteehead the

    ChExeiveOffandhavfiveothfulltimtec

    alexps. Autty beeopeonad the

    join

    of

  • 8/12/2019 Stat Nrm

    76/107

    ChExeiveOffon 05-200Fou

    outfiveTeccalExps theranAddnalSec

    aryhavbeeapptedtheNRTherecmeof

    remingTeccalExps thefielagrturertic

    re undpros.

    heNRhasformatecomon

    gui

  • 8/12/2019 Stat Nrm

    77/107

    nesWahedDevpmProandafteapp

    al govingbodofNRthesamhasbeecirced all

    Staon Ma200forimpmeionWahedDevpm

    Prommas insttionconnedtheguines

    (c)

    R

    ainfedAreaDev

    el

  • 8/12/2019 Stat Nrm

    78/107

    opmentPr

    ogramme(RAD

    P)IntheBudgets

    peechofUnionFi

    nanceMinisterfo

    r

  • 8/12/2019 Stat Nrm

    79/107

    theyear200

    7-08,anewsche

    menamely,Rainfed

    AreaDevelopme

    ntProgramme(RA

    D

  • 8/12/2019 Stat Nrm

    80/107

    P)wasann

    ounced.ThePla

    nningCommission

    hascommunicat

    edthein-principl

    e

  • 8/12/2019 Stat Nrm

    81/107

    approvaltoth

    eimplementation

    ofCentrallySpons

    oredSchemeofR

    ADPatacostofRs.

    3

  • 8/12/2019 Stat Nrm

    82/107

    500.00crore

    duringtheXIFive

    YearPlanincluding

    acomponentofRs.

    .00croforNR

    on Ma200Bason revdoutof

    Rs.

  • 8/12/2019 Stat Nrm

    83/107

    0.0croascomunied thePlang

    CossioandthecomentrecedfromvarsMines/artmts/Dsioof DAtheEFNothasbeerevd sentheMiny oFine PlangCossioTheEFNotwasdisc

    sedamegchad Secary(PlangCossio

    on

  • 8/12/2019 Stat Nrm

    84/107

    Aug200Bason discsiotheEFNotrevd beisenthePlangCossioforapp

    albefit platoExpdituFineCotteeUnd

    thisprommit exped cov30lakha.rainare

    durthePlaperfor curyea(2009)Budproon

  • 8/12/2019 Stat Nrm

    85/107

  • 8/12/2019 Stat Nrm

    86/107

    ndsduring

    XIPlan

    Dug FivYeaPla

    anareof32.miln withat estate

    c

    ostofRs2584

    8.00crorehas

  • 8/12/2019 Stat Nrm

    87/107

    beentarg

    etedfordeve

    lopmentunder

    variousprogr

    ammes.TheMi

    n

  • 8/12/2019 Stat Nrm

    88/107

    istry-wisea

    ndScheme-wis

    etentativetar

    getandoutlay

    proposedfor

    v

  • 8/12/2019 Stat Nrm

    89/107

    ariousWat

    ershedDevel

    opmentProgra

    mmesfordeve

    lopmentofde

    g

  • 8/12/2019 Stat Nrm

    90/107

    radedlan

    dsforXIFiveY

    earPlanaregiv

    eninAnnexur

    eIII.

    5. Formul

    a

  • 8/12/2019 Stat Nrm

    91/107

    tionandCir

    culationofOp

    erationalGui

    delines

    TheNatnalRaed

    AreAutorit(NRAAhascircateComo

    Gu

  • 8/12/2019 Stat Nrm

    92/107

    idelinesf

    orWatershed

    Development

    Pro

    jects(CG

    DWP)forimpl

    e

  • 8/12/2019 Stat Nrm

    93/107

    mentation

    ofallWatersh

    edDevelopme

    ntProgramme

    sinthecountr

    y.

  • 8/12/2019 Stat Nrm

    94/107

    Accordin

    gtotheinstru

    ctionscontai

    nedintheCGW

    DP,theopera

    ti

  • 8/12/2019 Stat Nrm

    95/107

    onalguid

    elinesforthe

    programmes,

    namely,NWDPR

    A,RVP&FPR,RA

  • 8/12/2019 Stat Nrm

    96/107

    DAS,&SLU

    Bhavebeencir

    culatedtothe

    statesforad

    option.TheOp

    e

  • 8/12/2019 Stat Nrm

    97/107

    rationalG

    uidelinesfor

    WatershedDev

    elopmentPro

    grammeinShif

    ti

  • 8/12/2019 Stat Nrm

    98/107

    ngCultivati

    onAreas(WDP

    SCA)havebee

    nalsoformula

    tedandsubmit

    t

  • 8/12/2019 Stat Nrm

    99/107

  • 8/12/2019 Stat Nrm

    100/107

    onofthes

    ametotheSta

    teGovernmen

    tsforadoption

    .

    4

  • 8/12/2019 Stat Nrm

    101/107

    Annexure-I

    State-wise extent of various kinds of Land Degradation in India

    (As per NBSS&LUP-ICAR-2005 on the Scale of 1:250,000)

    (Area in thousand hectares)

    S.N. Name of the Water Wind Water

    Salinity/ Soil

    Complex

    Degraded

    Geographi

    Degraded

    States

    Erosio

    n

    Erosio

    n

    Loggin

    g

    Alkalini

    ty

    Acidit

    y

    Proble

    m Area

    cal

    Area

    Area(%

    )

    1)

    AndhraPradesh 11518 0 1896 517 905 156

    14992 27505 54.5

    2)ArunachalPradesh 2372 0 176 0 1955 0 4503 8374 53.8

    3) Assam 688 0 37 0 612 876 2213 7844 28.2

    4)Bihar+Jharkhand 3024 0 2001 229 1029 0 6283 17387 36.1

    5) Goa 60 0 76 0 2 24 162 370 43.9

    6) Gujarat 5207 443 523 294 0 1666 8133 19602 41.5

    7) Haryana 315 536 146 256 0 214 1467 4421 33.2

    8) Himachal Pradesh 2718 0 1303 0 157 0 4178 5567 75.0

    9) Jammu & Kashmir 5460 1360 200 0 0 0 7020 22224 31.6

    10) Karnataka 5810 0 941 110 58 712 7631 19179 39.8

    11) Kerala 76 0 2098 0 138 296 2608 3886 67.1

    12) Madhya Pradesh+ 17883 0 359 46 6796 1126

    26210 44345 59.1

    Chhattisgarh

    13) Maharastra 11179 0 0 1056 517 303

    13055 30771 42.4

    14) Manipur 133 0 111 0 481 227 952 2233 42.6

    15) Mizoram 137 0 0 0 1050 694 1881 2108 89.2

    16) Meghalaya 137 0 7 0 1030 34 1208 2243 53.9

    17) Nagaland 390 0 0 0 127 478 995 1658 60.0

    18) Orissa 5028 0 681 75 263 75 6122 15571 39.3

    19) Punjab 372 282 338 288 0 0 1280 5036 25.4

    20) Rajasthan 3137 6650 53 1418 0 110

    11368 34224 33.2

    21) Sikkim 158 0 0 0 76 0 234 710 33.0

    22) Tamil Nadu 4926 0 96 96 78 138 5334 13006 41.0

    23) Tripura 121 0 191 0 203 113 628 1049 59.9

    2

    4) Uttar Pradesh+ 11392 212 2350 1370 0 0

    1532

    4 29441 52.0

  • 8/12/2019 Stat Nrm

    102/107

    Uttarakhand

    25) West Bengal 1197 0 710 170 556 119 2752 8875 31.0

    26) Delhi 55 0 6 10 0 11 82 148 55.4

    27)

    UnionTerritories 187 0 0 9 0 9 205 825 24.8

    Grand Total 93680 9483 14299 5944 16033 7381

    14682

    0 328602Grand Total(Millionha) 93.68 9.48 14.30 5.94 16.03 7.38

    146.82 328.60

    Source : There are several estimates for the extent of degraded lands reported by various agencies in the country.These estimates vary largely due to variation in approaches and methodologies of estimation. In absence ofcomprehensive and periodic scientific surveys, the figures reported by National Bureau of Soil Survey & LandUse Planning, Nagpur based on studies and several estimates (2005) for various land degradation have beenconsidered as logically concluded and are being used for various purposes.

    5

  • 8/12/2019 Stat Nrm

    103/107

    Annexure -

    Degraded Lands Developed under various Watershed Development Programmes,since inception upto Tenth Five Year Plan

    (Area in Lakh ha. and Expenditure in Rs. Crore

    Ministry/Scheme Progress since Progress during X Plan Progress since inceptionS.No. and year of start

    inception upto IXPlan (2002-07)

    upto endof

    XPlan*

    Area Expr. Area Expr. Area Expr.

    (A) Ministry of Agriculture, (Department of Agriculture & Cooperation)1. NWDPRA 69.79 1877.74 23.30 1147.82 93.09 3025.56

    (1990-91)

    2. RVP & FPR 54.88 1516.26 9.98 727.98 64.86 2244.24(1962 & 81)

    3. WDPSCA 2.58 166.27 1.35 129.31 3.93 295.58(1974-75)

    4. RADAS 5.81 76.39 1.30 45.35 7.11 121.74(1985-86)

    5. WDF 0.00 0.00 0.59 26.02 0.59 26.02

    (1999-00)6. EAPs 13.35 2039.81 4.80 1927.54 18.15 3967.35

    Sub Total 146.41 5676.47 41.32 4004.02 187.73 9680.49

    (B)Ministry of Rural Development ( Department of Land

    Resources)1. DPAP(1973-74) 68.95 3284.74 68.32 1557.76 137.27 4842.50

    2. DDP(1977-78) 33.56 797.38 45.17 1152.50 78.73 1949.88

    3. IWDP(1988-89) 37.34 616.51 62.22 1821.64 99.56 2438.15

    4. EAPs 1.40 18.39 3.60 274.28 5.00 292.67

    Sub Total 141.25 4717.02 179.31 4806.18 320.56 9523.20

    ( C)

    Ministry of Environment andForests

    1. NAEP(1989-90) 0.70 47.53 0.00 0.00 0.70 47.53

    Total (A+B+C) 288.36 10441.02 220.63 8810.20 508.9919251.2

    2

    Abbreviations:

    NWDPRA -National Watershed Development Project for RainfedArea

    RVP & FPR - River Valley Project & Flood Prone River

    WDPSCA -Watershed Development Project for Shifting CultivationArea

    RADAS - Reclamation & Development of Alkali and Acid SoilWDF - Watershed Development FundEAPs - Externally Aided ProjectsDPAP - Drought Prone Area ProgrammeDDP - Desert Development ProgrammeIWDP - Integrated Wasteland Development Project

    NAEP - National Afforestation and Eco-Development Project

  • 8/12/2019 Stat Nrm

    104/107

    Source: Working Group Report of Natural Resource Management for Eleventh Five Year Plan,constituted by Planning Commission, New Delhi, Feb., 2007.

    6

  • 8/12/2019 Stat Nrm

    105/107

    Annexure III

    Target and Outlay Proposed under various Watershed DevelopmentProgrammes for XI Plan

    Implementing Nameof

    Scheme/ Target for XI PlanOutlay for XI

    PlanDeptt./Ministry Programme (Million ha.) (Rs. in crore)

    Department of NWDPRA 1.50 1500.00

    Agriculture & RVP & FPR 1.25 1500.00Cooperation, MoA

    WDPSCA 0.20 240.00

    RADAS 0.10 100.00

    WDF 0.50 600.00

    EAPs 0.50 750.00

    RADP (Proposed) 3.00 3300.00

    Sub total 7.05 7990.00

    Departmentof

    land

    IWDP

    Resources, MoRD DPAP

    24.00* 15358.00DDP

    Sub Total 24.00 15358.00

    PlanningHill Area and Western 1.00 2500.00

    GhatDevelopmen

    tCommission

    Programmes

    Total for XI Plan 32.05 25848.00

    * DDP, DPAP and IWDP have been merged together and named as IntegratedWatershed Development Programme (IWDP).

  • 8/12/2019 Stat Nrm

    106/107

    7

  • 8/12/2019 Stat Nrm

    107/107