Land Degradation Scenario of India and Programmes/Schemes fordevelopment of degraded lands
1. Introduction
This decline in per capita land availability in the country is mostly on account ofrising population.
Out of 328.7 million hectare of geographical area of India, about 141 millionhectares is Net Cultivated Area. Of this, about 57 million hectare (40%) is irrigatedand the remaining 85 million (60%) is rainfed. This area is generally subject to windand water erosion and is in different stages of degradation for subjecting to intensiveagricultural production. Therefore, it needs improvement in terms of its productivityper unit of land and per unit of water for optimum production. Rainfed agriculture ischaracterized by low levels of productivity and low input usage. Crop production issubjected to considerable instability from year to year due to its dependence onrainfall, which is slightly erratic and variant in space and time. More than 200 millionof the rural poor live in the rainfed regions. These risk prone areas exhibit a widevariation and instability in yields.
Watershed Programme for Development of Degraded LandVarious Watershed Development Programmes are being implemented by
mainly three ministries, namely, Ministry of Agriculture, Ministry of Rural
1
-
8/12/2019 Stat Nrm
2/107
Developm
ent&Minis
tryofEnvi
ronment&F
orestsfor
d
-
8/12/2019 Stat Nrm
3/107
evelopme
ntofdegra
dedlands.
Theseprogr
ammesaren
a
-
8/12/2019 Stat Nrm
4/107
mely,(i
)National
WatershedD
evelopment
Pro
jectfor
-
8/12/2019 Stat Nrm
5/107
Rainfed
Areas(NWDP
RA),(ii)S
oilConserv
ationinth
e
-
8/12/2019 Stat Nrm
6/107
Catchme
ntsofRiver
ValleyPro
ject&Floo
dProneRiv
e
-
8/12/2019 Stat Nrm
7/107
r(RVP&
FPR),(iii
)Reclamati
on&Develo
pmentofAl
k
-
8/12/2019 Stat Nrm
8/107
ali&Ac
idSoil(RA
DAS),(iv)
WatershedD
evelopment
P
-
8/12/2019 Stat Nrm
9/107
ro
jecti
nShifting
Cultivation
Areas(WDP
SCA)(v)Dr
o
-
8/12/2019 Stat Nrm
10/107
ughtPro
neAreaPro
gramme(DPA
P)(vii)In
tegratedWa
s
-
8/12/2019 Stat Nrm
11/107
-
8/12/2019 Stat Nrm
12/107
restatio
n&Eco
D
evelopment
Pro
ject(NA
EP).Inadd
i
-
8/12/2019 Stat Nrm
13/107
tionto
above,few
Externally
AidedPro
je
cts(EAPs)
a
-
8/12/2019 Stat Nrm
14/107
rebeing
implemente
dwithtech
nicalandf
inancialas
s
-
8/12/2019 Stat Nrm
15/107
istance
ofexternal
agencies.
Sinceincep
tionuptoT
e
-
8/12/2019 Stat Nrm
16/107
nthFive
YearPlan,
anareaof
50.89mill
ionha.has
-
8/12/2019 Stat Nrm
17/107
beendev
elopedwith
anexpendi
tureofRs.
19251.22cr
o
-
8/12/2019 Stat Nrm
18/107
-
8/12/2019 Stat Nrm
19/107
toIXFi
veYearPl
an,during
XPlanand
sinceincep
t
-
8/12/2019 Stat Nrm
20/107
ionupto
Xplanare
giveninA
nnexure
I
I.Partsof
-
8/12/2019 Stat Nrm
21/107
suchdev
elopedland
sarebroug
htundercu
ltivationt
o
-
8/12/2019 Stat Nrm
22/107
maintai
nbalancei
ndifferent
typesofl
anduses.
3
.
-
8/12/2019 Stat Nrm
23/107
-
8/12/2019 Stat Nrm
24/107
dsofMi
nistryofAgriculture
,Departmen
tofAgricu
-
8/12/2019 Stat Nrm
25/107
lture&
Cooperation:
I. Schemes/Pr
ogrammesofN
RMDivision
The
N
-
8/12/2019 Stat Nrm
26/107
aturalRe
sourceManag
ementDivision
isimplementin
gmainlythree
C
-
8/12/2019 Stat Nrm
27/107
entrallySp
onsoredProg
rammesandth
reeCentralSe
ctorSchemes
w
-
8/12/2019 Stat Nrm
28/107
ithma
joro
bjectivesofp
reventionofl
anddegradati
onandrestor
a
-
8/12/2019 Stat Nrm
29/107
tionofpro
ductivepoten
tialofthedeg
radedlandsi
nthecountry.T
h
-
8/12/2019 Stat Nrm
30/107
eScheme-
wisehighlight
softheprogr
amme
/scheme
are:
(A) CentralSe
c
-
8/12/2019 Stat Nrm
31/107
torSchem
e(Plan&NonP
lan):1)
-
8/12/2019 Stat Nrm
32/107
-
8/12/2019 Stat Nrm
33/107
-
8/12/2019 Stat Nrm
34/107
Thorgzatis aengedpreatioofdis-wi
maof degdatThprosedtars 20009
SLareun:
(a) R(b) D(c) L(d) S
n
amnt Rs11crounPla& R1.4crofor
-
8/12/2019 Stat Nrm
35/107
NoPlaisallotedforcoeti
thetars.
2)
-
8/12/2019 Stat Nrm
36/107
-
8/12/2019 Stat Nrm
37/107
-
8/12/2019 Stat Nrm
38/107
-
8/12/2019 Stat Nrm
39/107
-
8/12/2019 Stat Nrm
40/107
20009amnt Rs0crois
allo
-
8/12/2019 Stat Nrm
41/107
tedforcoctivassh&
memtrangcoes
3) WDPSCA
(Plan) AspecialCentralAs
sistancetoStatePlanScheme
onWatershedDevelopmentPr
-
8/12/2019 Stat Nrm
42/107
ojectinShiftingCultiv
ationAreas(WDPSCA)isbe
ngimplementedinNorthEaste
rnStateswith100%Speci
al
2
-
8/12/2019 Stat Nrm
43/107
AssnceSatPlaUndthissche,
are3.9lakhha.havbeetreasincinceonupt
PlaDur20009,abo0.4lakhha.arebetrea
at estied of 40.cro
(B) Cent
rallySpons
o
-
8/12/2019 Stat Nrm
44/107
redProg
ramme-(Plan
-Subsumed
underMMA)
:
RVP &FPR:Un
d
-
8/12/2019 Stat Nrm
45/107
erSoil
Conservatio
nintheCa
tchmentsof
RiverVall
e
-
8/12/2019 Stat Nrm
46/107
y&Floo
dProneRiv
er(RVP&F
PR),since
inception
u
-
8/12/2019 Stat Nrm
47/107
ptoXPl
an,anarea
of65.27l
akhha.hav
ebeentrea
t
-
8/12/2019 Stat Nrm
48/107
ed.Duri
ng2008-09,
about2.90
lakhha.a
reaistarg
e
-
8/12/2019 Stat Nrm
49/107
tedfor
treatmentw
ithestimat
edcostof
Rs.251.00
c
-
8/12/2019 Stat Nrm
50/107
rore.
RADAS
:TheProgra
mmeforRec
lamationof
AlkaliSoil
(
-
8/12/2019 Stat Nrm
51/107
RAS)now
namedasR
eclamation
andDevelop
mentofAlk
a
-
8/12/2019 Stat Nrm
52/107
-
8/12/2019 Stat Nrm
53/107
es;wher
ealkalinit
yexists.S
inceincept
ionuptoXPla
an
-
8/12/2019 Stat Nrm
54/107
are6.5lakhha.hasbeereced.
Dur20009,abo0.5lakhha.arehasbeetarg
d recatiowiththeestied ofRs.00cro
SLUB:TheStat
eLandUse
B
-
8/12/2019 Stat Nrm
55/107
oard(SL
UB)isast
afforiente
dprogramme
andisbei
n
-
8/12/2019 Stat Nrm
56/107
gimplem
entedinth
eallStates
&UTs.Und
erthispro
g
-
8/12/2019 Stat Nrm
57/107
rammesi
nceincepti
onuptoXP
lananamou
ntofRs38
.
-
8/12/2019 Stat Nrm
58/107
11crore
hasbeenu
tilized.Dur20009,
3.5croisliketo butilforundtakivars
actiesundSLU
II. Schemes
/
-
8/12/2019 Stat Nrm
59/107
Programme
sofRFSDivisi
onfordevelop
mentofdegrad
edlands
TheRFSDivon also
-
8/12/2019 Stat Nrm
60/107
impmengfewproames fdev
opmnt o
degradedl
andsincludingrainfedare
as.Themains
c
-
8/12/2019 Stat Nrm
61/107
hemesand
programmeso
fRFSDivisio
nare:
(a) National
WatershedDevel
-
8/12/2019 Stat Nrm
62/107
opmentProje
ctforRainfedArea
s(NWDPRA)
T
heNationalWaters
hedDevelopme
-
8/12/2019 Stat Nrm
63/107
-
8/12/2019 Stat Nrm
64/107
94.lakhha.havbeedevpedund
theprommDurthePlaisproed devp
abo30.lakhha.covgabo535micwathedFor
yea20009,hasbeetargd covabo4.0lakh
ha.withestied ofRs..53cro
(b) Natio
n
-
8/12/2019 Stat Nrm
65/107
alRainfedAre
aAuthority(NRA
A) -TheUnionGo
vernmenthavec
onstitutedaNation
al
-
8/12/2019 Stat Nrm
66/107
RainfedArea
Authority(NRAA)o
n03-11-2006togi
vefocusedattent
iontotheproblemof
th
-
8/12/2019 Stat Nrm
67/107
-
8/12/2019 Stat Nrm
68/107
bodycharg
edwiththeroleofex
aminingguideline
sinvariousexistin
gschemesandin
th
-
8/12/2019 Stat Nrm
69/107
-
8/12/2019 Stat Nrm
70/107
eiswiderthan
merewaterconser
vationandwillco
verallaspectsofs
ustainableandh
oli
-
8/12/2019 Stat Nrm
71/107
sticdevelop
mentofrainfedarea
s,includingappro
priatefarmingand
livelihoodsystema
p
-
8/12/2019 Stat Nrm
72/107
proaches.It
wouldalsofocus
onissuespertaini
ngtolandlessand
marginalfarmers,si
n
-
8/12/2019 Stat Nrm
73/107
cetheycon
stitutethelargemajor
ityofinhabitantsofra
infedareas.
RAhas
twostrure. firsttiertheGovningBoathatwillpro
-
8/12/2019 Stat Nrm
74/107
enecaryleadshipandappriat
coonatinimpentn prommTheGovning
Boaischad theUniAgrtureMinr co-cha
d theUniRurDevpm
3
-
8/12/2019 Stat Nrm
75/107
Minr. secd is ExeiveCo
tteeconingtecalexps repentesfrom
staoldMines.TheExeiveCotteehead the
ChExeiveOffandhavfiveothfulltimtec
alexps. Autty beeopeonad the
join
of
-
8/12/2019 Stat Nrm
76/107
ChExeiveOffon 05-200Fou
outfiveTeccalExps theranAddnalSec
aryhavbeeapptedtheNRTherecmeof
remingTeccalExps thefielagrturertic
re undpros.
heNRhasformatecomon
gui
-
8/12/2019 Stat Nrm
77/107
nesWahedDevpmProandafteapp
al govingbodofNRthesamhasbeecirced all
Staon Ma200forimpmeionWahedDevpm
Prommas insttionconnedtheguines
(c)
R
ainfedAreaDev
el
-
8/12/2019 Stat Nrm
78/107
opmentPr
ogramme(RAD
P)IntheBudgets
peechofUnionFi
nanceMinisterfo
r
-
8/12/2019 Stat Nrm
79/107
theyear200
7-08,anewsche
menamely,Rainfed
AreaDevelopme
ntProgramme(RA
D
-
8/12/2019 Stat Nrm
80/107
P)wasann
ounced.ThePla
nningCommission
hascommunicat
edthein-principl
e
-
8/12/2019 Stat Nrm
81/107
approvaltoth
eimplementation
ofCentrallySpons
oredSchemeofR
ADPatacostofRs.
3
-
8/12/2019 Stat Nrm
82/107
500.00crore
duringtheXIFive
YearPlanincluding
acomponentofRs.
.00croforNR
on Ma200Bason revdoutof
Rs.
-
8/12/2019 Stat Nrm
83/107
0.0croascomunied thePlang
CossioandthecomentrecedfromvarsMines/artmts/Dsioof DAtheEFNothasbeerevd sentheMiny oFine PlangCossioTheEFNotwasdisc
sedamegchad Secary(PlangCossio
on
-
8/12/2019 Stat Nrm
84/107
Aug200Bason discsiotheEFNotrevd beisenthePlangCossioforapp
albefit platoExpdituFineCotteeUnd
thisprommit exped cov30lakha.rainare
durthePlaperfor curyea(2009)Budproon
-
8/12/2019 Stat Nrm
85/107
-
8/12/2019 Stat Nrm
86/107
ndsduring
XIPlan
Dug FivYeaPla
anareof32.miln withat estate
c
ostofRs2584
8.00crorehas
-
8/12/2019 Stat Nrm
87/107
beentarg
etedfordeve
lopmentunder
variousprogr
ammes.TheMi
n
-
8/12/2019 Stat Nrm
88/107
istry-wisea
ndScheme-wis
etentativetar
getandoutlay
proposedfor
v
-
8/12/2019 Stat Nrm
89/107
ariousWat
ershedDevel
opmentProgra
mmesfordeve
lopmentofde
g
-
8/12/2019 Stat Nrm
90/107
radedlan
dsforXIFiveY
earPlanaregiv
eninAnnexur
eIII.
5. Formul
a
-
8/12/2019 Stat Nrm
91/107
tionandCir
culationofOp
erationalGui
delines
TheNatnalRaed
AreAutorit(NRAAhascircateComo
Gu
-
8/12/2019 Stat Nrm
92/107
idelinesf
orWatershed
Development
Pro
jects(CG
DWP)forimpl
e
-
8/12/2019 Stat Nrm
93/107
mentation
ofallWatersh
edDevelopme
ntProgramme
sinthecountr
y.
-
8/12/2019 Stat Nrm
94/107
Accordin
gtotheinstru
ctionscontai
nedintheCGW
DP,theopera
ti
-
8/12/2019 Stat Nrm
95/107
onalguid
elinesforthe
programmes,
namely,NWDPR
A,RVP&FPR,RA
-
8/12/2019 Stat Nrm
96/107
DAS,&SLU
Bhavebeencir
culatedtothe
statesforad
option.TheOp
e
-
8/12/2019 Stat Nrm
97/107
rationalG
uidelinesfor
WatershedDev
elopmentPro
grammeinShif
ti
-
8/12/2019 Stat Nrm
98/107
ngCultivati
onAreas(WDP
SCA)havebee
nalsoformula
tedandsubmit
t
-
8/12/2019 Stat Nrm
99/107
-
8/12/2019 Stat Nrm
100/107
onofthes
ametotheSta
teGovernmen
tsforadoption
.
4
-
8/12/2019 Stat Nrm
101/107
Annexure-I
State-wise extent of various kinds of Land Degradation in India
(As per NBSS&LUP-ICAR-2005 on the Scale of 1:250,000)
(Area in thousand hectares)
S.N. Name of the Water Wind Water
Salinity/ Soil
Complex
Degraded
Geographi
Degraded
States
Erosio
n
Erosio
n
Loggin
g
Alkalini
ty
Acidit
y
Proble
m Area
cal
Area
Area(%
)
1)
AndhraPradesh 11518 0 1896 517 905 156
14992 27505 54.5
2)ArunachalPradesh 2372 0 176 0 1955 0 4503 8374 53.8
3) Assam 688 0 37 0 612 876 2213 7844 28.2
4)Bihar+Jharkhand 3024 0 2001 229 1029 0 6283 17387 36.1
5) Goa 60 0 76 0 2 24 162 370 43.9
6) Gujarat 5207 443 523 294 0 1666 8133 19602 41.5
7) Haryana 315 536 146 256 0 214 1467 4421 33.2
8) Himachal Pradesh 2718 0 1303 0 157 0 4178 5567 75.0
9) Jammu & Kashmir 5460 1360 200 0 0 0 7020 22224 31.6
10) Karnataka 5810 0 941 110 58 712 7631 19179 39.8
11) Kerala 76 0 2098 0 138 296 2608 3886 67.1
12) Madhya Pradesh+ 17883 0 359 46 6796 1126
26210 44345 59.1
Chhattisgarh
13) Maharastra 11179 0 0 1056 517 303
13055 30771 42.4
14) Manipur 133 0 111 0 481 227 952 2233 42.6
15) Mizoram 137 0 0 0 1050 694 1881 2108 89.2
16) Meghalaya 137 0 7 0 1030 34 1208 2243 53.9
17) Nagaland 390 0 0 0 127 478 995 1658 60.0
18) Orissa 5028 0 681 75 263 75 6122 15571 39.3
19) Punjab 372 282 338 288 0 0 1280 5036 25.4
20) Rajasthan 3137 6650 53 1418 0 110
11368 34224 33.2
21) Sikkim 158 0 0 0 76 0 234 710 33.0
22) Tamil Nadu 4926 0 96 96 78 138 5334 13006 41.0
23) Tripura 121 0 191 0 203 113 628 1049 59.9
2
4) Uttar Pradesh+ 11392 212 2350 1370 0 0
1532
4 29441 52.0
-
8/12/2019 Stat Nrm
102/107
Uttarakhand
25) West Bengal 1197 0 710 170 556 119 2752 8875 31.0
26) Delhi 55 0 6 10 0 11 82 148 55.4
27)
UnionTerritories 187 0 0 9 0 9 205 825 24.8
Grand Total 93680 9483 14299 5944 16033 7381
14682
0 328602Grand Total(Millionha) 93.68 9.48 14.30 5.94 16.03 7.38
146.82 328.60
Source : There are several estimates for the extent of degraded lands reported by various agencies in the country.These estimates vary largely due to variation in approaches and methodologies of estimation. In absence ofcomprehensive and periodic scientific surveys, the figures reported by National Bureau of Soil Survey & LandUse Planning, Nagpur based on studies and several estimates (2005) for various land degradation have beenconsidered as logically concluded and are being used for various purposes.
5
-
8/12/2019 Stat Nrm
103/107
Annexure -
Degraded Lands Developed under various Watershed Development Programmes,since inception upto Tenth Five Year Plan
(Area in Lakh ha. and Expenditure in Rs. Crore
Ministry/Scheme Progress since Progress during X Plan Progress since inceptionS.No. and year of start
inception upto IXPlan (2002-07)
upto endof
XPlan*
Area Expr. Area Expr. Area Expr.
(A) Ministry of Agriculture, (Department of Agriculture & Cooperation)1. NWDPRA 69.79 1877.74 23.30 1147.82 93.09 3025.56
(1990-91)
2. RVP & FPR 54.88 1516.26 9.98 727.98 64.86 2244.24(1962 & 81)
3. WDPSCA 2.58 166.27 1.35 129.31 3.93 295.58(1974-75)
4. RADAS 5.81 76.39 1.30 45.35 7.11 121.74(1985-86)
5. WDF 0.00 0.00 0.59 26.02 0.59 26.02
(1999-00)6. EAPs 13.35 2039.81 4.80 1927.54 18.15 3967.35
Sub Total 146.41 5676.47 41.32 4004.02 187.73 9680.49
(B)Ministry of Rural Development ( Department of Land
Resources)1. DPAP(1973-74) 68.95 3284.74 68.32 1557.76 137.27 4842.50
2. DDP(1977-78) 33.56 797.38 45.17 1152.50 78.73 1949.88
3. IWDP(1988-89) 37.34 616.51 62.22 1821.64 99.56 2438.15
4. EAPs 1.40 18.39 3.60 274.28 5.00 292.67
Sub Total 141.25 4717.02 179.31 4806.18 320.56 9523.20
( C)
Ministry of Environment andForests
1. NAEP(1989-90) 0.70 47.53 0.00 0.00 0.70 47.53
Total (A+B+C) 288.36 10441.02 220.63 8810.20 508.9919251.2
2
Abbreviations:
NWDPRA -National Watershed Development Project for RainfedArea
RVP & FPR - River Valley Project & Flood Prone River
WDPSCA -Watershed Development Project for Shifting CultivationArea
RADAS - Reclamation & Development of Alkali and Acid SoilWDF - Watershed Development FundEAPs - Externally Aided ProjectsDPAP - Drought Prone Area ProgrammeDDP - Desert Development ProgrammeIWDP - Integrated Wasteland Development Project
NAEP - National Afforestation and Eco-Development Project
-
8/12/2019 Stat Nrm
104/107
Source: Working Group Report of Natural Resource Management for Eleventh Five Year Plan,constituted by Planning Commission, New Delhi, Feb., 2007.
6
-
8/12/2019 Stat Nrm
105/107
Annexure III
Target and Outlay Proposed under various Watershed DevelopmentProgrammes for XI Plan
Implementing Nameof
Scheme/ Target for XI PlanOutlay for XI
PlanDeptt./Ministry Programme (Million ha.) (Rs. in crore)
Department of NWDPRA 1.50 1500.00
Agriculture & RVP & FPR 1.25 1500.00Cooperation, MoA
WDPSCA 0.20 240.00
RADAS 0.10 100.00
WDF 0.50 600.00
EAPs 0.50 750.00
RADP (Proposed) 3.00 3300.00
Sub total 7.05 7990.00
Departmentof
land
IWDP
Resources, MoRD DPAP
24.00* 15358.00DDP
Sub Total 24.00 15358.00
PlanningHill Area and Western 1.00 2500.00
GhatDevelopmen
tCommission
Programmes
Total for XI Plan 32.05 25848.00