Start the NQView Program

1
1. Start the NQView Program 2. Wait for the program to finish uploading the configuration 3. After the configuration is complete, we will see introduction wizard / welcome page. The wizard will guide us step by step procedure to start with Diversity Optimizer. Usually we just pass through the wizard without making any change. 4. After the wizard, we will see Diversity Optimizer window. First create jobs, tasks and campaign in order to start testing using 3 UEs simultanuously. 5. Then connect the device (UE) one by one. Do not connect the 3 UEs all together to avoid any problems with the software. 6. After all devices are connected, Load the Map of the floor plan or MRT Route . this can be done from “Real time” window. 7. we are ready to start walk test by pressing start button on the menu campaign on Control Window. Then we walk to collect data from the 8. back to “Real time” window and put a mark on every floor or every place where we need to put a mark. 9. After test complete, press stop button on the menu campaign 10. Then check the file result in the assigned folder to make sure we did the test properly.

description

start

Transcript of Start the NQView Program

Page 1: Start the NQView Program

1. Start the NQView Program2. Wait for the program to finish uploading the configuration3. After the configuration is complete, we will see introduction wizard / welcome page. The

wizard will guide us step by step procedure to start with Diversity Optimizer.Usually we just pass through the wizard without making any change.

4. After the wizard, we will see Diversity Optimizer window. First create jobs, tasks and campaign in order to start testing using 3 UEs simultanuously.

5. Then connect the device (UE) one by one. Do not connect the 3 UEs all together to avoid any problems with the software.

6. After all devices are connected, Load the Map of the floor plan or MRT Route .this can be done from “Real time” window.

7. we are ready to start walk test by pressing start button on the menu campaign on Control Window. Then we walk to collect data from the

8. back to “Real time” window and put a mark on every floor or every place where we need to put a mark.

9. After test complete, press stop button on the menu campaign10. Then check the file result in the assigned folder to make sure we did the test properly.