Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, 20021 SLAC EPICS...

15
Ron Chestnut EPICS Collaboration Mtg May 21-23, 2002 1 Stanford Linear Accelerator Center SLAC EPICS Projects Yesteryear, Today, and Tomorrow

description

Ron ChestnutEPICS Collaboration Mtg May 21-23, EPICS Tools and Applications StripTool is now a sine qua non of the control room Channel Archiver being mated to Oracle for speed and flexibility VDCT (newest Database Configuration Tool) now treated as a reliable tool. EDM (newest Display Manager) now available at SLAC for test Alarm Handler in use Strong core of EPICS developers, growing as we speak.

Transcript of Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, 20021 SLAC EPICS...

Page 1: Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, 20021 SLAC EPICS Projects Yesteryear, Today, and Tomorrow.

Ron Chestnut EPICS Collaboration Mtg May 21-23, 2002

1

Stanford Linear Accelerator Center

SLAC EPICS Projects

Yesteryear, Today, and Tomorrow

Page 2: Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, 20021 SLAC EPICS Projects Yesteryear, Today, and Tomorrow.

Ron Chestnut EPICS Collaboration Mtg May 21-23, 2002 2

Present ESD EPICS• PEP-II RF – 8 VXI-based stations• Bunch Injection • Damping Ring RF – Allen Bradley support

• Bucket-wise luminosity monitor• NLC Test Accelerator – 2 VME IOCs

— 60/120 Hz pulsed operation • PEP-II Tune tracker

• Other SLAC EPICS Projects— Longitudinal Feedback – John Fox’s group— SPEAR III upgrade (Ongoing)— BaBar – Slow control – many IOCs.

Page 3: Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, 20021 SLAC EPICS Projects Yesteryear, Today, and Tomorrow.

Ron Chestnut EPICS Collaboration Mtg May 21-23, 2002 3

EPICS Tools and Applications

• StripTool is now a sine qua non of the control room• Channel Archiver being mated to Oracle for speed

and flexibility• VDCT (newest Database Configuration Tool) now

treated as a reliable tool.• EDM (newest Display Manager) now available at

SLAC for test• Alarm Handler in use• Strong core of EPICS developers, growing as we

speak.

Page 4: Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, 20021 SLAC EPICS Projects Yesteryear, Today, and Tomorrow.

Ron Chestnut EPICS Collaboration Mtg May 21-23, 2002 4

Fill and luminosity data

Page 5: Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, 20021 SLAC EPICS Projects Yesteryear, Today, and Tomorrow.

Ron Chestnut EPICS Collaboration Mtg May 21-23, 2002 5

NLC Test Acc. Upgrade• Veetest & Labview ( ½ Hertz)• EPICS replacement

— Two new IOCS— 60 Hz RF control

• Scanning ADC fault data• Complex subroutine records

Page 6: Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, 20021 SLAC EPICS Projects Yesteryear, Today, and Tomorrow.

Ron Chestnut EPICS Collaboration Mtg May 21-23, 2002 6

PEP-II Tune Tracker

Page 7: Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, 20021 SLAC EPICS Projects Yesteryear, Today, and Tomorrow.

Ron Chestnut EPICS Collaboration Mtg May 21-23, 2002 7

ESD EPICS Devices

• Allen Bradley – DCM-based

• GPIB – ethernet LAN and Industry Pack

• Shared Memory – Bit3

• Many SLAC-specific RF VXI-based modules

• CAMAC hardware and drivers from TJNAF

• VSAM (Slow analog)– BaBar and NLCTA

• ADC, TDC, DAC, Dig. I/O – NLC Test Accelerator

Page 8: Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, 20021 SLAC EPICS Projects Yesteryear, Today, and Tomorrow.

Ron Chestnut EPICS Collaboration Mtg May 21-23, 2002 8

Current ESD Epics Projects

• NLC 8-Pack Support (Due end of Autumn)— Next Step for the NLC Test Accelerator— New ADCs, RF Control

• General GPIB support (Wishlist)— Replacing HPUX-based GPIB support

• PEP-II RF upgrade (Due end of Summer)— More RF stations, enhanced VXI RF modules

Page 9: Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, 20021 SLAC EPICS Projects Yesteryear, Today, and Tomorrow.

Ron Chestnut EPICS Collaboration Mtg May 21-23, 2002 9

Current EPICS Plans• Upgrade PEP-II RF IOCs from niCpu030 to PPC

VXI Controllers• Move all production to 3.13.6 during the summer• Provide SNL/SEQ support• Continue to coordinate SLAC-wide EPICS• Look seriously at RTEMS• Switch to VDCT• Keep abreast of 3.14 readiness• Provide SLAC EPICS training

Page 10: Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, 20021 SLAC EPICS Projects Yesteryear, Today, and Tomorrow.

Ron Chestnut EPICS Collaboration Mtg May 21-23, 2002 10

Linear Coherent Light Source

• Just passed CD-1 Lehman review• SLAC/LLBL/LLNL/Argonne collaboration• 270 Million dollar project• Construction start 2006/ready 2008

— When do we get first real money?• EPICS to be used wherever reasonable

Page 11: Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, 20021 SLAC EPICS Projects Yesteryear, Today, and Tomorrow.

Ron Chestnut EPICS Collaboration Mtg May 21-23, 2002 11

Page 12: Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, 20021 SLAC EPICS Projects Yesteryear, Today, and Tomorrow.

Ron Chestnut EPICS Collaboration Mtg May 21-23, 2002 12

Linac CenterLine

LCLS Injector Parts

QE02

Transverse RFCavity

WS2/OTR5/BPM8

OTR6 WS4

BPM7/WS1/OTR4

CM3/BPM4/OTR2

OTR3,BPM6

OTR1

BPM2CM2

BPM7/OTR7

Valve

SC4

WS3/CM4

Sector 20-8BSector 20-8A BeamStopper

D. DowellX2494

March 27, 2002

SC2S2

SC3

SC5

BPM9

RF Gun

L0 AcceleratorsSC7

EO2/SC6/BPM5

BPM3

Valve

SC8

SC9V

SC9H SC10

5.00m.Scale:

RadiationShielding

BPM11/OTR9

BPM10

QE01

QE03QE04

StraightAhead

Spectrometer

Tune-upDump/

Faraday CupOTR10/

BPM12/CM6

SC11

OTR11/BPM13

QM01

QM02

QB

QM03&QM04

Page 13: Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, 20021 SLAC EPICS Projects Yesteryear, Today, and Tomorrow.

Ron Chestnut EPICS Collaboration Mtg May 21-23, 2002 13

LCLS Injector in EPICS

SLC Timing Injector IOC

Klystron 1

Klystron N

MPGBeam CodesBGRPSEtc.

Timing slave to SLCTiming master forKlystron IOCs

Evaluate APS / SNStiming systems

All Klystrons either fully SLC or fullyEPICS!

ANL EPICSfor Undulator

Page 14: Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, 20021 SLAC EPICS Projects Yesteryear, Today, and Tomorrow.

Ron Chestnut EPICS Collaboration Mtg May 21-23, 2002 14

LCLS Site PlanLCLS Site Plan

Page 15: Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, 20021 SLAC EPICS Projects Yesteryear, Today, and Tomorrow.

Ron Chestnut EPICS Collaboration Mtg May 21-23, 2002 15

LCLS Undulator Controls• Supplied by Argonne APS - lock, stock, and barrel

— Employs and extends designs from LEUTL (Low Energy Undulator Test Line)

— All EPICS, 16 VME IOCs• Argonne and SLAC EPICS groups will coordinate efforts during the

whole project— Timing— Machine Protection— Networking— Global Feedbacks— EPICS Details

• VME Crates, CPU types• Naming Convention• Database and screen design

— Commissioning and integration