W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
Standards Update
Steve RueckertDirector of Standards
![Page 2: Standards Update](https://reader036.fdocuments.us/reader036/viewer/2022082819/568139ec550346895da1a683/html5/thumbnails/2.jpg)
2
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
Current NERC Projects
• TOP/IRO Revisions– Project a result of FERC proposal to remand
several IRO and TOP standards.• Removed critical reliability aspects
– Includes three TOP and six IRO standards – Two new defined terms• Real-time Assessment• Operational Planning Analysis
– Ballot September 10-19
![Page 3: Standards Update](https://reader036.fdocuments.us/reader036/viewer/2022082819/568139ec550346895da1a683/html5/thumbnails/3.jpg)
3
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
Current NERC Projects
• BAL-002-2• Clarifies that a responsible entity is not subject
to returning its reporting ACE to the recovery state if:– It is experiencing an EEA– A Balancing Contingency Event exceeds its MSSC
• Fourth Ballot – closes October 2
![Page 4: Standards Update](https://reader036.fdocuments.us/reader036/viewer/2022082819/568139ec550346895da1a683/html5/thumbnails/4.jpg)
4
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
Current NERC Projects
• Ten additional projects that will be balloted before October 22
• See the NERC Weekly Standards and Compliance Bulletin– http://
www.nerc.com/pa/Stand/Pages/default.aspx• 2015-2017 RSDP states that the pace of work
will likely become more deliberate
![Page 5: Standards Update](https://reader036.fdocuments.us/reader036/viewer/2022082819/568139ec550346895da1a683/html5/thumbnails/5.jpg)
5
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
Recent WECC Ballots
• VAR-002-WECC-2 Automatic Voltage Regulator• VAR-501-WECC-2 Power System Stabilizer– Retirement of P81-type Requirements• Required Documentation
– 83% Quorum– 100% Weighted Sector Approval– Before the Board for approval on September 18 – If approved will be sent to NERC/FERC for approval
![Page 6: Standards Update](https://reader036.fdocuments.us/reader036/viewer/2022082819/568139ec550346895da1a683/html5/thumbnails/6.jpg)
6
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
Recent WECC Ballots
• INT-018-WECC-CRT-1 Use of e-Tag Energy Product Codes Specific to the WECC– Reformatted for consistency– Definitions removed and added to Glossary• No changes to the definitions
– 82% Quorum– 97.2% Weighted Sector Approval– Before the Board for approval on September 18
![Page 7: Standards Update](https://reader036.fdocuments.us/reader036/viewer/2022082819/568139ec550346895da1a683/html5/thumbnails/7.jpg)
7
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
Current WECC Projects
• WECC-0101 Generator Validation Policy Conversion– Proposes to incorporate elements from the WECC
Generator Testing and Validation Policy into mandatory standards as a WECC Regional Variance
– Lowers the threshold for testing from 75 MW to 20 MW
– Requires validation every five years rather than every ten years
![Page 8: Standards Update](https://reader036.fdocuments.us/reader036/viewer/2022082819/568139ec550346895da1a683/html5/thumbnails/8.jpg)
8
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
Current WECC Projects
• WECC-0107 PSS Design and Performance– Proposes to incorporate elements from the WECC
Policy Statement on Power System Stabilizers and the Tuning Guide into VAR-501-WECC-2
– Would continue to require PSS to be in service– Would require PSS installation– Would require PSS tuning
![Page 9: Standards Update](https://reader036.fdocuments.us/reader036/viewer/2022082819/568139ec550346895da1a683/html5/thumbnails/9.jpg)
9
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
Current WECC Projects
• WECC-0108 Modification of INT-021-WECC-CRT-1.3– WIT Checkout Confirmation– Process for scheduling and checkout between BAs
needs to be clarified– Will serve as the primary means for confirmation
for NET Scheduled Interchange and NET Actual Interchange
– Drafting team has been solicited• Poor response - window extended until September 15
![Page 10: Standards Update](https://reader036.fdocuments.us/reader036/viewer/2022082819/568139ec550346895da1a683/html5/thumbnails/10.jpg)
10
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
Current WECC Projects
• WECC-0110 INT-011-WECC-CRT-2 Ten Minute Recallable e-Tag Functionality for Reserves– Define the use of ten-minute recallable e-Tags as a
reserve product. – Conflicts with BAL-002-WECC-2• Needs to be modified
– Drafting team has been solicited• Poor response - window extended until September 15