STANDARD SPECIFICATION FOR SMALL BUILDING Web viewProvide and similar expressions mean supply,...
Transcript of STANDARD SPECIFICATION FOR SMALL BUILDING Web viewProvide and similar expressions mean supply,...
1 PROJECT SPECIFIC REQUIREMENTSDIPL Std Spec For Small Building Works PSRs – November 2017
Reference
Read these Project Specific Requirements in conjunction with the Standard Specification for Small Building Works 2017 (SSSBW) and the Drawings if any. Only those parts of the Standard Specification which refer to the works being carried out apply.
Standard Specification
The technical specification for this project is the Standard Specification for Small Building Works 2017 which is a separate printed document of reference text.
For more information visit: https://transport.nt.gov.au/infrastructure/specification-services/technical-specifications/buildings or contact Specification Services.
Site Copy
Retain a current copy of the Standard Specification for Small Building Works 2017 on site for the duration of the Contract. Retain a copy of these Project Specific Requirements on site for the duration of the contract.
Copies are available from Specification Services, Department of Infrastructure, Planning and Logistics on Third Floor, Highway House, 14 Palmerston Circuit, Palmerston. Tel No; (08) 8946 5021 or email Specification Services at: [email protected]
Project Specific Requirements
The selection of specific items or materials for the works being carried out are as specified in these Project Specific Requirements or shown as notes on the drawings.
Clause Numbering
The section and clause numbers in the Project Specific Requirements remain consistent and refer back to the relevant section and clause in the Standard Specification for Small Building Works 2017.
Precedence
Any provision in the Project Specific Requirements or on the project drawings shall override any conflicting provision in the Standard Specification for Small Building Works 2017.
Hold & Witness Points
These apply whether Quality Assurance or Project Control is included or not in this project. Refer to the definitions of Hold Points and Witness Points in the general requirements section of the reference specification.
Contents
SSSBW Section 1 GENERAL REQUIREMENTS
SSSBW Section 2 SITE PREPARATION
SSSBW Section 3 CONCRETE CONSTRUCTION
SSSBW Section 4 STEEL CONSTRUCTION
SSSBW Section 5 TIMBER CONSTRUCTION
SSSBW Section 6 BLOCK CONSTRUCTION
SSSBW Section 7 INSULATION SARKING AND PLIABLE MEMBRANES
SSSBW Section 8 ROOFING
SSSBW Section 9 DOORS AND WINDOWS
SSSBW Section 10 CLADDING AND LINING
SSSBW Section 11 SUSPENDED CEILINGS
SSSBW Section 12 RENDERING AND PLASTERING
SSSBW Section 13 JOINERY AND FIXTURES
SSSBW Section 14 TILING
SSSBW Section 15 PAINTING
SSSBW Section 16 FLOOR COVERINGS
SSSBW Section 17 PLUMBING AND DRAINAGE
SSSBW Section 18 ELECTRICAL INSTALLATIONS
SSSBW Section 19 MECHANICAL INSTALLATIONS
SSSBW Section 20 FENCES
SSSBW Section 21 PAVING
SSSBW Section 22 LANDSCAPE
SSSBW Section 23 REFERENCED AUSTRALIAN STANDARDS
SSSBW Section 24 OTHER REFERENCED STANDARDS
SSSBW Section 25 ACTS, REGULATIONS, AUTHORITIES AND CODES
SSSBW Section 26 FIXTURES SCHEDULE
SSSBW Section 27 NT CLIMATE ZONES TABLE
SSSBW Section 1 GENERAL REQUIREMENTS
SSSBW Clause 1.2 DEFINITIONS
ADDENDUM
Add the following definitions.
Approval/AuthorisationObtain written or verbal advice from the Superintendent on the specific matter requiring approval and/or authorisation unless statutory requirements state otherwise or unless a different approver or authoriser is specified.
As Built InformationMeans the same as As Constructed Information.
As Constructed InformationA documented record, including drawings, of the details of a construction following its completion. Includes, and means the same as, Works As Executed Information, As Installed Information and As Built Information
As Installed InformationMeans the same as As Constructed Information.
Business DayMeans the same as Day.
Calendar DayMeans any day of the week including weekends and Public Holidays.
Compatibility Of MaterialsEnsure all materials which are used are compatible with all other materials which may be affected.
DayMeans working days, Monday to Friday, excluding Northern Territory wide Public Holidays, and excluding weekends.
DIPL/the Department
The Department of Infrastructure, Planning and Logistics.
Provide (The definition of this term replaces the existing definition.)Provide and similar expressions mean supply, install, connect, test, commission, and leave ready for use. It includes development of the design beyond that documented.
ShallIs indicative of a mandatory requirement unless the context clearly indicates otherwise.
Working DayMeans the same as Day.
Working HoursMeans the hours, on a working day, from 8am to 4.30pm.
Works As Executed InformationMeans the same as As Constructed Information.
SSSBW Clause 1.6.2Termite Management - Tests - Soil barrier
Method: [complete/edit]
Tests: [complete/edit]
SSSBW Clause 1.11 EVIDENCE OF APPROVAL OF THE STATUTORY AUTHORITIES
Authorities: [complete/edit]
SSSBW Clause 1.12 AS CONSTRUCTED INFORMATION
ADDENDUM
Add the following paragraph as the first paragraph in the Clause.
Witness Point - Provide As Constructed drawings and information. Show information of building elements, plant, and equipment across all disciplines. Show co-ordinate dimensions where applicable. Refer to the NTG Technical Drawings Part 1 - Requirements for Technical Records Management document, which is accessible via https://dipl.nt.gov.au/infrastructure/technical-standards-guidelines-and-specifications/technical-records . Drawings without changes shall be described as "As Constructed - No Changes" in the amendment description column.
SSSBW Clause 1.20 OTHER REQUIREMENTS
SSSBW Section 2 SITE PREPARATION
SSSBW Clause 2.2 DEMOLITION
2.2.3 Photographs: [complete/edit]
2.2.4 Demolished items: [complete/edit]
2.2.4 / 2.2.5 Salvaged items: [complete/edit]
2.2.5 Recycling items: [complete/edit]
2.2.6 Hazardous materials: [complete/edit]
2.2.7 Asbestos: [complete/edit]
SSSBW Clause 2.3 TREE PROTECTION
2.3.1 Trees to be retained: [complete/edit]
SSSBW Clause 2.5 SITE CLEARING
2.5.3 Mulching: [complete/edit]
SSSBW Clause 2.11 OTHER REQUIREMENTS
SSSBW Section 3 CONCRETE CONSTRUCTION
SSSBW Clause 3.3 TEST AUTHORITY
3.3.1 Tests: [complete/edit]
3.3.7 Test method: [complete/edit]
SSSBW Clause 3.8 CONCRETE
3.8.1 Slump: [complete/edit]
Element: [complete/edit]
Concrete Grade: [complete/edit]
SSSBW Clause 3.11 FINISHES TO UNFORMED SURFACES
Element: [complete/edit]
Concrete Finish: [complete/edit]
SSSBW Clause 3.13 OTHER REQUIREMENTS
SSSBW Section 4 STEEL CONSTRUCTION
SSSBW Clause 4.3 STRUCTURAL STEEL
4.3.4 Shop drawings: [complete/edit]
SSSBW Clause 4.5 PROTECTIVE COATING
4.5.1 Zinc based coatings:
SSSBW Clause 4.7 OTHER REQUIREMENTS
SSSBW Section 5 TIMBER CONSTRUCTION
SSSBW Clause 5.2 TIMBER FRAMING
5.2.6 Timber grades: [complete/edit]
5.2.13 Timber decking type: [complete/edit]
SSSBW Clause 5.3 TIMBER ROOF TRUSSES
Roof truss type: [complete/edit]
5.3.3 Shop drawings: [complete/edit]
SSSBW Clause 5.3.5MISCELLANEOUS ITEMS
Roof Battens: [complete/edit]
Ceiling Battens: [complete/edit]
SSSBW Clause 5.4 OTHER REQUIREMENTS
SSSBW Section 6 BLOCK CONSTRUCTION
SSSBW Clause 6.2 MATERIALS AND COMPONENTS
6.2.2 Masonry Units
Type: [complete/edit]
Size: [complete/edit]
Colour: [complete/edit]
SSSBW Clause 6.8 OTHER REQUIREMENTS
SSSBW Section 7 INSULATION, SARKING AND PLIABLE MEMBRANES
SSSBW Clause 7.1 GENERAL
Proprietary item: [complete/edit]
SSSBW Clause 7.3 MATERIALS AND COMPONENTS
7.3.1 Insulation [complete/edit]
SSSBW Clause 7.5 INSTALLATION
INSULATION TYPES AND R-VALUES
7.5.2 Bulk Insulation
Walls: [complete/edit]
Roof: [complete/edit]
7.5.4 Wall Sarking Materials: [complete/edit]
7.5.5 Roof Sarking Materials: [complete/edit]
7.6 Vapour Barrier: [complete/edit]
SSSBW Clause 7.6.2CONTINOUS AIR CONDITIONING
Design requirements: [complete/edit]
SSSBW Clause 7.6.4BLANKET FOR SOUND INSULATION
Rw Value: [complete/edit]
Extent: [complete/edit]
To Ceiling: Rockwool blankets.
Rw Value: [complete/edit]
Extent: [complete/edit]
SSSBW Clause 7.7 OTHER REQUIREMENTS
SSSBW Section 8 ROOFING
SSSBW Clause 8.2 MATERIALS AND COMPONENTS
8.2.1 Roof material:
Profile: [complete/edit]
8.2.2 Safety mesh: [complete/edit]
Thickness: [complete/edit]
Finish: [complete/edit]
Capping and flashings: [complete/edit]
SSSBW Clause 8.7 ROOF PLUMBING
8.7.1 Selection and installation of rainwater goods
Gutters: [complete/edit]
Extent: [complete/edit]
Downpipes: [complete/edit]
SSSBW Clause 8.8 OTHER REQUIREMENTS
SSSBW Section 9 DOORS AND WINDOWS
SSSBW Clause 9.2.8LOCKSETS AND HARDWARE
Corrosion resistance category: [complete/edit]
SSSBW Clause 9.4 STEEL DOOR FRAMES
Type: [complete/edit]
Size: [complete/edit]
SSSBW Clause 9.5 TIMBER DOORS
Locations: [complete/edit]
Type: [complete/edit]
9.5.4 TYPE (NT5) - LOUVRED DOOR
Material: [complete/edit]
Finish: [complete/edit]
SSSBW Clause 9.9 SECURITY SCREEN DOORS AND WINDOW GRILLES
9.9.2 General
System: [complete/edit]
SSSBW Clause 9.11 LOCKSETS
LOCK AND LATCH SCHEDULE
Proprietary item: [complete/edit]
Finish: [complete/edit]
9.11.1 External doors: [complete/edit]
9.11.2 Internal doors: [complete/edit]
WC and bathroom doors: [complete/edit]
Sliding glass doors: [complete/edit]
Other door hardware items: [complete/edit]
9.11.4 Keying [complete/edit]
SSSBW Clause 9.12 WINDOWS
9.12.3 Shop drawings: [complete/edit]
Window type: [complete/edit]
Manufacturer: [complete/edit]
Finish: [complete/edit]
Insect screens: [complete/edit]
Security screens: [complete/edit]
Seals: [complete/edit]
Other fittings: [complete/edit]
SSSBW Clause 9.13 GLAZING
WINDOWS
Glazing: [complete/edit]
Safety Glass: [complete/edit]
MIRRORS
Type: [complete/edit]
Sizes: [complete/edit]
Locations: [complete/edit]
SHOWER SCREENS
Manufacturer: [complete/edit]
Door type: [complete/edit]
Glass type: [complete/edit]
SSSBW Clause 9.14.6 DEBRIS SCREEN
Manufacturer: [complete/edit]
SSSBW Clause 9.17 OTHER REQUIREMENTS
SSSBW Section 10 CLADDING AND LINING
SSSBW Clause 10.1 GENERAL
External cladding: [complete/edit]
Manufacturer: [complete/edit]
Finish: [complete/edit]
Thermal break: [complete/edit]
Soffit: [complete/edit]
Joints: [complete/edit]
Finish: [complete/edit]
SSSBW Clause 10.7 LINING
10.7.1 Materials and components
Generally: [complete/edit]
Fibre cement joints: [complete/edit]
Wet area lining: [complete/edit]
Humidity resistance (RH) [complete/edit]
Special linings: [complete/edit]
Size: [complete/edit]
Acoustic rating: [complete/edit]
Finish: [complete/edit]
SSSBW Clause 10.12 TRIM
Cornice: [complete/edit]
Architraves: [complete/edit]
Skirting: [complete/edit]
SSSBW Clause 10.13 OTHER REQUIREMENTS
SSSBW Section 11 SUSPENDED CEILINGS
SSSBW Clause 11.3 MATERIALS AND COMPONENTS
AMENDMENT
Replace the paragraph “Fibrous plaster tiles” with the following text.
Do not use fibrous plaster tiles.
Use glass reinforced plaster acoustic tiles which have the following characteristics:
Size; 600 x 600 mm, unless different grid dimensions approved,
NRC rating; 0.7 minimum,
R value; 0.8 m2K/W minimum,
Thickness; 30 mm nominal (32 mm acceptable),
Surface finish; factory applied white anti-mould paint.
END OF AMENDMENT
Fire rated system [complete/edit]
Acoustic rated system [complete/edit]
Proprietary system: [complete/edit]
CEILING CODE TYPE A B
Rondo - Balanced tee roll formed exposed system.
Rondo screw up ceiling suspended system
Location: -
Support system: Exposed grid. Screw up concealed system.
Basic grid: 600 x 600 mm. -
Material: Galvanized steel or aluminum
Galvanized steel or aluminum
Exposed member finish: Factory paint finish. -
Exposed member colour: White. -
Wall trim: [complete/edit] Ceiling Lining
Material: [complete/edit] Joints: [complete/edit] Finish: [complete/edit] Colour: [complete/edit] Plasterboard Tiles
Standard: To AS 2588.
Thickness: 13 mm.
Finish: [complete/edit] Colour: [complete/edit] Acoustic rating: [complete/edit]
Pattern: [complete/edit] Thickness: 32 mm (nominally 30 mm).
Finish: Painted.
Colour: [complete/edit] SSSBW Clause 11.6 OTHER REQUIREMENTS
SSSBW Section 12 PLASTERING
SSSBW Clause 12.4 PLASTERING
Location: [complete/edit]
Required finish: [complete/edit]
Surface finish: [complete/edit]
SSSBW Clause 12.5 OTHER REQUIREMENTS
SSSBW Section 13 JOINERY AND FIXTURES
SSSBW Clause 13.6 CUPBOARD AND DRAWER UNITS
Cupboard schedule: [complete/edit]
SSSBW Clause 13.8 FIRE FIGHTING
Portable extinguishers: [complete/edit]
Fire blankets: [complete/edit]
SSSBW Clause 13.9 DISPLAY BOARDS
13.9.1 White boards
Size: [complete/edit]
13.9.2 Pin boards
Size: [complete/edit]
Colour: [complete/edit]
SSSBW Clause 13.10 CLOTHES HOISTS
Type: [complete/edit]
SSSBW Clause 13.11 GRAB RAILS
Type: [complete/edit]
SSSBW Clause 13.12 LETTER BOXES
Type: [complete/edit]
SSSBW Clause 13.13 OTHER REQUIREMENTS
SSSBW Section 14 TILING
SSSBW Clause 14.1 GENERAL
WALL TILES
Type: [complete/edit]
Size: [complete/edit]
Adhesive: [complete/edit]
Grout: [complete/edit]
FLOOR TILES
Type: [complete/edit]
Size: [complete/edit]
Adhesive: [complete/edit]
Grout: [complete/edit]
SSSBW Clause 14.7 OTHER REQUIREMENTS
SSSBW Section 15 PAINTING
SSSBW Clause 15.5 PAINTING SCHEDULE
CODES: Codes are Australian Paint Approval Scheme (APAS) specification codes.
FINISHES SCHEDULE
PAINT COLOURS: The paint colours shown in this schedule are standard colours from the following:
MANUFACTURER: [complete/edit]
EXTERNAL FINISHES:
ITEM FINISH COLOUR
INTERNAL FINISHES:
ITEM FINISH COLOUR
JOINERY FINISHES:
ITEM FINISH COLOUR
SSSBW Section 16 FLOOR COVERINGS
SSSBW Clause 16.3 MATERIALS AND COMPONENTS
UNDERLAYS
16.3.1 Hardboard underlay [complete/edit] 16.3.2 Carpet underlay [complete/edit]
CARPET
Proprietary item: [complete/edit]
Fixing: [complete/edit]
Underlay: [complete/edit]
16.3.3 Hot melt adhesive tape[complete/edit]
SSSBW Clause 16.6 RESILIENT FINISHES
Material: [complete/edit]
Sheet joints:
SSSBW Clause 16.7 OTHER REQUIREMENTS
SSSBW Section 17 PLUMBING AND DRAINAGE
SSSBW Clause 17.6 MATERIALS AND COMPONENTS
Tapware Schedule [complete/edit]
TAPWARE
Manufacturer: [complete/edit]
Style: [complete/edit]
Finish: [complete/edit]
Sanitary Fixtures Schedule [complete/edit]
SANITARY FIXTURES
Manufacturer: [complete/edit]
Style: [complete/edit]
Finish: [complete/edit]
SSSBW Clause 17.8 STORMWATER
Stormwater Pipes: [complete/edit]
SSSBW Clause 17.9 WASTEWATER
17.9.2 Design [complete/edit]
17.9.5 Septic tanks [complete/edit]
Type: [complete/edit]
Size: [complete/edit]
SSSBW Clause 17.10 COLD AND HEATED WATER
Water heater: [complete/edit]
Rainwater tanks: [complete/edit]
SSSBW Clause 17.11 FIRE HOSE REELS
Type: [complete/edit]
SSSBW Clause 17.12 GAS
Gas appliances schedule: [complete/edit]
SSSBW Clause 17.13 OTHER REQUIREMENTS
SSSBW Section 18 ELECTRICAL INSTALLATIONS
SSSBW Clause 18.3 INSTALLATION GENERALLY
Masonry Walls; [complete/edit]
SSSBW Clause 18.4 CONSUMER MAINS AND METERING
Connection: [complete/edit]
SSSBW Clause 18.5 DISTRIBUTION BOARD
Type: [complete/edit]
SSSBW Clause 18.6 ACCESSORIES
Accessories: [complete/edit]
Intruder Alarm system: [complete/edit]
SSSBW Clause 18.7 APPLIANCES
Appliances: [complete/edit]
SSSBW Clause 18.8 TELECOMMUNICATIONS CABLING
18.8.2 General
Requirements: [complete/edit]
SSSBW Clause 18.12 TELEPHONES IN BUILDINGS
Requirements: [complete/edit]
SSSBW Clause 18.13 TELEVISION
Antennae Requirements: [complete/edit]
SSSBW Clause 18.15 OTHER REQUIREMENTS
SSSBW Section 19 MECHANICAL INSTALLATIONS
SSSBW Clause 19.2 AIR CONDITIONERS
SPLIT SYSTEMS
Cooling capacity (kW): [complete/edit]
Heating capacity (kW): [complete/edit]
Fresh air quantity (l/s): [complete/edit]
Proprietary item: [complete/edit]
SSSBW Clause 19.7 FANS
Fan type: [complete/edit]
Air quantity: L/s @ Pa: [complete/edit]
Proprietary item: [complete/edit]
SSSBW Clause 19.11 OTHER REQUIREMENTS
SSSBW Section 20 FENCES
SSSBW Clause 20.3 CONSTRUCTION GENERALLY
20.3.10 Mowing Strips: [complete/edit]
SSSBW Clause 20.5 FENCE TYPES
Location: [complete/edit]
Fence type: [complete/edit]
SSSBW Clause 20.6 OTHER REQUIREMENTS
SSSBW Section 21 PAVING
SSSBW Clause 21.5 ASPHALT PAVING
Location: [complete/edit]
Details: [complete/edit]
SSSBW Clause 21.6 SPRAY SEALING
Location: [complete/edit]
Details: [complete/edit]
SSSBW Clause 21.7 UNIT PAVING
MASONRY SEGMENTAL PAVERS
Location: [complete/edit]
Manufacturer: [complete/edit]
Size: [complete/edit]
Colour: [complete/edit]
SSSBW Clause 21.8 IN SITU CONCRETE PAVING
Location: [complete/edit]
Finish: [complete/edit]
SSSBW Clause 21.11 OTHER REQUIREMENTS
SSSBW Section 22 LANDSCAPE
SSSBW Clause 22.5 SAMPLES
Samples [complete/edit]
SSSBW Clause 22.8 TURFING
Area to be turfed: [complete/edit]
SSSBW Clause 22.9 GRASS SEEDING
Area to be seeded: [complete/edit]
Seed species: [complete/edit]
Application rate: [complete/edit]
SSSBW Clause 22.10 SPRAYGRASS (HYDROSEEDING)
Area to be grassed: [complete/edit]
SSSBW Clause 22.12 PLANTING
PLANTING SCHEDULE
Trees: [complete/edit]
Palms: [complete/edit]
Shrubs: [complete/edit]
Ground Cover: [complete/edit]
SSSBW Clause 22.13 MULCHING
Mulch type: [complete/edit]
SSSBW Clause 22.15 GARDEN EDGING
Edging type: [complete/edit]
SSSBW Clause 22.16 IRRIGATION
22.16.4 Contractor’s design plans:[complete/edit]
22.16.14 Irrigation schedule: [complete/edit]
SSSBW Clause 22.18 COMPLETION
Maintenance Manual: [complete/edit]
SSSBW Clause 22.19 OTHER REQUIREMENTS
SSSBW Section 23 REFERENCED AUSTRALIAN STANDARDS
SSSBW Section 24 OTHER REFERENCED STANDARDS
SSSBW Section 25 ACTS, REGULATIONS, AUTHORITIES AND CODES
SSSBW Section 26 FIXTURES SCHEDULES