A AREVA July 19, 2013 NRC:13:057 U.S. Nuclear Regulatory Commission Document Control Desk 11555 Rockville Pike Rockville, MD 20852 Submittal of Revision 5 of the U.S. EPR Final Safety Analysis Report for Design Certification Ref. 1: Letter, Sandra M. Sloan (AREVA NP Inc.) to Document Control Desk (NRC), "Application for Standard Design Certification of the U.S. EPR (Project No. 733)," NRC:07:070, December 11, 2007. Ref. 2: Letter, Sandra M. Sloan (AREVA NP Inc.) to Document Control Desk (NRC), "Submittal of Revision 1 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:09:064, May 29, 2009. Ref. 3: Letter, Sandra M. Sloan (AREVA NP Inc.) to Document Control Desk (NRC), "Submittal of Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref. 4: Letter, Sandra M. Sloan (AREVA NP Inc.) to Document Control Desk (NRC), "Submittal of Revision 3 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:11:085, August 10, 2011. Ref. 5: Letter, Pedro Salas (AREVA NP Inc.) to Document Control Desk (NRC), "Re-Submittal of Revision 4 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:12:057, November 15, 2012. AREVA NP Inc. (AREVA NP) hereby submits Revision 5 of the U.S. EPR Final Safety Analysis Report (FSAR). Revision 0 of the U.S. EPR FSAR was submitted to the NRC as part of the application for Standard Design Certification of the U.S. EPR in Reference 1. Revisions 1 through 4 of the U.S. EPR FSAR were submitted to the NRC in References 2 through 5. The following items are enclosed on separate CDs: 1. U.S. EPR Final Safety Analysis Report including Sensitive Unclassified Non-Safeguards Information (SUNSI), to be withheld under 10 CFR 2.390. 2. U.S. EPR Final Safety Analysis Report in which the SUNSI material is redacted, termed the "Public Version." AREVA NP INC. 3315 Old Forest Road, PO. Box 10935, Lynchburg, VA 24508-0935 Tel.: 434 832-3000 - www.arevu.com 1i JN

Transcript of Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final...

Page 1: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

AAREVA

July 19, 2013NRC:13:057

U.S. Nuclear Regulatory CommissionDocument Control Desk11555 Rockville PikeRockville, MD 20852

Submittal of Revision 5 of the U.S. EPR Final Safety Analysis Report for Design Certification

Ref. 1: Letter, Sandra M. Sloan (AREVA NP Inc.) to Document Control Desk (NRC), "Application for

Standard Design Certification of the U.S. EPR (Project No. 733)," NRC:07:070, December 11,2007.

Ref. 2: Letter, Sandra M. Sloan (AREVA NP Inc.) to Document Control Desk (NRC), "Submittal ofRevision 1 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:09:064,May 29, 2009.

Ref. 3: Letter, Sandra M. Sloan (AREVA NP Inc.) to Document Control Desk (NRC), "Submittal ofRevision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081,

August 31, 2010.

Ref. 4: Letter, Sandra M. Sloan (AREVA NP Inc.) to Document Control Desk (NRC), "Submittal of

Revision 3 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:11:085,August 10, 2011.

Ref. 5: Letter, Pedro Salas (AREVA NP Inc.) to Document Control Desk (NRC), "Re-Submittal of Revision4 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:12:057, November15, 2012.

AREVA NP Inc. (AREVA NP) hereby submits Revision 5 of the U.S. EPR Final Safety Analysis Report (FSAR).Revision 0 of the U.S. EPR FSAR was submitted to the NRC as part of the application for Standard Design

Certification of the U.S. EPR in Reference 1. Revisions 1 through 4 of the U.S. EPR FSAR were submitted to theNRC in References 2 through 5.

The following items are enclosed on separate CDs:

1. U.S. EPR Final Safety Analysis Report including Sensitive Unclassified Non-Safeguards Information(SUNSI), to be withheld under 10 CFR 2.390.

2. U.S. EPR Final Safety Analysis Report in which the SUNSI material is redacted, termed the "PublicVersion."

AREVA NP INC.

3315 Old Forest Road, PO. Box 10935, Lynchburg, VA 24508-0935Tel.: 434 832-3000 - www.arevu.com

1i JN

Page 2: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Document Control Desk NRC:13:057July 19, 2013 Page 2

To facilitate NRC review, a summary of changes for Tier 1 and Tier 2 is enclosed on Attachments I and 2,respectively. These summaries are provided by chapter and subsection, and lists AREVA NP's classification ofthe type of change, and short description of change. The type of changes are:

RAI - FSAR markups have been previously provided as part of RAI responses.

RAI - Advanced - FSAR markups have been previously provided as part of Advanced RAI responses. Ifchanges are subsequently modified as a result of NRC review, the FSAR will be revised in a futurerevision.

Editorial, or Consistency Editorial Change - Corrections or improvements such as typographicalchanges, adding or changing acronyms, etc.

Consistency Update - Changes that are made to make the FSAR internally consistent or consistent withother design information.

Corrective Action - Changes that result from an internal condition report written on an issueassociated with the FSAR. These changes are generally narrow in scope and improve the presentationin the FSAR such as clarifying previously provided information or correcting figure titles, etc.

Design Change - Changes that are associated with an internal Design Change Request that have beenprocessed and that are not associated with any RAI response. These changes are expected to haveminimal impact on the NRC review, but could be a change to the design hardware, analysis, change inclassification, etc.

Changes in the FSAR text are identified by change bars. Minor editorial changes such as those related topunctuation and capitalization are generally not marked.

Revision 5 of the U.S. EPR FSAR includes changes associated with responses to NRC Requests for AdditionalInformation (RAIs) submitted through June 2013 (including advanced RAI responses), although the timing forinclusion of RAI-associated changes varies by chapter, and RAI response submittal date.

AREVA NP looks forward to continued constructive interactions with the NRC to support efficient conduct ofthe U.S. EPR design certification review.

Page 3: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Document Control DeskJuly 19, 2013

NRC:13:057Page 3

If you have any questions related to this information, please contact Len Gucwa by telephone at(434) 832-3466, or by e-mail at [email protected].

Regulatory AffairsAREVA NP Inc.

Attachments1.2.

Enclosures:

U.S. EPR FSAR Tier 1 Summary of Changes to Rev. 5U.S. EPR FSAR Tier 2 Summary of Changes to Rev. 5

1. U.S. EPR Final Safety Analysis Report including Sensitive Unclassified Non-Safeguards Information (SUNSI), to bewithheld under 10 CFR 2.390

2. U.S. EPR Final Safety Analysis Report in which the SUNSI material is redacted, termed the "Public Version"

cc: A. M. SnyderDocket No. 52-020

Page 4: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 1US-EPR FSAR Tier 1

Summar _of Changes for Rev. 5Item Chapter Subsection Type of Description of ChangeNo. Change

1 2 2.1.1 (Table 2.1.1- RAI Changes associated with RAI 525 Supplement 123) response to Question 09.01.04-23

2 2 2.1.1 (Tables RAI Changes associated with RAI 527 Supplement 22.1.1-4 & 2.1.1-11; response to Question 14.03.02-61Figures 2.1.1-1 &2.1.1-11)

3 2 2.1.1 (Table 2.1.1- RAI Changes associated with RAI 527 Supplement 21 81 resoonse to Question 14.03,02-58

4 2 2.1.1 (Table 2.1.1- RAI Changes associated with RAI 527 Supplement 28_ response to Question 14.03.02-59

5 2 2.1.1 (Table 2.1.1- RAI Changes associated with RAI 575 Supplement 18_ ) resoonse to Question 06.02.01-105

6 2 2.1.1 (Table 2.1.1- RAI Changes associated with RAI 340 Supplement 14_ 8 resoonse to Question 06.02.01-57

7 2 2.1.1 (Table 2.1.1- RAI Changes associated with RAI 218 Supplement 38_. 2.1.1.1 resoonse to Question 03.04.01-8

8 2 2.1.1 (Table 2.1.1- RAI Changes associated with RAI 527 Supplement 28. Item 2.15) response to Question 14.03,02-60

9 2 2.1.1 (Tables RAI Changes associated with RAI 527 Supplement 22.1.1-8, 2.1.1-10, response to Question 14.03.02-572.1.1-11; Figure2.1.1-41)

10 2 2.1.1 (Tables RAI - Changes associated with RAI 541 Advanced response2.1.1-8, 2.1.1-10, Advanced to Question 02-32.1.1-11), 2.1.1.2,2.1.1.3

11 2 2.1.1 (Figure 2.1.1. Editorial Changes associated with correction to Figure title41)

12 2 2.1.1.2, 2.1.1.3 RAI Changes associated with RAI 527 Supplement 2response to Question 14.03.02-61

13 2 2.1.2 (Table 2.1.2- RAI Changes associated with RAI 527 Supplement 211) resoonse to Question 14.03.02-57

14 2 2.1.2 (Table 2.1.2- RAI - Changes associated with RAI 541 Advanced response_3) Advanced to Question 02-3

15 2 2.1.3 (Table 2.1.3- RAI Changes associated with RAI 370 Supplement 241) resoonse to Question 03.07.02-64

16 2 2.1.3 (Table 2.1.3- RAI - Changes associated with RAI 557 Advanced response1) A•dvancjed to Question 14.03.07-39

17 2 2.1.3 (Table 2.1.3- RAI Changes associated with RAI 527 Supplement 31. Item 3.2) - resoonse to Question 14.03.02-62

18 2 2.1.4 (Table 2.1.4- RAI Changes associated with RAI 370 Supplement 241) resoonse to Question 03.07.02-64

19 2 2.1.4 (Table 2.1.4- RAI - Changes associated with RAI 557 Advanced response! 'Advanced to Question 14.03.07-39

20 2 2.1.5 (Table 2.1.5- RAI Changes associated with RAI 345 Supplement 1521 resoonse to Question 09.02.01-41

21 2 2.1.5 (Table 2.1.5- RAI Changes associated with RAI 527 Supplement 231 resoonse to Question 14.03.02-57

22 2 2.1.5 (Table 2.1.5- RAI - Changes associated with RAI 541 Advanced responseAdvanced to Question 02-3

23 2 2.2.1 (Table 2.2.1- RAI - Changes associated with RAI 563 Advanced response2; Figure 2.2.1-1 Advanced to Question 19-356Rhtq 3 thni 6 nf 6)

24 2 2.2.1 (Table 2.2.1- RAI Changes associated with RAI 577 Supplement 15) resoonse to Question 14.03.03-54

Page 1 of 5

Page 5: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 1US-EPR FSAR Tier 1

Summary f Changes for Rev. 5Item Chapter Subsection Type of Description of ChangeNo. Change

25 2 2.2.2 (Tables RAI Changes associated with RAI 569 Supplement 12.2.2-1 & 2.2.2-3; response to Question 06.02.02-139Figure 2.2.2-1 Sht1 of 3)

26 2 2.2.2 (Table 2.2.2- RAI Changes associated with RAI 577 Supplement 11 3) resoonse to Question 14.03.03-54

27 2 2.2.2 (Table 2.2.2- RAI Changes associated with RAI 340 Supplement 143_ resoonse to Question 06.02.01-57

28 2 2.2.3 (Table 2.2.3- RAI Changes associated with RAI 569 Supplement 11 & Figure 2.2.3-1 response to Question 06.02.02-139Shts 1 thru 4 of 8)

29 2 2.2.3 (Tables RAI - Changes associated with RAI 563 Advanced response2.2.3-1, 2.2.3-2; Advanced to Question 19-356Figure 2.2.3-1)

30 2 2.2.3 (Table 2.2.3- RAI Changes associated with RAI 569 Supplement 131 response to Question 06.02,02-138

31 2 2.2.3 (Table 2.2.3- RAI Changes associated with RAI 577 Supplement 131 resoonse to Question 14.03.03-54

32 2 2.2.4 (Tables RAI - Changes associated with RAI 563 Advanced response2.2.4-1, 2.2.4-2; Advanced to Question 19-356Figure 2.2.4-1)

33 2 2.2.4 (Table 2.2.4- RAI Changes associated with RAI 577 Supplement 13) resoonse to Question 14.03.03-54

34 2 2.2.5 (Table 2.2.5- RAI Changes associated with RAI 577 Supplement 13) resoonse to Question 14.03.03-54

35 2 2.2.6 (Table 2.2.6- RAI Changes associated with RAI 577 Supplement 13) response to Question 14.03.03-54

36 2 2.2.7 (Table 2.2.7- RAI Changes associated with RAI 577 Supplement 13) response to Question 14.03.03-54

37 2 2.2.8 (Tables RAI Changes associated with RAI 525 Supplement 132.2.8-1 and 2.2.8- response to Question 09.01.04-25

38 2 2.3.1 (Table 2.3.1- Design Changes associated with AGA Drawings for Safeguard1) ChBnae Buildino Elevator Machine Rooms

39 2 2.3.3 (Table 2.3.3- RAI - Changes associated with RAI 563 Advanced response1: Fioure 2.3.3-1) Advanced to Question 19-356

40 2 2.3.3 (Table 2.3.3- RAI Changes associated with RAI 577 Supplement 1_ 3) res•onse to Question 14.03.03-54

41 2 2.4.1 (Table 2.4.1- RAI Changes associated with RAI 505 Supplement 296_ resoonse to Question 07.01-35

42 2 2.4.1 (Table 2.4.1- Design Changes associated with Reinstatement of LCQ6) Change Transfer Valves & Piping and Normal Operating

Pnpqitipn of the MOV in the Pqqiwv. Flnndinn I in.q43 2 2.4.1 (Table 2.4.1- RAI Changes associated with RAI 505 Supplement 27

_7) resoonse to Question 07.01-4444 2 2.4.2 (Table 2.4.2- RAI - Changes associated with RAI 563 Advanced response

- 4_ A) d to Question 19-35645 2 2.4.4 (Tables RAI Changes associated with RAI 505 Supplement 30

2.4.4-2. 2.4.4-3) resoonse to Question 07.01-3546 2 2.4.9 (Tables RAI Changes associated with RAl 555 Supplement 6

2.4.9-1. 2.4.9-2) response to Question 07.01-5347 2 2.4.10 (Tables RAI Changes associated with RAI 555 Supplement 6

2.4.10-1. 2.4.10-2) _ resoonse to Question 07.01-5348 2 2.4.19 (Table Design Changes associated with modifications to Self

S24 19-1) Chanae Powered Neutron Detectors (SPNDI Amolifier Circuit49 2 2.4.24 (Table RAI Changes associated with RAI 505 Supplement 27

.2.4424-4) 1 response to Question 07.01-44

Page 2 of 5

Page 6: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 1US-EPR FSAR Tier 1

Summary of Changes for Rev. 5Item Chapter Subsection Type of Description of ChangeNo. Change

50 2 2.4.24 (Table RAI Changes associated with RAI 505 Supplement 292.4.24-4) resoonse to Question 07.01-35

51 2 2.4.25 (Tables RAI Changes associated with RAI 505 Supplement 292.4.25-2, 2.4.25-3) response to Question 07.01-35

52 2 2.4.25 (Tables RAI Changes associated with RAI 505 Supplement 302.4.25-2. 2.4.25-3) response to Question 07.01-35

53 2 2.4.25 (Tables Design Changes associated with Reinstatement of LCQ2.4.25-2 & 2.4.25- Change Transfer Valves & Piping and Normal Operating.1 pnPsitinn nf th. MOV in th. Pa.eivp Floodino I in.•

54 2 2.5.2 (Tables RAI - Changes associated with RAI 563 Advanced response2.5.2-1, 2.5.2-2 & Advanced to Question 19-3562.5.2-3; Figure2.5.2-1)

55 2 2.5.4 (Table 2.5.4- RAI Changes associated with RAI 577 Supplement 14) resoonse to Question 14.03.03-54

56 2 2.5.5 (Table 2.5.5- RAI Changes associated with RAI 564 Supplement 21) resoonse to Question 08.02-8

57 2 2.6.1 RAI - Changes associated with RAI 527 Advanced responseAdvanced to Question 14.03.07-38

58 2 2.6.1 (Tables RAI - Changes associated with RAI 578 Advanced response2.6.1-1 thru 2.6.1- Advanced to Question 09.04.03-73; Figures 2.6.1-1thru 2.6.1-3)

59 2 2.6.1 (Table 2.6.1- RAI Changes associated with RAI 511 Supplement 72) response to Question 06.04-10

60 2 2.6.3 (Table 2.6.3- RAI Changes associated with RAI 505 Supplement 291 ) resoonse to Question 07.01-35

61 2 2.6.3 (Tables RAI - Changes associated with RAI 578 Advanced response2.6.3-1, 2.6.3-3; Advanced to Question 09.04.03-7Figures 2.6.3-1,2.6.3-2)

62 2 2.6.4 (Tables RAI - Changes associated with RAI 578 Advanced response2.6.4-1 thru 2.6.4- Advanced to Question 09.04.03-73; Figure 2.6.4-1)

63 2 2.6.4 (Table 2.6.4- RAI - Changes associated with RAI 527 Advanced response3) Advanced to Question 14.03.07-38

64 2 2.6.4 (Table 2.6.4- RAI Changes associated with RAI 511 Supplement 83_ _resoonse to Question 06.04-9

65 2 2.6.5 (Table 2.6.5- RAI - Changes associated with RAI 578 Advanced response1, 2.6.5-2; Figure Advanced to Question 09.04.03-72.6.5-1)

66 2 2.6.6 (Table 2.6.6- RAI - Changes associated with RAI 527 Advanced response3) Advanced to Question 14.03.07-38

67 2 2.6.6 (Table 2.6.6- RAI - Changes associated with RAI 578 Advanced response1 thru 2.6.6-3; Advanced to Question 09.04.03-7Figures 2.6.6-1,2.6.6-2)

68 2 2.6.6 (Table 2.6.6- RAI Changes associated with RAI 511 Supplement 83_ ) resoonse to Question 06.04-9

69 2 2.6.6 (Tables RAI Changes associated with RAI 505 Supplement 291 2.6.6-1 & 2.6.6-2) __-::]resoonse to Question 07.01-35

Page 3 of 5

Page 7: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 1US-EPR FSAR Tier 1

Summary of Changes for Rev. 5Item Chapter Subsection Type of Description of ChangeNo. Change

70 2 2.6.7 (Tables RAI - Changes associated with RAI 578 Advanced response2.6.7-1, 2.6.7-3; Advanced to Question 09.04.03-7Figure 2.6.7-1 thru2.6.7-4)

71 2 2.6.8 (Figure 2.6.8 RAI - Changes associated with RAI 563 Advanced response1 1) Advanced to Question 19-356

72 2 2.6.8 (Tables RAI - Changes associated with RAI 578 Advanced response2.6.8-2 thru 2.6.8- Advanced to Question 09.04.03-74; Figure 2.6.8-1)

73 2 2.6.8 (Table 2.6.8- RAI - Changes associated with RAI 527 Advanced response4) Advanced to Question 14.03.07-38

74 2 2.6.8 (Table 2.6.8- RAI Changes associated with RAI 577 Supplement 14) resoonse to Question 14.03.03-54

75 2 2.6.8 (Table 2.6.8- RAI Changes associated with RAI 511 Supplement 84) response to Question 06.04-9

76 2 2.6.9 (Tables RAI - Changes associated with RAI 578 Advanced response2.6.9-1 thru 2.6.9- Advanced to Question 09.04.03-73; Figures 2.6.9-1thru 2.6.9-4)

77 2 2.6.9 (Tables RAI Changes associated with RAI 505 Supplement 292.6.9-1 and 2.6.9- response to Question 07.01-352)

78 2 2.6.10 RAI - Changes associated with RAI 578 Advanced responseAdvanced to Question 09.04.03-7

79 2 2.6.13 (Tables RAI Changes associated with RAI 505 Supplement 292.6.13-1 and response to Question 07.01-352.6.13-2)

80 2 2.6.13 (Tables RAI - Changes associated with RAI 578 Advanced response2.6.13-1 thru Advanced to Question 09.04.03-72.6.13-3; Figure2.6.13-1)

81 2 2.7.1 (Table 2.7.1- RAI Changes associated with RAI 505 Supplement 292) resoonse to Question 07.01-35

82 2 2.7.1 (Table 2.7.1- RAI Changes associated with RAI 577 Supplement 13) resoonse to Question 14.03.03-54

83 2 2.7.2 (Table 2.7.2- RAI Changes associated with RAI 577 Supplement 13) response to Question 14.03.03-54

84 2 2.7.5 RAI - Changes associated with RAI 563 Advanced responseAdvanced to Question 19-356

85 2 2.7.11 Editorial Changes associated with editorial correction to Item7.9 (Eouioment and System Performance)

86 2 2.7.11 (Table Design Changes associated with EDG Redesign of Ventilation2.7.11-3; Figure Change for EDG Diesel Hall & ESW Cooling for Electrical2.7.11-1 Shts 1 Control Room; and In Service Testing requirements forthru 4 of 5) pumps and valves

87 2 2.7.11 (Tables Design Changes associated with operation of Essential2.7.11-1 & 2.7.11- Change Service Water System valves as MOVs2; Figure 2.7.11-1Sht 5 of 5)

88 2 2.7.11 (Table RAI Changes associated with RAI 577 Supplement 1.2.7.11-3) resoonse to Question 14.03.03-54

89 2 2.8.1 (Table 2.8.1- RAI Changes associated with RAI 439 Supplement 113) resoonse to Question 14.03.07-36

90 2 2.8.1.2.2, RAI Changes associated with RAI 439 Supplement 112.8.1.2.5 1 response to Question 14.03.07-36

Page 4 of 5

Page 8: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 1US-EPR FSAR Tier 1

Summary of Changes for Rev. 5Item Chapter Subsection Type of Description of ChangeNo. Change

91 2 2.8.2 (Table 2.8.2- RAI Changes associated with RAI 577 Supplement 13) resoonse to Question 14.03.03-54

92 2 2.8.6 (Table 2.8.6- RAI Changes associated with RAI 577 Supplement 1_ 3) resoonse to Question 14,003-54

93 2 2.8.7 (Tables RAI Changes associated with RAI 462 Supplement 82.8.7-1 & 2.8.7-2; response to Question 06.02.03-8Figure 2.8.7-1)

94 2 2.8.7 (Tables Design Changes associated with Reinstatement of LCQ2.8.7-1 & 2.8.7-2; Change Transfer Valves & Piping and Normal OperatingFigure 2.8.7-1) Position of the MOV in the Passive Flooding Lines

95 2 2.8.7 (Tables RAI - Changes associated with RAI 557 Advanced response2.8.7-1 & 2.8.7-3) yAdvanced to Question 14.03.07-39

96 2 2.8.7 (Table 2.8.7- RAI - Changes associated with RAI 527 Advanced response3) Advanced to Question 14.03.07-38

97 2 2.8.7 (Table 2.8.7- RAI Changes associated with RAI 577 Supplement 13) resoonse to Question 14.03.03-54

98 2 2.8.9 (Table 2.8.9- RAI - Changes associated with RAI 527 Advanced response1) Advanced to Question 1403.07-38

99 2 2.9.1 (Tables RAI - Changes associated with RAI 557 Advanced response2.9.1-1 & 2.9.1-3) Advanced to Question 14.03.07-39

100 2 2.9.2 (Tables RAI - Changes associated with RAI 557 Advanced response_2.9.2-1 & 2.9.2-2) Advanced to Question 14.03.07-39

101 2 2.9.3 (Tables RAI - Changes associated with RAI 557 Advanced response2.9.3-1 & 2.9.3-3) Advanced to Question 14.03.07-39

102 2 2.9.4 (Tables RAI - Changes associated with RAI 527 Advanced response2.9.4-1 thru 2.9.4- Advanced to Question 14.03.07-38

103 2 2.10.1 (Tables RAI Changes associated with RAI 530 Supplement 32,10.1-1, 2,10.1-2) response to Question 09.01.05-24

104 3 3.5 (Tables 3.5-1 RAI Changes associated with RAI 462 Supplement 8thru 3.5-3) resoonse to Question 06.02.03-8

105 3 3.5 (Table 3.5-3) RAI - Changes associated with RAI 563 Advanced responseAdvanced to Question 19-356

106 3 3.5 (Tables 3.5-3 RAI Changes associated with RAI 568 Supplement 1& 3.5-4; Figure 3.5 response to Question 06.02.04-13

107 3 3.5 (Table 3.5-4) RAI Changes associated with RAI 577 Supplement 1resoonse to Question 14.03.03-54

108 5 5.0 (Table 5.0-1 & RAI Changes associated with RAI 547 Supplement 6Note) resoonse to Question 03.07.02-78

109 5 5.0 (Table 5.0-1 & RAI Changes associated with RAI 320 Supplement 8Note) resoonse to Question 03,07,02-63

110 5 5.0 (Table 5.0-1) RAI - Changes associated with RAI 541 Advanced responseAdvanced to Question 02-3

Page 5 of 5

Page 9: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 2US-EPR FSAR Tier 2

S y of Changes for Rev. 5Item Chapter Subsection Type of Description of ChangeNo. Change

1 Intro I (Table I-1) RAI Changes associated with RAI 505 Supplement 29response to Question 07.01-35

2 Intro I (Table I-1) RAI Changes associated with RAI 585 Supplement 1response to Question 03.09.06-20

3 Intro I (Table I-1) RAI Changes associated with RAI 370 Supplement 24response to Question 03.07.02-64

4 Intro I (Table I-1) RAI Changes associated with RAI 525 Supplement 14resoonse to Question 09-01.04-22

5 Intro I (Table I-1) RAI - Changes associated with RAI 583 Advanced responseAdvanced to Question 03.08.03-25

6 1 1.1 (Table 1.1-1) RAI Changes associated with RAI 527 Supplement 2response to Question 14.03,0;2-61

7 1 1.1 (Table 1.1-1) RAI - Changes associated with RAI 578 Advanced responseAdvanced to Question 09.04.03-7

8 1 1.1 (Table 1.1-1) Editorial Chang.s associated with acronym editorial corrections

9 1 1.2 (Figure 1.2-37) RAI Changes associated with RAI 439 Supplement 11response to Question 14.03.07-36

10 1 1.2, 1.2.3.1.2 RAI - Changes associated with RAI 541 Advanced responseAdvanced to Question 02-3

11 1 1.2.3.1.2 RAI Changes associated with RAI 565 Supplement 1response to Question 19-358

12 1 1.6 (Table 1.6-1) RAI Changes associated with RAI 336 Supplement 2response to Question 18-84

13 1 1.6 (Table 1.6-1) RAI Changes associated with RAI 505 Supplement 30response to Question 07.01-35

14 1 1.6 (Table 1.6-1) RAI Changes associated with RAI 565 Supplement 1resoonse to Question 19-357

15 1 1.6 (Table 1.6-1) RAI Changes associated with RAI 565 Supplement 1resoonse to Question 19-358

16 1 1.6 (Table 1.6-1) RAI Changes associated with RAI 565 Supplement 1respon~se to Question 19-360

17 1 1.6 (Table 1.6-1) RAI - Changes associated with RAI 563 Advanced responseAdvanced to Question 19-356

18 1 1.6 (Table 1.6-1) Editorial Changes associated with submittal of Technical ReportANP-10306P Rev, 1

19 1 1.6 (Table1.6-1) RAI Changes associated with RAI 571 Supplement 1response to Question 04.02-18, Round 7 RAI

responses to ANP-10285P, and Technical Report ANP-

20 1 1.6 (Table 1.6-1) RAI Changes associated with RAI 403 Supplement 11response to Questions 15.06.05-61, 15.06.05-62 and1 x Nfi nR5-83

21 1 1.8 (Tables 1.8-1, RAI - Changes associated with RAI 541 Advanced response_1.8-2)Advanced to Question 02-3

22 1 1.8 (Table 1.8-2) RAI Changes associated with RAI 218 Supplement 3response to Question 03.04.01-8

23 1 1.8 (Table 1.8-2) RAI Changes associated with RAI 388 Supplement 3reseonse to Question 03.09.03-22

24 1 1.8 (Table 1.8-2) RAI Changes associated with RAI 109 Supplement 3response to Question 03.05.01.03-2

25 1 1.8 (Table 1.8-2) RAI Changes associated with RAI 273 Supplement 17response to Question 11.05-2

26 1 1.8 (Table 1.8-2) RAI Changes associated with RAI 564 Supplement 2_ __"_ response to Question 08.02-8

27 1" 1.8 (Table 1.8-2) RAI Changes associated with RAI 549 Supplement 2response to Question 13.03-8

28 1' 1.8 (Table 1.8-2) RAI Changes associated with RAI 547 Supplement 5response to Question 03.06.01-14

29 1 11.8 (Table 1.8-2) RAI Changes associated with RAI 291 Supplement 10f -_resoonse to Question 03.09.05-26

30 1 1.8 (Table 1.8-2) RAI - Changes associated with RAI 563 Advanced responseMO IAdvand to Question 19-356

Page 1 of 29

Page 10: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 2US-EPR FSAR Tier 2

Summary of Changes for Rev. 5Item Chapter Subsection Type of Description of ChangeNo. Change

31 1 1.8 (Table 1.8-2) RAI Changes associated with RAI 370 Supplement 24resoonse to Question 03.07.02-64

32 1 1.8 (Table 1.8-2) RAI - Changes associated with RAI 539 Advanced responseAdvanced to Question 12.03-12,04-29

33 1 1.8 (Table 1.8-2) RAI Changes associated with RAI 570 Supplement 4resoonse to Question 12.03-12,04-32

34 1 1.8 (Table 1.8-2) RAI - Changes associated with RAI 455 Advanced responseAdvanee• to Question 19-341

35 1 1.8 (Table 1.8-2) RAI - Changes associated with RAI 579 Advanced responseAdvanced to Question 19-366

36 1 1.9 (Table 1.9-2) RAI - Changes associated with RAI 541 Advanced response_______ ____________Ad!VaRicd...... to Question 02-3

37 1 1.9.6 Design Changes associated with US EPR Codes andChanae Standards

38 2 2.1 (Table 2.1-1 & RAI Changes associated with RAI 547 Supplement 6Nte_ resoonse to Question 03.07.02-78

39 2 2.1 (Table 2.1-1 & RAI Changes associated with RAI 320 Supplement 8No__ te) resoonse to Question 03.07.02-63

40 2 2.1 (Table 2.1-1) RAI - Changes associated with RAI 541 Advanced responseAdvanced to Question 02-3

41 2 2.3, 2.3.1 RAI - Changes associated with RAI 541 Advanced responseAdvanced to Question 02-3

42 2 2.5.2.6 RAI Changes associated with RAI 370 Supplement 23resoonse to Question 03.07.01-27

43 2 2.5.2.6 RAI Changes associated with RAI 547 Supplement 6r'esponse to Question 03.07.02-78

44 2 2.5.2.6 RAI Changes associated with RAI 320 Supplement 8response to Question 03.07.02-63

45 2 2.5.4.10.1 RAI Changes associated with RAI 547 Supplement 6resoonse to Question 03.07.02-78

46 2 2.5.4.10.1 RAI Changes associated with RAI 320 Supplement 8resoonse to Question 03.07.02-63

47 2 2.5.4.10.1 RAI Changes associated with RAI 370 Supplement 24resoonse to Question 03.07.02-64

48 3 3.1.1.1.1, RAI Changes associated with RAI 420 Supplement 123.!1.12.1 resoonse to Question 03.02.01-12

49 3 3.1.1.1.1, RAI - Changes associated with RAI 541 Advanced response3.1.1.2.1 Advanced to Question 02-3

50 3 3.1.3.7.1 RAI Changes associated with RAI 513 Supplement 14resoonse to Question 09.01.01-61

51 3 3.1.4.4.1 RAI Changes associated with RAI 513 Supplement 14resoonse to Question 09.01.01-61

52 3 3.2 (Table 3.2.2-1 RAI Changes associated with RAI 420 Supplement 12& Notes) resoonse to Question 03.02.02-7

53 3 3.2, 3.2.1 RAI Changes associated with RAI 420 Supplement 12resoonse to Question 03.02.01-12

54 3 3.2.1.4 RAI Changes associated with RAI 554 Supplement 2response to Question 11.02-27

55 3 3.2.2 (Table 3.2.2- RAI - Changes associated with RAI 578 Advanced response1 & Notes) Advanced to Question 09.04.03-7

56 3 3.2.2 (Table 3.2.2- RAI - Changes associated with RAI 528 Advanced responseI & Notes) Advanced to Question 11.05-28

57 3 3.2.2 (Table 3.2.2- RAI Changes associated with RAI 530 Supplement 31) response to Question 09.01.05-24

58 3 3.2.2 (Table 3.2.2- RAI Changes associated with RAI 567 Supplement 11)esponse to Question 03.02.02-15

59 3 3.2.2 (Table 3.2.2- RAI Changes associated with RAI 569 Supplement 11) response to Question 06.02,02-1 39

60 3 3.2.2 (Table 3.2.2- RAI Changes associated with RAI 505 Supplement 291) response to Question 07.01-35

61 3 3.2.2 (Table 3.2.2- RAI - Changes associated with RAI 563 Advanced response1) Advanced to Question 19-356

Page 2 of 29

Page 11: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 2US-EPR FSAR Tier 2

Summary f Changes for Rev. 5Item Chapter Subsection Type of Description of ChangeNo. Change

62 3 3.2.2 (Table 3.2.2- RAI Changes associated with RAI 462 Supplement 81_ response to Question 06.02.03-8

63 3 3.2.2 (Table 3.2.2- RAI Changes associated with RAI 554 Supplement 21_ resoonse to Question 11.02-27

64 3 3.2.2 (Table 3.2.2- RAI - Changes associated with RAI 576 Advanced response1_Adanced to Question 03.02.02-16

65 3 3.2.2 (Table 3.2.2- Corrective Changes associated with reclassification of Vent Stack1) Action

66 3 3.2.2 (Table 3.2.2- Design Changes associated with SSC Classification change to1_ Chanae LCQ and Condensate Polisher Shielding

67 3 3.2.2 (Table 3.2.2- Design Changes associated with Reinstatement of LCQ1) Change Transfer Valves & Piping and Normal Operating

Pn__itinn nf the MtlV in thp PRgqivp Flnndinn I inM

68 3 3.2.2 (Table 3.2.2- Design Changes associated with modifications to Self1) (jgq Powered Neutron Detectors (SPND) Amplifier Circuit

69 3 3.2.2 (Table 3.2.2- Design Changes associated with Classification Changes for1) Chanoe Structures, Systems and Comoonents

70 3 3.2.2 (Table 3.2.2- Design Changes associated with Component Cooling Water1) Chanoe System Safety Class Interface Inconsistencies

71 3 3.2.2 (Table 3.2.2- Design Changes associated with EDG Redesign of Ventilation1) Change for EDG Diesel Hall & ESW Cooling for Electrical

Control Room; and In Service Testing requirements fornl imng anrti ynh/p

72 3 3.2.2 (Table 3.2.2- Design Changes associated with reclassification of the Vent1)_Chanae Stack to Safety Related

73 3 3.3, 3.3.2, 3.3.2.1, RAI - Changes associated with RAI 541 Advanced responseS3.3.2.2. 3.3.2.3 Advne to Question 02-3

74 3 3.4.1 RAI Changes associated with RAI 218 Supplement 3response to Question 03.04.01-8

75 3 3.4.1 RAI Changes associated with RAI 547 Supplement 5resoonse to Question 03.06.01-14

76 3 3.4.3.3 RAI Changes associated with RAI 218 Supplement 3resoonse to Question 03.04.01-8

77 3 3.5 (Tables 3.5-1 RAI - Changes associated with RAI 541 Advanced response&, 3.5-2) Advanced to Question 02-3

78 3 3.5.1, 3.5.1.1.3, RAI - Changes associated with RAI 541 Advanced response3.5.1.4 Advanced to Question 02-3

79 3 3.5.1.2.3 RAI Changes associated with RAI 547 Supplement 5response to Question 03.06.01-14

80 3 3.5.1.3 RAI Changes associated with RAI 109 Supplement 3response to Question 03.05.01,03-2

81 3 3.5.2, 3.5.3.1.1.3 RAI - Changes associated with RAI 541 Advanced responseAdvanced to Question 02-3

82 3 3.6.1 (Table 3.6.1- Design Changes associated with Supporting Documentation- 2) Cn for FSAR Section 3.6 Tables

83 3 3.6.1 (Tables Design Changes associated with AGA Drawings for Safeguard1&36,1-2, 3.6.1-3' Change Buildina Elevator Machine Rooms

84 3 3.6.2.5.1 RAI Changes associated with RAI 547 Supplement 5resoonse to Question 03.06.01-14

85 3 3.6.3 RAI Changes associated with RAI 547 Supplement 5resoonse to Question 03.06.01-14

86 3 3.7.1 (Table 3.7.1- RAI Changes associated with RAI 370 Supplement 231. Note 4_ resoonse to Question 03.07.01-27

87 3 3.7.1 (Table 3.7.1- RAI Changes associated with RAI 320 Supplement 89 and Note; response to Question 03.07.02-63Figures 3.7.1-62Snrl 1 7 1 -R __ _

88 3 3.7.1.1.1 RAI - Changes associated with RAI 376 Advanced response_____ _n__ d to Question 03.08.05-31

89 3 3.7.1.1.1, RAI Changes associated with RAI 320 Supplement 83.7.1.1.2 resoonse to Question 03.07.02-63

90 3 3.7.1.1.2 RAI - Changes associated with RAI 155 Advanced responseAdvanced to Question 03.08.01-13

Page 3 of 29

Page 12: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 2US-EPR FSAR Tier 2

Summar of Changes for Rev. 5Item Chapter Subsection Type of Description of Change

No. Change

91 3 3.7.1.2 RAI Changes associated with RAI 370 Supplement 23response to Question 03.07,01-27

92 3 3.7.1.2 RAI Changes associated with RAI 320 Supplement 8resoonse to Question 03.07.02-63

93 3 3.7.1.3, 3.7.1.4 RAI Changes associated with RAI 320 Supplement 8resoonse to Question 03.07.02-63

94 3 3.7.2 (Table 3.7.2- RAI Changes associated with RAI 547 Supplement 31, Figures 3.7.2- response to Question 03.07.02-7614 thru 3.7.2-46and 3.7.2-50 thru3.7.2-55)

95 3 3.7.2 (Tables RAI Changes associated with RAI 320 Supplement 8

3.7.2-1, 3.7.2-3, response to Question 03.07.02-633.7.2-8 & Note,3.7.2-9, 3.7.2-10,3.7.2-29, 3.7.2-32;Figures 3.7.2-14thru 3.7.2-46 and3.7.2-50 thru 3.7.2-55, 3.7.2-59, 3.7.2-60, 3.7.2-67 thru3.7.2-70, 3.7.2-74thru 3.7.2-100,3.7.2-104 thru3.7.2-124, 3.7.2-126, 3.7.2-128thru 3.7.2-130,3.7.2-132, 3.7.2-137, 3.7.2-147,3.7.2-153 thru3.7.2-160)

96 3 3.7.2 (Tables RAI - Changes associated with RAI 376 Advanced response3.7.2-9, 3.7.2-28; Advanced to Question 03.08.05-31Figures 3.7.2-71thru 3.7.2-73,3.7.2-101 thru3.7.2-103, 3.7.2-148 thru 3.7.2-150)

97 3 3.7.2 (Table 3.7.2- RAI Changes associated with RAI 370 Supplement 2310) response to Question 03.07.01-27

98 3 3.7.2 (Figures RAI Changes associated with RAI 547 Supplement 63.7.2-151 and response to Question 03.07.02-783.7.2-152),3.7.2.3.1.4

99 3 3.7.2.1.1, RAI Changes associated with RAI 320 Supplement 83.7.2.1.3, response to Question 03.07.02-633.7.2.1.4

Page 4 of 29

Page 13: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 2US-EPR FSAR Tier 2

Summary f Changes for Rev. 5Item Chapter Subsection Type of Description of ChangeNo. Change

100 3 3.7.2.2, 3.7.2.3.1, RAI Changes associated with RAI 320 Supplement 83.7.2.3.1.1, response to Question 03.07.02-633.7.2.3.1.2,3.7.2.3.1.3,3.7.2.3.1.4,3.7.2.3.2, 3.7.2.4,3.7.2.4.1,3.7.2.4.2,3.7.2.4.3,3.7.2.4.4,3.7.2.4.5,3.7.2.4.6, 3.7.2.5,3.7.2.16

101 3 3.7.2.3.1 RAI Changes associated with RAI 527 Supplement 2response to Question 14.03.02-61

102 3 3.7.2.3.1.2 RAI Changes associated with RAI 547 Supplement 3response to Question 03.07.02-76

103 3 3.7.2.3.1.4 RAI - Changes associated with RAI 376 Advanced responseAdvanced to Question 03.08.05-31

104 3 3.7.2.4.2, RAI Changes associated with RAI 370 Supplement 233.7.2.4.6 response to Question 03.07.01-27

105 3 3.7.2.5 RAI - Changes associated with RAI 376 Advanced responseAdvanced to Question 03.08.05-31

106 3 3.7.2.8 RAI - Changes associated with RAI 563 Advanced responseAdvanced to Question 19-356

107 3 3.7.2.8 (Table RAI Changes associated with RAI 370 Supplement 243.7.2-30) resoonse to Question 03.07.02-64

108 3 3.8 RAI Changes associated with RAI 527 Supplement 2response to Question 14.03,02-61

109 3 3.8 (Table 3.8-13; RAI Changes associated with RAI 547 Supplement 6Figures 3.8-103, response to Question 03.07.02-783.8-105, 3.8-107thru 3.8-115)

110 3 3.8 (Figure 3.8-53) RAI - Changes associated with RAI 563 Advanced responseAdvanced to Question 19-356

111 3 3.8 (Figures 3.8- Corrective Changes associated with revisions to Safeguard56, 3.8-57, 3.8-63, Action Building General Arrangement Drawings3.8-78, 3.8-79 &3.8-85)

112 3 3.8 (Figure 3.8- RAI Changes associated with RAI 345 Supplement 15101) response to Question 09.02.01-41

113 3 3.8 (Figure 3.8- RAI - Changes associated with RAI 376 Advanced responseil)111' A n to Question 03.08.05-31

114 3 3.8 (Figures 3.8- RAI - Changes associated with RAI 354 Advanced response124 thru 3.8-136) Advanced to Question 03.08.05-22

115 3 3.8.1.1, 3.8.1.2.1, RAI - Changes associated with RAI 583 Advanced response3.8.1.2.2, Advanced to Question 03.08.03-2538123 3816

116 3 3.8.1.1, 3.8.1.3.1 RAI - Changes associated with RAI 541 Advanced responseAdvanced to Question 02-3

117 3 3.8.1.7.1 RAI Changes associated with RAI 527 Supplement 2resoonse to Question 14.03.02-59

118 3 3.8.1.7.1, RAI - Changes associated with RAI 583 Advanced response3.8.1.7.2 Advanced to Question 03.08.03-25

119 3 3.8.2.1.1 RAI - Changes associated with RAI 541 Advanced responseAdvanced to Question 02-3

120 3 3.8.2.2.1, RAI - Changes associated with RAI 583 Advanced response3.8.2.2.2, Advanced to Question 03.08.03-25,38223 1___1

Page 5 of 29

Page 14: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 2US-EPR FSAR Tier 2

____ __ of Changes for Rev. 5Item Chapter Subsection Type of Description of Change

No. Change

121 3 3.8.2.3.1 RAI - Changes associated with RAI 541 Advanced responseAdvanced to Question 02-3

122 3 3.8.3.1.1 RAI Changes associated with RAI 513 Supplement 12response to Question 09.01.04-20

123 3 3.8.3.1.13 RAI Changes associated with RAI 570 Supplement 3resoonse to Question 12.03-12,04-32

124 3 3.8.3.2.1, RAI - Changes associated with RAI 583 Advanced response3.8.3.28 3 2y3 d to Question 03.08.03-25

125 3 3.8.3.3.1 RAI - Changes associated with RAI 541 Advanced responseAd•anced to Question 02-3

126 3 3.8.3.4.4 RAI - Changes associated with RAI 412 Advanced responseAdtvanced. o Question 03.07,02-74

127 3 3.8.4.1.2, RAI - Changes associated with RAI 541 Advanced response3.8.4.1.3, Advanced to Question 02-33.8.4.1.5,3.8.4.1.8,3.8.4.3.1,3.8.4.4.1,3.8.4.4.3,3.8.4.4.4

128 3 3.8.4.2.1, RAI - Changes associated with RAI 583 Advanced response3.8.4.2.3 Advanced to Question 03.08.03-25

129 3 3.8.4.4.1 RAI - Changes associated with RAI 412 Advanced responseAdvanced to Question 03.07.02-74

130 3 3.8.5.1.1, 3.8.5.2, RAI - Changes associated with RAI 583 Advanced response3.8.5.3 3.85.4.1 Advanced to Question 03.08.03-25

131 3 3.8.5.3, 3.8.5.4.1, RAI - Changes associated with RAI 541 Advanced response3.8.54.2 Advanced to Question 02-3

132 3 3.8.5.4.2 RAI Changes associated with RAI 547 Supplement 6rPesoonse to Question 03.07.02-78

133 3 3.8.6 Design Changes associated with US EPR Codes andChanoe Standards

134 3 3.8.6 RAI - Changes associated with RAI 583 Advanced responseAdvanced to Question 03.08-03-25

135 3 3.9.1.1.3 Editorial Changes associated with acronym editorial corrections

136 3 3.9.2.7 Editorial Changes associated with submittal of Technical ReportANP-10306P Rev, 1

137 3 3.9.3 (Tables RAI - Changes associated with RAI 541 Advanced response3.9.3-2 & Note, Advanced to Question 02-33.9.3-4 & Note),I q 11 1

138 3 3.9.3, 3.9.3.1, RAI Changes associated with RAI 547 Supplement 53.9.3.1.1 resoonse to Question 03.06.01-14

139 3 3.9.3.1.1 RAI Changes associated with RAI 388 Supplement 3r'_esponse to Question 03.09.03-22

140 3 3.9.3.3 RAI Changes associated with RAI 585 Supplement 1res•,onse to Question 03.09.06-20

141 3 3.9.4 RAI Changes associated with RAI 513 Supplement 14resoonse to Question 09.01.01-61

142 3 3.9.5.2 RAI Changes associated with RAI 291 Supplement 10resoonse to Question 03.09.05-26

143 3 3.9.6 (Tables Design Changes associated with In Service Testing3,9 6-1 & 3.9.6.2) Chanae reauirements for pumps and valves

144 3 3.9.6 (Table RAI Changes associated with RAI 497 Supplement 73.9.6.2) rlesonse to Question 03.09.06-19

145 3 3.9.6 (Table RAI Changes associated with RAI 462 Supplement 83_.9.6.2) resoonse to Question 06.02.03-8

146 3 3.9.6 (Table 3.9.6- RAI - Changes associated with RAI 563 Advanced response2) tvanced o Question 19-356

147 3 3.9.6 (Table 3.9.6- Editorial Changes associated with correction to ASME OM2) Code Cateaorv for Valve ID No. 30PEB22AA196

Page 6 of 29

Page 15: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 2U,S-EPR FSAR Tier 2

Summary of Changes for Rev. 5Item Chapter Subsection Type of Description of ChangeNo. Change

148 3 3.9.6 (Table 3.9.6- Design Changes associated with Reinstatement of LCQ2) Change Transfer Valves & Piping and Normal Operating

Psitinn nf thp Mi'V in thp Pngivp Flnndtinn I iner149 3 3.9.6 (Table 3.9.6- Design Changes associated with operation of Essential

2C) ~ana. Service Water System valves as MOVs150 3 3.9.6.1 RAI Changes associated with RAI 585 Supplement 1

resoonse to Question 03.09.06-20151 3 3.10 (Table 3.10- RAI Changes associated with RAI 406 Supplement 15

1) resoonse to Question 09.02,02-114152 3 3.10 (Table 3.10- RAI Changes associated with RAI 505 Supplement 29

1) response to Question 07.01-35

153 3 3.10 (Table 3.10- RAI Changes associated with RAI 462 Supplement 81) response to Question 06.02.03-8

154 3 3.10 (Table 3.10- Editorial Changes associated with format of entries for EQ1) Desianated Function and Safety Class (NABVS)

155 3 3.10 (Table 3.10- RAI Changes associated with RAI 218 Supplement 31 } resoonse to Question 03.04.01-8

156 3 3.10 (Table 3.10- RAI Changes associated with RAI 511 Supplement 81) resoonse to Question 06.04-9

157 3 3.10 (Table 3.10- Design Changes associated with Reinstatement of LCQ1) Change Transfer Valves & Piping and Normal Operating

Pnqitinn nf the MOV in the P..ive Flnnrinn I ineq158 3 3.10 (Table 3.10- Design Changes associated with Electrical Changes to U.S.

1) Chanoe EPR FSAR Table 3.2.2-1159 3 3.10 (Table 3.10- Design Changes associated with EDG Redesign of Ventilation

1) Change for EDG Diesel Hall & ESW Cooling for ElectricalControl Room; and In Service Testing requirements for

_____________.ijmnq andI vat

160 3 3.10 (Table 3.10- Design Changes associated with AGA Drawings for Safeguard1) Chanae Buildino Elevator Machine Rooms

161 3 3.10 (Tables 3.10- Corrective Changes associated with Equipment Qualification /1 & 3.10-2) Action safetv desionation of Fuel Pool Cooling Comoonents

162 3 3.10 (Tables 3.10- RAI - Changes associated with RAI 563 Advanced response1, 3.10-2) Advanced to Question 19-356

163 3 3.10 (Tables 3.10- RAI - Changes associated with RAI 578 Advanced response1.3,10-21 Advanced. . to Question 09.04.03-7

164 3 3.10 (Table 3.10- RAI - Changes associated with RAI 576 Advanced response2) to Question 03.02.02-16

165 3 3.10.1.1, 3.10.2 RAI Changes associated with RAI 585 Supplement 1resoonse to Question 03.09.06-20

166 3 3.10.4 RAI Changes associated with RAI 547 Supplement 5resoonse to Question 03.06.01-14

167 3 3.11 RAI Changes associated with RAI 547 Supplement 5resoonse to Question 03.06.01-14

168 3 3.11 (Table 3.11- RAI Changes associated with RAI 218 Supplement 31) resoonse to Question 03.04,01-8

169 3 3.11 (Table 3.11- RAI Changes associated with RAI 406 Supplement 151_ resoonse to Question 09.02.02-114

170 3 3.11 (Table 3.11- RAI - Changes associated with RAI 578 Advanced response1) Advanced to Question 09.04.03-7

171 3 3.11 (Table 3.11- RAI - Changes associated with RAI 528 Advanced response1 ) Advanced to Question 11.05-28

172 3 3.11 (Table 3.11- Corrective Changes associated with reclassification of Vent Stack1)

173 3 3.11 (Table 3.11- Design Changes associated with AGA Drawings for Safeguard1_ Chanoe Building Elevator Machine Rooms

174 3 3.11 (Table 3.11- Design Changes associated with Reinstatement of LCQ1) Change Transfer Valves & Piping and Normal Operating

SPnsffitinn of the MC)V in the Passive Flnndinn ine*q175 3 3.11 (Table 3.11- Design Changes associated with modifications to Self

!1 Chanae Powered Neutron Detectors (SPND) Amplifier Circuit

Page 7 of 29

Page 16: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 2US-EPR FSAR Tier 2

Summary f Changes for Rev. 5Item Chapter Subsection Type of Description of Change

No. Change

176 3 3.11 (Table 3.11- Design Changes associated with Environmental Qualification1) Change Program Designation for Fuel Pool Cooling andI Pi rifilrtinn qvqtpm II C) I nlntinn V IvP,

177 3 3.11 (Table 3.11- Design Changes associated with operation of Essential1) Shan ervice Water System valves as MOVs

178 3 3.11 (Table 3.11- Design Changes associated with EDG Redesign of Ventilation1) Change for EDG Diesel Hall & ESW Cooling for Electrical

Control Room; and In Service Testing requirements forn1 Imnr, nnrid vnving

179 3 3.11 (Table 3.11- Design Changes associated with reclassification of the Vent1 ' Chan~oe Stack to Safety Related

180 3 3.11 (Tables 3.11- RAI Changes associated with RAI 525 Supplement 91& 3. 11 1-91 response to Question 09.01.04-38

181 3 3.11 (Tables 3.11- RAI Changes associated with RAI 505 Supplement 291 & 3.11-2) response to Question 07.01-35

182 3 3.11 (Tables 3.11- RAI Changes associated with RAI 462 Supplement 81 & 3,11-2) response to Question 06.02.03-8

183 3 3.11 (Tables 3.11- RAI - Changes associated with RAI 576 Advanced response1 & 3,11-2) Advanced to Question 03.02.02-16

184 3 3.11 (Tables 3.11- Corrective Changes associated with Equipment Qualification /_ _ 1 & 3.11-2) Action safetv desianation of Fuel Pool Cooling Comoonents

185 3 3.11 (Tables 3.11- RAI - Changes associated with RAI 563 Advanced response1, 3.11-2) Advanced to Question 19-356

186 3 3.11.2.2 RAI Changes associated with RAI 585 Supplement 1response to Question 03.09.06-20

187 3 3.11.7 RAI Changes associated with RAI 585 Supplement 1response to Question 03.09.06-20

188 3 3.12.5.9, RAI Changes associated with RAI 547 Supplement 53.12.5.10.1, response to Question 03.06.01-14, 19 s in _i

189 3 3.12.5.10.4 RAI Changes associated with RAI 388 Supplement 3response to Question 03.09.03-22

190 3 3B (Figure 31-1) RAI Changes associated with RAI 439 Supplement 11response to Question 14.03.07-36

191 3 3B (Figure 3B-1) RAI Changes associated with RAI 370 Supplement 24resoonse to Question 03,07.02-64

192 3 3B (Figure 3B-30) RAI - Changes associated with RAI 563 Advanced responseSAdvan~ced o Question 19-356

193 3 3B (Figures 3B- Corrective Changes associated with revisions to Safeguard33, 3B-34, 3B-40, Action Building Dimensional Arrangement Drawings38-55, 3B-56 &31-62)

194 3 3C (Figure 3C-9), RAI Changes associated with RAI 371 Supplement 293C.4.2.2.1 response to Question 03.07.01-29

195 3 3D (Table 3D-1) RAI Changes associated with RAI 218 Supplement 3resoonse to Question 03.04.01-8

196 3 3D (Table 3D-8) RAI Changes associated with RAI 17 Supplement 2response to Question 15.00.03-1

197 3 3D (Tables 3D-4 RAI - Changes associated with RAI 578 Advanced responsethru 3D-7) Advanced to Question 09304,03-7

198 3 3E (Table 3E.1- Design Changes associated with AGA Drawings for Safeguard38)n Buildino Elevator Machine Rooms

199 3 3E, 3E.1, 3E.1.1 RAI Changes associated with removal of obsolete materialthru 3E.1.9 in advance of the RAI 155 response to Question 03.8.4(Tables 3E.1-3 6, Critical Sectionsthru 3E.1-37, 3E.1-40 & 3E.1--41;Figures 3E.1-1thru 3E.1-76)

Page 8 of 29

Page 17: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 2US-EPR FSAR Tier 2

Sum ar _lOf Changes for Rev. 5Item Chapter Subsection Type of Description of ChangeNo. Change

200 3 3E.1 RAI Changes associated with RAI 547 Supplement 6resoonse to Question 03.07-02-78

201 3 3E.1 (Table 3E.1- RAI Changes associated with RAI 547 Supplement 640) response to Question 03.07.02-78

202 3 3E.2, 3E.2.1 thru RAI Changes associated with removal of obsolete material3E.2.3 (Tables in advance of the RAI 155 response to Question 03.8.43E.2-1 thru 3E.2-6 6, Critical Sections& 3E.2-9; Figures3E.2-1 thru 3E.2-12)

203 3 3E.3, 3E.3.1 thru RAI Changes associated with removal of obsolete material3E.3.3 (Tables in advance of the RAI 155 response to Question 03.8.43E.3-1 thru 3E.3- 6, Critical Sections10; Figures 3E.3-2thru 3E.3-10)

204 4 4.1 (Table 4.1-2), RAI Changes associated with RAI 571 Supplement 14.1.2 response to Question 04.02-18, Round 7 RAI

responses to ANP-1 0285P, and Technical Report ANPS1n325P

205 4 4.2, 4.2.1.4, RAI Changes associated with RAI 571 Supplement 14.2.1.4.1, response to Question 04.02-18, Round 7 RAI4.2.1.5.3, responses to ANP-10285P, and Technical Report ANP4.2.1.5.10, 10325PA 'D 1 r 1)

206 4 4.2.2.2. 4.2.3.4, RAI Changes associated with RAI 571 Supplement 14.2.3.5, 4.2.3.5.1, response to Question 04.02-18, Round 7 RAI4.2.3.5.2, responses to ANP-10285P, and Technical Report ANP4.2.3.5.5, 10325P4.2.3.5.6,4.2.3.5.7

207 4 4.2.4.2, 4.2.4.2.2, RAI Changes associated with RAI 571 Supplement 14.2.4.2.5, response to Question 04.02-18, Round 7 RAI4.2.4.3.2, 4.2.5, responses to ANP-10285P, and Technical Report ANPA 3_ 5_ _ 1__ _ 1359p

208 4 4.4.2.6.3, RAI Changes associated with RAI 571 Supplement 14.4.2.7.2, 4.4.7 response to Question 04.02-18, Round 7 RAI

responses to ANP-10285P, and Technical Report ANP1 _v3 r, P

209 4 4.6.1 RAI - Changes associated with RAI 541 Advanced responseAdvanced to Question 02-3

210 4 4.6.6 RAI Changes associated with RAI 505 Supplement 30resoonse to Question 07.01-35

211 5 5.1 (Figure 5.1-4) RAI - Changes associated with RAI 563 Advanced responseAdvanced to Question 19-356

212 5 5.2 (Table 5.2-1 & RAI Changes associated with RAI 560 response toNote 4) Question 05.02.01.01-7

213 5 5.2 (Table 5.2-3) RAI Changes associated with RAI 556 Supplement 1response to Question 09.03.04-27

214 5 5.2.2.9 Corrective Changes associated with Pressurizer Safety ReliefAction Valve desian per BTP 5-2. Section B.3

215 5 5.2.3.2.1 RAI Changes associated with RAI 513 Supplement 14response to Question 09,01,01-61

216 5 5.2.5.5.3 RAI - Changes associated with RAI 528 Advanced responseAdvanced~ to Question 11.05-28

217 5 5.3 (Table 5.3-4) Corrective Changes associated with correction to Table 5.3-4Actionj headinos for Fluence Columns

218 5 5.4.1.1, 5.4.1.2.1 RAI - Changes associated with RAI 563 Advanced responseAdvanced to Question 19-356

219 5 5.4.7.2.1 RAI - Changes associated with RAI 579 Advanced responseAdvanced to Question 19-366

Page 9 of 29

Page 18: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 2US-EPR FSAR Tier 2

_____v _ f Changes for Rev. 5Item Chapter Subsection Type of Description of Change

No. Change

220 5 5.4.13.2 Editorial Changes associated with correction of reference toTable 5.4-8

221 6 6.1.1.4 Corrective Changes associated with correction of error in FSARAction Rev. 4 processing of RAI 546 Supplement 1 response

M 0 Opqtinn 06 02 02-131I222 6 6.2.1 (Table 6.2.1- RAI Changes associated with RAI 389 Supplement 14

1_3) response to Question 06.02.02-49223 6 6.2.1 (Table 6.2.1- RAI Changes associated with RAI 575 Supplement 1

4 & Notes) resoonse to Question 06.02.01-105224 6 6.2.1.1.1 RAI - Changes associated with RAI 541 Advanced response

Advanced to Question 02-3225 6 6.2.1.1.2 RAI Changes associated with RAI 575 Supplement 1

resoonse to Question 06.02.01-105

226 6 6.2.3 (Tables RAI - Changes associated with RAI 578 Advanced response6.2.3-1 thru 6.2.3- Advanced to Question 09.04.03-73; Figures 6.2.3-1,

227 6 6.2.3 (Table 6.2.3- RAI Changes associated with RAI 233 Supplement 72 & Notes) resoonse to Question 06.05.03-1

228 6 6.2.3.1 RAI Changes associated with RAI 462 Supplement 8resoonse to Question 06.02.03-8

229 6 6.2.3.1 RAI - Changes associated with RAI 578 Advanced responsen d to Question 09 .04 .03-7

230 6 6.2.3.2.1 RAI Changes associated with RAI 233 Supplement 7resoonse to Question 06.05.03-1

231 6 6.2.3.2.2.1, RAI - Changes associated with RAI 578 Advanced response6.2.3.2.2.2 to Question 09.04.03-7

232 6 6.2.3.2.2.1, RAI Changes associated with RAI 505 Supplement 296.2.3.2.2.2, response to Question 07.01-35

233 6 6.2.3.2.3 RAI Changes associated with RAI 462 Supplement 8resoonse to Question 06.02.03-8

234 6 6.2.3.2.3, 6.2.3.3 RAI - Changes associated with RAI 578 Advanced responsethru 6.23.5 A to Question 09.04.03-7

235 6 6.2.3.3 RAI Changes associated with RAI 233 Supplement 7response to Question 06.05.03-1

236 6 6.2.4 (Table 6.2.4- RAI Changes associated with RAI 414 Supplement 171 & Notes) response to Question 07.03-30

237 6 6.2.4 (Table 6.2.4- RAI Changes associated with RAI 406 Supplement 151) response to Question 09.02.02-114

238 6 6.2.4 (Table 6.2.4- RAI Changes associated with RAI 505 Supplement 291) res•onse to Question 07.01-35

239 6 6.2.4 (Table 6.2.4- RAI - Changes associated with RAI 563 Advanced response1) Advanced to Question 19-356

240 6 6.2.4 (Table 6.2.4- RAI Changes associated with RAI 462 Supplement 81) response to Question 06.02.03-8

241 6 6.2.4.2.2 RAI - Changes associated with RAI 529 Advanced responseAdvanced to Question 12.03-12.04-28

242 6 6.2.4.2.2 RAI - Changes associated with RAI 528 Advanced responseAdvanced_ to Question 11.05-28

243 6 6.2.4.2.5 RAI Changes associated with RAI 414 Supplement 17resoonse to Question 07.03-30

244 6 6.2.5 (Figures RAI - Changes associated with RAI 566 Advanced response6.2.5-2 thru 6.2.5- Advanced to Question 06.02.05-32

245 6 6.2.5 (Figures RAI Changes associated with RAI 553 Supplement 46.2.5-10 thru 6.2.5- response to Question 06.02.05-31.141

246 6 6.2.5 (Figure 6.2.5- RAI Changes associated with RAI 473 Supplement 615) response to Question 06.02.05-24

247 6 6.2.5.2.1 RAI Changes associated with RAI 553 Supplement 4r_ eonse to Question 06.02.05-31

Page 10 of 29

Page 19: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 2US-EPR FSAR Tier 2

Summary of Changes for Rev. 5

Item Chapter Subsection Type of Description of ChangeNo. Change

248 6 6.2.5.2.1 RAI Changes associated with RAI 574 Supplement 1response to Question 06.02.05-33

249 6 6.2.5.3, 6.2.5.3.2, RAI Changes associated with RAI 553 Supplement 4,6-2-5,•,3 response to Question 06.02.05-31

250 6 6.2.5.3.1 RAI - Changes associated with RAI 566 Advanced responseAdvanced to Question 06.02.05-32

251 6 6.2.5.3.2 RAI Changes associated with RAI 473 Supplement 6response to Question 06.02.05-24

252 6 6.2.6 (Figure 6.2.6- RAI Changes associated with RAI 462 Supplement 81) resoonse to Question 06.02.03-8

253 6 6.2.6.5 RAI Changes associated with RAI 462 Supplement 8resoonse to Question 06.02.03-8

254 6 6.2.6.6 RAI Changes associated with RAI 462 Supplement 8response to Question 06.02.03-8

255 6 6.2.8 RAI Changes associated with RAI 553 Supplement 4response to Question 06.02.05-31

256 6 6.3 RAI Changes associated with RAI 511 Supplement 5response to Question 06.02.02-125

257 6 6.3 RAI Changes associated with RAI 511 Supplement 5response to Question 06.02.02-126

258 6 6.3 (Table 6.3-6; RAI - Changes associated with RAI 563 Advanced responseFigure 6.3-2 Sht 1 Advanced to Question 19-356of 29

259 6 6.3 (Tables 6.3-2, RAI Changes associated with RAI 553 Supplement 36.3-3; Figures 6.3- response to Question 06.03-188 thru 6.3-11)

260 6 6.3.2.2.1, RAI - Changes associated with RAI 563 Advanced response6,3,2,2-2 Advanced. to Question 19-356

261 6 6.3.2.2.2 RAI Changes associated with RAI 511 Supplement 5response to Question 06.02.02-125

262 6 6.3.3.3 RAI Changes associated with RAI 553 Supplement 3response to Question 06.03-18

263 6 6.3.6 RAI - Changes associated with RAI 563 Advanced responseAdvanced to Question 19-356

264 6 6.3.6 RAI Changes associated with RAI 553 Supplement 3response to Question 06.03-18

265 6 6.3.6 Design Changes associated with US EPR Codes andChanae Standards

266 6 6.4.2.2, 6.4.2.3, RAI - Changes associated with RAI 578 Advanced response6.4.5. 6.4.7 Advanced to Question 09.04.03-7

267 6 6.5.1 (Table 6.5-1) RAI - Changes associated with RAI 578 Advanced responseAd•a•rced to Question 09.04.03-7

268 6 6.5.1.1, 6.5.1.2.1, RAI - Changes associated with RAI 578 Advanced response6.5.1.2.2, 6.5.1.3, Advanced to Question 09.04.03-76.5.1.4, 6.5.3.2,

269 6 6.5.4 RAI Changes associated with RAI 462 Supplement 8response to Question 06.02.03-8

270 6 6.8 (Figure 6.8-1) RAI - Changes associated with RAI 563 Advanced responseAdvanced ito Question 19-356

271 7 7.1 (Table 7.1-5 & RAI Changes associated with RAI 505 Supplement 29Notes; Figure 7.1- response to Question 07.01-351 Sht 11 of 16;Figure 7.1-29)

272 7 7.1 (Tables 7.1-5, RAI Changes associated with RAI 505 Supplement 307.1-7; Figure 7.1- response to Question 07.01-35

273 7 7.1 (Figures 7.1-6 RAI Changes associated with RAI 505 Supplement 29and 7.1-131 FSAR markups for response to Question 07.01-44

274 7 7.1 (Figures 7.1-6, RAI Changes associated with RAI 505 Supplement 271 7.1-13) 1 response to Question 07.01-44

Page 11 of 29

Page 20: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 2US-EPR FSAR Tier 2

Summary f Changes for Rev. 5Item Chapter Subsection Type of Description of ChangeNo. Change

275 7 7.1 (Figure 7.1-29) RAI Changes associated with RAI 505 Supplement 27response to Question 07.01-36

276 7 7.1, 7.1.1.4.3, RAI Changes associated with RAI 555 Supplement 47.1.1.6.5, response to Question 07.01-547.1.3.6.13 (Tables7.1-4 & 7.1-9;Figures 7.1-1, 7.1-2, 7.1-6, 7.1-8, 7.1-21 Shts I and 2 of2)

277 7 7.1, 7.1.1.6.5 RAI Changes associated with RAI 555 Supplement 4_ (Figure 7.1-30) resoonse to Question 07.01-55

278 7 7.1.1.2 RAI Changes associated with RAI 505 Supplement 30response to Question 07.01-35

279 7 7.1.1.3.1 RAI - Changes associated with RAI 563 Advanced responseAdvanced to Question 19-356

280 7 7.1.1.3.2 RAI Changes associated with RAI 505 Supplement 29response to Question 07.01-35

281 7 7.1.1.3.2 RAI Changes associated with RAI 555 Supplement 6resoonse to Question 07.01-53

282 7 7.1.1.4.2 RAI Changes associated with RAI 505 Supplement 27response to Question 07.01-36

283 7 7.1.1.4.2 RAI Changes associated with RAI 505 Supplement 29response to Question 07.01-35

284 7 7.1.1.4.6 RAI Changes associated with RAI 555 Supplement 6resoonse to Question 07.01-53

285 7 7.1.1.6.4 RAI Changes associated with RAI 505 Supplement 29response to Question 07.01-35

286 7 7.1.1.6.6, RAI Changes associated with RAI 555 Supplement 67.1.1.6.7 resoonse to Question 07.01-53

287 7 7.1.2 (Table 7.1-2; RAI Changes associated with RAI 555 Supplement 6Figures 7.1-11, response to Question 07.01-537,1-12)

288 7 7.1.3.2.13 RAI Changes associated with RAI 555 Supplement 6resnonse to Question 07.01-53

289 7 7.1.3.4.6, RAI Changes associated with RAI 555 Supplement 67.1.3.4.7, response to Question 07.01-53717.1.34 A

290 7 7.1.3.6.7 RAI - Changes associated with RAI 541 Advanced responseAdvanced t o Question 02-3

291 7 7.1.4 RAI - Changes associated with RAI 563 Advanced responseAdvanced to Question 19-356

292 7 7.1.4 RAI Changes associated with RAI 505 Supplement 30resoonse to Question 07.01-35

293 7 7.2.1.3.5 RAI Changes associated with RAI 555 Supplement 4response to Question 07.01-54

294 7 7.2.3 RAI Changes associated with RAI 505 Supplement 30resoonse to Question 07.01-35

295 7 7.3 (Figure 7.3-20) RAI Changes associated with RAI 414 Supplement 17'esponse to Question 07.03-30

296 7 7.3 (Figure 7.3-21) Corrective Changes associated with signal reception for ValveAction Numbers 30KBA34 AA012 and 30KBA35 AAOO1

'rnnnigfpnryv nhnnpl

297 7 7.3 (Figure 7.3-23) Corrective Changes associated with Figure 7.3-23/Chapter 8,Action Section 8.3.1.1.3 Inconsistencies

298 7 7.3 (Figures 7.3- RAI Changes associated with RAI 505 Supplement 3033 Shts 1 & 2 of 2, response to Question 07.01-35_ 7 3-151

Page 12 of 29

Page 21: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 2US-EPR FSAR Tier 2

Summary f Changes for Rev. 5Item Chapter Subsection Type of Description of ChangeNo. Change

299 7 7.3 (Figures 7.3- RAI Changes associated with RAI 505 Supplement 2933, 7.3-35, 7.3-36, response to Question 07.01-357.3-38, 7.3-39, 7.342, 7.3-45 thru 7.347, 7.3-49, 7.3-53,7.3-60, 7.3-65 thru7.3-69)

300 7 7.3, 7.3.1.1, RAI Changes associated with RAI 505 Supplement 297.3.1.2.11, response to Question 07.01-35731212

301 7 7.3.1 RAI Changes associated with RAI 505 Supplement 27response to Question 07.01-44

302 7 7.3.1.1, 7.3.1.2.2, RAI Changes associated with RAI 555 Supplement 47.3.1.2.8, response to Question 07.01-547.3.1.2.10,7.3.1.2.12,7.3.1.2.15,7.3.1.2.17,7.3.1.4.1,7.3.1.4.6

303 7 7.3.1.2.9 RAI Changes associated with RAI 414 Supplement 17res•onse to Question 07.03-30

304 7 7.3.1.2.12 Corrective Changes associated with correction of the EmergencyAction 1Diesel Generator actuation loading seauence

305 7 7.3.1.2.12 Corrective Changes associated with Figure 7.3-23/Chapter 8,Action Section 8.3.1.1.3 Inconsistencies

306 7 7.3.1.2.14 RAI - Changes associated with RAI 528 Advanced responseAdvanced_ to Question 11.05-28

307 7 7.3.1.3.1, RAI Changes associated with RAI 505 Supplement 297.3.1.3.3, response to Question 07.01-357.3.1.3.5,7.3.1.4.1,7.3.1.4.2,7.3.1.4.3,7.3.1.4.4,7.3.1.4.6

308 7 7.3.1.3.3 RAI Changes associated with RAI 511 Supplement 7response to Question 06.04-10

309 7 7.3.2.1.3 RAI Changes associated with RAI 505 Supplement 27resoonse to Question 07.01-44

310 7 7.3.2.3.3 RAI Changes associated with RAI 505 Supplement 29resoonse to Question 07.01-35

311 7 7.3.2.3.3 RAI Changes associated with RAI 505 Supplement 30resoonse to Question 07.01-35

312 7 7.3.3 RAI Changes associated with RAI 505 Supplement 30resoonse to Question 07.01-35

313 7 7.4.1.3.4 RAI Changes associated with RAI 555 Supplement 6resoonse to Question 07.01-53

314 7 7.5 (Table 7.5-1) RAI - Changes associated with RAI 528 Advanced responseAdvanced to Question 11.05-28

315 7 7.6 (Figures 7.6-1 RAI Changes associated with RAI 505 Supplement 29thru 7.6-3, 7.6-5 response to Question 07.01-35thru 7.6-10, 7.6-12)

316 7 7.6 (Figures 7.6-1, RAI Changes associated with RAI 505 Supplement 307.6-5 thru 7.6-8) response to Question 07.01-35

317 7 7.6.1.2.1 thru RAI Changes associated with RAI 505 Supplement 297.6.1.2.7 resoonse to Question 07.01-35

Page 13 of 29

Page 22: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 2US-EPR FSAR Tier 2

Summary f Changes for Rev. 5Item Chapter Subsection Type of Description of ChangeNo. Change

318 7 7.6.1.2.4 RAI - Changes associated with RAI 563 Advanced responseAdvanced to Question 19-356

319 7 7.6.1.2.5, RAI Changes associated with RAI 555 Supplement 47 ,6,1,;2,7 resoonse to Question 07.01-54

320 7 7.6.1.2.7 RAI Changes associated with RAI 505 Supplement 30resoonse to Question 07.01-35

321 7 7.7.2.2.6 RAI Changes associated with RAI 555 Supplement 6resoonse to Question 07.01-53

322 7 7.7.2.3.2 RAI Changes associated with RAI 555 Supplement 6resoonse to Question 07.01-53

323 7 7.7.2.3.5 RAI Changes associated with RAI 547 Supplement 5response to Question 03.06.01-14

324 7 7.7.2.7 RAI Changes associated with RAI 555 Supplement 6resoonse to Question 07.01-53

325 7 7.8 (Table 7.8-1) RAI Changes associated with RAI 505 Supplement 29resoonse to Question 07.01-35

326 7 7.8.1 (Table 7.8-1 RAI Changes associated with RAI 505 Supplement 27& Notes) resoonse to Question 07.01-44

327 7 7.8.1.1.3 RAI Changes associated with RAI 505 Supplement 27resoonse to Question 07.01-44

328 7 7.8.3 RAI Changes associated with RAI 505 Supplement 30resoonse to Question 07.01-35

329 8 8.1.4.1 RAI Changes associated with RAI 564 Supplement 1resoonse to Question 08.02-8

330 8 8.2 (Table 8.2-1) RAI Changes associated with RAI 564 Supplement 2resoonse to Question 08.02-8

331 8 8.2.2.1 RAI - Changes associated with RAI 541 Advanced responseAdvanced to Question 02-3

332 8 8.2.2.4 RAI Changes associated with RAI 564 Supplement 2response to Question 08.02-8

333 8 8.3 (Tables 8.3-2 RAI - Changes associated with RAI 563 Advanced response& Notes, 8.3-4, Advanced to Question 19-3568.3-7 and 8.3-12;Figures 8.3-1, 8.3-2, 8.3-5)

334 8 8.3 (Tables 8.3-4 Corrective Changes associated with design impacts due tothru 8.3-7) Action Ultimate Heat Sink size increase

335 8 8.3.1.1.1 RAI - Changes associated with RAI 563 Advanced responseAd!vancd to Question 19-356

336 8 8.3.1.1.5 RAI Changes associated with RAI 547 Supplement 5resoonse to Question 03.06.01-14

337 8 8.3.1.1.5, RAI - Changes associated with RAI 578 Advanced response8.3.1.1.7 v to Question 09.04.03-7

338 8 8.3.1.1.7 RAI - Changes associated with RAI 563 Advanced responseAdvanced to Question 19-356

339 8 8.3.1.2.1 RAI - Changes associated with RAI 541 Advanced responseAdvanced to Question 02-3

340 8 8.3.1.2.11 Design Changes associated with Reinstatement of LCQChange Transfer Valves & Piping and Normal Operating

Pn__itinn nf the MOV in the P2.%ivj Finndinn I ins341 8 8.3.2.1.1.1, RAI - Changes associated with RAI 563 Advanced response

8.3.2.1.1.6, Advanced to Question 19-356, ' 321 17

342 8 8.3.2.2.1 RAI - Changes associated with RAI 541 Advanced responseAdvanced to Question 02-3

343 8 8.3.2.2.8 RAI - Changes associated with RAI 563 Advanced response____ _V_ t9 Question 19-356

344 8 8.3.3 RAI - Changes associated with RAI 563 Advanced responseAdvanced to Question 19-356

345 8 8.3.3 Design Changes associated with US EPR Codes and_Chanae Standards

Page 14 of 29

Page 23: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 2US-EPR FSAR Tier 2

Summ y Changes for Rev. 5Item Chapter Subsection Type of Description of ChangeNo. Change

346 8 8.3.4 (Tables 8.3- RAI - Changes associated with RAI 578 Advanced response4 & Notes, 8.3-5 & Advanced to Question 09.04.03-7Note, 8.3-6 &Note, 8.3-7 &Notes)

347 8 8.4 (Tables 8.4-1 RAI - Changes associated with RAI 578 Advanced response& 8.4-2) Advanced to Question 09.04.03-7

348 8 8.4.1.4 RAI - Changes associated with RAI 578 Advanced responseAdvanced to Question 09.04.03-7

349 9 9.1.2 Consistency Changes associated with description of New andUdate_ Spent Fuel Storage

350 9 9.1.2 (Figures RAI - Changes associated with RAI 445 Advanced response9.1.2-2 & 9.1.2-7) Advanced to Question 03.08.04-15

351 9 9.1.2.2.2 RAI Changes associated with RAI 513 Supplement 14resoonse to Question 09.01.01-61

352 9 9.1.2.3 RAI Changes associated with RAI 526 Supplement 5resoonse to Question 09.01.02-40

353 9 9.1.3 (Table 9.1.3- Design Changes associated with Fuel Pool Cooling and1; Figure 9.1.3-2 Change Purification System Design for OverpressureShts 1 thru 5 of 5) Protection

354 9 9.1.3.1 RAI - Changes associated with RAI 528 Advanced responseAdvanced to Question 11.05-28

355 9 9.1.3.4 RAI Changes associated with RAI 526 Supplement 4resonse to Question 09.01.03-15

356 9 9.1.3.4 RAI Changes associated with RAI 526 Supplement 5resoonse to Question 09.01.02-40

357 9 9.1.3.4 RAI - Changes associated with RAI 528 Advanced responseA____ r__to*p Question 11.05-28

358 9 9.1.3.4 Consistency Changes associated with safety evaluation for the FuelU___ date Pool Cooling and Purification System

359 9 9.1.4 (Table 9.1.4- RAI Changes associated with RAI 525 Supplement 14-2) resoonse to Question 09.01.04-22

360 9 9.1.4 (Figure 9.1.4- RAI Changes associated with RAI 513 Supplement 1212) response to Question 09.01.04-20

361 9 9.1.4 (Figure 9.1.4- RAI Changes associated with RAI 525 Supplement 13t13 resoonse to Question 09.01.04-30

362 9 9.1.4.2 RAI Changes associated with RAI 525 Supplement 6resoonse to Question 09.01.04-32

363 9 9.1.4.2 RAI Changes associated with RAI 525 Supplement 6resoonse to Question 09.01.04-35

364 9 9.1.4.2 RAI Changes associated with RAI 525 Supplement 7resoonse to Question 09.01.04-34

365 9 9.1.4.2.1 RAI Changes associated with RAI 525 Supplement 12resoonse to Question 09.01.04-23

366 9 9.1.4.2.1 RAI Changes associated with RAI 513 Supplement 14response to Question 09.01.01-61

367 9 9.1.4.2.1 RAI Changes associated with RAI 526 Supplement 6resoonse to Question 09.01.02-41

368 9 9.1.4.2.1 RAI Changes associated with RAI 534 Supplement 4resoonse to Question 09.01,04-39

369 9 9.1.4.2.1, RAI Changes associated with RAI 513 Supplement 129.1.4.3.3 resoonse to Question 09.01.04-20

370 9 9.1.4.2.2 RAI Changes associated with RAI 525 Supplement 11resoonse to Question 09.01.04-29

371 9 9.1.4.2.2 RAI Changes associated with PAl 525 Supplement 13resoonse to Question 09.01.04-30

372 9 9.1.4.2.2 RAI Changes associated with PAl 525 Supplement 14resoonse to Question 09.01.04-33

373 9 9.1.4.2.2 RAI Changes associated with PAl 525 Supplement 14H_ resoonse to Question 09.01.04-37

Page 15 of 29

Page 24: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 2US-EPR FSAR Tier 2

Summary of Changes for Rev. 5Item Chapter Subsection Type of Description of ChangeNo. Change

374 9 9.1.4.2.2 RAI Changes associated with RAI 525 Supplement 15response to Question 09.01.04-31

375 9 9.1.4.2.2 Design Changes associated with ANSI N14.6 Code Year_hnqg

376 9 9.1.4.2.2, RAI Changes associated with RAI 525 Supplement 79.1.4.3.1 response to Question 09.01.04-21

377 9 9.1.4.3 RAI Changes associated with RAI 525 Supplement 11response to Question 09.01.04-29

378 9 9.1.4.3 RAI Changes associated with RAI 534 Supplement 4resoonse to Question 09.01.04-39

379 9 9.1.4.3.1 RAI Changes associated with RAI 525 Supplement 13r__ __ esoonse to Question 09.01.04-24

380 9 9.1.4.3.4 RAI Changes associated with RAI 526 Supplement 5response to Question 09.01.02-40

381 9 9.1.4.4 RAI Changes associated with RAI 525 Supplement 10resoonse to Question 09.01.04-27

382 9 9.1.4.5 RAI Changes associated with RAI 525 Supplement 14resoonse to Question 09.01.04-22

383 9 9.1.4.5, 9.1.4.6 RAI Changes associated with RAI 525 Supplement 9response to Question 09.01.04-38

384 9 9.1.4.6 RAI Changes associated with RAI 534 Supplement 4response to Question 09.01.04-39

385 9 9.1.4.6 Design Changes associated with ANSI N14.6 Code Year_hnqe

386 9 9.1.5 (Table 9.1.5- RAI Changes associated with RAI 530 Supplement 31 & Notes) response to Question 09.01.05-24

387 9 9.1.5.2.4 RAI Changes associated with RAI 530 Supplement 3resoonse to Question 09.01.05-24

388 9 9.1.5.2.4 RAI Changes associated with RAI 525 Supplement 13resoonse to Question 09.01.04-26

389 9 9.1.5.6 Design Changes associated with ANSI N14.6 Code YearChange

390 9 9.2.1 (Tables RAI Changes associated with RAI 345 Supplement 159.2.1 -1 & 9.2.1-2) _ resoonse to Question 09.02.01-41

391 9 9.2.1 (Table 9.2.1- Design Changes associated with EDG Redesign of Ventilation3; Figure 9.2.1-1 Change for EDG Diesel Hall & ESW Cooling for ElectricalSht 2 of 4) Control Room; and In Service Testing requirements for

nimni nnrl inghmg

392 9 9.2.1 (Table 9.2.1- Design Changes associated with update of alarm information3_ ) Chanqe

393 9 9.2.1 (Figure 9.2.1- Design Changes associated with operation of Essential1 Sht 4 of 4), Change Service Water System valves as MOVs9.2.1.7.1.5,9.2.1.7.2,9.2.1.7.3

394 9 9.2.1.1, 9.2.1.2, Design Changes associated with EDG Redesign of Ventilation9.2.1.7.2, Change for EDG Diesel Hall & ESW Cooling for Electrical9.2.1.7.3 Control Room; and In Service Testing requirements for

n_ mneni imns and epp

395 9 9.2.1.7.1.2, Corrective Changes associated with Essential Service Water9.,2 1.7.1.3 Acjtion System desian

396 9 9.2.1.7.3 RAI - Changes associated with RAI 528 Advanced responseAda nced to Question 11.05-28

397 9 9.2.2 (Figure 9.2.2- Design Changes associated with addition of position sensors2 Sht 7 of 7) Change on the CCWS RCP Thermal Barrier Containment

I Iltinn VnIvP.

398 9 9.2.2 (Figure 9.2.2- Design Changes associated with SAHRS HX Design Change4 )

399 9 9.2.2.1 RAI - Changes associated with RAI 528 Advanced response_Advanced Ito Question 11.05-28

Page 16 of 29

Page 25: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 2US-EPR FSAR Tier 2

Summar f Changes for Rev. 5Item Chapter Subsection Type of Description of ChangeNo. Change

400 9 9.2.2.3.1 RAI - Changes associated with RAI 528 Advanced responseAdvanced to Question 11.05-28

401 9 9.2.2.3.1, RAI Changes associated with RAI 505 Supplement 299.2.2.6.1.1, response to Question 07.01-35

402 9 9.2.2.6.1.1 RAI Changes associated with RAI 406 Supplement 15resoonse to Question 09.02.02-114

403 9 9.2.2.6.1.3 RAI Changes associated with RAI 505 Supplement 30response to Question 07.01-35

404 9 9.2.4.2.2 RAI - Changes associated with RAI 578 Advanced responseAdvanced to Question 09.04.03-7

405 9 9.2.5 (Tables RAI Changes associated with RAI 351 Supplement 109.2.5-1 & 9.2.5-2) response to Question 09.02.05-27

406 9 9.2.5 (Table 9.2.5- RAI Changes associated with RAI 345 Supplement 152 & Figure 9.2.5-3) response to Question 09.02.01-41

407 9 9.2.5.3.1, 9.2.5.5 RAI - Changes associated with RAI 541 Advanced responseAdvanced to Question 02-3

408 9 9.2.8 (Tables RAI - Changes associated with RAI 578 Advanced response9.2.8-1 & 9.2.8-2; Advanced to Question 09.04.03-7Table 9.2.8-4Notes; Figure0') 1.A9

409 9 9.2.8 (Table 9.2.8- RAI Changes associated with RAI 505 Supplement 303) resoonse to Question 07.01-35

410 9 9.2.8.2.2 RAI - Changes associated with RAI 578 Advanced responseAdvanced to Question 09.04.03-7

411 9 9.2.8.3.2 RAI - Changes associated with RAI 578 Advanced responseAdvanced to Question 09.04.03-7

412 9 9.2.8.4 RAI - Changes associated with RAI 578 Advanced responseAdvanced to Question 09.04.03-7

413 9 9.2.8.4 RAI - Changes associated with RAI 528 Advanced responseAdvanc to Question 11.05-28

414 9 9.3.1.6 Design Changes associated with US EPR Codes andChance Standards

415 9 9.3.2 (Tables RAI - Changes associated with RAI 528 Advanced response9.3.2-1 & 9.3.2-2) Advanced to Question 11.05-28

416 9 9.3.2 (Figure 9.3.2 Editorial Changes associated with editorial corrections to1 Shts 2 & 8 of 9) Fieures for Nuclear Samoling System

417 9 9.3.2 (Figure 9.3.2 Design Changes associated with Component Cooling Water1. 9.3.2.1 Chance Svstem Safety Class Interface Inconsistencies

418 9 9.3.2.3 RAI - Changes associated with RAI 528 Advanced responseA d to Question 11.05-28

419 9 9.3.3 RAI - Changes associated with RAI 528 Advanced responseAdvanced to Question 11.05-28

420 9 9.3.3 (Figure 9.3.3 RAI - Changes associated with RAI 563 Advanced response1 Shts 1 thru 9 of Advanced to Question 19-356

421 9 9.3.3 (Figure 9.3.3 Design Changes associated with update to KTE Sump Level1 Sht 7 of 9) Change Instrumentation for consistency with Table 3.2.2-1

422 9 9.3.3.1 RAI - Changes associated with RAI 563 Advanced responseAdvanced to Question 19-356

423 9 9.3.3.1 Design Changes associated with Component Cooling WaterChanoe System Safety Class Interface Inconsistencies

424 9 9.3.3.2.2 RAI - Changes associated with RAI 563 Advanced responseAdvanced to Question 19-356

425 9 9.3.3.3 Design Changes associated with Component Cooling WaterChanae System Safety Class Interface Inconsistencies

426 9 9.3.4 (Figure 9.3.4 Design Changes associated with Component Cooling Water1). 9.34.1 Chance . System Safety Class Interface Inconsistencies

Page 17 of 29

Page 26: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 2US-EPR FSAR Tier 2

Summary f Changes for Rev. 5Item Chapter Subsection Type of Description of ChangeNo. Change

427 9 9.3.4 (Figure 9.3.4- Design Changes associated with addition of capability to pump2 Sht 5 of 5) Change spent resins from KBE to KPF

428 9 9.3.4 (Figure 9.3.4- RAI - Changes associated with RAI 528 Advanced response4 Sht 2 of 2) Advanced to Question 11.05-28

429 9 9.3.4 (Figure 9.3.4- Design Changes associated with Reactor Boron and Water4 Sht 1 of 2) Change Makeup System Revised Design Pressure

430 9 9.3.4.1 RAI Changes associated with RAI 554 Supplement 2resoonse to Question 11 .02-27

431 9 9.3.4.2.1 RAI Changes associated with RAI 559 Supplement 1resoonse to Question 09.03.04-28

432 9 9.3.4.2.1 RAI Changes associated with RAI 513 Supplement 14resoonse to Question 09.01.01-61

433 9 9.3.4.2.1 RAI - Changes associated with RAI 528 Advanced responseAdvanced to Question 11.05-28

434 9 9.3.4.2.2 Design Changes associated with Component Cooling WaterChanae System Safety Class Interface Inconsistencies

435 9 9.3.4.2.3.2 Consistency Changes associated with description of NormalI date oeration

436 9 9.3.4.3 RAI Changes associated with RAI 554 Supplement 2resoonse to Question 11.02-27

437 9 9.3.4.4 RAI Changes associated with RAI 513 Supplement 14resoonse to Question 09.01.01-61

438 9 9.4.1 (Table 9.4.1- RAI - Changes associated with RAI 578 Advanced response1; Figures 9.4.1-1 Advanced to Question 09.04.03-7lhni 9 4 1-11

439 9 9.4.1.1 RAI - Changes associated with RAI 528 Advanced responseAdvanced to Question 11 05-28

440 9 9.4.1.1, 9.4.1.2, RAI - Changes associated with RAI 578 Advanced response9.4.1.2.2, Advanced to Question 09.04.03-7

, 41 23441 9 9.4.1.2.1, RAI Changes associated with RAI 511 Supplement 7

q-,4-1.2-3 resoonse to Question 06,04-10442 9 9.4.1.2.2, RAI Changes associated with RAI 505 Supplement 29

9.4,1.2,3 resoonse to Question 07.01-35443 9 9.4.1.3 thru RAI - Changes associated with RAI 578 Advanced response

_9.4.1,6 tdvanced to Question 09.04.03-7444 9 9.4.2 (Figure 9.4.2- RAI - Changes associated with RAI 578 Advanced response

1) Advanced to Question 09.04.03-7445 9 9.4.2.1 RAI Changes associated with RAI 511 Supplement 8

resoonse to Question 06.04-9446 9 9.4.2.1 RAI - Changes associated with RAI 578 Advanced response

Advanced to Question 09.04.03-7447 9 9.4.2.2.2, RAI - Changes associated with RAI 578 Advanced response

)-4-222.3 Advanced to Question 09.04.03-7448 9 9.4.2.2.3 RAI Changes associated with RAI 505 Supplement 29

resoonse to Question 07.01-35449 9 9.4.2.4, 9.4.2.6 RAI - Changes associated with RAI 578 Advanced response

Advanced to Question 09.04.03-7450 9 9.4.3 (Figures RAI - Changes associated with RAI 528 Advanced response

9.4.3-1 and 9.4.3- Advanced to Question 11.05-2891

451 9 9.4.3 (Figures RAI Changes associated with RAI 511 Supplement 89.4.3-1 thru 9.4.3- response to Question 06.04-9

452 9 9.4.3.1, 9.4.3.2.1, RAI - Changes associated with RAI 578 Advanced response9.4.3.2.2, Advanced to Question 09.04.03-7

453 9 9.4.3.2.3 RAI Changes associated with RAI 511 Supplement 8I response to Question 06.04-9

Page 18 of 29

Page 27: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 2US-EPR FSAR Tier 2

Summary Changes for Rev. 5Item Chapter Subsection Type of Description of ChangeNo. Change

454 9 9.4.3.4, 9.4.3.6 RAI - Changes associated with RAI 578 Advanced responseAdvanced to Question 09.04.03-7

455 9 9.4.4 RAI - Changes associated with RAI 578 Advanced responseAdvanced to Question 09.04.03-7

456 9 9.4.5 (Table 9.4.5- RAI - Changes associated with RAI 578 Advanced response1; Figures 9.4.5-1, Advanced to Question 09.04.03-79 4A 5-9

457 9 9.4.5, 9.4.5.1 RAI - Changes associated with RAI 578 Advanced responseAdvan__ced to Question 09.04.03-7

458 9 9.4.5.1 Corrective Changes associated with SBVS safety relatedAction functions under FSAR Section 9.4.5.1

459 9 9.4.5.1, 9.4.5.2.1 RAI Changes associated with RAI 511 Supplement 8resoonse to Question 06.04-9

460 9 9.4.5.2.1 thru RAI - Changes associated with RAI 578 Advanced response9.4.5.2.3 Advanced to Question 09.04.03-7

461 9 9.4.5.2.2, RAI Changes associated with RAI 505 Supplement 299.4.5.2.3 resoonse to Question 07.01-35

462 9 9.4.5.3 thru RAI - Changes associated with RAI 578 Advanced response9A.5.6 'Advanced to Question 09.04.03-7

463 9 9.4.6 (Figures RAI - Changes associated with RAI 578 Advanced response9.4.6-1 thru 9.4.6- Advanced to Question 09.04.03-741

464 9 9.4.6.1 RAI - Changes associated with RAI 578 Advanced responseAdvanced to Question 09.04.03-7

465 9 9.4.6.2.1 RAI Changes associated with RAI 505 Supplement 29resoonse to Question 07.01-35

466 9 9.4.6.2.1 RAI - Changes associated with RAI 578 Advanced responseAdvanced to Ouestion 09.04.03-7

467 9 9.4.6.2.3 RAI Changes associated with RAI 505 Supplement 29response to Question 07.01-35

468 9 9.4.6.2.3 RAI - Changes associated with RAI 578 Advanced response'Advanced to Question 09.04.03-7

469 9 9.4.6.4, 9.4.6.6 RAI - Changes associated with RAI 578 Advanced responseAdvanced to Question 09.04.03-7

470 9 9.4.7 (Table 9.4.7- RAI - Changes associated with RAI 578 Advanced response1; Figures 9.4.7-1 Advanced to Question 09.04.03-7thru 9.4.7-5)

471 9 9.4.7 (Figures RAI Changes associated with RAI 462 Supplement 89.4.7-1 & 9.4.7-2) response to Question 06.02.03-8

472 9 9.4.7 (Figure 9.4.7- RAI - Changes associated with RAI 563 Advanced response2__Aanced to Question 19-356

473 9 9.4.7 (Figure 9.4.7- Design Changes associated with Component Cooling Water4. 9.4.7.1 Chanae System Safety Class Interface Inconsistencies

474 9 9.4.7.1, 9.4.7.2.1 RAI - Changes associated with RAI 578 Advanced responsethru 9.4.7.2.3 Advanced to Question 09.04.03-7

475 9 9.4.7.1, 9.4.7.2.1, RAI - Changes associated with RAI 563 Advanced response9.4.7.2.2, Advanced to Question 19-356SA 47? 9.

476 9 9.4.7.2.1, RAI Changes associated with RAI 511 Supplement 8- 9,4,7 2.3 resnonse to Ouestion 06.04-9

477 9 9.4.7.2.2 Design Changes associated with Component Cooling Water_hljne System Safety Class Interface Inconsistencies

478 9 9.4.7.2.3 RAI - Changes associated with RAI 528 Advanced response,Advanced to Question 11.05-28

479 9 9.4.7.3 Design Changes associated with Component Cooling WaterChane System Safety Class Interface Inconsistencies

480 9 9.4.7.4, 9.4.7.4.1, RAI - Changes associated with RAI 578 Advanced response

9,4,7,5, 9,471.. nced to Question 09.04.03-7481 9 9.4.7.5 RAI - Changes associated with RAI 528 Advanced response

Adanced Ito Question 11.05-28

Page 19 of 29

Page 28: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 2US-EPR FSAR Tier 2

Sum ar ___f Changes for Rev. 5Item Chapter Subsection Type of Description of ChangeNo. Change

482 9 9.4.7.6 Design Changes associated with Component Cooling WaterChanae System Safety Class Interface Inconsistencies

483 9 9.4.8 (Figures RAI - Changes associated with RAI 578 Advanced response9-4.8-1 & 9-4-8-2) Advanced to Question 09.04.03-7

484 9 9.4.8 (Figure 9.4.8- RAI - Changes associated with RAI 528 Advanced response:% Advanced to Question 11.05-28

485 9 9.4.8.1, 9.4.8.2.1, RAI - Changes associated with RAI 578 Advanced response9.4.8.2.2, Advanced to Question 09.04.03-79.4.8.2.3, 9.4.8.3thru 9.4.8.6

486 9 9.4.9 (Figure 9.4.9- RAI - Changes associated with RAI 578 Advanced response1)Aanced to Question 09.04.03-7

487 9 9.4.9.1, 9.4.9.2.1 RAI - Changes associated with RAI 578 Advanced response_ thru 9.4.9.2.3 A n to Question 09.04.03-7

488 9 9.4.9.2.1, RAI Changes associated with RAI 505 Supplement 29- 9.4.9.2.2 resoonse to Question 07.01-35

489 9 9.4.9.2.1 RAI - Changes associated with RAI 541 Advanced responseAdvanced o Question 02-3

490 9 9.4.9.2.2, RAI Changes associated with RAI 505 Supplement 29- 9.4.9.2.3 resoonse to Question 07.01-35

491 9 9.4.9.6 RAI - Changes associated with RAI 578 Advanced responseAdvanced to Question 09,04,03-7

492 9 9.4.10, 9.4.10.1, RAI - Changes associated with RAI 578 Advanced response9.4.10.2.1, Advanced to Question 09.04.03-79.4.10.2.2,9.4.10.2.3,9.4.10.6

493 9 9.4.11.2.1, RAI - Changes associated with RAI 578 Advanced response9.4.11.2.2, Advanced to Question 09.04.03-79.4.11.2.3,9.4.11.6

494 9 9.4.11.2.1, RAI - Changes associated with RAI 541 Advanced response9.4.11.2.3 Advanced to Question 02-3

495 9 9.4.11.2.2, RAI Changes associated with RAI 505 Supplement 299.4.11.2.3 res•onse to Question 07.01-35

496 9 9.4.12 (Figure RAI - Changes associated with RAI 578 Advanced response- 9.4.12-1) dane to Question 09.04.03•-7

497 9 9.4.12.2.2, RAI - Changes associated with RAI 578 Advanced response9.4.12.6 Advanced to Question 09.04.03-7

498 9 9.4.13 (Figure RAI - Changes associated with RAI 578 Advanced response9.4,13-1) to Question 09-04,03-7

499 9 9.4.13.1, RAI - Changes associated with RAI 578 Advanced response9.4.13.2.2, Advanced to Question 09.04.03-7q,4 1316

500 9 9.4.14 (Table RAI - Changes associated with RAI 578 Advanced response9.4.14-1; Figures Advanced to Question 09.04.03-79.4.14-1, 9.4.14-2), 9.4.14.2.1,9.4.14.2.2,9.4.14.4 thru9.4.14.7

501 9 9.4.14.6 RAI - Changes associated with RAI 528 Advanced responseAdvanced to Question 11,05-28

502 9 9.5.1 (Figures RAI - Changes associated with RAI 563 Advanced response9.5.1-1 Shts 1 thru Advanced to Question 19-35614 of 14, 9.5.1-2Shts 1 thru 2 of 2,9.5.1-3, and 9.5.1-4)

Page 20 of 29

Page 29: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 2US-EPR FSAR Tier 2

Summary of Changes for Rev. 5Item Chapter Subsection Type of Description of ChangeNo. Change

503 9 9.5.1.1, 9.5.1.2.1 RAI - Changes associated with RAI 563 Advanced responseAdvanced to Question 19-356

504 9 9.5.1.2.1 RAI Changes associated with RAI 547 Supplement 5response to Question 03.06.01-14

505 9 9.5.1.3 RAI Changes associated with RAI 547 Supplement 5resoonse to Question 03.06.01-14

506 9 9.5.1.7 RAI - Changes associated with RAI 563 Advanced responseAdvanced to Question 19-356

507 9 9.5.2 RAI Changes associated with RAI 549 Supplement 2response to Question 13.03-8

508 9 9.5.4.2.2 Consistency Changes associated with statement of purpose forUpdate Flame Arrestors

509 9 9.5.4.2.2 RAI - Changes associated with RAI 541 Advanced responseAdvanced to Question 02-3

510 9 9.5.6.2.2 Consistency Changes associated with description of Air Dryer andUpdate Filter

511 9 9.5.8.4 Consistency Changes associated with description of the DieselUpdate Generator Air Intake and Exhaust System (safety-

_Mtpci nnrtinn)512 9 9A (Table 9A-2; RAI - Changes associated with RAI 563 Advanced response

Fioure 9A-6) Advanced to Question 19-356513 9 9A (Figures 9A-1, Design Changes associated with updates to Figures for fire

9A-2, 9A-5 & Change barrier drawings

514 9 9A (Figures 9A-6 Corrective Changes associated with Safeguard Building 1 Figuresthru 9A-16 & Action and including editorial "background" updateNotes)

515 9 9A (Figures 9A-17 Corrective Changes associated with Safeguard Building 2/3thru 9A-27 & Action Figures and including editorial "background" updateNotes)

516 9 9A (Figures 9A-28 Corrective Changes associated with Safeguard Building 4 Figuresthru 9A-38 & Action and including editorial "background" updateNotes)

517 9 9A (Figures 9A- Design Changes associated with Reactor Building Figures and39 thru 9A-51 & Change including editorial "background" updateNntp_,._

518 9 9A (Figures 9A-52 Design Changes associated with Nuclear Auxiliary Buildingthru 9A- 65 & Change Figures and including editorial "background" updateNotp-,s

519 9 9A (Figures 9A-66 Corrective Changes associated with Radioactive Wastethru 9A-75 & Action Processing Building Figures and including editorialNnt_._ l "han.knrninmd" i ndatp

520 9 9A (Figures 9A-84 Design Changes associated with Fuel Building Figures andthru 9A-97 & Change including editorial "background" updateNotes)

521 9 9A (Figures 9A-98 Corrective Changes associated with Access Building Figuresthru 9A-106 & ActionN_____ ~ntp, s

522 10 10.2.4 RAI Changes associated with RAI 109 Supplement 3resoonse to Question 03.05.01,03-2

523 10 10.3 (Table 10.3- RAI - Changes associated with RAI 528 Advanced response_4) _Advanced Ito Question 11.05-28

524 10 10.3 (Figure 10.3- RAI - Changes associated with RAI 563 Advanced response2) AdanIced to Question 19-356

Page 21 of 29

Page 30: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 2US-EPR FSAR Tier 2

Summary f Changes for Rev. 5Item Chapter Subsection Type of Description of ChangeNo. Change

525 10 10.3.1 RAI - Changes associated with RAI 528 Advanced responseAdvanced to Question 11 .05-28

526 10 10.3.2.2 RAI - Changes associated with RAI 563 Advanced responseAdvanced to Question 19-356

527 10 10.3.2.3.4 Consistency Changes associated with deletion of reference toUpdate Station blackout (SBO)

528 10 10.3.3 RAI - Changes associated with RAI 541 Advanced responseAdvanced to Question 02-3

529 10 10.3.4 RAI - Changes associated with RAI 528 Advanced responseAdvanced to Question 11.05-28

530 10 10.4.7 (Figure RAI Changes associated with RAI 462 Supplement 810.4.7-1 Sht 1 of response to Question 06.02.03-8

531 10 10.4.7.2.1 RAI Changes associated with RAI 555 Supplement 6response to Question 07.01-53

532 10 10.4.7.2.2 RAI Changes associated with RAI 462 Supplement 8response to Question 06.02.03-8

533 10 10.4.7.2.3 RAI Changes associated with RAI 555 Supplement 6response to Question 07.01-53

534 10 10.4.7.3 RAI Changes associated with RAI 462 Supplement 8response to Question 06.02.03-8

535 10 10.4.8 RAI - Changes associated with RAI 527 Advanced responseAdvanced to Question 14.03.07-38

536 10 10.4.8 (Figure RAI Changes associated with RAI 462 Supplement 810.4.8-1 Shts 1 & response to Question 06.02.03-89 nf 3)

537 10 10.4.8 (Figures RAI Changes associated with RAI 554 Supplement 210.4.8-1 Shts 2 & response to Question 11.02-273 of 3; and 10.4.8-2 Shts 1,2 &3 of4)

538 10 10.4.8 (Figures Design Changes associated with SSC Classification change to10.4.8-1 Shts 1 Change LCQ and Condensate Polisher Shieldingthru 3 of 3; and10.4.8-2 Shts 1thru 4 of 4)

539 10 10.4.8 (Figure Design Changes associated with Reinstatement of LCQ10.4.8-1 Sht 1 of Change Transfer Valves & Piping and Normal Operating3) Position of the MOV in the Passive Flooding Lines

540 10 10.4.8.1 RAI Changes associated with RAI 554 Supplement 2resoonse to Question 11.02-27

541 10 10.4.8.1 RAI - Changes associated with RAI 528 Advanced responseAdvanced to Question 11.05-28

542 10 10.4.8.1, Design Changes associated with Reinstatement of LCQ10.4.8.2.2 Change Transfer Valves & Piping and Normal Operating

Pnsfitinn of the MOV in the Pas.•ive Flnndinn I ine,

543 10 10.4.8.3.2 Editorial Changes associated with correction of reference toSection 10.4.8.3.2

544 10 10.4.8.4 RAI Changes associated with RAI 554 Supplement 2resoonse to Question 11.02-27

545 10 10.4.8.4, 10.4.8.5 RAI Changes associated with RAI 462 Supplement 8response to Question 06.02.03-8

546 10 10.4.9 (Table RAI - Changes associated with RAI 563 Advanced response10.4.9-3; Figure Advanced to Question 19-35610.4.9-1 Shts 1nndi -' nfl.3

547 10 10.4.9.2.1, RAI - Changes associated with RAI 563 Advanced response10.4.9.2.2.5, Advanced to Question 19-3561104 q 3

Page 22 of 29

Page 31: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 2US-EPR FSAR Tier 2

Summary f Changes for Rev. 5Item Chapter Subsection Type of Description of ChangeNo. Change

548 11 11.1 (Tables 11.1- RAI Changes associated with RAI 17 Supplement 21, 11.1-3 and 11.1- response to Question 15.00.03-1

1 _ 7 P Nnt_._

549 11 11.1.2.3, 11.1.4 RAI Changes associated with RAI 17 Supplement 2response to Question 15.00.03-1

550 11 11.2 (Figure 11.2- RAI Changes associated with RAI 554 Supplement 21) r1,_esonse to Question 11.02-27

551 11 11.2.3.3 RAI Changes associated with RAI 273 Supplement 17resoonse to Question 11.05-2

552 11 11.2.3.8 RAI - Changes associated with RAI 528 Advanced response____v__n_ t Question 11.05-28

553 11 11.4 (Tables 11.4- RAI - Changes associated with RAI 539 Advanced response1 thru 11.4-9 & Advanced to Question 12.03-12.04-29, referencing RAI 54811.4-11 thru 11.4- Question 12.03-12.04-31

554 11 11.4.1.2.1 RAI - Changes associated with RAI 541 Advanced responseAdvaned to Question 02-3

555 11 11.4.2.2, RAI - Changes associated with RAI 528 Advanced response11.4.2.,3•,_1 23 an to Question 11.05-28

556 11 11.5 (Table 11.5- RAI Changes associated with RAI 511 Supplement 8m1 Figure 11.5-1) response to Question 06.04-9

557 11 11.5.1 (Table 11.5- RAI - Changes associated with RAI 528 Advanced response1 & Notes; Figure Advanced to Question 11.05-2811, 5-1

558 11 11.5.3.1.1 thru RAI - Changes associated with RAI 528 Advanced response11.5.3.1.12 t o Question 11.05-28

559 11 11.5.3.1.4 RAI Changes associated with RAI 511 Supplement 81 _ resoonse to Question 06.04-9

560 11 11.5.3.2 RAI - Changes associated with RAI 528 Advanced responseAdvanced to Question 11.05-28

561 11 11.5.4.1 RAI Changes associated with RAI 17 Supplement 2response to Question 15.00.03-1

562 11 11.5.4.2 thru RAI - Changes associated with RAI 528 Advanced response11.5.4.6, 11.5.4.8 Advanced to Question 11.05-28thru 11.5.4.18

563 11 11.5.4.15 RAI Changes associated with RAI 273 Supplement 17response to Question 11.05-2

564 11 11.5.4.15 RAI Changes associated with RAI 273 Supplement 17response to Question 11.05-5

565 12 12.2 RAI Changes associated with RAI 554 Supplement 2resoonse to Question 11.02-27

566 12 12.2 (Table 12.2- RAI Changes associated with RAI 17 Supplement 24: Finure 12,2-1) response to Question 15.00.03-1

567 12 12.2 (Tables 12.2- RAI - Changes associated with RAI 539 Advanced response7, 12.2-8, 12.2-10 Advanced to Question 12.03-12.04-29, referencing RAI 548thru 12.2-17, 12.2- Question 12.03-12.04-3124 thru 12.2-70)

568 12 12.2.1.2 RAI Changes associated with RAI 17 Supplement 2response to Question 15.00,03-1

569 12 12.2.1.3, 12.2.1.4, RAI - Changes associated with RAI 539 Advanced response12.2.1.5, Advanced to Question 12.03-12.04-29, referencing RAI 5481991 ?1 01 1_ _ (3Htinn 19 n'I-19 U4-3R1

570 12 12.2.1.8, 12.2.1.9, RAI - Changes associated with RAI 539 Advanced response12.2.1.10, Advanced to Question 12.03-12.04-29, referencing RAI 5481292.1 11 _ _ ijpqtinn 12 0M-12 U4-31

571 12 12.2.1.10 RAI Changes associated with RAI 554 Supplement 2response to Question 11.02-27

572 12 12.2.1.17 thru RAI - Changes associated with RAI 539 Advanced response12.2.1.19 Advanced to Question 12.03-12.04-29, referencing RAI 548

___tinn 19 Mg-19 U4-11

Page 23 of 29

Page 32: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 2US-EPR FSAR Tier 2

Summar f Changes for Rev. 5Item Chapter Subsection Type of Description of ChangeNo. Change

573 12 12.3 (Tables 12.3- RAI - Changes associated with RAI 539 Advanced response

1, 12.3-15 thru Advanced to Question 12.03-12.04-29, referencing RAI 5481 19 1-17) Oijpstinn 12 03-12 04-31

574 12 12.3 (Table 12.3-3 RAI - Changes associated with RAI 528 Advanced response=Note) Advanced to Question 11.05-28

575 12 12.3 (Table 12.3- RAI Changes associated with RAI 273 Supplement 173) resoonse to Question 11.05-2

576 12 12.3 (Table 12.3- RAI Changes associated with RAI 511 Supplement 84) response to Question 06,04-9

577 12 12.3 (Tables 12.3- RAI - Changes associated with RAI 529 Advanced response3 & 12.3-4) Advanced to Question 12.03-12.04-28

578 12 12.3 (Tables 12.3- RAI - Changes associated with RAI 539 Advanced response14 & 12.3-18; Advanced to Question 12.03-12.04-29Figures 12.3-34,12.3-35, 12.3-37,12.3-38, 12.3-42thru 12.3-46 &12.3-52 thru 12.3-59)

579 12 12.3 (Figures 12.3- RAI - Changes associated with RAI 563 Advanced response21.12.3-64) Adtanced to Question 19-356

580 12 12.3 (Figures 12.3- RAI Changes associated with RAI 525 Supplement 1233 thru 12.3-35) response to Question 09,01 ,04-23

581 12 12.3 (Figure 12.3- RAI Changes associated with RAI 548 Supplement 1- 47) resoonse to Question 12.03-12,04-31

582 12 12.3 (Figures 12.3- RAI - Changes associated with RAI 578 Advanced response72 12.3-74) Advanrced to Question 09.04.03-7

583 12 12.3.1.8.1 RAI Changes associated with RAI 548 Supplement 1_resoonse to Question 12.03-12,04-30

584 12 12.3.1.8.1 RAI Changes associated with RAI 570 Supplement 4_resoonse to Question 12.03-12.04-32

585 12 12.3.1.8.2 RAI Changes associated with RAI 548 Supplement 1response to Question 12.03-12,04-31

586 12 12.3.2.2 RAI - Changes associated with RAI 539 Advanced responseAdvanced to Question 12.03-12.04-29, referencing RAI 548

_'Otilnn 19 03-12 04-31587 12 12.3.2.3 RAI - Changes associated with RAI 539 Advanced response

Advanced to Question 12.03-12,04-29588 12 12.3.4.2.3 RAI - Changes associated with RAI 578 Advanced response

Advanced to Question 09.04.03-7589 12 12.3.6.5 RAI Changes associated with RAI 462 Supplement 8

resoonse to Question 06,02,03-8590 12 12.3.6.5.1 RAI Changes associated with RAI 534 Supplement 4

resoonse to Question 09.01.04-39591 12 12.3.6.5.6 RAI Changes associated with RAI 462 Supplement 8

response to Question 06,02,03-8592 12 12.3.6.5.6 RAI Changes associated with RAI 511 Supplement 8

resoonse to Question 06,04-9593 12 12.3.7 RAI - Changes associated with RAI 539 Advanced response

Advanced to Question 12.03-12.04-29, referencing RAI 548_ _ __ _ tinn 12 03-12 U4-31

594 13 13.3 RAI Changes associated with RAI 549 Supplement 2response to Question 13-03-8

595 14 14.2 (Table 14.2- RAI - Changes associated with RAI 563 Advanced response1) Advanced to Question 19-356

596 14 14.2 (Table 14.2- RAI Changes associated with RAI 513 Supplement 14_ 1) resoonse to Question 09.01.01-61

597 14 14.2.12.1.1 RAI Changes associated with RAI 550 Supplement 11 _resoonse to Question 09-01-03-16

598 14 14.2.12.3.4. RAI - Changes associated with RAI 563 Advanced response14.2,12.3.6 Advanced to Question 19-356

Page 24 of 29

Page 33: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 2US-EPR FSAR Tier 2

Summary of Chanes for Rev. 5Item Chapter Subsection Type of Description of Change

No. Change

599 14 14.2.12.5.2 RAI Changes associated with RAI 548 Supplement 1resoonse to Question 12.03-12,04-30

600 14 14.2.12.5.2 RAI Changes associated with RAI 570 Supplement 4r__Donse to Question 12.03-12.04-32

601 14 14.2.12.5.9 RAI - Changes associated with RAI 563 Advanced responseAdvanced to Question 19-356

602 14 14.2.12.6.1 RAI Changes associated with RAI 513 Supplement 14resoonse to Question 09,01.01-61

603 14 14.2.12.6.3, RAI - Changes associated with RAI 563 Advanced response14.2.12.6.8 Advanced to Question 19-356

604 14 14.2.12.8.3 thru RAI - Changes associated with RAI 578 Advanced response14.2.12.8.5, Advanced to Question 09.04.03-714.2.12.8.7 thru14.2.12.8.11,14.2.12.8.19

605 14 14.2.12.8.4 RAI - Changes associated with RAI 563 Advanced responseAdvanced to Question 19-356

606 14 14.2.12.8.10 RAI Changes associated with RAI 511 Supplement 5respoonse to Question 06,04-11

607 14 14.2.12.9.1 RAI Changes associated with RAI 462 Supplement 8response to Question 06.02.03-8

608 14 14.2.12.10.3 RAI - Changes associated with RAI 563 Advanced responseAdvanced to Question 19-356

609 14 14.2.12.11.19 RAI - Changes associated with RAI 529 Advanced responseAdvanced to Question 12.03-12,04-28

610 14 14.2.12.11.29 RAI Changes associated with RAI 505 Supplement 27resoonse to Question 07.01-44

611 14 14.2.12.12.1 RAI - Changes associated with RAI 563 Advanced responseAdvanced to Question 19-356

612 14 14.2.12.16.3 RAI Changes associated with RAI 388 Supplement 3response to Question 03.09.03-22

613 14 14.3 RAI Changes associated with RAI 568 Supplement 1resoonse to Question 06.02.04-13

614 14 14.3 (Table 14.3- Editorial Changes associated with acronym editorial corrections

615 14 14.3 (Table 14.3- RAI - Changes associated with RAI 527 Advanced response

8)dae to Question 14.03.07-38616 15 15.0 (Tables 15.0- RAI Changes associated with RAI 34 Supplement 4

24,15.0-27 & response to Questions 15.06.03-1 and 15.06.03-2

Note, 15.0-29)

617 15 15.0 (Tables 15.0- RAI Changes associated with RAI 558 Supplement 142, 15.0-51; response to Question 09.04.05-5Figure 15.0-12)

618 15 15.0.0.3.7 Design Changes associated with Reinstatement of LCQChange Transfer Valves & Piping and Normal Operating

pn~qitinn nf thp MOV in thp Pa.ive Floorfinn I ine.,

619 15 15.0.0.3.9 RAI Changes associated with RAI 547 Supplement 5resoonse to Question 03.06.01-14

620 15 15.0.3.6 RAI Changes associated with RAI 34 Supplement 4response to Questions 15.06.03-1 and 15.06.03-2

621 15 15.0.3.11.2 RAI Changes associated with RAI 462 Supplement 8resoonse to Question 06,02,03-8

622 15 15.4.3.1.2, Design Changes associated with removal of reference to High15.4.6.1.2, Change Neutron Flux (Source Range) per WebCAP 2010-326215.4.1 3 1

Page 25 of 29

Page 34: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 2US-EPR FSAR Tier 2

Summary of Changes for Rev. 5Item Chapter Subsection Type of Description of ChangeNo. Change

623 15 15.6 (Tables 15.6- RAI Changes associated with RAI 34 Supplement 44, 15.6-5, 15.6-24; response to Question 15.06.03-3Figures 15.6-94thni 1; RAM1fR _

624 15 15.6 (Tables1 5.6- RAI Changes associated with RAI 34 Supplement 45, 15.6-6; Figures response to Questions 15.06.03-1 and 15.06.03-215.6-11 thru 15.6-

625 15 15.6.3.1, RAI Changes associated with RAI 34 Supplement 415.6.3.1.1, response to Question 15.06.03-315.6.3.2, 15.6.3.3,15.6.3.3.2,

626 15 15.6.3.2, RAI Changes associated with RAI 34 Supplement 415.6.3.3.3 resnonse to Questions 15.06.03-1 and 15.06.03-2

627 15 15.6.5.3, 15.6.6 RAI Changes associated with RAI 571 Supplement 1response to Question 04.02-18, Round 7 RAIresponses to ANP-10285P, and Technical Report ANP.1_,n9g2P

628 15 15.6.5.4.2, 15.6.6 RAI Changes associated with RAI 403 Supplement 11response to Questions 15.06.05-61, 15.06.05-62 and1, A A Oti-R63

629 16 3.3.1 (SR 3.3.1.3, RAI Changes associated with RAI 505 Supplement 27Table 3.3.1-1) response to Question 07.01-39

630 16 3.3.4 (SR 3.3.4.5, RAI Changes associated with RAI 505 Supplement 27Table 3-3-4-1) resoonse to Question 07.01-44

631 16 3.7.12 (SRs RAI - Changes associated with RAI 584 Advanced response3.7.12.6 & Advanced to Question 06.02.03-93.7.12 10)

632 16 3.7.12 (SR RAI Changes associated with RAI 511 Supplement 83.,7,12,307 response to Question 06.04-9

633 16 3.7.16 (Figure RAI Changes associated with RAI 513 Supplement 93.7.16-1) response to Questions 09.01.01-53 & 09.01.01-54

634 16 3.7.19 (SR RAI Changes associated with RAI 345 Supplement 153.7, 319.1 resoonse to Question 09.02.01-41

635 16 3.7.21 RAI Changes associated with RAI 558 Supplement 1resoonse to Question 09.04.05-5

636 16 3.7.22 (LCO, Design Changes associated with Reinstatement of LCQApplicability, Change Transfer Valves & Piping and Normal OperatingActions, SR) Position of the MOV in the Passive Flooding Lines

637 16 3.7.23 (All RAI Changes associated with RAI 526 Supplement 6Sections) resoonse to Question 09.01.02-41

638 16 3.8.1 (SR Design Changes associated with diesel generator- 3-8,1,17) Chane . reauirements

639 16 3.8.3 (Actions, Design Changes associated with diesel generatorSRs 3.8.3-1 & Change requirements

1 _____ 1 A :1-91640 16 3.8.11 (All RAI - Changes associated with RAI 563 Advanced response

Sections thru SR Advanced to Question 19-356_ 911R 1)

641 16 3.9.7 (LCO) RAI - Changes associated with RAI 572 Advanced responseAdvanced to Question 19-364

642 16 5.5.15 RAI Changes associated with RAI 527 Supplement 2resoonse to Question 14.03.02-60

643 16 5.6.3 RAI Changes associated with RAI 571 Supplement 1response to Question 04.02-18, Round 7 RAIresponses to ANP-10285P, and Technical Report ANP-1_n19rP

644 16 B 3.3.1 (Refs) RAI Changes associated with RAI 505 Supplement 30r___ onse to Question 07.01-35

Page 26 of 29

Page 35: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 2US-EPR FSAR Tier 2

Summary of Changies for Rev. 5Item Chapter Subsection Type of Description of ChangeNo. Change

645 16 B 3.3.1 (SR RAI Changes associated with RAI 505 Supplement 273.3.1.3) response to Question 07.01-39

646 16 B 3.3.4 (SR RAI Changes associated with RAI 505 Supplement 27_3.3.4.5) response to Question 07-01-44

647 16 B 3.4.11 Corrective Changes associated with design of Pressurizer SafetyAction Relief Valve per BTP 5-2. Section B.3

648 16 B 3.6.6 (Bkgrd, RAI Changes associated with RAI 511 Supplement 8Refs) response to Question 06.04-9

649 16 B 3.6.7 (Bkgrd) RAI - Changes associated with RAI 578 Advanced responseAdvanced to Question 09.04.03-7

650 16 B 3.7.8 (Bkgrd) Design Changes associated with EDG Redesign of VentilationChange for the EDG Diesel Hall and ESW Cooling for the

Flpr'trir.l rnntrol Room651 16 B 3.7.10 (Bkgrd) RAI Changes associated with RAI 511 Supplement 7

response to Question 06.04-10652 16 B 3.7.11 (Bkgrd) RAI Changes associated with RAI 511 Supplement 7

resoonse to Question 06,04-10653 16 B 3.7.12 (Bkgrd, RAI - Changes associated with RAI 578 Advanced response

LCO, Applicability, Advanced to Question 09.04.03-7Actions)

654 16 B 3.7.12 (Bkgrd, RAI Changes associated with RAI 511 Supplement 8SR. Refs) response to Question 06.04-9

655 16 B 3.7.12 (LCO, RAI - Changes associated with RAI 584 Advanced responseSRs 3.7.12.6 Advanced to Question 06.02.03-9&3.7.12.10)

656 16 B 3.7.16 (Bkgrd) RAI Changes associated with RAI 513 Supplement 9response to Questions 09.01.01-53 & 09,01-01-54

657 16 B 3.7.19 (LCO, RAI Changes associated with RAI 345 Supplement 15SR 3.7.19.1) resnonse to Question 09.02.01-41

658 16 B 3.7.19 (Bkgrd) RAI - Changes associated with RAI 541 Advanced responseAdvanced to Question 02-3

659 16 B 3.7.21 RAI Changes associated with RAI 558 Supplement 1resnonse to Question 09.04.05-5

660 16 B 3.7.22 (All Design Changes associated with Reinstatement of LCQSections) Change Transfer Valves & Piping and Normal Operating

PoRitinn of the MOV in the Pqqivp Flnnolinn I ipse661 16 B 3.7.23 (All RAI Changes associated with RAI 526 Supplement 6

Sections) resoonse to Question 09-01.02-41662 16 B 3.8.3 (Actions, Design Changes associated with Volume Requirements for

SR 3.8.3.1 & Change EDG Fuel Oil, Lube Oil, and Day TanksA2A 9 _

663 16 B 3.8.3 (Bkgrd, Design Changes associated with diesel generatorActions, SRs 3.8.3 Change requirements1 & 2 Re:_•f _ _

664 16 B 3.8.11 (All RAI - Changes associated with RAI 563 Advanced responseSectiorns) Advanced to Question 19-356

665 16 B 3.9.7 (LCO, SR RAI - Changes associated with RAI 572 Advanced response3.9.7.11 Advanced to Question 19-364

666 17 17.4 (Table 17.4- RAI - Changes associated with RAI 563 Advanced response1)Avancd to Question 19-356

667 17 17.4 (Tables 17.4- Design Changes associated with I&C Architecture andS1.17.4-2) Dhance Distributed Control System

668 17 17.4.2.2, 17.4.2.3 Design Changes associated with I&C Architecture andChanoe Distributed Control System

669 17 17.6.8 RAI Changes associated with RAI 547 Supplement 5resnonse to Question 03.06.01-14

670 18 18.1.6 RAI Changes associated with RAI 336 Supplement 2response to Question 18-84

671 18 18.2.4 RAI Changes associated with RAI 336 Supplement 2resoonse to Question 18-84

Page 27 of 29

Page 36: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 2US-EPR FSAR Tier 2

Summar~y of Chan es for Rev. 5Item Chapter Subsection Type of Description of ChangeNo. Change

672 18 18.3.5 RAI Changes associated with RAI 336 Supplement 2resnonse to Question 18-84

673 18 18.5.4 RAI Changes associated with RAI 336 Supplement 2resoonse to Question 18-84

674 18 18.6.4 RAI Changes associated with RAI 336 Supplement 2response to Question 18-84

675 18 18.7.1.2 RAI Changes associated with RAI 555 Supplement 6response to Question 07.01-53

676 18 18.7.2.4 RAI Changes associated with RAI 336 Supplement 2resoonse to Question 18-84

677 18 18.7.3 RAI Changes associated with RAI 336 Supplement 2response to Question 18-84

678 18 18.7.4.6 RAI Changes associated with RAI 336 Supplement 2response to Question 18-84

679 18 18.7.9 RAI Changes associated with RAI 336 Supplement 2response to Question 18-84

680 18 18.7.9 RAI Changes associated with RAI 505 Supplement 30response to Question 07.01-35

681 18 18.10.4 RAI Changes associated with RAI 336 Supplement 2response to Question 18-84

682 18 18.11.5 RAI Changes associated with RAI 336 Supplement 2resoonse to Question 18-84

683 18 18.12.4 RAI Changes associated with RAI 336 Supplement 2response to Question 18-84

684 19 19.1 RAI Changes associated with RAI 527 Supplement 2resoonse to Question 14.03.02-61

685 19 19.1 (Tables 19.1- RAI - Changes associated with RAI 455 Advanced response37 & 19.1-106; Advanced to Question 19-341Figure 19.1-31)

686 19 19.1 (Table 19.1- RAI - Changes associated with RAI 227 Advanced response109) Advanced to Question 19-292

687 19 19.1 (including RAI - Changes associated with RAI 289 Advanced responseassociated § 19.1 Advanced to Question 19-329Tables & Figures)

688 19 19.1.2.2, 19.1.2.3 RAI Changes associated with RAI 547 Supplement 5response to Question 0:3,06.01-14

689 19 19.1.5.1.1.1 thru RAI - Changes associated with RAI 455 Advanced response19.1.5.1.1.4, Advanced to Question 19-34119.1.5.1.2.2 thru19.1.5.1.2.4

690 19 19.1.5.4, RAI - Changes associated with RAI 541 Advanced response19.1.5.4.1 Advanced to Question 02-3

691 19 19.1.5.4.1 RAI Changes associated with RAI 561 Supplement 1response to Question 19-01-48

692 19 19.1.5.4.2 RAI Changes associated with RAI 561 Supplement 1response to Question 19.01-49

693 19 19.1.5.4.3 RAI Changes associated with RAI 561 Supplement 1response to Question 19.01-50

694 19 19.1.9 RAI - Changes associated with RAI 455 Advanced responseAdvanced to Question 19-341

695 19 19.1.9 RAI Changes associated with RAI 505 Supplement 30response to Question 07.01-35

696 19 19.2 (Table 19.2- Design Changes associated with SAHRS HX Design Change_r Chanpe

697 19 19.2 (Table 19.2- RAI - Changes associated with RAI 563 Advanced response6: Fioure 19.2-22) va to Question 19-356

698 19 19.2.3.3.3.1, RAI Changes associated with RAI 511 Supplement 519.2.3.3.3.2 resoonse to Question 06.02,02-126

699 19 19.2.4.4.1.3 RAI Changes associated with RAI 553 Supplement 4resoonse to Question 06.02.05-31

Page 28 of 29

Page 37: Standard Design Certification of the U.S. EPR (Project No ... · Revision 2 of the U.S. EPR Final Safety Analysis Report for Design Certification," NRC:10:081, August 31, 2010. Ref.

Attachment 2US-EPR FSAR Tier 2

Summary of Chanqes for Rev. 5

Page 29 of 29

Item Chapter Subsection Type of Description of ChangeNo. Change

700 19 19.2.4.4.5.2 RAI Changes associated with RAI 473 Supplement 6_esoonse to Question 06.02.05-24

701 19 19.2.5 RAI Changes associated with RAI 547 Supplement 5response to Question 03.06.01-14

702 19 19.2.5.3 RAI - Changes associated with RAI 460 Advanced responseAdvanced to Question 19-350

703 19 19.2.7.3 RAI Changes associated with RAI 565 Supplement 1resoonse to Question 19-357

704 19 19.2.7.4 RAI Changes associated with RAI 565 Supplement 1resoonse to Question 19-358

705 19 19.2.7.4 RAI Changes associated with RAI 565 Supplement 2resoonse to Question 19-360

706 19 19.2.7.4 Consistency Changes associated with reference to Appendix 3EEditorial_hana__

707 19 19.2.7.4, RAI Changes associated with RAI 565 Supplement 119.2.7.5.2 response to Question 19-359

708 19 19.2.7.4, RAI Changes associated with RAI 565 Supplement 119.2.7.5.2 response to Question 19-363

709 19 19.2.7.5.2 RAI Changes associated with RAI 565 Supplement 1res•onse to Question 19-361

710 19 19.2.7.5.4 RAI Changes associated with RAI 565 Supplement 1resoonse to Question 19-363

711 19 19.2.8, 19.2.9 RAI - Changes associated with RAI 563 Advanced responseAdvanced to Question 19-356

712 19 19.2.9 RAI Changes associated with RAI 565 Supplement 1_resoonse to Question 19-357

713 19 19.2.9 RAI Changes associated with RAI 565 Supplement 1resoonse to Question 19-360

714 19 Appendices 19A, RAI - Changes associated with RAI 289 Advanced response19B & 19C ( Advanced to Question 19-329