STAKEHOLDER MEETINGTHURSDAY, JANUARY 10, 2019
![Page 2: STAKEHOLDER MEETING - Houston Bike Plan€¦ · 10-01-2019 · PowerPoint Presentation Author: Eccles, Peter - PD Created Date: 1/10/2019 5:17:48 PM ...](https://reader034.fdocuments.us/reader034/viewer/2022042420/5f370826e8c69f7efe478007/html5/thumbnails/2.jpg)
Agenda
• Project History, Overview, and Purpose
• Recommended Design
• Timeline and Next Steps
• Q&A
![Page 3: STAKEHOLDER MEETING - Houston Bike Plan€¦ · 10-01-2019 · PowerPoint Presentation Author: Eccles, Peter - PD Created Date: 1/10/2019 5:17:48 PM ...](https://reader034.fdocuments.us/reader034/viewer/2022042420/5f370826e8c69f7efe478007/html5/thumbnails/3.jpg)
Project History
Austin and LaBranch have been identified as priority bikeway corridors by…
• Comprehensive Bikeway Plan (1993)
• Houston Bike Plan (2017)
• Museum Park Livable Centers Study (2018)
• Midtown Strategic Plan (2018)
![Page 4: STAKEHOLDER MEETING - Houston Bike Plan€¦ · 10-01-2019 · PowerPoint Presentation Author: Eccles, Peter - PD Created Date: 1/10/2019 5:17:48 PM ...](https://reader034.fdocuments.us/reader034/viewer/2022042420/5f370826e8c69f7efe478007/html5/thumbnails/4.jpg)
“High-Comfort” Bikeways
One of the key elements to improve bicycling in Houston is the expansion of safe, connected bikeways that minimize people’s interaction with high volume, high speed traffic.
—Houston Bike Plan
![Page 5: STAKEHOLDER MEETING - Houston Bike Plan€¦ · 10-01-2019 · PowerPoint Presentation Author: Eccles, Peter - PD Created Date: 1/10/2019 5:17:48 PM ...](https://reader034.fdocuments.us/reader034/viewer/2022042420/5f370826e8c69f7efe478007/html5/thumbnails/5.jpg)
City-County Bikeway Partnership
• In April 2018, Commissioner Rodney Ellis of Harris County Precinct 1 pledged $10 million to expand Houston’s “high-comfort” bikeway network
• City leads planning, public engagement; provides additional funding
![Page 6: STAKEHOLDER MEETING - Houston Bike Plan€¦ · 10-01-2019 · PowerPoint Presentation Author: Eccles, Peter - PD Created Date: 1/10/2019 5:17:48 PM ...](https://reader034.fdocuments.us/reader034/viewer/2022042420/5f370826e8c69f7efe478007/html5/thumbnails/6.jpg)
Regional Spines
• Using bayou trails as anchors, connects many underserved communities with the region’s jobs, parks, and other major destinations
• Rapid implementation
• Will expand Houston’s “high-comfort” bikeway network from ~8 to nearly 30 miles
![Page 7: STAKEHOLDER MEETING - Houston Bike Plan€¦ · 10-01-2019 · PowerPoint Presentation Author: Eccles, Peter - PD Created Date: 1/10/2019 5:17:48 PM ...](https://reader034.fdocuments.us/reader034/viewer/2022042420/5f370826e8c69f7efe478007/html5/thumbnails/7.jpg)
Austin Corridor
• North/South bikeway anchored by Buffalo and Brays Bayous
• Links Downtown to Midtown, Museum District, Hermann Park, TMC
• Cornerstone of regional network
• Aligned on Austin, LaBranch, and Crawford
![Page 8: STAKEHOLDER MEETING - Houston Bike Plan€¦ · 10-01-2019 · PowerPoint Presentation Author: Eccles, Peter - PD Created Date: 1/10/2019 5:17:48 PM ...](https://reader034.fdocuments.us/reader034/viewer/2022042420/5f370826e8c69f7efe478007/html5/thumbnails/8.jpg)
Two-way Cycle TrackAustin Street
Lamar Street, Houston, TX
Washington, DC
Calgary, AB
![Page 9: STAKEHOLDER MEETING - Houston Bike Plan€¦ · 10-01-2019 · PowerPoint Presentation Author: Eccles, Peter - PD Created Date: 1/10/2019 5:17:48 PM ...](https://reader034.fdocuments.us/reader034/viewer/2022042420/5f370826e8c69f7efe478007/html5/thumbnails/9.jpg)
Neighborhood BikewayLaBranch, Calumet/Prospect, Crawford
Portland, OR Minneapolis, MN
![Page 10: STAKEHOLDER MEETING - Houston Bike Plan€¦ · 10-01-2019 · PowerPoint Presentation Author: Eccles, Peter - PD Created Date: 1/10/2019 5:17:48 PM ...](https://reader034.fdocuments.us/reader034/viewer/2022042420/5f370826e8c69f7efe478007/html5/thumbnails/10.jpg)
Why Austin?
• Low traffic volumes
• Not directly connected to freeway access ramps
• Directly connected to HCC at South end, Buffalo Bayou trail extension at North end
• Previous proposal: Caroline/Austin one-way pair
• Midtown section of Caroline to be under construction for 24 months
• Two-way design allows for quick implementation of regional network
• Can be revisited in future
![Page 11: STAKEHOLDER MEETING - Houston Bike Plan€¦ · 10-01-2019 · PowerPoint Presentation Author: Eccles, Peter - PD Created Date: 1/10/2019 5:17:48 PM ...](https://reader034.fdocuments.us/reader034/viewer/2022042420/5f370826e8c69f7efe478007/html5/thumbnails/11.jpg)
Why LaBranch?
![Page 12: STAKEHOLDER MEETING - Houston Bike Plan€¦ · 10-01-2019 · PowerPoint Presentation Author: Eccles, Peter - PD Created Date: 1/10/2019 5:17:48 PM ...](https://reader034.fdocuments.us/reader034/viewer/2022042420/5f370826e8c69f7efe478007/html5/thumbnails/12.jpg)
Why Crawford?
• Aligns with Centennial Gardens entrance to Hermann Park
• All-way stop and crossing enhancements proposed at Hermann Drive
![Page 13: STAKEHOLDER MEETING - Houston Bike Plan€¦ · 10-01-2019 · PowerPoint Presentation Author: Eccles, Peter - PD Created Date: 1/10/2019 5:17:48 PM ...](https://reader034.fdocuments.us/reader034/viewer/2022042420/5f370826e8c69f7efe478007/html5/thumbnails/13.jpg)
Austin Downtown to McGowen52’ wide
Existing
Proposed
![Page 14: STAKEHOLDER MEETING - Houston Bike Plan€¦ · 10-01-2019 · PowerPoint Presentation Author: Eccles, Peter - PD Created Date: 1/10/2019 5:17:48 PM ...](https://reader034.fdocuments.us/reader034/viewer/2022042420/5f370826e8c69f7efe478007/html5/thumbnails/14.jpg)
Austin McGowen to Holman35’ wide
PREVIOUS PROPOSAL
Existing
![Page 15: STAKEHOLDER MEETING - Houston Bike Plan€¦ · 10-01-2019 · PowerPoint Presentation Author: Eccles, Peter - PD Created Date: 1/10/2019 5:17:48 PM ...](https://reader034.fdocuments.us/reader034/viewer/2022042420/5f370826e8c69f7efe478007/html5/thumbnails/15.jpg)
Austin McGowen to Holman35’ wide
Proposed
Existing
Proposed(Mid-block)
![Page 16: STAKEHOLDER MEETING - Houston Bike Plan€¦ · 10-01-2019 · PowerPoint Presentation Author: Eccles, Peter - PD Created Date: 1/10/2019 5:17:48 PM ...](https://reader034.fdocuments.us/reader034/viewer/2022042420/5f370826e8c69f7efe478007/html5/thumbnails/16.jpg)
Austin McGowen to Holman35’ wide
Proposed(Minor Intersections)
Proposed(Major Intersections)
![Page 17: STAKEHOLDER MEETING - Houston Bike Plan€¦ · 10-01-2019 · PowerPoint Presentation Author: Eccles, Peter - PD Created Date: 1/10/2019 5:17:48 PM ...](https://reader034.fdocuments.us/reader034/viewer/2022042420/5f370826e8c69f7efe478007/html5/thumbnails/17.jpg)
LaBranch HCC to Prospect/Calumet35’ wide
Existing
Proposed
![Page 18: STAKEHOLDER MEETING - Houston Bike Plan€¦ · 10-01-2019 · PowerPoint Presentation Author: Eccles, Peter - PD Created Date: 1/10/2019 5:17:48 PM ...](https://reader034.fdocuments.us/reader034/viewer/2022042420/5f370826e8c69f7efe478007/html5/thumbnails/18.jpg)
Crawford Prospect/Calumet to Hermann22’ wide each way
Existing
Proposed
![Page 19: STAKEHOLDER MEETING - Houston Bike Plan€¦ · 10-01-2019 · PowerPoint Presentation Author: Eccles, Peter - PD Created Date: 1/10/2019 5:17:48 PM ...](https://reader034.fdocuments.us/reader034/viewer/2022042420/5f370826e8c69f7efe478007/html5/thumbnails/19.jpg)
Timeline and Next Steps
• Stakeholder Engagement
Now and ongoing
• 50% Design
Mid January 2019
• 90% Design
Late February 2019
• 100% Design
Mid March 2019
• Construction Begins
Late March 2019