A
0.000 m
00_Ground Floor
A
4.100 m
01_First Floor
A
8.150 m
Second Floor
A
12.050 m
03_Third Floor.
A
19.850 m
05_Roof
R6 R7 R8 R9 R10 R11 R12 R13 R14
A
21.825 m
06_Parapet
R5R4R3R1 R2
A
15.950 m
04_Fourth Floor
3300 6075 6075 6075 6075 6075 6075 5625 5625 6075 6075 6075 3300
Stair tower - panelcolour TBC
Stair tower - panelcolour TBC
A
0.000 m
00_Ground Floor
A
4.100 m
01_First Floor
A
8.150 m
Second Floor
A
12.050 m
03_Third Floor.
A
19.850 m
05_Roof
ABE CD
A
21.825 m
06_Parapet
A
15.950 m
04_Fourth Floor
9000 9000 6000 12000 Stair tower - panelcolour TBC
Red Brick (colour TBC)
Glass
Metal Cladding Standing Seam / Aluminium Rainscreen Panel (TBC)
Solar Thermal Collectior - area TBC
Metal Cladding Aluminium Horizontal Composite Panel (TBC)
Pre-cast concrete/ reconstituted stone panel (TBC)
Metal clad recessed reveals shown to head of allopenings within brick
Red Brick - referenceimage - Swansea BayCampus student halls ofresidence to west of site
Potential green wall
AHR Architects Ltd8th FloorClifton HeightsTriangle WestBristolBS8 1EJUnited Kingdom
T +44(0)117 9299146E [email protected]
original by date created approved by
client name
project
drawing
computer file plot date
project number scale
drawing number rev issue status
This drawing is to be read in conjunction with all relateddrawings. All dimensions must be checked and verified onsite before commencing any work or producing shopdrawings.The originator should be notified immediately ofany discrepancy. This drawing is copyright and remains theproperty of AHR.
@A3 1 : 200
C:\Revit Projects\2015.00682.000 - IMPACT, SwanseaUniversity REVIT 2015 - RT local.rvt
F
HB HB22/06/16
North and West Elevations
2015.00682.000
IMPACT
Swansea University
AHR-AR-B02-20-300 PL
1 : 200
West Elevation
1 : 200
North Elevation
0
SCALE 1 :
4 8 12
200
Rev Description Date Dr by App by
A Revised for Stage 2 Issue 22.07.16 HB HB
B Revised to include clientdirected post stage 2changes
16.09.16 HB HB/GO
C Revised to include clientdirected post stage 2changes
05.10.16 HB HB
D PT Agreed Elevations. Handrail added to north and southelevation. Notes added. Keyamended. Issued forcomment. Grid reviewed.
17.01.17 RT FC
E Issued for Public Consultation 09.02.17 RT FC
F Precast stone added to northelevation following SU review.Material palette refined.
17.02.17 RT FC