Stage 2 D/DBP Sample Schedules - Louisiana Department of Health

189
Stage 2 D/DBP Sample Schedules Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site. Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter) All public water systems must collect a TTHMs/HAA5 sample set at each sample site. PHM = Peak Historical Month MBD = Monitoring Begin Date 1/1/2013 YR Monitoring Begin Date: Frequency of Sampling: 29 PALMS TRAILER PARK LA1117023 Sample Point ID Sample Address/Location PWS ID PHM or Collection Month: 49028 SQUIRREL ALLEY RD DBP01 9 September - 18263 TAB CREEK RD DBP02 9 September - 1/1/2013 YR Monitoring Begin Date: Frequency of Sampling: A CHILDS WORLD DAY CARE & LEARNING CENTR LA2005266 Sample Point ID Sample Address/Location PWS ID PHM or Collection Month: KITCHEN TAP DBP01 9 September - 1 YEAR OLD ROOM DBP02 9 September - 1/1/2013 YR Monitoring Begin Date: Frequency of Sampling: A TO Z DAYCARE CENTER LA2103320 Sample Point ID Sample Address/Location PWS ID PHM or Collection Month: MAIN BLDG FRONT DBP01 8 August - KITCHEN DBP02 8 August - 1/1/2013 YR Monitoring Begin Date: Frequency of Sampling: ABITA SPRINGS WATER SYSTEM LA1103002 Sample Point ID Sample Address/Location PWS ID PHM or Collection Month: CENTER BOARD @ PACKET DBP02 8 August - 6TH STREET @ ST. CHARLES DBP03 8 August - 1/1/2013 YR Monitoring Begin Date: Frequency of Sampling: AIR LIQUIDE GEISMAR UTILITY SERVICES LA2005256 Sample Point ID Sample Address/Location PWS ID PHM or Collection Month: RUBICON ENTRY DBP01 8 August - 10/1/2015 QT Monitoring Begin Date: Frequency of Sampling: AJAX BEULAH WATER SYSTEM LA1069015 Sample Point ID Sample Address/Location PWS ID PHM or Collection Month: 963 BETHANY ROAD DBP02 12 December - HWY 487 @ UNION GROVE RD DBP03 12 December - Wednesday, February 7, 2018 Page 1 of 189

Transcript of Stage 2 D/DBP Sample Schedules - Louisiana Department of Health

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

29 PALMS TRAILER PARK LA1117023

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

49028 SQUIRREL ALLEY RDDBP01 9 September-

18263 TAB CREEK RDDBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

A CHILDS WORLD DAY CARE & LEARNING CENTR LA2005266

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

KITCHEN TAPDBP01 9 September-

1 YEAR OLD ROOMDBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

A TO Z DAYCARE CENTER LA2103320

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

MAIN BLDG FRONTDBP01 8 August-

KITCHENDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ABITA SPRINGS WATER SYSTEM LA1103002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

CENTER BOARD @ PACKETDBP02 8 August-

6TH STREET @ ST. CHARLESDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

AIR LIQUIDE GEISMAR UTILITY SERVICES LA2005256

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

RUBICON ENTRYDBP01 8 August-

10/1/2015 QT Monitoring Begin Date: Frequency of Sampling:

AJAX BEULAH WATER SYSTEM LA1069015

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

963 BETHANY ROADDBP02 12 December-

HWY 487 @ UNION GROVE RDDBP03 12 December-

Wednesday, February 7, 2018 Page 1 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ALABAMA WATER SYSTEM LA1013001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HIGHWAY 151 AND LINCOLN PARISH ROADDBP01 7 July-

14077 HIGHWAY 151DBP02 7 July-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

ALBERTA WATER SYSTEM LA1013002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

FAIR RDDBP01 8 August-

LAKEFRONT ROADDBP02 8 August-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

ALEXANDER MILNE HOME FOR WOMEN LA1103196

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1024 MILNE CIRCLEDBP01 9 September-

1052 MILNE CIRCLEDBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ALLEN PARISH WW DISTRICT NO 1 LA1003001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

3090 E RIVER ROADDBP01 6 June-

257 SHALLOW HOLE ROADDBP02 6 June-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

ALMA PLANTATION LTD LA1077048

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

12734 HWY 416DBP02 8 August-

4412 HWY 413DBP04 8 August-

7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

ALMATIS LA2005165

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

ADMIN BLDGDBP01 7 July-

WAREHOUSEDBP03 7 July-

Wednesday, February 7, 2018 Page 2 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ANGELLE S TRAILER PARK WATER SYSTEM LA1055060

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2321 MILLS RD LOT 35DBP02 7 July-

2321 MILLS RD OFFICEDBP03 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ANGIE WATER SUPPLY LA1117008

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

CORNER OF DIXIE ST & HWY 1071DBP01 8 August-

HOUSTON @ 30365DBP02 8 August-

7/1/2016 QT Monitoring Begin Date: Frequency of Sampling:

ANNADALE PLANTATION WATER SUPPLY LA1047011

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

TRACTOR SHEDDBP01 8 August-

54198 HWY 995DBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ARC OF ACADIANA LA1001011

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

ADMINISTRATION BUILDINGDBP02 6 June-

CAFETERIADBP03 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ARCADIA WATER SYSTEM LA1013003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

DANIEL ST @ BEECH STDBP02 8 August-

1192 JONESBORO ROADDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ARCHIBALD WATER SYSTEM LA1083012

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

139 HWY 135DBP01 7 July-

646 HWY 3048DBP02 7 July-

Wednesday, February 7, 2018 Page 3 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

7/1/2015 YR Monitoring Begin Date: Frequency of Sampling:

ARDAGH GLASS WATER SYSTEM LA2061003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

NORTH SIDE OF VISITORS PARKINGDBP01 7 July-

SOUTH WALL OF ADMIN BLDGDBP02 7 July-

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

ASCENSION CONSOLIDATED UTILITY DIST 1 LA1005045

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

MODESTEDBP01 6 June-

JULESDBP03 6 June-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

ASCENSION PARISH WATER WORKS DISTRICT 2 LA1005001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

MARCHAND SCHOOL ROAD AT HWY 22DBP02 6 June-

HIGHWAY 44 AND HIGHWAY 942DBP03 6 June-

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

ASSUMPTION PARISH WW DISTRICT 1 LA1007001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1100 HIGHWAY 662DBP01 9 September-

2505 HIGHWAY 1DBP02 9 September-

7261 HIGHWAY 1DBP03 9 September-

3649 HIGHWAY 308DBP04 9 September-

7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

ATHENS WATER SYSTEM LA1027001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

14683 HWY 9DBP02 7 July-

HWY 9 SOUTHDBP03 7 July-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

ATLANTA WATER SUPPLY LA1127001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

12137 MAIN STREETDBP01 9 September-

705 HWY 1228DBP02 9 September-

Wednesday, February 7, 2018 Page 4 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

AUDUBON PARK APARTMENTS WATER SYSTEM LA1033133

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

CLUBHOUSEDBP01 9 September-

BUILDING 9DBP02 9 September-

7/1/2016 QT Monitoring Begin Date: Frequency of Sampling:

AUTUMN ACRES MHP WATER SYSTEM LA1017002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 701DBP02 9 September-

LOT 756DBP03 9 September-

4/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

AVOYELLES PARISH WATERWORKS DISTRICT 1 LA1009002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

B.F. LEMOINEDBP01 5 May-

BIG BEND CHURCHDBP02 5 May-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

AVOYELLES WARD 3 WATERWORKS DISTRICT LA1009017

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

260 LEE STREETDBP01 5 May-

1462 HWY 1187DBP02 5 May-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

AVOYELLES WARD ONE WATER SYSTEM INC LA1009016

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1638 SALINE RDDBP01 7 July-

HWY 107DBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

AVOYELLES WATER COMMISSION LA1009021

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

7162 HWY 1DBP03 5 May-

12066 HWY 1DBP04 5 May-

Wednesday, February 7, 2018 Page 5 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

AZALEA LANE TRAILER PARK LA1103004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 143DBP02 8 August-

LOT 101DBP03 8 August-

1/1/2016 3Y Monitoring Begin Date: Frequency of Sampling:

BABY BEGINNINGS LA2005265

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

NORTH EAST TAP 1DBP01 8 August-

TAP 1 - INSIDE BLDGDBP02 8 August-

1/1/2016 QT Monitoring Begin Date: Frequency of Sampling:

BACKWOOD VILLAGE WATER SYSTEM LA1127022

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 505 AND WILLARD TAYLORDBP02 3 March-

LUCKY ROADDBP03 3 March-

4/1/2012 QT Monitoring Begin Date: Frequency of Sampling:

BARKSDALE AFB WATER SYSTEM LA1015022

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HANGER ONEDBP03 8 August-

CHILD DEVELOPMENT CENTERDBP05 8 August-

FUELSDBP06 8 August-

OFF LOAD FACILITYDBP07 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BARRON RIDGE SUBDIVISION WATER SYSTEM LA1017072

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

10963 BARROW RIDGEDBP01 6 June-

10829 BARROW RIDGEDBP02 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BASF CORPORATION LA2005003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

WEST GATE SECURITY BUILDINGDBP02 8 August-

ACETYLENE BUILDINGDBP03 8 August-

Wednesday, February 7, 2018 Page 6 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

4/1/2014 YR Monitoring Begin Date: Frequency of Sampling:

BASTROP WATER SYSTEM LA1067003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

TEAKWOODDBP02 8 August-

INDUSTRIAL DRIVEDBP04 2 February-

7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:

BATON ROUGE WATER COMPANY LA1033005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

GEN BEN DAVIS @ VETSDBP03 7 July-

14061 TROY DUPLESSISDBP10 7 July-

40250 PELICAN POINT PKWYDBP11 7 July-

9526 ARLEENDBP12 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BAYOU BONNE IDEE WS LA1067002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

11724 HORSESHOE LAKE RDDBP01 8 August-

BONNE IDEE RD.DBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BAYOU DES CANNES WATER SYSTEM LA1039016

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

4283 RUPPERT ROADDBP02 10 October-

591 HWY 190 WESTDBP03 10 October-

7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

BAYOU LACOMBE MIDDLE SCHOOL LA2103053

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SIDE OF MAIN BUILDINGDBP02 7 July-

SAMPLE TAP AT GYMDBP03 7 July-

4/1/2014 YR Monitoring Begin Date: Frequency of Sampling:

BAYOU LIBERTY WATER ASSOCIATION LA1103005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LIBERTY @ CARROLL RDDBP01 11 November-

DIXIE RANCH RD @ VICTORIA WAYDBP04 8 August-

Wednesday, February 7, 2018 Page 7 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

BAYOU MACON WATER SYSTEM LA1065005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

154 ANTLEY RDDBP01 7 July-

1240 HWY 577 SDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BAYOU PIERRE WATER SYSTEM LA1081008

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HALIFAX PLANTATION RD @ HWY 1DBP01 8 August-

HARTS ISLAND RD @ ELLERBEE RDDBP02 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

BAYOU TECHE WATER WORKS LA1099002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1009 WENDY DRIVEDBP01 8 August-

KYLE LANDRY @ NORTHSIDE ROADDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BAYVIEW DEVELOPMENT LA2101026

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BAYVIEW DRIVE (POC #1)DBP01 9 September-

LOT #6 CAPTAINS LANE (POC#5)DBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BAYWOOD ESTATES SUBD LA1105045

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

42375 MAGNOLIA LOOPDBP01 8 August-

17384 BAYWOOD DRIVEDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BCC DETENTION CENTER WS LA1083016

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

UNIT 2DBP01 8 August-

FIRE HOUSEDBP02 8 August-

Wednesday, February 7, 2018 Page 8 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BEAR CREEK WATER SYSTEM LA1049001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1254 ARCADIA HWYDBP01 7 July-

475 BEAR KNOLLDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BEAU CHENE WATER SYSTEM LA1103006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

205 MAKO NAKODBP01 8 August-

137 ACADIAN LANEDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BEAUREGARD DISTRICT NO 2 WARD NO 5 LA1011012

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SNYDER RD @ HWY 389DBP01 7 July-

4456 HWY 27DBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BEAUREGARD WATER DISTRICT #5 LA1011009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

DANIEL ASHWORTH RDDBP01 8 August-

MIDDLE OF FISH HOLE LOOPDBP02 8 August-

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

BEAUREGARD WATER WORKS DIST #3 LA1011008

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1-2 RAGLEY ON CONLEYDBP01 9 September-

TEXAS EASTERN ROADDBP02 9 September-

BANNISTER ROADDBP03 9 September-

THOMAS SMITH ROADDBP04 9 September-

CLAYTON ISLES ROADDBP05 9 September-

SCHEUTZ ROADDBP06 9 September-

Wednesday, February 7, 2018 Page 9 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BEEKMAN WATER SYSTEM LA1067018

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HENDRIX RD - STATE LINEDBP01 10 October-

STEVENSON @ CROSSETTDBP02 10 October-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BELAH FELLOWSHIP WATER SYSTEM LA1059001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HASSAN DRIVE @ HWY 8DBP01 7 July-

HURRICANE CR & WHITE SULPHUR SPRINGS RDDBP02 7 July-

1/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

BEL-DI-GIL WATER SYSTEM LA1017004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

ADGER STDBP01 7 July-

HWY 173DBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BELLA VISTA MHP WATER SYSTEM LA1017005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

308 BUDDYDBP01 8 August-

3006 BELLA VISTADBP02 8 August-

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

BELLE CHASSE WATER DISTRICT LA1075001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BC FIREHOUSE - HWY 123DBP02 9 September-

WILSON SUBD HWY 23DBP03 9 September-

GRAIN ELEVATORDBP05 9 September-

WOODLAND HIGHWAYDBP06 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BELLE PLACE TRAILER PARK WATER SYSTEM LA1055082

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

600 ST NAZAIRE LOT 23DBP01 6 June-

600 ST NAZAIRE LOT 75DBP02 6 June-

Wednesday, February 7, 2018 Page 10 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BELLE RINA LA1005006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

819 E VERNADBP01 8 August-

614 E VERNADBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BELLEVILLE SUBDIVISION WATER SYSTEM LA1055094

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

128 LA RUE CANNES(TCR006)DBP02 8 August-

141 LA RUE BIARRITZ(MRT007)DBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BELLEVUE WATER SYSTEM LA1015041

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BODCAU DAM ROADDBP01 8 August-

S. CLOVER LEAFDBP02 8 August-

7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

BELLWOOD WATER SYSTEM LA1069014

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 117 & 118 EDBP01 9 September-

4600 HWY 118 @ MINKDBP02 9 September-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

BELMONT WATERWORKS INC LA1085053

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HIGHWAY 1216DBP02 8 August-

HIGHWAY 174DBP03 8 August-

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

BERNICE WATER SYSTEM LA1111001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

PINE GROVE ROADDBP01 8 August-

PISGAH ROADDBP02 8 August-

Wednesday, February 7, 2018 Page 11 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

4/1/2012 QT Monitoring Begin Date: Frequency of Sampling:

BETTER WATERWORKS WATER SYSTEM LA1073003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

201 BARBARA DRIVEDBP01 8 August-

BARNES RD SWARTZ FAIRBANKSDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BEVERLY HEIGHTS MANOR LA1103178

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

537 PANTHERDBP01 9 September-

526 NORTHSHORE LANEDBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BIENVILLE WATER SYSTEM LA1013004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

253109 LA HWY 9 (NORTH)DBP02 7 July-

LA HWY 507DBP03 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BIG BRANCH TRAILER PARK LA1103182

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

TRAILER 1DBP01 8 August-

BTWN TRAILER 22 AND 23DBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BIG CAJUN II POWER PLANT LA2077010

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BC2 WAREHOUSEDBP01 8 August-

TRAINING CENTERDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BIG OAKS WATER SYSTEM LA1017081

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

11011 BIG OAKS TRAILDBP01 6 June-

10047 BIG OAKS TRAILDBP02 6 June-

Wednesday, February 7, 2018 Page 12 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BIOLAB, INC LA2019053

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

WASTEWATER TREATMENT PLANT TAPDBP01 8 August-

CENTRAL MAINTENANCE SAMPLE TAPDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BISTINEAU WATER SYSTEM LA1119001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

3948 HWY 371DBP02 7 July-

616 MARTHA WOODSDBP03 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BLACK RIVER WATER SYSTEM LA1025002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 124 @ DELTA GINDBP01 8 August-

HWY 124 @ HWY 3037DBP02 8 August-

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

BLANCHARD WATER SYSTEM LA1017006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

9302 LOWERY RDDBP05 6 June-

8206 N LAKESHORE DRDBP06 6 June-

9735 HEREFORD RDDBP07 6 June-

7411 GREYWOOD DRDBP08 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BLOCKER WATER SYSTEM LA1119002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

KINGS CORNER RDDBP01 8 August-

DAVIS STORE @ PORTERVILLE RDDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BOASSO INDUSTRIES,LLC LA2103397

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

MACHINE SHOPDBP02 8 August-

NE CORNER OF BLDG ON RIGHTDBP03 8 August-

Wednesday, February 7, 2018 Page 13 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

BOB COMMUNITY WATERWORKS LA1043016

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

474 COTTON ISLANDDBP01 2 February-

POINT OF ENTRYDBP02 2 February-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BODCAU WATER WORKS LA1015021

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

121 SKIPPER ROADDBP01 9 September-

BETTY JOAN ROADDBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BOGUE-LUSA WATER WORKS DISTRICT LA1117009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

12019 HWY 21DBP02 5 May-

109 RALPH DRIVEDBP03 5 May-

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

BON TERRE CORPORATION WATER SYSTEM LA1005004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

11485 COUNTRY CLUB DRDBP01 8 August-

39374 BON TERRE DRDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BONITA WATER SYSTEM LA1067004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

OLD BONITA ROADDBP01 9 September-

HUMPHREY ROADDBP02 9 September-

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

BRADY MOBILE HOME PARK LA1017090

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

5044 GREENWOOD RD - LOT 23DBP01 8 August-

5044 GREENWOOD RD - LOT 31DBP02 8 August-

Wednesday, February 7, 2018 Page 14 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2014 YR Monitoring Begin Date: Frequency of Sampling:

BRIER LAKE UTILITIES INC LA1103141

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

31101 BELMONT CTDBP02 8 August-

61301 WILDBERRY CTDBP03 8 August-

7/1/2016 QT Monitoring Begin Date: Frequency of Sampling:

BRIGAS ESTATES WATER SYSTEM LA1019001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

QUAIL LANEDBP02 9 September-

5954 NOBIE LANEDBP03 9 September-

1/1/2012 YR Monitoring Begin Date: Frequency of Sampling:

BROOKHOLLOW SUBDIVISION WATER SYSTEM LA1055166

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

114 GREENSIDEDBP02 7 July-

316 CREEKSIDEDBP03 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BROUILLETTE WATER SYSTEM INC LA1009003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 452 LOCK AND DAMDBP01 5 May-

KIM RUSH AND FORD'S LANEDBP02 5 May-

1/1/2018 QT Monitoring Begin Date: Frequency of Sampling:

BROWNVILLE WATER SYSTEM LA1073004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

WT HEMPHILL & DELAUGHTERDBP01 5 May-

BAILEY & TIPPETTDBP02 5 May-

EDWARDS & WASHINGTONDBP03 5 May-

919 W OLIVEDBP04 5 May-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

BRYCELAND WATER SYSTEM LA1013005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

209 COLLINSWORTHDBP02 9 September-

198 RED CLAY HILLDBP03 9 September-

Wednesday, February 7, 2018 Page 15 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

BUCKEYE WATER DISTRICT 50 LA1079004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

282 WOODSON LANDINGDBP01 5 May-

6641 HIGHWAY 28 EDBP02 5 May-

7887 HICKORY GROVE ROADDBP03 5 May-

112 OLD BEAUBOUEFDBP04 5 May-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

C K B TRAILER PARK WATER SYSTEM LA1019059

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BEHIND LOTS 30 & 31 END OF LINE SE SIDEDBP01 8 August-

BEHIND LOT # 1 END OF LINE SW CORNERDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CA INST OF TECH - LIGO OBSERVATORY LA2063042

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

TAP AT OFFICEDBP01 8 August-

TAP AT SCHOOL BLDGDBP02 8 August-

10/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

CADEVILLE WATER DISTRICT LA1073060

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 34 AT HWY 546DBP01 8 August-

DR DAVIS DR AT GOLSON RDDBP03 8 August-

10/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

CAJUN MOBILE HOME PARK WATER SYSTEM LA1055121

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

111 GIREER RD LOT 60DBP01 9 September-

111 GIREER RD LOT 10DBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CAL MAINE FOODS, INC LA2091030

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

FRONT TAPDBP01 10 October-

CHLORINE ROOMDBP02 10 October-

Wednesday, February 7, 2018 Page 16 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2014 YR Monitoring Begin Date: Frequency of Sampling:

CALCASIEU PARISH WW 12 WARD 3 LA1019126

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

3961 HENRY PUGHDBP01 10 October-

END OF VERMILION DRIVEDBP03 10 October-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

CALCASIEU PARISH WW DIST 9 CARLYSS LA1019116

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

275 GROS ROADDBP01 7 July-

3058 GUM ISLANDDBP03 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CALCASIEU PARISH WW DISTRICT 7 LA1019114

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

3397 EDGERLY RDDBP01 8 August-

251 SAM DUNHAM RDDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CALCASIEU PARISH WW DISTRICT 8 LA1019118

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

4351 LUTHER ROADDBP01 6 June-

PARK RIDGE LANE @ HWY 90DBP02 6 June-

4/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

CALCASIEU PARISH WW DISTRICT NO 1 LA1019051

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

4562 TOPSYDBP01 7 July-

4569 CYPRESS LAKEDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CALCASIEU PARISH WW DISTRICT NO 4 LA1019053

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

3740 BACK BAY CTDBP01 6 June-

3405 SMITH FERRY RDDBP02 6 June-

Wednesday, February 7, 2018 Page 17 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CALCASIEU PARISH WW DISTRICT NO 5 LA1019084

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 397DBP02 8 August-

PALOMINODBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CALCASIEU REFINING COMPANY W S LA2019132

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

WATER @ C DOCKDBP01 8 August-

WATER @ VACUUM UNITDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CALCASIEU WW #14 WARD 5 LA1019042

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2343 BIG WOODS EDGERLY ROADDBP02 9 September-

GREEN ISLAND ROAD AND POLK SMITH LOOPDBP03 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CALHOUN WATER SYSTEM LA1073006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

451 OWENS ROADDBP01 8 August-

267 HWY 151 NDBP02 8 August-

7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

CAMERON PARISH WATER AND WW DISTRICT 1 LA1023001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1735 MARSHALL STREETDBP01 7 July-

799 DAVIS ROADDBP02 7 July-

4/1/2015 YR Monitoring Begin Date: Frequency of Sampling:

CAMERON PARISH WW DISTRICT 10 LA1023005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

DEEP BAYOUDBP01 9 September-

GULF BEACH HIGHWAYDBP02 9 September-

Wednesday, February 7, 2018 Page 18 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

4/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

CAMERON PARISH WW DISTRICT 11 - BIG LAKE LA1023013

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 384 DEATONVILLEDBP01 6 June-

351 MARTIN HEBERT STDBP02 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CAMERON PARISH WW DISTRICT 11-SWEET LAKE LA1023011

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1002 HWY 385DBP02 6 June-

605 GRANGERVILLEDBP03 6 June-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

CAMERON PARISH WW DISTRICT 2 LA1023002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

DELTRA HARDINDBP02 7 July-

RECREATION CIRCLEDBP03 7 July-

7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

CAMERON PARISH WW DISTRICT 7 LA1023003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

6595 W. CREOLE HWYDBP01 9 September-

675 E. CREOLE HWYDBP02 9 September-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

CAMERON PARISH WW DISTRICT 9 LA1023012

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

CHENIER PERDUE RD DEAD ENDDBP01 6 June-

180 2 B ROADDBP02 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CAMPTI WATER SYSTEM LA1069001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HIGHWAY 80 @ M&M GROCERYDBP01 8 August-

HIGHWAY 71DBP02 8 August-

Wednesday, February 7, 2018 Page 19 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

CARTER PLANTATION LA1063119

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

MAINTENANCE BLDGDBP01 8 August-

30902 CARTER CEMETERY RDDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CARTHAGE BLUFF MARINA LA1063125

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 10DBP01 8 August-

LOT 19EDBP02 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

CASTOR WATER SYSTEM LA1013006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

POST OFFICEDBP02 8 August-

CITY HALLDBP03 8 August-

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

CECILIA WATER CORPORATION LA1099005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1842 DECLOUETDBP01 3 March-

1039 LYNN ROMERO DRDBP02 3 March-

D'ANGEREAU ROADDBP03 3 March-

1502 GRAND ANSE HWYDBP04 3 March-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

CENTRAL BOSSIER WATER SYSTEM LA1015039

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2711 OLD PLAIN DEALING ROADDBP01 8 August-

OLD PLAIN DEALING RD @ ADGER LAKE RDDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CENTRAL CLAIBORNE WATER SYSTEM LA1027009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

CHAT LOOPDBP01 9 September-

LA540DBP02 9 September-

Wednesday, February 7, 2018 Page 20 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CENTRAL GRANT WATER SYSTEM LA1043013

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HALFWAY BETWEEN 562 & 827 MILITARY ROADDBP01 8 August-

441 NELMS LOOPDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CENTRAL PARK SUBDIVISION LA1103088

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

38189 COMMERCIAL COURTDBP01 7 July-

56721 CASS STREETDBP02 7 July-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

CENTRAL WATER SYSTEM LA1119003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BOGALEWIS FLUSH VALVEDBP01 8 August-

BURSON ROADDBP02 8 August-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

CERTAINTEED WATER SYSTEM LA2019010

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

EYE SHOWERDBP01 8 August-

TRAINING BLDGDBP02 8 August-

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

CHAPMAN APARTMENTS LA1103150

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

73601 CHAPMAN DR, D-3DBP01 7 July-

73601 CHAPMAN DR, E-3DBP03 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CHARLES ROSE MHP LA1105069

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 1DBP02 8 August-

LOT 37DBP03 8 August-

Wednesday, February 7, 2018 Page 21 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2012 YR Monitoring Begin Date: Frequency of Sampling:

CHARTRES PLACE SUBDIVISION WATER SYSTEM LA1055173

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

403 TAPESTRYDBP02 7 July-

209 TAPESTRYDBP03 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CHATA MOBILE HOME PARK LA1103125

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

WORK SHOPDBP01 8 August-

LOT 31DBP02 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

CHATAIGNIER WATER SYSTEM LA1039002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1456 LANCE DE CAVELIERDBP01 6 June-

BOB'S ANTIQUE SHOPDBP02 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CHATA-IMA ELEMENTARY SCHOOL W S LA2103029

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

FRONT OF BUILDING (MRT-003)DBP02 8 August-

EAST BUILDING ACROSS FROM WELLDBP03 8 August-

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

CHATHAM WATER SYSTEM LA1049004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

129441 SAWYER ROADDBP01 4 April-

1221 ROBERSON ST.DBP02 4 April-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CHEE CHEE BAY WATER SYSTEM LA1069011

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

GOLDONNA ROAD AND CONLAY FREDERICK ROADDBP01 8 August-

CHESAPEAKE GAS PLANT AND MAMMY TRAIL RDDBP02 8 August-

Wednesday, February 7, 2018 Page 22 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CHENIERE DREW NORTH WATER SYSTEM LA1073100

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

ARK RD & GREENBRIARDBP02 5 May-

HWY 80 & OLE 15DBP03 5 May-

1/1/2018 QT Monitoring Begin Date: Frequency of Sampling:

CHENIERE DREW SOUTH WATER SYSTEM LA1073099

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1206 PUCKETT LANEDBP02 11 November-

CHEEKS AND CHENIERE STATIONDBP03 11 November-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

CHESTERS MOBILE HOME ESTATE WATER SYSTEM LA1055197

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

112 PELTIERDBP01 8 August-

128 PELTIERDBP02 8 August-

10/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

CHESTNUT-READHIMER WATER SYSTEM LA1069012

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

WEAVER CEM RDDBP01 8 August-

COFFEE CROSSINGDBP02 8 August-

1/1/2018 YR Monitoring Begin Date: Frequency of Sampling:

CHOUDRANT WATER SYSTEM LA1061002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

160 WALKER ROADDBP02 8 August-

NORFIELD DR & LOBLOLLY LNDBP04 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CITGO PETROLEUM - CONTRACTOR COMP W S LA2019138

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

GATE 64 GUARD SHACKDBP01 9 September-

VACANT TRAILER ON EAST SIDE OF PROPERTYDBP02 9 September-

Wednesday, February 7, 2018 Page 23 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CITGO PETROLEUM REFINERY WATER SYSTEM LA2019015

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

D DOCKDBP02 9 September-

K34DBP03 9 September-

4/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

CITGO-PECAN GROVE CENTER LA2019141

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

COOK HOUSEDBP01 9 September-

WOMENS OUTSIDE RESTROOMDBP02 9 September-

1/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

CITY OF ABBEVILLE WATER SYSTEM LA1113001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

VFW LIONS CLUB/JIMMY VORHOFF, JR. DRIVEDBP01 3 March-

WEST PORT STREETDBP02 3 March-

CORNER INNDBP03 3 March-

FRANKS ALLEYDBP04 3 March-

10/1/2014 YR Monitoring Begin Date: Frequency of Sampling:

CITY OF ALEXANDRIA WATER SYSTEM LA1079001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2125 AIRBASE ROADDBP03 11 November-

145 ST ANDREWSDBP05 8 August-

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

CITY OF BAKER WATER SYSTEM LA1033003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

17417 WISDOMDBP01 9 September-

12443 WEDGEWOODDBP02 9 September-

1801 DEBRA STREETDBP03 9 September-

14203 FELICITY DRIVEDBP04 9 September-

Wednesday, February 7, 2018 Page 24 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

CITY OF BOGALUSA WATER SYSTEM LA1117001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1228 BORGNE AVEDBP01 4 April-

733 SUPERIOR AVEDBP02 4 April-

1700 S COLUMBIA STDBP03 4 April-

1509 YOUNGS RDDBP04 4 April-

7/1/2012 QT Monitoring Begin Date: Frequency of Sampling:

CITY OF BOSSIER CITY WATER SYSTEM LA1015004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

POE 1401 HAMILTONDBP01 8 August-

N WILLOW AT AIRLINEDBP02 8 August-

2007 WAKEFIELDDBP03 8 August-

3009 DONALDDBP04 8 August-

2200 LANDAUDBP05 8 August-

HWY 80@SWEPCO POLE #79DBP06 8 August-

2223 KIRBY SMITHDBP07 8 August-

BARKSDALE@ RR WWTPDBP08 8 August-

1/1/2018 QT Monitoring Begin Date: Frequency of Sampling:

CITY OF BREAUX BRIDGE WATER SYSTEM LA1099003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

606 LATIOLAISDBP01 11 November-

1213 S MAIN STDBP02 11 November-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CITY OF BROUSSARD HWY 90 WATER SYSTEM LA1055194

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1225 HWY 90 - MEL'S DINERDBP01 6 June-

FABRE RDDBP02 6 June-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

CITY OF BROUSSARD PURCHASE WATER SYSTEM LA1055193

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

606 ST. ETIENNE RD.DBP01 6 June-

PEAR TREE CIRCLEDBP02 6 June-

Wednesday, February 7, 2018 Page 25 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CITY OF BROUSSARD WATER SYSTEM LA1055003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

702 HUVAL DRIVEDBP02 6 June-

POST OFFICE - S. EOLA ROADDBP04 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CITY OF CARENCRO WATER SYSTEM LA1055005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

333 EAST GLORIA SWITCHDBP01 9 September-

121 ANDRE STDBP02 9 September-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

CITY OF DENHAM SPRINGS WATER SYSTEM LA1063004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

11400 LA HWY 1033DBP02 8 August-

10000 DAVIS LANEDBP03 8 August-

JOHNSON ROADDBP05 8 August-

30593 FAIRWAY VIEWDBP06 8 August-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

CITY OF DERIDDER WATER SYSTEM LA1011001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1507 NORTH PINE ROADDBP02 8 August-

HIGHWAY 3226DBP05 8 August-

1/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

CITY OF GONZALES WATER SYSTEM LA1005030

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2425 S. BURNSIDE AVEDBP05 8 August-

2312 S SAN FRANCISCODBP06 8 August-

1908 S ROBERT WILSON RDDBP07 8 August-

1517 N COONTRAP RDDBP08 8 August-

Wednesday, February 7, 2018 Page 26 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

7/1/2014 YR Monitoring Begin Date: Frequency of Sampling:

CITY OF HAMMOND WATER SYSTEM LA1105009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

101 CONRAD ANDERSONDBP01 5 May-

SOUTH RANGE ROAD @ E. HANSONDBP03 5 May-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CITY OF JEANERETTE WATER SYSTEM LA1045004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

MAIN STREET - EAST ENDDBP01 9 September-

MAIN STREET - WEST ENDDBP02 9 September-

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

CITY OF JENNINGS WATER SYSTEM LA1053003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2404 EAST ACADEMY AVEDBP01 8 August-

1909 AIRPORT ROADDBP02 8 August-

4023 SHIRLEY DRIVEDBP03 8 August-

1607 CHURCH STREETDBP04 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CITY OF KAPLAN WATER SYSTEM LA1113009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2913 N HERPINDBP01 11 November-

512 CHENEAU RDDBP02 11 November-

4/1/2012 QT Monitoring Begin Date: Frequency of Sampling:

CITY OF LAKE CHARLES WATER SYSTEM LA1019029

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

4908 DESOTO STREETDBP01 8 August-

209 HELEN STREETDBP02 8 August-

2437K ORY ROADDBP03 8 August-

4260 INDIGO PLACEDBP04 8 August-

Wednesday, February 7, 2018 Page 27 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CITY OF LEESVILLE WATER SYSTEM LA1115019

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

GILLIES & TEXAS HIGHWAYDBP02 8 August-

1ST & ALLEN AVEDBP03 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

CITY OF MANY WATER SYSTEM LA1085016

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

POE LAB TREAT PLANTDBP04 6 June-

FISHER ROADDBP05 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CITY OF MARKSVILLE WATER SYSTEM LA1009011

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

105 HILDA LANEDBP02 8 August-

WASHINGTON STREET EXTDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CITY OF OAKDALE WATER SYSTEM LA1003006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

352 PINE LANEDBP01 6 June-

107 N HOSPITAL DRIVEDBP02 6 June-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

CITY OF PINEVILLE WATER SYSTEM LA1079016

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BAYOU MARIE RDDBP01 6 June-

COLLEGE DRIVEDBP02 6 June-

SUSEK DRIVEDBP03 6 June-

WOODWIND DRIVEDBP04 6 June-

Wednesday, February 7, 2018 Page 28 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

CITY OF PLAQUEMINE WATER SYSTEM LA1047005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

25315 DICKINSON STDBP01 5 May-

ISLAND GOLF COURSEDBP03 5 May-

ANTHONY ST @ BAYOU ROADDBP04 5 May-

59335 WW HARLEAUX BLVDDBP05 5 May-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CITY OF RAYNE WATER SYSTEM LA1001007

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 35 LIFT STATIONDBP01 8 August-

CEMETARY ON BETTY STDBP02 8 August-

1/1/2012 YR Monitoring Begin Date: Frequency of Sampling:

CITY OF SCOTT WATER SYSTEM LA1055026

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1010 DELHOMMEDBP02 5 May-

424 LAURENDBP03 5 May-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

CITY OF ST MARTINVILLE WATER SYSTEM LA1099007

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2598 CATAHOULA HWYDBP01 9 September-

CYPRESS ISLAND ROADDBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CITY OF VIDALIA WATER SYSTEM LA1029011

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

MURRAY STREETDBP02 8 August-

ALABAMA STREETDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CITY OF VILLE PLATTE WATER SYSTEM LA1039010

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

ACORIEL / 1750 E. MAIN STDBP02 7 July-

211 MOREIN STDBP03 7 July-

Wednesday, February 7, 2018 Page 29 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CITY OF WINNFIELD WATER SYSTEM LA1127012

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

FAIRGROUNDS ROADDBP01 7 July-

1107 EAST LAFAYETTE STREETDBP02 7 July-

7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

CITY OF YOUNGSVILLE PURCHASE WS LA1055195

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

105 FIELDCREST PKWYDBP01 8 August-

706 LAFAYETTE STDBP02 8 August-

1011 LANGLINAIS STDBP03 8 August-

310 BURLEY RDDBP04 8 August-

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

CITY OF YOUNGSVILLE WATER SYSTEM LA1055035

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

310 RAILROADDBP04 8 August-

635 BEACONDBP05 8 August-

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

CLARENCE WATER SYSTEM LA1069002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

MS. BANKS HIGHWAY 84 EDBP02 3 March-

436 HIGHWAY 6DBP03 3 March-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CLARKS WATER SYSTEM LA1021001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 547 & HESTER RDDBP01 7 July-

232 OUCHITA AVEDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CLEARVIEW MOBILE HOME PARK LA1019122

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 26DBP02 8 August-

LOT 50DBP03 8 August-

Wednesday, February 7, 2018 Page 30 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

COLLINSTON WATER SYSTEM LA1067005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

GEORGE FRANKLIN AND SWAN LAKEDBP01 8 August-

MAIN STREET AND DOWD STREETDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

COLUMBIA HEIGHTS WATER DISTRICT LA1021003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

8521 HWY 165 SDBP02 6 June-

7184 HIGHWAY 165 SDBP03 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

COLUMBIA WATER SYSTEM LA1021002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

774 FISHERDBP01 7 July-

PEARL AT BANNISTERDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

COLWORTH PLACE WATER SUPPLY LA1017073

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

10310 SCOUT DRIVEDBP01 6 June-

10380 SCOUT DRIVEDBP02 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

COLYELL COMMUNITY WATER LA1063003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

28312 S SATSUMADBP01 8 August-

18955 MCCOY ROADDBP02 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

CONCORD WATER SYSTEM LA1111022

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

802 HWY 348DBP01 8 August-

2597 HWY 551DBP02 8 August-

Wednesday, February 7, 2018 Page 31 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

CONCORDIA WATERWORKS DISTRICT 1 LA1029003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1877 DOTY ROADDBP02 7 July-

19078 HWY 15DBP03 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CONSOLIDATED WATERWORKS DISTRICT 2 LA1067012

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

12831 CROSSETT ROADDBP01 8 August-

COOPERLAKE ROAD AND YELDELL ROADDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CONSOLIDATED WWKS DISTRICT 1 OF BOSSIER LA1015026

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BLACKWOOD CIR @ APPLEWOOD TRAILDBP03 8 August-

3423 GINGER DRIVEDBP04 8 August-

7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

CONVERSE WATER SYSTEM LA1085007

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

790 S FRONT STDBP01 8 August-

106 W DESOTODBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CORNEY WATER SYSTEM LA1111002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

578 PRICE RDDBP01 8 August-

BEHIND 585 UNION CROWDBP02 8 August-

4/1/2015 QT Monitoring Begin Date: Frequency of Sampling:

COTTON PLANT WATER SYSTEM LA1021009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HIGHWAY 126 @ SHORT HATTEN ROADDBP02 5 May-

CHILDRESS ROADDBP03 5 May-

Wednesday, February 7, 2018 Page 32 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

COTTON VALLEY WATER SYSTEM LA1119004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

ADKINS AND WEST ROADDBP01 8 August-

HWY 160 AND COX ROADDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

COUNTRY CLUB TRAILER PK LA1103010

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

144 RAINEYDBP02 8 August-

162 RAINEYDBP03 8 August-

7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:

COUNTRY ESTATES WATER SYSTEM NORTH LA1073011

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

148 EVANS ROADDBP02 8 August-

191 PICKETT LANEDBP03 8 August-

7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

COUNTRY ESTATES WATER SYSTEM SOUTH LA1073118

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

113 HICKORY HILLSDBP01 8 August-

VINWOOD @ HWY 139DBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

COUNTRY LIVING ESTATES WATER SYSTEM LA1017076

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 110DBP01 8 August-

LOT 53DBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

COUNTRY LIVING TRAILER PARK WATER SYSTEM LA1019102

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

6100 CENTRAL CT., LOT 1DBP01 9 September-

LOT 15DBP02 9 September-

Wednesday, February 7, 2018 Page 33 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

COUNTRY PINES SUBDIVISION WATER SYSTEM LA1019083

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2150 W. TANK FARM ROADDBP02 8 August-

2504 SALMON STREETDBP03 8 August-

1/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

COUNTRY PLACE SUBD WATER SYSTEM LA1015005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

ELMVIEW & SHERWOODDBP01 9 September-

COUNTRY LN & OAK RIDGEDBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

COUNTRYSIDE MOBILE HOME COURT LA1005119

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 30DBP02 8 August-

LOT 35DBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

COUNTRYVIEW MOBILE HOME COURT LA1005202

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 2DBP02 8 August-

LOT 26DBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

COUSHATTA WATER SYSTEM LA1081001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 71 S @ HUCKABAY STDBP02 7 July-

1713 JONES STREETDBP03 7 July-

10/1/2014 YR Monitoring Begin Date: Frequency of Sampling:

COVINGTON WATER SUPPLY LA1103011

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

OLD LANDINGDBP01 2 February-

MASSACHUSETTS AND N THEARDDBP07 11 November-

Wednesday, February 7, 2018 Page 34 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

4/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

COX FERRY WATER SYSTEM LA1111027

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

120 EASY LIVING LANEDBP01 6 June-

222 EASY LIVING LANEDBP02 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CRESTON WATER SYSTEM LA1069003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 156 & 153DBP01 6 June-

HWY 9 & W WIND CHURCH RDDBP02 6 June-

1/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

CROWLEY WATER SYSTEM (LAWCO) LA1001002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

183 FOREST DRIVEDBP01 2 February-

102 EAST PARK STREETDBP02 2 February-

175 HOYTDBP03 2 February-

800 ODD FELLOWS RDDBP05 2 February-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

CULBERTSON WATER SYSTEM LA1061024

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1120 NORRIS RDDBP01 8 August-

1738 KENS LANDING RDDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CULI - BEAU VILLAGE LA1103113

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

26274 TRANQUILITY TRAILDBP01 8 August-

26367 CRESCENT DRIVEDBP02 8 August-

4/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

CULLEN WATER SYSTEM LA1119005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1948 WALNUT ROADDBP02 5 May-

CITY HALL 405 COYLE AVEDBP03 5 May-

Wednesday, February 7, 2018 Page 35 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

4/1/2012 QT Monitoring Begin Date: Frequency of Sampling:

CYPRESS BLACK BAYOU WATER SYSTEM LA1015040

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

357 LINTON BELLEVUE ROADDBP01 10 October-

RYAN RD & CYPRESS SHORESDBP02 10 October-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

CYPRESS WATER SYSTEM LA1013019

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

184 PINEDBP01 7 July-

2713 LAKE ROADDBP02 7 July-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

DALCOUR WATERWORKS DISTRICT LA1075004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 39DBP01 9 September-

WHITE DITCHDBP02 9 September-

10/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

DARBONNE WS NORTH LA1111024

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOCKHARTDBP02 8 August-

SPEARSVILLEDBP03 8 August-

188 MCBROOM RDDBP04 8 August-

10/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

DARBONNE WS SOUTH LA1111023

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1113 JONES CROSSINGDBP04 8 August-

1167 PINE GROVE CHURCH RDDBP05 8 August-

3139 EVERGREEN RDDBP06 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

DAVID WADE CORRECTIONAL CENTER WS LA1027008

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

INTERSECTION OF HWY 520 AND BELL HILLDBP02 8 August-

NEAR WELL HOUSEDBP03 8 August-

Wednesday, February 7, 2018 Page 36 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

DEEPWOODS UTILITIES INC LA1017058

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LONGBRANCHDBP01 7 July-

9840 DEEPWOODSDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

DELHI WATER SUPPLY LA1083002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

22 HWY 609 - ELEVATED TANKDBP02 8 August-

910 FLORIDA STDBP03 8 August-

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

DELTA DOWNS INC WATER SYSTEM LA2019021

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

PATIODBP02 9 September-

TAP AT BACK OFFICE (RACE MAINTENANCE)DBP03 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

DELTA WATER SYSTEM LA1065001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

END OF STAFFORD STDBP01 9 September-

301 THIRD STDBP02 9 September-

1/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

DELTECH CORPORATION LA2033025

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

MAINTENANCE LUNCHROOM SINKDBP01 9 September-

POE-001DBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

DENNY DRIVE WATER SYSTEM LA1017009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

8502 DENNY DRIVEDBP01 6 June-

8429 DENNY DRIVEDBP02 6 June-

Wednesday, February 7, 2018 Page 37 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

DEQUINCY WATER SYSTEM (LAWCO) LA1019008

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1601 W 4TH STREETDBP01 8 August-

842 PULLARD STREETDBP02 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

DESOTO PARISH WATER WORKS DISTRICT 1 LA1031030

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

JENNY LOOPDBP02 10 October-

HWY 5 @ HWY 789DBP03 10 October-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

DIVERSION WATER - BAYOU ESTATES LA1005005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

11294 TRACY STREETDBP02 8 August-

PENNY STDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

DIVERSION WATER - CHINQUAPIN LA1063114

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

22828 CHENE BLANCDBP02 9 September-

23396 CHENE BLANCDBP03 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

DIVERSION WATER - CYPRESS LAKES LA1005208

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

8505 M'S COVEDBP02 8 August-

8502 FRANK DRIVEDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

DIVERSION WATER - CYPRESS POINT LA1063118

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

15813 CYPRESS POINT LANEDBP02 8 August-

ENTRANCE ON LEFT SIDEDBP03 8 August-

Wednesday, February 7, 2018 Page 38 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

DIVERSION WATER - MONTROSE SUBDIVISION LA1063103

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

OAK FORREST ESTATESDBP02 8 August-

MONTROSE NORTH DRIVEDBP03 8 August-

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

DIVERSION WATER - OLD MILL SETTLEMENT LA1063115

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

14060 OLD MILL SETTLEMENT TRACEDBP01 8 August-

17575 COVE LNDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

DIVERSION WATER - RIVER RUN ESTATES LA1005206

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

10005 RIVER RUNDBP02 8 August-

10079 RIVER RUNDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

DIVERSION WATER - STONEHILL LA1063123

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

19992 FIELDSTONE RDDBP02 8 August-

19860 STONE HILL RDDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

DIVERSION WATER - TERRY HARBOR CAMPSITES LA1063036

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

20475 FAIRWAY DRIVEDBP02 9 September-

YACHT SLIP 53DBP03 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

DIVERSION WATER- OLIVIA ROSE LA1063029

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 25DBP02 8 August-

LOT 16DBP03 8 August-

Wednesday, February 7, 2018 Page 39 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

DIVERSION WATER- WATER FRONT WEST LA1063104

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HOMEPORT WELL SITEDBP02 8 August-

14468 BAYOU TERRACE DRIVEDBP03 8 August-

1/1/2015 YR Monitoring Begin Date: Frequency of Sampling:

DIXIE GARDEN - KINGS HWY WATER SYSTEM LA1017087

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

7843 EAST KINGS HWYDBP01 8 August-

BRIDGE CLUBDBP02 8 August-

1/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

DIXIE GARDEN WATER SUPPLY LA1017075

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

4845 DIXIE GARDEN DRIVEDBP01 1 January-

4761 DIXIE GARDENS DRIVEDBP04 1 January-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

DIXIE INN WATER SYSTEM LA1119006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 80 @ SOUTHFIELDDBP01 8 August-

MCARTHUR STREETDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

DIXIE OVERLAND WATER SYSTEM LA1119007

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HARVEYS BARBER SHOP ROAD @ STUCKEY ROADDBP02 8 August-

COUNTRY PINES @ HWY 80DBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

DIXON CORRECTIONAL INSTITUTE LA1037002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

COMPOUND 1 SALLY PORT 1DBP02 6 June-

BACHELOR OFFICERS QTR C3DBP03 6 June-

Wednesday, February 7, 2018 Page 40 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

DOMINO SUGAR LA2087001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

WATER PLANTDBP01 8 August-

BOILER HOUSE (MRT)DBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

DORCHEAT ACRES WATER SYSTEM LA1119032

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

456 PERRY BURNS ROADDBP01 8 August-

WISE ROAD @ FRYE ROADDBP02 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

DOW USA, LA DIVISION LA2047003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BLOCK 110 NEW DOCK SITE #1DBP01 8 August-

CONF CENTER SUPPLY HEADER SITE #8DBP02 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

DOWNSVILLE WATER SYSTEM LA1111004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SUE CALHOUN RD & HWY 145DBP02 3 March-

4787 HWY 151DBP03 3 March-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

DOYLINE WATERWORKS DISTRICT 1 LA1119008

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SCOTT AND MAINDBP01 7 July-

259 STRONG STREETDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

DREAM COURTS MOBILE HOME PARK LA1103174

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 1DBP01 7 July-

LOT 10DBP02 7 July-

Wednesday, February 7, 2018 Page 41 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

DUBACH WATER SYSTEM LA1061003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

236 FULLER LOOPDBP02 12 December-

8925 HWY 167SDBP03 12 December-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

DUBBERLY WATER SYSTEM LA1119009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

156 STUCKEY ROADDBP01 9 September-

146 PERO CHURCH ROADDBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

DUNCAN HEIGHTS MOBILE HOME PARK LA1045039

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

3107 OLIVIA RD. WAREHOUSEDBP01 6 June-

3107 OLIVIA RD. LOT #5DBP02 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

DUNHAM PRICE GROUP WATER SYSTEM LA2019134

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SW TAP AT OFFICEDBP01 9 September-

NW TAP AT OFFICEDBP03 9 September-

Wednesday, February 7, 2018 Page 42 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2012 QT Monitoring Begin Date: Frequency of Sampling:

E JEFFERSON WW DISTRICT 1 LA1051001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1520 CHICKASAW AVEDBP01 9 September-

5249 VETERANS HWYDBP04 9 September-

5304 JANICE AVENUEDBP05 9 September-

3600 JEFFERSON HIGHWAY, BLDG EDBP06 9 September-

5028 WILSON DRIVEDBP07 9 September-

4524 CHATEAU DRIVEDBP08 9 September-

6201 FLAGLER STREETDBP09 9 September-

8900 SHELDON STDBP10 9 September-

2215 CLEARY AVEDBP11 9 September-

4936 YORKDBP12 9 September-

118 GLENWOOD AVEDBP13 9 September-

3404 ARKANSAS AVEDBP14 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

EAGLE LAKE MOBILE HOME PARK LA1103110

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1210 EAGLE LANE BLVD LOT 210DBP01 8 August-

1210 EAGLE LANE BLVD LOT 19DBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

EAGLE WATER SYSTEM LA1017012

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

10131 FREEDOMS WAYDBP02 6 June-

10005 WOOLWORTH ROADDBP03 6 June-

4/1/2015 QT Monitoring Begin Date: Frequency of Sampling:

EAST ALLEN PARISH WATER WORKS LA1003011

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HIGHWAY 190 AND HIGHWAY 995DBP01 6 June-

COTTON GINDBP02 6 June-

Wednesday, February 7, 2018 Page 43 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

EAST CARROLL WS NORTH LA1035006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

183 HOPEWELL RDDBP06 7 July-

2637 LA 596DBP07 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

EAST CARROLL WS SOUTH LA1035007

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2555 HWY 581DBP02 7 July-

9672 HWY 65 SDBP03 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

EAST CENTRAL VERNON WATER SYSTEM LA1115117

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HIGHWAY 117 & HIGHWAY 465DBP01 7 July-

HIGHWAY 489 AND SAN HILLDBP02 7 July-

7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

EAST COLUMBIA WATER SYSTEM LA1021004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HORSE SHOE LN @ HWY 559DBP02 9 September-

HOT SHOT RD @ HWY 559DBP03 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

EAST CROSS WATER SYSTEM LA1081002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

END OF LINE HWY 515DBP01 7 July-

2618 HWY 71DBP02 7 July-

7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

EAST DESOTO WATER SYSTEM LA1031005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HIGHWAY 84DBP02 7 July-

SLOAN ROADDBP03 7 July-

Wednesday, February 7, 2018 Page 44 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

EAST FELICIANA RURAL BLUFF CREEK WS LA1037015

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

285 SCOTT-BARR RDDBP02 8 August-

39696 HWY 37DBP05 8 August-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

EAST FELICIANA RURAL GURLEY RD WS LA1037004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

3615 GREENBRIAR RDDBP07 8 August-

13008 HWY 955DBP08 8 August-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

EAST FELICIANA RURAL HWY 964 WS LA1037016

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

4751 LA 68DBP01 8 August-

313 HWY 964DBP02 8 August-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

EAST FELICIANA RURAL PLANK-GROSS BATTLE LA1037017

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

9027 HWY 958DBP01 8 August-

4210 LA 63DBP02 8 August-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

EAST FELICIANA RURAL TURNER RD WS LA1037018

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1212 HWY 67DBP01 8 August-

8530 SHAFFETTDBP02 8 August-

7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

EAST FELICIANA RURAL-REEVES-MORGAN LA1037011

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LAWSON 1610 HWY 952DBP01 8 August-

JACKSON ROP 4349 HWY 952DBP02 8 August-

Wednesday, February 7, 2018 Page 45 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

EAST FELICIANA WWKS DISTRICT 7 LA1037014

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

9670 HWY 422 (POC#1)DBP01 7 July-

5965 GILEAD RD (POC#6)DBP03 7 July-

1/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

EAST HODGE WATER SYSTEM LA1049006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1816 BROWN STDBP02 8 August-

6008 EBONY STDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

EAST JENA WATER SYSTEM INC LA1059017

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

9539 HWY 84 EASTDBP02 8 August-

3205 HWY 459DBP03 8 August-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

EAST PARK SUBDIVISION WATER SYSTEM LA1019079

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

6701 RALIEGHDBP02 8 August-

2601 EVA LNDBP03 8 August-

7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

EAST RICHLAND WW DISTRICT LA1083003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

MCHAND AND HWY 854DBP02 9 September-

129 COLLEGEDBP03 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

EASTERN HEIGHTS WATER WORKS LA1105003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

115 HWY 1054DBP02 7 July-

15748 HWY 16DBP03 7 July-

Wednesday, February 7, 2018 Page 46 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

EASTERN LOUISIANA MENTAL HEALTH SYSTEMS LA1037005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

FRONT GATEDBP01 8 August-

SEWER PLANTDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

EASTSIDE WATER SYSTEM LA1039003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

4332 WHITEVILLE ROADDBP01 8 August-

2003 BELAIRE COVE RDDBP02 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

EBARB WWKS DIST # 1 - AIMWELL AREA LA1085059

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

327 DOGWOOD DRIVEDBP03 9 September-

HWY 191 AND HWY 474DBP04 9 September-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

EBARB WWKS DIST # 1 - N EBARB/BELMONT LA1085058

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 1218 AT NOBLE/CARDINAL ROADDBP01 9 September-

YOUNGS ROAD AT WRIGHTS LANDINGDBP02 9 September-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

EBARB WWKS DIST #1 - NORTH EBARB LA1085043

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 3229 AT N TOLEDO BEND ST PARKDBP02 6 June-

HWY 482 & PINK PANTHERDBP03 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

EBENEZER WATER SYSTEM LA1049026

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

CANEY STDBP01 8 August-

RAMSEY RD AT CLIFF RAMSEY RD (POC#1)DBP02 8 August-

Wednesday, February 7, 2018 Page 47 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

EDEN ISLES WATER SUPPLY LA1103013

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

4782 PONTCHARTRAINDBP03 7 July-

102 CYPRESS LAKEDBP05 7 July-

274 NICKLAUS DRDBP06 7 July-

204 LORELEI CIRCLEDBP07 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

EDGEFIELD WATER SYSTEM LA1081003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

7741 HWY 371DBP02 9 September-

525 EDISTODBP03 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

EDWARDS MILLCREEK WATER SYSTEM LA1013010

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

26385 HWY 9DBP02 7 July-

27209 HWY 9DBP03 7 July-

7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:

EGAN WATER CORPORATION LA1001025

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

FERNEST RD @ REED RDDBP02 7 July-

HWY 97 @ RIVERSIDE WEST RDDBP03 7 July-

7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

EGAN WATER CORPORATION NO 2 LA1001026

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1718 SWIFT ROADDBP01 7 July-

CHESTER LEE @ THIRD STREETDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ELM POINT ESTATES WATER SYSTEM LA1099024

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2300 ATCHAFALAYA R HWY LOT 106DBP01 8 August-

2300 ATCHAFALAYA R HWY LOT 1DBP02 8 August-

Wednesday, February 7, 2018 Page 48 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

EMC WATER SYSTEM INC LA1079006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

8019 TWIN BRIDGES ROADDBP01 8 August-

235 RICHMOND ROADDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

EMPIRE POINT COMMUNITY WATER SYSTEM LA1115047

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1612 OAKRIDGE DRIVEDBP01 7 July-

175 LAKEVIEW DRIVEDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ENON ELEMENTARY SCHOOL LA2117015

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

POC #5 - GYMDBP01 6 June-

POC #3 - MAIN BUILDING 1DBP02 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ENTERGY GULF STATES LOUISIANA LLC LA2019103

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

EAST SIDE OF TURNER SHOPDBP01 7 July-

TAP-COAL MAINTENANCE SHOPDBP02 7 July-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

ENTERPRISE WATER SYSTEM LA1025003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

ROSIN CREEK CHURCHDBP02 11 November-

JIM BOWIEDBP03 11 November-

7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

EPPS WATER SYSTEM LA1123001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HIGHWAY 134 WDBP02 8 August-

HWY 17 AND PECAN STREETDBP03 8 August-

Wednesday, February 7, 2018 Page 49 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

EQUISTAR CHEMICAL LP LA2019094

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

MAIN GATE GUARD HOUSEDBP02 7 July-

EAST GATE GUARD HOUSEDBP03 7 July-

7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:

EROS COMMUNITY WATER SYSTEM LA1049022

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2311 HWY 548DBP02 8 August-

290 CENTURY LOOPDBP03 8 August-

4/1/2015 QT Monitoring Begin Date: Frequency of Sampling:

EROS WATER SYSTEM LA1049007

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1510 THIRD STDBP02 8 August-

4608 OKALOOSA RDDBP05 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

EUNICE WATER SYSTEM (LAWCO) LA1097022

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

I E MILLER & SONS - HWY 190 EDBP01 8 August-

455 RUE NORMANDIEDBP02 8 August-

901 SITTIG RDDBP03 8 August-

1447 NILEDBP04 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

EVANGELINE OAKS WATER SYSTEM LA1015009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

EVANGELINE DRIVE SOUTHDBP02 7 July-

EVANGELINE DRIVE NORTHDBP03 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

EVANGELINE PARISH INDUSTRIAL PARK W S LA1039014

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

IRON WORKS ON HOLLOWAYDBP01 6 June-

REGION A PARISH YARDDBP02 6 June-

Wednesday, February 7, 2018 Page 50 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

EVANGELINE WW DISTRICT 1 - PINE PRAIRIE LA1039004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1189 BIG VICK ROADDBP01 6 June-

1968 BEAVER ROADDBP02 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

EVANS SCHOOL LA2115003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

PROCESSING PLANTDBP02 8 August-

HIGH SCHOOLDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

EVERGREEN ESTATES WATER SYSTEM LA1017051

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 6133DBP02 8 August-

LOT 6112DBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

EXXONMOBIL CHEMICAL BATON ROUGE POLYMER LA2033003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

KITCHEN IN PPOC BUILDINGDBP02 7 July-

ADMIX BUILDINGDBP03 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FAIRVIEW MOBILE ESTATES NORTH WS LA1019080

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BEHIND OFFICEDBP01 8 August-

LOT 105DBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FAIRVIEW MOBILE ESTATES SOUTH WS LA1019096

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 301DBP01 8 August-

LOT 588DBP02 8 August-

Wednesday, February 7, 2018 Page 51 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

FAIRVIEW UNION WATER SYSTEM LA1081012

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 784 AND HWY 71DBP02 6 June-

DAVIS SPRINGS TANKDBP03 6 June-

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

FAITH DAY SCHOOL & ACADEMY LA2005231

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

EAST EXTERIOR OF PRINCIPAL'S OFFICEDBP01 8 August-

BETWEEN EAST & WEST BUILDINGS ON BREEZEWDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FALSE RIVER WATER COMPANY LA1077041

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

14295 HWY 416DBP01 9 September-

8027 FALSE RIVER ROADDBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FAMILY COURT MOBILE HOME PARK LA1005118

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 14DBP01 8 August-

LOT 1BDBP02 8 August-

7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:

FARMERVILLE WATER SYSTEM LA1111005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

121 PREAUS STREETDBP02 8 August-

1912 PARK BAY DRIVEDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FELLOWSHIP WATER SYSTEM LA1061004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 563 NORTHDBP02 9 September-

MCGUIRE AT EAVESDBP03 9 September-

Wednesday, February 7, 2018 Page 52 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FIFTH WARD JR HIGH W S LA2103042

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

GYM SAMPLE TAPDBP02 8 August-

SAMPLE TAP AT OFFICEDBP03 8 August-

4/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

FIFTH WARD WATER SYSTEM LA1009007

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

MARCELS & HIGHWAY 1DBP01 5 May-

512 RV ROADDBP02 5 May-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FISHER WATER SYSTEM LA1085009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

729 4-L DRIVEDBP01 8 August-

633 LAUREL STDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FISKE UNION WATER SYSTEM LA1123002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

COOK RD & HWY 879, 1559 COOK RDDBP02 7 July-

4603 HWY 2DBP03 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FLORIDA PAR JUV DETENTION CENTER LA1105081

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

28528 HWY 190 NEW ADDITION (SOUTH MOD)DBP02 6 June-

28528 HWY 190 ORIGINAL BLDG ( ADMIN AREADBP03 6 June-

7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:

FLORIEN WATER SYSTEM LA1085011

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 474 - LIONS CLUBDBP01 8 August-

NORTH OF LEWING CIRCLE @ N NOLANDBP02 8 August-

Wednesday, February 7, 2018 Page 53 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FLUKER CHAPEL WATER WORKS LA1105005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

66433 HWY 51DBP01 9 September-

66136 SMITH ROADDBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FOLSOM WATER SUPPLY LA1103014

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

81555 ANTHONY RDDBP01 9 September-

12430 SOUTH HAY HOLLOW RDDBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FORDOCHE, TOWN OF LA1077009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

6754 HWY 77DBP03 5 May-

4306 FORDOCHE RDDBP04 5 May-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FOREST GLEN SD LA1103137

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

25691 WEST JACKSONDBP01 7 July-

26170 EAST BEECHDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FOREST HILL UTILITIES LA1079009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2862 HWY 112DBP01 5 May-

INTERSECT HWY 165 / BARTON RDDBP02 5 May-

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

FORMOSA PLASTICS CORPORATION LA2033102

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

VCM1 CONTROL ROOMDBP01 9 September-

Wednesday, February 7, 2018 Page 54 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FORT POLK NORTH HOUSING WATER SYSTEM LA1115087

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

16401 RIVERTON & PINEHURSTDBP01 7 July-

15009 VAN TINE COURTDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FORT POLK NORTH WATER SYSTEM LA1115064

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

7400 BLOCK @ MONTICELLO & H AVENUEDBP01 7 July-

8501 @ NORTH SIDE OF MEMPHISDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FORT POLK SOUTH WATER SYSTEM LA1115065

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BLDG 2501DBP01 7 July-

PALMETTO TERRACE - TRAILER PARKDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FOSTER POULTRY FARMS (ARCADIA FEEDMILL) LA2013012

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

OUTSIDE TAP @ SE CORNER TRUCK RECEIVINGDBP01 8 August-

TAP IN BOILER ROOM IN ARCADIA FEEDMILLDBP02 8 August-

1/1/2014 YR Monitoring Begin Date: Frequency of Sampling:

FOUNTAINBLEAU SCHOOL LA2103380

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

JR HIGH GYM TAPDBP02 9 September-

SEWER PLANT TAPDBP03 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FOUR FORKS WATER SYSTEM LA1017062

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SPRINGRIDGE @ HWY 169DBP01 7 July-

PAULA STREETDBP02 7 July-

Wednesday, February 7, 2018 Page 55 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FOURTH WARD WATER WORKS LA1063005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

PEA RIDGE @ OLD CCDBP01 9 September-

HORSESHOE RD W @ HWY 43DBP02 9 September-

1/1/2018 QT Monitoring Begin Date: Frequency of Sampling:

FRANKLIN WATER SUPPLY LA1101003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

CAYCE & MAIN STREETDBP03 1 January-

528 MORRIS STDBP04 1 January-

107 TYLER LNDBP05 1 January-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FRIENDSHIP WATER SYSTEM LA1013007

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

6475 HWY 155 - SCALLIONSDBP01 8 August-

1949 DANVILLE RDDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FROST TOWN WATER SYSTEM LA1073014

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

557 WEEMS ROADDBP01 8 August-

1247 GARLAND GIN ROADDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FSWC - FRENCH SETTLEMENT LA1063019

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

14360 RUE DE FLEURDBP02 8 August-

HWY42 & HWY 16DBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FSWC - HAMMOND HEIGHTS LA1105010

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

46074 N. CHERRY STREETDBP01 6 June-

HWY 442 & WHISKEY LANEDBP02 6 June-

Wednesday, February 7, 2018 Page 56 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FSWC - OAKRIDGE LA1063058

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

NW CORNER OF PRIMROSE CTDBP01 8 August-

BETWEEN 10970& 11000 OAKRIDGE DRIVEDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FSWC - OAKWOOD ESTATES LA1105017

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

39789 OAKWOOD ESTATESDBP02 8 August-

39627 OAKWOOD ESTATESDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FSWC- BRADY PLACE LA1105091

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

NE CORNER OF N BRADLEY CT & HWY 445DBP01 8 August-

NE CORNER OF W BRADLEY CT & S BRADLEY CTDBP02 8 August-

7/1/2016 QT Monitoring Begin Date: Frequency of Sampling:

FSWC- COYELL HOMESITE LA1063124

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

20023 AYDELL LNDBP01 8 August-

19545 AYDELL LNDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FSWC- PINE HEAVEN LA1063089

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

15861 RUTH DRIVEDBP02 6 June-

16146 RUTH DRIVEDBP03 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FSWC- SPRINGFIELD AREA LA1063024

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

30340 CATHOLIC HALL RDDBP01 6 June-

SW HWY 42 AT HWY 43DBP02 6 June-

Wednesday, February 7, 2018 Page 57 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FSWC -STONEBRIDGE LA1063121

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

NE CORNER OF HWY 1032 & STONEBRIDGE CTDBP01 8 August-

21240 DEBBIE LANEDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FSWC- VELMA LA1105078

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SE CORNER OF HUCK RD & LARUSSA LNDBP01 6 June-

13137 BRICKYARD RDDBP02 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FSWC- VINCENT PLACE LA1063041

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

20320 HWY 16DBP01 8 August-

BTWN 14335-14361 VINCENT PLACEDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FSWC- WHITEHALL/ HEAD OF ISLAND LA1063028

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

18724 OLD FERRY RD.DBP01 6 June-

27255 VAMPRAN RD.DBP02 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FSWC-BANKSTON LA1105036

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

58239 OLD US 51DBP01 8 August-

13120 STOREY ROADDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FSWC-JUSTIN HEIGHTS LA1063101

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

CUL DE SAC ON BRITTANY CTDBP01 8 August-

13866 BRITTANY COURTDBP02 8 August-

Wednesday, February 7, 2018 Page 58 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

FSWC-SANDY RIDGE LA1063110

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

18012 RYAN STREETDBP01 8 August-

18036 W RIVERVIEWDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

G AND J MOBILE HOME ESTATES WATER SYSTEM LA1055014

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

200 JOHN WAYNE DRDBP01 7 July-

D206 JOHN WAYNE DRDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

G AND R MOBILE HOME PARK WATER SYSTEM LA1055013

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

307 PECAN GROVE LOT #81DBP01 8 August-

307 PECAN GROVE LOT #5DBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

GARDEN HEIGHTS SUBD WATER SYSTEM LA1055138

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

100 ST NERI LANEDBP01 6 June-

100 ST BLEISE LANEDBP02 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

GARDEN HEIGHTS WATER SYSTEM LA1019018

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BLANCO 7329DBP01 8 August-

CHRIS LANEDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

GARDNER COMMUNITY WATER SYSTEM LA1079010

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

RACHAL ROADDBP01 8 August-

10793 HWY 28 WDBP02 8 August-

Wednesday, February 7, 2018 Page 59 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

GEORGIA PACIFIC CORPORATION LA2073042

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

CORRUGATED RESTROOMDBP02 8 August-

HYDROPNEUMATIC TANKDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

GERMANTOWN WATER SYSTEM LA1119011

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

NORTHWOOD @ HWY 159DBP02 8 August-

WOODARD @ ASPENDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

GIBSLAND WATER SYSTEM LA1013008

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

934 CEDAR STDBP01 7 July-

COLEMAN STDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

GIFFORD MOBILE HOME PARK I LA1019101

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 34DBP01 8 August-

LOT 49DBP02 8 August-

1/1/2018 YR Monitoring Begin Date: Frequency of Sampling:

GIFFORD MOBILE HOME PARK II LA1019115

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 57DBP01 8 August-

LOT 86DBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

GILARK WATER SYSTEM LA1119012

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1541 METHODIST CAMP RDDBP01 5 May-

INTERSECTION OF FRENCH DELANEY AND ALLENDBP02 5 May-

Wednesday, February 7, 2018 Page 60 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

GILBERT WATER SYSTEM LA1041002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

200 OLD HIGHWAY 15DBP01 8 August-

7752 GILBERT STREETDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

GIL-GAL WATER SYSTEM LA1119034

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

FINCHER CREEK @ HARRIS ROADDBP01 8 August-

HWY 80 @ BECK CURVE ROADDBP02 8 August-

4/1/2014 YR Monitoring Begin Date: Frequency of Sampling:

GILLIS LONG CENTER LA1047008

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BLDG 165DBP01 9 September-

TRAILER 40DBP02 9 September-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

GIVING HOPE RETREAT LA1103062

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

FIRST BLDG ON RIGHT PASS GATEDBP04 8 August-

BLDG ON LEFT PASS WELLDBP05 8 August-

4/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

GLEN LEAF MOBILE HOME COMMUNITY LA1017089

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

STOCKDALE RD (LOT#46)DBP01 9 September-

PENNINGTON RD (LOT#166)DBP02 9 September-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

GLENCOE COMMUNITY WATER SYSTEM LA1101004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

121 GEORGETOWNDBP02 7 July-

151 CHAPEL LANEDBP03 7 July-

Wednesday, February 7, 2018 Page 61 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

GOLDONNA WATER SYSTEM LA1069004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

814 N. GOODWILLDBP01 8 August-

248 ASH STREETDBP02 8 August-

4/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

GOODWILL WATER SYSTEM LA1123004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2356 HWY 588DBP02 8 August-

543 WARDLINE RDDBP04 8 August-

4/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

GRAMBLING STATE UNIV WEST LA1061016

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

WEST WILLOW STDBP02 8 August-

PINE STREETDBP03 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

GRAMBLING STATE UNIVERSITY WS LA1061005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LAB SCHOOLDBP02 5 May-

ALMA J. BROWNDBP03 5 May-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

GRAMBLING WATER SYSTEM LA1061006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

118 COVE VIEW RDDBP01 8 August-

1030 W MARTIN LUTHER KINGDBP02 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

GRAMERCY WATERWORKS LA1093002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LA 3125DBP02 5 May-

WATER TOWERDBP03 5 May-

Wednesday, February 7, 2018 Page 62 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

GRAND CANE WATER SYSTEM LA1031006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BLUNT MILL ROADDBP02 8 August-

WEST K JON ROADDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

GRAND ISLE SHIPYARD WATER SYSTEM LA2113279

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

TEST POINT 1DBP01 6 June-

TEST POINT 2DBP02 6 June-

7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

GRAND PRAIRIE WATER SYSTEM LA1097002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

308 LOPEZ RDDBP01 9 September-

1164 PEACHTREE LNDBP02 9 September-

4/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

GRAPHIC PACKAGING INTERNATIONAL INC - A LA2073043

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

RESERVOIR TAPDBP01 8 August-

R & D BUILDINGDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

GRAPHIC PACKAGING INTERNATIONAL INC - B LA2073044

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

EI SHOPDBP01 8 August-

#6/#7 PAPER MACHINE MAIN SHOPDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

GRAYSON WATER SYSTEM LA1021005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

8765 HWY 165DBP01 8 August-

HWY 850 & MIXON LANEDBP02 8 August-

Wednesday, February 7, 2018 Page 63 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

GREATER WARD 1 WATERWORKS DISTRICT LA1061007

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

RABB AND VZ TOP ROADDBP01 7 July-

COOK AND CHANDLER ROADDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

GREEN ACRES SUBDIVISION WATER SYSTEM LA1011004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1634 LAKEVIEW STDBP01 8 August-

1935 N PINE STDBP02 8 August-

7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

GREEN ACRES SUBDIVISION WS LA1073016

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BUCKHORN BEND AND ARNOLDDBP01 8 August-

BUCKHORN BEND AND JACKSONDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

GREENBRIAR PRAIRIE BASSE WATER SYSTEM LA1097032

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

127 HIGHWAY 182DBP01 8 August-

535 DON GUILBEAU ROADDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

GREENSBURG WATER SYSTEM LA1091004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

13775 HWY 37DBP02 8 August-

329 HWY 1042DBP03 8 August-

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

GRETNA WATERWORKS LA1051003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

VIGIL AT THEARDDBP05 8 August-

GRETNA BLVD AT CREAGANDBP06 8 August-

GRETNA LAB TAPDBP07 8 August-

FREDERICHS AT WHITNEYDBP08 8 August-

Wednesday, February 7, 2018 Page 64 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

GULF STREAM MANOR WATER SYSTEM LA1019123

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 34DBP02 8 August-

LOT 248DBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

H2O SYSTEMS INC - AUTUMN HAVEN LA1103190

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

127 MISTY CREEK DRIVEDBP02 8 August-

RECREATION DR OFF HAVEN WAYDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

H2O SYSTEMS INC - BLEU LAKE HILLS LA1103132

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

114 HIGHLAND CREST DRDBP02 8 August-

39 GREEN HILLS DRDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

H2O SYSTEMS INC - GRANDE PALMS LA1103142

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

NORTH SIDE OF BLDG 5DBP01 8 August-

WEST SIDE BLDG 1DBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

H2O SYSTEMS INC - GREENLEAVES UTILITIES LA1103118

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

129 REMINGTON DRIVEDBP02 8 August-

1472 WOODMERE DRIVEDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

H2O SYSTEMS INC - GUSTE ISLAND WATER SU LA1103189

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

452 BELLE POINTEDBP02 8 August-

240 GRAND OAKS DRIVEDBP03 8 August-

Wednesday, February 7, 2018 Page 65 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

H2O SYSTEMS INC - I59 MOBILE HOME PARK LA1103179

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

101 COMMERCIAL DRIVEDBP01 8 August-

CONCORD LOOP 4TH HYDRANTDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

H2O SYSTEMS INC - MONEY HILLS ESTATES LA1103164

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

592 NORTHWOODS DRDBP02 8 August-

713 PLANTATION DRDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

H2O SYSTEMS INC - MONTEREY SUBDIVISION LA1103148

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1421 CAROLINE STREETDBP02 8 August-

1215 LABARRE STREETDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

H2O SYSTEMS INC - PENN MILL LAKES LA1103185

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

464 STEEPLE CHASE RDDBP01 8 August-

112 PENN MILL LAKES BLVDDBP02 8 August-

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

H2O SYSTEMS INC - RIVER PARK LA1103198

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

75575 JOYCE DRDBP01 11 November-

75184 CRESTVIEW HILLS LOOPDBP02 11 November-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

H2O SYSTEMS INC - WHIPPOORWILL GROVE LA1103165

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

25513 RED ROBIN DRIVEDBP02 8 August-

81111 BLUE HERON DRIVEDBP03 8 August-

Wednesday, February 7, 2018 Page 66 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2012 YR Monitoring Begin Date: Frequency of Sampling:

HABERSHAM SUBDIVISION WATER SYSTEM LA1055174

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

300 KIPPSFORDDBP02 7 July-

103 SCRIBNERDBP03 7 July-

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

HAGEWOOD WATER SYSTEM LA1069005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

POC 5 POSEY ROADDBP01 2 February-

6464 HIGHWAY 6DBP02 2 February-

7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

HALFWAY-CARROLL WATER SYSTEM LA1081005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

#3 124 JOE PRICE RDDBP01 7 July-

#5 LA HWY 515DBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

HALL SUMMIT WATER SYSTEM LA1081004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HIGHWAY 783 AND MT ZION ROADDBP01 8 August-

NORTH STREETDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

HAMMOCK WATER SUPPLY LA1079030

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

PILGRIM ROAD AT HIGGINS HOUSEDBP01 6 June-

NORTH MERCHANT ROADDBP02 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

HANCOCK HAVEN WATER SYSTEM LA1049033

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

360 3 FINGERS ROADDBP01 9 September-

452 HAVEN LOOPDBP02 9 September-

Wednesday, February 7, 2018 Page 67 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

HAPPY ACRES MOBILE HOME PARK LA1117024

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

19900 CRAPE MYRTLE RDDBP01 7 July-

19811 HAPPY ACRES RDDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

HAYNESVILLE WATER SYSTEM LA1027002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

199 HAYNESDBP01 8 August-

915 FRANCES DRDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

HEBERT WATER SYSTEM LA1021006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

6276 HWY 133DBP01 6 June-

PUCKETT BEND ROAD @ HIGHWAY 848DBP02 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

HEFLIN WATER SYSTEM LA1119013

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 792 AND TED RISERDBP01 10 October-

HWY 371 AND WOODMILLDBP02 10 October-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

HENDERSON NINA WATER SYSTEM INC LA1099006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

3361 A GRAND POINT HWYDBP01 4 April-

1212 BORDELON ROADDBP02 4 April-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

HICKORY GROVE WATER SYSTEM LA1081010

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

POC #5 HWY 787DBP01 3 March-

HIGHWAY 507DBP02 3 March-

Wednesday, February 7, 2018 Page 68 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

10/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

HICO WATER SYSTEM LA1061008

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

4853 HWY 151DBP03 10 October-

HWY 545 @ HWY 167DBP04 10 October-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

HIDDEN HILLS SUBDIVISION WATER SYSTEM LA1097026

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 16 HIDDEN HILLS COMMDBP02 6 June-

LOT 105 HIDDEN HILLS COMMDBP03 6 June-

7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:

HIDDEN OAKS SUBDIVISION WS LA1073061

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

115 DOLLY DRIVEDBP01 8 August-

108 AYCOCKDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

HIGHLAND WATER WORKS LA1015047

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HIGHWAY 80 SAMPLE TAPDBP01 8 August-

816 EAGLE NESTDBP02 8 August-

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

HIGHWAY 1148 WATER SYSTEM LA1047026

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

20030 DANIEL LANEDBP02 8 August-

58830 HWY 1148DBP04 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

HIGHWAY 51 MHP LA1105088

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

STREET FLUSH TAPDBP01 8 August-

LOT CDBP02 8 August-

Wednesday, February 7, 2018 Page 69 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

HIGHWAY 513 WATER SUPPLY LA1031028

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

513 CUTOFFDBP01 7 July-

METCALFDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

HILLCREST / SNEAD APARTMENTS LA1103160

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

101 CDBP01 7 July-

104 DDBP02 7 July-

7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

HILLCREST MHP WATER SYSTEM LA1015012

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 36DBP01 7 July-

LOT 103DBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

HILLSIDE PARK SUBDIVISION WS LA1073064

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

VALLEYHILL AND CONIFERDBP01 8 August-

101 LACROSSE DRIVEDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

HILLSIDE WATER AND SEWAGE LLC LA1017015

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 97DBP01 7 July-

LOT 49DBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

HILLY-GREENWOOD WATER SYSTEM LA1061027

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

NEW PROSPECT CHURCH RDDBP01 6 June-

WOODS ROADDBP02 6 June-

Wednesday, February 7, 2018 Page 70 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

HINESTON WATER SYSTEM, INC LA1079012

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2886 HWY 121DBP01 8 August-

HARPER @ HWY 112DBP02 8 August-

1/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

HODGE WATER SYSTEM LA1049008

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HUNT AND THIRD ST ALLEYDBP01 9 September-

WILLOW STREETDBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

HOLIDAY MOBILE HOME VILLA WATER SYSTEM LA1055015

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2808 W PINHOOK OFFICEDBP02 7 July-

2808 W PINHOOK LOT 47DBP03 7 July-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

HOLMESVILLE WATER SYSTEM LA1111008

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HIGHWAY 15DBP01 4 April-

JONES AND PARDUE ROADDBP02 4 April-

10/1/2015 QT Monitoring Begin Date: Frequency of Sampling:

HOLUM WATER SYSTEM LA1021007

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LA849&WATERBIND RDDBP03 8 August-

3297 LA 126DBP04 8 August-

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

HOMELAND HEIGHTS LA1103072

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

37651 RIO STDBP01 9 September-

37620 LOPEZ STDBP03 9 September-

Wednesday, February 7, 2018 Page 71 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

HOMER WATER SYSTEM LA1027003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

DIALYSIS CENTERDBP02 8 August-

EBENEZER CHURCH ROADDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

HOOD CONTAINER OF LA, LLC LA2125008

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SOUTH MILLDBP02 9 September-

7/1/2016 QT Monitoring Begin Date: Frequency of Sampling:

HORSE SHOE ROAD WATER SYSTEM LA1119015

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

121 MATHESDBP01 8 August-

242 HORSESHOE LOOPDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

HOSANNA LUTHERAN CHURCH LA2103413

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

POC 4DBP02 9 September-

POC 2DBP03 9 September-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

HOSSTON MIRA WATER SYSTEM LA1017016

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

15669 HIGHWAY 71DBP02 7 July-

17655 HIGHWAY 71DBP03 7 July-

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

HOUMA WATER TREATMENT SERVICE AREA LA1109001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

WILLIAMS @ SIXTHDBP04 8 August-

DR BEATROUS ROADDBP05 8 August-

BENOIT PSDBP06 8 August-

FRANKLIN @ WHITEDBP07 8 August-

Wednesday, February 7, 2018 Page 72 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

HOUSE OF RAEFORD LA2013015

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LEFT HAND WASH ON SOUTH SIDEDBP02 8 August-

HAND WASH BESIDE CHILLERDBP03 8 August-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

HOUSTON RIVER WATERWORKS DISTRICT 11 LA1019119

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

FIRE STATION HWY 90 WDBP01 8 August-

2537 HWY 388DBP02 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

HUDSON GAARS MILL WATER SYSTEM LA1127015

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

4036 HWY 34DBP01 9 September-

6653 HWY 126DBP02 9 September-

1/1/2012 YR Monitoring Begin Date: Frequency of Sampling:

HUNTINGTON MOBILE HOME PARK WATER SYSTEM LA1017084

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 89DBP01 8 August-

LOT 43DBP02 8 August-

4/1/2016 QT Monitoring Begin Date: Frequency of Sampling:

HWY 84 WEST WATER SUPPLY LA1127007

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

POC #5 377 SPILLWAY NEW JBP CHRCHDBP01 4 April-

SYLVAN MEADOWS LOOPDBP02 4 April-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

IBERIA PARISH WATER WORKS DISTRICT NO 3 LA1045002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

VALERY @ JEFFERSON ISLAND ROADDBP02 7 July-

4601 COTEAU ROADDBP03 7 July-

Wednesday, February 7, 2018 Page 73 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

IBERVILLE WATER WORKS DISTRICT 3 LA1047002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 404DBP03 9 September-

58200 BELLEVIEW ROADDBP04 9 September-

1/1/2012 YR Monitoring Begin Date: Frequency of Sampling:

IBERVILLE WATERWORKS DISTRICT #2 LA1047007

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1125 HWY 991DBP01 7 July-

2005 BESSON ROADDBP02 7 July-

1/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

IDA WATER SYSTEM LA1017017

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

18766 CAROLINADBP01 7 July-

18120 MEANS ROADDBP02 7 July-

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

INDEPENDENCE WATER SYSTEM LA1105012

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

143 LAMARCA LANEDBP01 7 July-

145 W. 2ND STREETDBP02 7 July-

7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:

INDIAN HILLS TRAILER PARK LA1103143

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SITE W-18DBP02 7 July-

SITE E-15DBP03 7 July-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

INDIAN VILLAGE WATER SYSTEM LA1073058

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 80 AND LANEY CROCKER RDDBP01 8 August-

2328 HWY 556 MRT-010DBP03 8 August-

Wednesday, February 7, 2018 Page 74 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

INGEVITY SOUTH CAROLINA - DERIDDER WS LA2011029

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BOILER HOUSE RESTROOMDBP01 8 August-

GUARD SHACKDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

INNIS WATER CORPORATION INC LA1077013

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LA HWY 417/COON RD (NORTH) BATCHELORDBP02 9 September-

LA HWY 418 CLOSE TO BUNGEE GRAIN PORT LEDBP03 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

INTERNATIONAL PAPER (MANSFIELD) LA2031009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

NEW TRAINING CENTERDBP02 8 August-

ADMINISTRATION BLDGDBP03 8 August-

1/1/2015 YR Monitoring Begin Date: Frequency of Sampling:

J E S T C LA1033132

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

JESTC WEST ENDDBP01 8 August-

JESTC EAST ENDDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

JAMESTOWN FRYEBURG WATER SYSTEM LA1013022

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HIGHWAY 792 @ TODD ROADDBP01 8 August-

LA154 @ MADDEN MILLCREEK RDDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

JEFF DAVIS CENTRAL WATERWORKS DISTRICT LA1053012

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

13490 POUSSON RDDBP01 8 August-

5396 PINE ISLAND HWYDBP02 8 August-

Wednesday, February 7, 2018 Page 75 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2016 QT Monitoring Begin Date: Frequency of Sampling:

JEFF DAVIS WATER AND SEWER COMMISSION 1 LA1053014

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

E RACCA RD AND HIGHWAY 26DBP01 12 December-

KEYSTONE ROAD AND HIGHWAY 382DBP02 12 December-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

JEFF DAVIS WATER DISTRICT 4 LA1053013

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SW CORNER OF BUCKLIN RD & PLACIDE RDDBP02 8 August-

NW CORNER OF HWY 102 & EMPIRE RDDBP03 8 August-

7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:

JENKINS COMMUNITY WATER SYSTEM LA1119016

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

MELVIN THOMAS ROADDBP02 8 August-

FOREMAN ROADDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

JESSE DUB JAMES T P WATER SYSTEM LA1019028

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 112DBP02 7 July-

LOT 11DBP03 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

JIMMY BABIN APARTMENTS LA1005046

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

45147 TEDDY BABIN RD - APT 16DBP02 7 July-

45202 TEDDY BABIN RD - APT 22DBP03 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

JIMS TRAILER PARK LA1063076

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 24DBP01 7 July-

LOT 38DBP02 7 July-

Wednesday, February 7, 2018 Page 76 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

JONES MCGINTY WATER SYSTEM LA1067017

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HIGHWAY 165 & KILBOURNEDBP01 6 June-

HOLLY RIDGEDBP02 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

JONES ROLLING RIDGE WATER COMPANY LA1017029

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

8962 ROLLING RIDGE DRIVEDBP01 9 September-

8908 FLINT HILLDBP02 9 September-

1/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

JONESBORO WATER SYSTEM LA1049010

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

650 FIREWOOD STDBP02 8 August-

GILBERT AND PINEDBP03 8 August-

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

JOURNEY FELLOWSHIP CHURCH LA2103522

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SW REAR BUILDING TAPDBP01 11 November-

SE REAR BILDG TAPDBP02 11 November-

7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:

JOYCE WATER SUPPLY LA1127008

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

6758 HWY 84DBP01 8 August-

340 LOUISIANADBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

JUNCTION CITY WATER SYSTEM LA1111009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

INTERSECTION OF PINE & AYCOCKDBP02 9 September-

718 EAST 5TH STREETDBP03 9 September-

Wednesday, February 7, 2018 Page 77 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

K & P MH & RV PARK WATER SYSTEM LA1019127

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 21DBP01 8 August-

LOT 1DBP02 8 August-

7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:

KEATCHIE WATER SYSTEM LA1031007

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1208 HWY 172DBP02 8 August-

WILLIE X ROADDBP03 8 August-

4/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

KEITHVILLE ELEMENTARY AND MIDDLE SCHOOL LA2017018

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

POC #2 FRONT NORTH C WINGDBP02 4 April-

POC #3 BACK SOUTH C WINGDBP03 4 April-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

KELLY WATER DISTRICT LA1021008

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

NEAR SOUTH TANKDBP02 8 August-

WOOTEN AND GRIUETTEDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

KENNEDY HEIGHTS SUBDIVISION LA1005017

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1904 SOUTH EDWARDDBP01 8 August-

2513 S PENN BLVDDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

KENTWOOD WATER SYSTEM LA1105014

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 51 SDBP01 8 August-

900 I-55 SERVICE RDDBP02 8 August-

Wednesday, February 7, 2018 Page 78 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

KIDZ KLUBHOUSE LA2103461

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

MAIN BUILDING AT PUMP HOUSEDBP01 9 September-

KITCHENDBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

KILLIAN WATER SYSTEM LA1063030

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HENRY RD @ HWY 22DBP02 9 September-

20224 RIVERSIDE DR/HWY 22DBP03 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

KINDERHAUS MONTESORRI LA2103304

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

DAYCARE AREADBP01 9 September-

POINT OF ENTRYDBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

KINGS COURT MHP WATER SYSTEM LA1055132

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

728 W GLORIA ST LOT 24DBP01 7 July-

728 W GLORIA ST LOT 8DBP02 7 July-

1/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

KIROLI DARBONNE WS LA1073020

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SHARON AND KIROLIDBP02 5 May-

2340 BAYOU DARBONNE DRDBP03 5 May-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

KOLIN RUBY WISE WATERWORK DISTRICT 11 A LA1079023

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

ACROSS FROM 54 Q STOCKMAN RD (POC#1)DBP01 8 August-

202 HARRIS FERRY RDDBP02 8 August-

Wednesday, February 7, 2018 Page 79 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

KTERI APARTMENTS LA1103081

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

APT 202DBP01 7 July-

APT 113DBP02 7 July-

1/1/2016 3Y Monitoring Begin Date: Frequency of Sampling:

LA PETITE DAY CARE CENTER LA2005191

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

44077 STRINGER BRIDGE ROAD TAP 2DBP01 8 August-

44077 STRINGER BRIDGE ROAD TAP 1DBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

LACOMBE NURSING CENTRE LA1103018

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

NORTHWEST SIDE OF MAIN BLDGDBP01 7 July-

SOUTHEAST MAIN ENTRANCEDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

LACOMBE-MANDEVILLE HEADSTART LA2103356

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BACK OF BUILDINGDBP02 8 August-

TAP IN BUILDINGDBP03 8 August-

1/1/2012 QT Monitoring Begin Date: Frequency of Sampling:

LAFAYETTE UTILITIES WATER SYSTEM LA1055017

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

GLORIA SWITCH RD & ARBORDBP01 7 July-

VENNARD AND VALLEY VIEWDBP02 7 July-

WALKER ROAD AND DOC BONINDBP03 7 July-

AMBASSADOR CAFFERY AND W. CONGRESSDBP04 7 July-

THOMAS NOLAN AND BRIGANTEDBP05 7 July-

KALISTE SALOOM AND E. BROUSSARDDBP06 7 July-

Wednesday, February 7, 2018 Page 80 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

4/1/2012 QT Monitoring Begin Date: Frequency of Sampling:

LAFOURCHE WATER DISTRICT 1 LA1057001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SITE 238 LEEVILLE TANKDBP01 6 June-

SITE 244 MAILBOX 464DBP02 6 June-

SITE 208 LAROSE FOOD MARTDBP03 6 June-

HWY 1 & WEST 121STDBP04 6 June-

SITE 278 PROSPECT & HWY 316DBP05 6 June-

SITE 270 BRAUD AUTOMOTIVEDBP06 6 June-

NORTH RACELAND TANKDBP07 6 June-

SITE 157 EMERY NICHOLASDBP08 6 June-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

LAKE BRUIN WATER DISTRICT #1 LA1107001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1318 HIGHWAY 606DBP01 2 February-

HIGHWAY 606 PLANTDBP02 2 February-

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

LAKE CASTLE SCHOOL LA2103409

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

WEST SIDE ON NORTH ENDDBP01 8 August-

SOUTH SIDE OF GYMDBP03 8 August-

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

LAKE CHARLES HARBOR TERMINAL DISTRICT WS LA2019165

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SHIP BERTH 10DBP01 8 August-

WAREHOUSE 8 NEAR WELL 2DBP02 8 August-

1/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

LAKE PROVIDENCE WATER SYSTEM LA1035002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1708 HIGHLAND ROADDBP01 8 August-

6002 HWY 65 NDBP02 8 August-

Wednesday, February 7, 2018 Page 81 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2014 YR Monitoring Begin Date: Frequency of Sampling:

LAKE RAMSEY LA1103139

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

350 RAMSEY COURTDBP01 8 August-

14020 S LAKESHORE DRDBP02 8 August-

1/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

LAKE SHREVE ESTATES WATER SYSTEM LA1017083

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

POC #5 9678 HERON SPRINGSDBP01 8 August-

POC #1 211 SPRINGLANDDBP02 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

LAKE ST JOHN WATERWORKS DISTRICT 1 LA1029006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

261 WILDLIFE AND FISHERIES RDDBP01 6 June-

5861 HWY 568DBP02 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

LAKESHORE ESTATES LA1103171

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1468 LAKESHORE BLVDDBP01 6 June-

1000 EAST END BLVDDBP02 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

LAKESHORE HIGH SCHOOL LA2103498

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

GYMDBP02 9 September-

SAMPLE TAP AT AUTO SHOPDBP03 9 September-

1/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

LAKESHORE SWARTZ WATER SYSTEM LA1073071

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

MCCAIN AND BALBOADBP02 5 May-

231 OLDS LNDBP04 5 May-

96 WHIPPOORWILL DRDBP05 5 May-

TOWN E DRDBP06 5 May-

Wednesday, February 7, 2018 Page 82 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

LAKEVIEW ESTATES SUBD WS LA1067007

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

11012 LAKEVIEWDBP01 7 July-

COPPERLAKE DRIVEDBP02 7 July-

4/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

LAKEVIEW TRAILER PARK WATER SYSTEM LA1055067

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

119 ESPOSIE LOT 25DBP02 7 July-

119 ESPOSIE LOT 3-ADBP03 7 July-

1/1/2012 QT Monitoring Begin Date: Frequency of Sampling:

LAKEVIEW WATER SYSTEM LA1017019

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

NLS @ N CROSSDBP01 9 September-

NORTH LAKESHORE AT LORRAINEDBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

LASALLE WATERWORKS DISTRICT 1 LA1059002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

115 EBENEZER RDDBP02 7 July-

1093 WESTON STDBP03 7 July-

4/1/2015 YR Monitoring Begin Date: Frequency of Sampling:

LATANIER WATER ASSOCIATION LA1079013

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

8705 HWY 1 SOUTHDBP02 8 August-

7603 HWY 1 SOUTHDBP03 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

LAWCO MANSURA LA1009010

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2588 LEGLISEDBP01 8 August-

6275 HIGHWAY 114DBP02 8 August-

Wednesday, February 7, 2018 Page 83 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

LAWTELL WATER WORKS DISTRICT NO 1 LA1097004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

N. 6TH STREETDBP01 6 June-

9730 HWY 190DBP02 6 June-

1/1/2014 YR Monitoring Begin Date: Frequency of Sampling:

LAZY WHEELS TRAILER PARK LA1103095

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

POC #3 LOT 33DBP01 8 August-

POC #2 LOT 46DBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

LE TRIOMPHE SUBDIVISION WATER SYSTEM LA1055162

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1113 LETRIOMPHE PKWYDBP02 6 June-

210 SAWGRASSDBP03 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

LEATHERMAN CREEK WATER SYSTEM LA1027014

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SHERRILL RD @ OLD ARCADIADBP02 8 August-

HWY 154 @ YOUNGBLOOD RDDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

LEE ROAD WATER CORPORATION LA1103020

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

502 RUE DE BACDBP02 8 August-

78340 HWY 437DBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

LELAND WATER SYSTEM INC LA1025007

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

DOTY RD @ MOSSY LNDBP02 8 August-

4377 HIGHWAY 913DBP03 8 August-

Wednesday, February 7, 2018 Page 84 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

LELEUX TRAILER PARK WATER SYSTEM LA1045027

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 52DBP01 6 June-

LOT 10DBP02 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

LENA WATER SYSTEM INC LA1079019

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

9167 HWY 1DBP01 6 June-

905 CLIFTON ROADDBP02 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

LETON WATER SYSTEM LA1119017

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

CROW ROADDBP02 7 July-

ANGI ROADDBP03 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

LEWISBURG BELLEVUE WATER SYSTEM LA1097006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1555 HIGHWAY 35DBP02 5 May-

1462 HIGHWAY 178DBP03 5 May-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

LEWISBURG ESTATES LA1103156

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

#1 DAVID DRDBP01 7 July-

#123 NORTHLAKE DRDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

LIDDIEVILLE WATER SYSTEM LA1041010

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

OTWELL ROAD AND HWY 135DBP02 7 July-

CORNER OF ERSKIN AND HWY 130DBP03 7 July-

Wednesday, February 7, 2018 Page 85 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

LIL ANGELS DAYCARE LA2117196

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

OUTSIDE SINK BEHIND BLDGDBP02 10 October-

KITCHEN (ACR)DBP03 10 October-

7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:

LINCOLN HILLS SUBDIVISION WS LA1073090

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

109 BLUE JAYDBP01 8 August-

102 GREEN FORESTDBP02 8 August-

7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:

LINCOLN PARISH WATERWORKS DISTRICT #1 LA1061009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BARMORE RD AND CRAWFORD RDDBP02 7 July-

3618 HWY 167DBP03 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

LINCOLN PARISH WATERWORKS DISTRICT #2 LA1061029

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

END OF LINE LA HIGHWAY 167DBP01 8 August-

5553 LA HIGHWAY 167DBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

LINCOLN PARISH WATERWORKS DISTRICT #3 LA1061010

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

4035 HWY 80DBP02 8 August-

4TH STREETDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

LINDA LANE WATER SYSTEM LA1017018

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

5970 ATTAWAY HILL LANEDBP01 6 June-

5955 ACORN RDDBP02 6 June-

Wednesday, February 7, 2018 Page 86 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

LINVILLE-HAILE WATER SYSTEM LA1111010

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

656 HAILE BAPTIST CHURCH RDDBP03 10 October-

2323 CROW FARM RD - FIRE STATIONDBP04 10 October-

7/1/2016 QT Monitoring Begin Date: Frequency of Sampling:

LIONS COPOLYMER GEISMAR LA2005167

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

PAINTERS SHACKDBP01 9 September-

POLY III CONTROL ROOMDBP02 9 September-

7/1/2016 QT Monitoring Begin Date: Frequency of Sampling:

LISBON WATER SYSTEM LA1027005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 518 & YOUNG RDDBP01 7 July-

GREEN ACRES & END POINT RDDBP02 7 July-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

LITROE WATER SYSTEM LA1111025

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

CROW FARM RDDBP01 9 September-

1336 E. PERRY MURRAY RDDBP03 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

LIVONIA WATER SYSTEM LA1077022

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

7759 AIRLINE HWYDBP02 8 August-

8389 AIRLINE HWYDBP03 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

LOGANSPORT WATER SYSTEM LA1031008

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SONAT (SP-11)DBP01 5 May-

THIRD STREETDBP02 5 May-

Wednesday, February 7, 2018 Page 87 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2014 YR Monitoring Begin Date: Frequency of Sampling:

LOLLIPOP RANCH LA2103319

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SE CORNER OF CHURCHDBP01 8 August-

SW CORNER OF DAYCAREDBP02 8 August-

1/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

LOUISIANA CLARKLIFT LA2017020

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

STEAM CLEAN AREADBP01 7 July-

BREAKROOMDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

LOUISIANA STATE PENITENTIARY LA1125005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

CAMP DDBP01 8 August-

PRO SHOPDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

LOUISIANA WAR VETERANS LA1037012

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

RESIDENT QUARTERSDBP01 8 August-

OLD MAINTENANCE BLDGDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

LPWD NORTH PRODUCTION FACILITY LA1055171

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

123 FROEBADBP02 9 September-

MAGELLAN & LA HWY 1252DBP03 9 September-

1/1/2012 QT Monitoring Begin Date: Frequency of Sampling:

LPWD SOUTH LA1055156

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

RIDGE ROAD/S. RICHFIELDDBP01 8 August-

ALTHEA/S. FIELDSPANDBP02 8 August-

3203 GOLDEN GRAINDBP03 8 August-

900 LEBLANCDBP04 8 August-

Wednesday, February 7, 2018 Page 88 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2012 QT Monitoring Begin Date: Frequency of Sampling:

LPWDN NORTH REGION LA1055191

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

315 VATICAN ROADDBP02 9 September-

LARUE BLANC AND RENAUDDBP03 9 September-

HESPER ROAD AND BRAQUETDBP04 9 September-

1712 WILDERNESS TRAILDBP05 9 September-

1/1/2012 YR Monitoring Begin Date: Frequency of Sampling:

LPWDN PURCHASE WEST SCOTT LA1055172

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LANDRY ROAD AND FACILE ROADDBP01 5 May-

504 HOLLIER ROADDBP02 5 May-

1/1/2012 YR Monitoring Begin Date: Frequency of Sampling:

LPWDN SOUTH REGION LA1055192

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

END OF CAMUSDBP02 9 September-

328 VIVIAN DRIVEDBP03 9 September-

1/1/2012 YR Monitoring Begin Date: Frequency of Sampling:

LSU AT ALEXANDRIA LA2079009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

WATER TOWERDBP02 5 May-

AGROMAY SHOPDBP03 5 May-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

LUCKY WATERWORKS LA1013009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

POC #5DBP01 7 July-

POC #3DBP02 7 July-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

LUTCHER WATERWORKS LA1093003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LUTCHER TOWN HALLDBP04 5 May-

TAP AT OXIDATION PONDDBP05 5 May-

Wednesday, February 7, 2018 Page 89 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

M A PATOUT AND SON SUGAR MILL W S LA2045057

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

3512 J PATOUT TAP @ ENGINEER OFFICEDBP01 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MADISONVILLE ON THE LAKE LA1103176

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

END OF SOUTH CHENIER ROADDBP01 8 August-

463 S CHENIER RDDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MADISONVILLE WATER SUPPLY LA1103022

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

306 PINE STDBP01 7 July-

CORNER OF CEDAR AND RENEDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MAGNOLIA PLANTATION WATER SYSTEM INC LA1113032

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

629 CHEMIN AGREABLE RDDBP01 7 July-

LA HWY 89 (85' SOUTH LUCIEN RD)DBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MAITLAND WATER WORKS DISTRICT LA1025011

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

8727 LEE BAYOU ROADDBP02 8 August-

3725 HWY 921DBP03 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

MAMOU ROAD WATER DISTRICT, INC LA1097018

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1327 MILTON ROADDBP02 10 October-

1395 TRANSCO ROADDBP03 10 October-

Wednesday, February 7, 2018 Page 90 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2015 YR Monitoring Begin Date: Frequency of Sampling:

MANCHAC LA2105124

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

30316 HIGHWAY 51DBP02 9 September-

30248 HIGHWAY 51DBP03 9 September-

4/1/2014 YR Monitoring Begin Date: Frequency of Sampling:

MANDEVILLE WATER SUPPLY LA1103023

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BOWLING GREEN - 701 FLORIDA STREETDBP01 2 February-

800 HEAVENS DRIVEDBP02 8 August-

1/1/2014 YR Monitoring Begin Date: Frequency of Sampling:

MANGANOS MOBILE HOME PARK LA1103071

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT #132DBP02 8 August-

LOT #144DBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MANGHAM WATER SYSTEM LA1083005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

847 BROADWAY OFF HWY 15DBP01 9 September-

186 EGYPT ST OFF HWY 576DBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MANIFEST RHINEHART WATER SYSTEM LA1059014

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BAILEY ROADDBP01 8 August-

HWY 8 @ HWY 126DBP02 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

MANSFIELD WATER SYSTEM LA1031009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

INT STARKS & PARK SW CNR (7UWB)DBP01 6 June-

HIGHWAY 175 SOUTHDBP03 6 June-

Wednesday, February 7, 2018 Page 91 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MARANATHA ACRES SUBDIVISION LA1005153

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

10314 MARANTHA ACRESDBP01 8 August-

10362 MARANTHA ACRESDBP02 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

MARATHON PETROLEUM COMPANY LLC LA2095008

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

ZONE 6 KITCHEN SINKDBP01 10 October-

NEW ADMINISTRATION BLDGDBP02 10 October-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MARINA DEL RAY WATER SYSTEM LA1103123

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

108 MARINA DEL RAYDBP02 7 July-

100 MARINA DEL RAYDBP03 7 July-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

MARION WATER SYSTEM LA1111011

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

245 ALICEDBP01 3 March-

3019 TAYLORDBP02 3 March-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MARKRIDGE PARK SUBDIVISION WATER SYSTEM LA1055137

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

238 AUBURN (TCR004)DBP02 8 August-

101 ROJEAN (MRT008)DBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MARSHS WATER AND SEWER LA1085041

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

205 PAUL STREETDBP01 9 September-

56 PAUL STREETDBP02 9 September-

Wednesday, February 7, 2018 Page 92 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MARTIN WATER SYSTEM LA1081006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

EVANS ROADDBP02 10 October-

HWY 507DBP03 10 October-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MAXIES MOBILE VALLEY WATER SYSTEM LA1055021

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

4350 HWY 90 EAST SITE 41ADBP01 8 August-

4350 HWY 90 EAST SITE #3DBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MAYFIELD ELEMENTARY SCHOOL LA2103505

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BACK OF BUILDING AT CAFETERIADBP01 7 July-

FRONT WEST SIDE OF BUIKDINGDBP02 7 July-

7/1/2016 QT Monitoring Begin Date: Frequency of Sampling:

MCCLENDON COMMUNITY WATER WELL LA1073028

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HORNE LANEDBP02 8 August-

BLAZIER LANEDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MCDONALD WATER SYSTEM LA1049011

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1000 COUNTRY ROADDBP01 8 August-

145 FOLKS ROADDBP02 8 August-

1/1/2016 3Y Monitoring Begin Date: Frequency of Sampling:

MCGAHA APARTMENTS LA1005085

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

TAP 2DBP01 8 August-

TAP 1DBP02 8 August-

Wednesday, February 7, 2018 Page 93 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:

MCINTYRE WATER SYSTEM LA1119019

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1169 HWY 80DBP02 8 August-

125 MILFORD RDDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MEADOWWOOD ESTATES WATER SYSTEM LA1017063

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

10484 MEADOW VIEWDBP01 6 June-

10361 MEADOW VIEW DRIVEDBP02 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MER ROUGE WATER SYSTEM LA1067009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

9300 HWY 133DBP01 6 June-

HWY 165 ACROSS FROM KENNEDY RICE DRYERSDBP02 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MIDDLE FORK WATER SYSTEM LA1027012

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HEBRON ROADDBP02 8 August-

GREER ROADDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MIDWAY WATER SYSTEM LA1119020

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

COX ROADDBP01 5 May-

BENNETT ROADDBP02 5 May-

4/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

MIDWAY WATER SYSTEM INC LA1097008

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

367 ATKINS BAYOUDBP01 8 August-

9099 HWY 105DBP02 8 August-

Wednesday, February 7, 2018 Page 94 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MILES MOBILE HOME PARK LA1019125

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

NE TRAILER BY WWTPDBP01 8 August-

NW TRAILER AT LAST LOTDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MILLCREEK WATER SYSTEM LA1013021

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HOUGHTON RDDBP01 8 August-

BIS LAKE RDDBP02 8 August-

1/1/2012 YR Monitoring Begin Date: Frequency of Sampling:

MILTON PURCHASE WATER SYSTEM LA1055196

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1320 GALLETDBP01 8 August-

1409 E BROUSSARDDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MILTON WATER SYSTEM INC LA1055046

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

101 RIVER BIRCHDBP01 8 August-

429 ESPASIEDBP02 8 August-

1/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

MINDEN WATER SYSTEM LA1119021

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 531 AND INDUSTRIALDBP01 8 August-

119 N TANGLEWOOD DRDBP02 8 August-

1108 PINE STREETDBP03 8 August-

404 INDUSTRIAL DRIVEDBP04 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MINERAL SPRINGS WATER SYSTEM LA1061013

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

ROCK CORNER CHURCHDBP01 8 August-

1540 PEG RIDGE ROADDBP02 8 August-

Wednesday, February 7, 2018 Page 95 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MIRE BRANCH WATER CORPORATION LA1001024

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

173 DR. PARROTT AVEDBP01 6 June-

5037 MIRE HIGHWAYDBP02 6 June-

4/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

MJS ESTATES LLC WATER SYSTEM LA1045040

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

3701 KEVIN DR LOT 7DBP01 6 June-

3701 KEVIN DR LOT 2DBP02 6 June-

4/1/2012 QT Monitoring Begin Date: Frequency of Sampling:

MONROE WATER SYSTEM LA1073031

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

MONROE CONFERENCE CENTER FRONT ENTRANCEDBP01 8 August-

NORTH 7TH AT K STREETDBP05 8 August-

OLIVE AT NORTH 6TH STREETDBP06 8 August-

JEFFERSON JR HIGH SCHOOLDBP07 8 August-

NORTHEAST AT FILHIOLDBP08 8 August-

WOODS AT 14TH STREETDBP09 8 August-

G.M. PLANTDBP10 8 August-

POINT OF ENTRYDBP11 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MONTELEONE JR HIGH SCHOOL LA2103489

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SAMPLE TAP AT GYMDBP02 9 September-

SAMPLE TAP AT WOODSHOPDBP03 9 September-

4/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

MONTEREY RURAL WATER SYSTEM INC LA1029007

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1076 MCCALL RDDBP01 5 May-

2881 HWY 29DBP02 5 May-

Wednesday, February 7, 2018 Page 96 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MONTICELLO WATER SYSTEM LA1035004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2803 HWY 579 BURGESDBP01 7 July-

7837 HWY 582 DRIVERDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MONTPELIER WATER SUPPLY LA1091006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

630 DURBIN LANEDBP02 8 August-

36031 HWY 16DBP03 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

MOORINGSPORT WATER SYSTEM LA1017023

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

FRANCIS & AGURSDBP01 7 July-

BROWN STREETDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MOREHOUSE CENTRAL WS LA1067010

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

DENT COCKRELL ROADDBP02 8 August-

9160 GRABAULT RDDBP03 8 August-

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

MORGAN CITY WATER SYSTEM LA1101005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

FEDERAL AND ADAMSDBP01 11 November-

1114 FRONT STREETDBP02 11 November-

MCDERMOTT AND LESLEYDBP03 11 November-

REC DEPARTMENTDBP04 11 November-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MORGANZA WATER SYSTEM LA1077025

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

882 CROCHET STDBP01 7 July-

LA 3050 AND BEAUVIASDBP02 7 July-

Wednesday, February 7, 2018 Page 97 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MORROW WATER SYSTEM INC LA1097009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

13707 HWY 71 (POC#6)DBP01 5 May-

856 FISHER RD (POC#4)DBP02 5 May-

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

MORTON SALT INC WATER SYSTEM LA2045053

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

CHANGE HOUSEDBP03 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MOSSVILLE WW DISTRICT NO 2 LA1019052

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

3911 WEST HWY 90DBP03 7 July-

810 ISABELLA STREETDBP04 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MOUNT CALM WATER SYSTEM LA1013018

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LA 147 AND GIRLSCOUT RDDBP01 8 August-

389 HWY 797DBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MOUNT HERMON WATER DISTRICT LA1117021

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 38 @ MT PISGAH ROADDBP01 6 June-

VERNON SCHOOL RD & THOMAS CRYER ROADDBP02 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MT LEBANON WATER SYSTEM LA1013011

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LA HIGHWAY 154 @ LA HIGHWAY 795DBP01 7 July-

OAK GROVE CHURCH ROADDBP02 7 July-

Wednesday, February 7, 2018 Page 98 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2014 YR Monitoring Begin Date: Frequency of Sampling:

MT MORIAH WATER SYSTEM LA1049036

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2157 HWY 148DBP01 8 August-

3077 RISER RDDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MT OLIVE WATER SYSTEM LA1013012

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LA HWY 508DBP01 7 July-

GASKIN ROADDBP02 7 July-

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

MT OLIVE WATERWORKS DISTRICT LA1061014

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

MITCHAM ORCHARD RD & CRESTHAVEN BLVDDBP02 8 August-

992 GARR RDDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MT ZION WATER SYSTEM LA1061015

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

151 N 500 YDS SOUTH OF JARMAN RD INTERSEDBP01 7 July-

WALNUT CREEK RD AT TEST SITE ACROSS FROMDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

MY PLACE MOBILE HOME PARK WATER SYSTEM LA1099025

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1367-A CHES BROUSSARDDBP01 9 September-

1369-I CHES BROUSSARDDBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

NATCHITOCHES PARISH WWKS DISTRICT 2 LA1069006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

139 BRIARWOOD COURTDBP02 6 June-

2971 OLD RIVER ROADDBP03 6 June-

Wednesday, February 7, 2018 Page 99 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

NATCHITOCHES WATER SYSTEM LA1069007

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

WTP 24 EFFLUENTDBP01 6 June-

4383 HWY 1DBP02 6 June-

COLLEGE AVENUEDBP03 6 June-

109 MORGAN LANEDBP05 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

NEBO WATER SYSTEM INC LA1059005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

8227 HWY 127 SOUTHDBP02 7 July-

213 HARVEY BRADFORD ROADDBP03 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

NEESE INDUSTRIES, INC LA2005267

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

OFFICE KITCHENDBP01 9 September-

EMPLOYEE KITCHENDBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

NEW CARROLL WATER SYSTEM LA1123005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

9031 LA 2DBP02 11 November-

15744 LA 585DBP03 11 November-

7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:

NEW HOPE ST CLAIR WATER SYSTEM LA1049024

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

POC# 4 HWY 146- NEW HOPE CHURCHDBP02 7 July-

INTERSECT LELAND PARDUE AND LELAND RDDBP03 7 July-

Wednesday, February 7, 2018 Page 100 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

10/1/2012 QT Monitoring Begin Date: Frequency of Sampling:

NEW IBERIA WATER SYSTEM (LAWCO) LA1045009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

ELTON & SANDAGERDBP01 3 March-

3611 BROKEN ARROWDBP02 3 March-

AI DELI STOREDBP05 3 March-

414 BOUTTE RDDBP06 3 March-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

NEW LLANO WATER DEPARTMENT LA1115022

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

OAK STREETDBP01 7 July-

STANTON ROADDBP02 7 July-

4/1/2012 QT Monitoring Begin Date: Frequency of Sampling:

NEW ORLEANS CARROLLTON WW LA1071009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

20711 OLD SPANISH TR (VIS)DBP01 10 October-

4330 ST CLAUDE (FSX)DBP02 10 October-

5600 FRANKLIN (E12)DBP03 10 October-

14434 CHEF MENTEUR HIGHWAYDBP05 10 October-

6900 DOWNMAN ROADDBP06 10 October-

2920 MAGAZINE STREETDBP07 10 October-

7300 CHEF MENTEUR HIGHWAYDBP08 10 October-

449 ESPLANADE AVENUEDBP09 10 October-

1211 ARABELLA STREETDBP10 10 October-

9600 HAYNE BLVDDBP11 10 October-

5550 CROWDER BLVDDBP12 10 October-

7223 PONCHARTRAIN BLVDDBP13 10 October-

Wednesday, February 7, 2018 Page 101 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

4/1/2012 QT Monitoring Begin Date: Frequency of Sampling:

NEW ORLEANS ALGIERS WATER WORKS LA1071001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

4115 WOODLAND (AN)DBP02 4 April-

3663 BEHRMAN (AA)DBP03 4 April-

3340 GEN. MEYER (AL)DBP04 4 April-

425 OPELOUSAS STREETDBP05 4 April-

13101 PATTERSON DRIVEDBP06 4 April-

123 1/2 OAK ALLEY DRIVEDBP07 4 April-

2501 MEMORIAL PARK DRIVEDBP08 4 April-

2914 VESPIAN STREETDBP09 4 April-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

NEW ROADS WATER SYSTEM LA1077026

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1208 OLINDE STDBP01 7 July-

801 MORNINGSIDE STDBP02 7 July-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

NEWELLTON WATER SYSTEM LA1107003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

117 POINT DRIVEDBP01 11 November-

130 MELTON STREETDBP02 11 November-

4/1/2015 QT Monitoring Begin Date: Frequency of Sampling:

NOBLE WATER SYSTEM LA1085017

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 1218 @ RED OAKDBP01 6 June-

KNOTT DRIVEDBP02 6 June-

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

NORANDA ALUMINA, LLC LA2093002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2ND FLOOR - DIGESTION BLDGDBP01 4 April-

HIGH TANK / WATER TOWERDBP02 4 April-

Wednesday, February 7, 2018 Page 102 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

NORTH CROWLEY WATER CORPORATION LA1001023

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

148 VICKSBURGDBP01 3 March-

4354 BRANCH HWYDBP02 3 March-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

NORTH DESOTO WATER SYSTEM LA1031011

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1229 STONEWALLDBP01 8 August-

120 CHURCH ROADDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

NORTH FRANKLIN WATER WORKS LA1041003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

453 HIGHWAY 610DBP01 8 August-

HIGHWAY 17 @ NATURES ACRES RDDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

NORTH HODGE WATER SYSTEM LA1049012

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOOP ST AT WEST 3RDDBP02 7 July-

5732 QUITMAN HWYDBP03 7 July-

7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

NORTH IBERVILLE WATER SYSTEM LA1047024

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

22940 HWY 386DBP01 8 August-

21305 SIDNEY ROADDBP02 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

NORTH LAKE ST JOHN WATER SYSTEM LA1029014

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

899 HWY 570DBP01 11 November-

5574 HWY 568DBP02 11 November-

Wednesday, February 7, 2018 Page 103 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2018 QT Monitoring Begin Date: Frequency of Sampling:

NORTH MONROE ET AL WATER SYSTEM LA1073035

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

22 MARTHA DRIVEDBP03 5 May-

296 BAYOU BANKSDBP04 5 May-

579 PARROTS BEAKDBP05 5 May-

1332 KEYSTONE RDDBP06 5 May-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

NORTH OAKS MEDICAL CENTER LA2105051

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

DIAGNOSTIC RMDBP01 7 July-

BOILER ROOMDBP02 7 July-

7/1/2016 QT Monitoring Begin Date: Frequency of Sampling:

NORTH WEBSTER PARISH INDUSTRIAL PARK LA2119011

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

B AND R DRIVEDBP02 8 August-

HWY 371DBP03 8 August-

1/1/2014 YR Monitoring Begin Date: Frequency of Sampling:

NORTHMINSTER PRESBYTERIAN MONTESSORI LA2103357

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

END OF SOUTH WINGDBP01 8 August-

DISTRIBUTION SYSTEMDBP02 8 August-

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

NORTHSHORE 1 COMMERCIAL CONDO ASSOC LA2103412

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

FRONT RIGHT SIDE OF BLDGDBP02 8 August-

LEFT SIDE OF BLDG TOWARDS REARDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

NORTHWEST ALLEN WWD WATER SYSTEM LA1003003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 26 & 201 VIZARDS RDDBP01 8 August-

6 MILE PENTACOSTAL ROAD & HWY 377 NDBP02 8 August-

Wednesday, February 7, 2018 Page 104 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

NORTON SHOP WATER SYSTEM LA1027010

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1862 HWY 521DBP01 9 September-

263 STATE LINE RDDBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

OAK GROVE WATER SYSTEM LA1123006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2880 FISKE UNION ROADDBP01 8 August-

HWY 17 SDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

OAK MEADOWS SUBDIVISION WATER SYSTEM LA1019076

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

6902 MEADOW VIEW LOOPDBP01 8 August-

7121 SHADOW LANEDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

OAK PINE MOBILE HOME PARK WATER SYSTEM LA1019112

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

726 TALLOWDBP01 8 August-

932 TALLOW LOT 29DBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

OAK RIDGE WATER SYSTEM LA1067014

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

106 N OAKDBP02 8 August-

DOGWOOD @ OAK STDBP03 8 August-

4/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

OAK RIVER ESTATES LA1103159

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

20125 OAK RIVER PLACEDBP02 8 August-

20055 OAK RIVER PLACEDBP03 8 August-

Wednesday, February 7, 2018 Page 105 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

OAK VILLA TRAILER PARK LA1103152

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

OFFICEDBP01 8 August-

LOT 128DBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

OAK VILLAGE MOBILE HOME PARK WS LA1005171

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 15DBP01 9 September-

LOT 29DBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

OCCIDENTAL CHEMICAL CORPORATION LA2005042

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

CO-GEN CONTROL ROOM SINKDBP02 8 August-

5CP CONTROL ROOM SINKDBP03 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

OIL CITY WATER WORKS LA1017026

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 1 & HWY 538DBP02 4 April-

10011 HIGHWAY 1 NORTHDBP03 4 April-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

OLD SALINE COMMUNITY WATER SYSTEM LA1013020

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

RIDGE ROAD BY FLUSHDBP02 8 August-

HWY I55DBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

OMNI GEOPHYSICAL LLC WATER SYSTEM LA2055086

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

MENS LAVATORYDBP01 8 August-

KITCHEN SINKDBP02 8 August-

Wednesday, February 7, 2018 Page 106 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

OPELOUSAS CITY OF WATER SYSTEM LA1097010

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1602 BLUE STDBP02 8 August-

2624 POWERS STREETDBP04 8 August-

1014 JUDSON WALSHDBP05 8 August-

123 MEMORY LANEDBP06 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

OXBOW CALCINING, LLC LA2033052

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

ADMINISTRATION BLDGDBP01 6 June-

LUNCHROOM BLDGDBP02 6 June-

MAINTENANCE SHOP SINKDBP03 6 June-

1/1/2014 YR Monitoring Begin Date: Frequency of Sampling:

PACKAGING CORP OF AMERICA - DERIDDER LA2011002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BLASTYARDDBP02 9 September-

NURSES STATIONDBP03 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

PALMETTO ADDICTION RECOVERY LA1083017

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

CABIN 8DBP01 8 August-

CABIN 1DBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

PALMETTO WATER WORKS INC LA1119022

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

493 LAKEVIEW DRDBP01 7 July-

195 PINE CIRCLEDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

PARADISE POINT WATER SYSTEM LA1049032

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

119 EDEN DRDBP01 8 August-

141 PARADISE DRIVEDBP02 8 August-

Wednesday, February 7, 2018 Page 107 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

10/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

PARISH UTILITIES OF ASCENSION LA1005035

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

EVANGELINEDBP03 9 September-

3227 GARRISON TURNAROUNDDBP05 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

PARKLAND TRAILER PARK WATER SYSTEM LA1055048

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

TAP #1 AT HOUSEDBP01 8 August-

TAP #5 LOT 33DBP02 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

PATTERSON WATER SYSTEM LA1101006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

729 KEM STREETDBP01 10 October-

508 TAFT STREETDBP03 10 October-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

PAVESTONE LA2103507

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

29095 KRENTEL RD-OFFICE AREADBP01 9 September-

29095 KRENTEL RD-BAG PLANTDBP02 9 September-

7/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

PEACEFUL PINES MHP WATER SYSTEM LA1015036

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 1DBP02 9 September-

LOT 16DBP03 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

PEARL PLANTATION TOWNHSE LA1103131

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

APT 377DBP01 8 August-

OUTSIDE PUMP HOUSEDBP02 8 August-

Wednesday, February 7, 2018 Page 108 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

PECAN ISLAND WW DISTRICT NO 3 LA1113029

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

24304 FRONT RIDGE RDDBP01 9 September-

32228 W LA HWY 82DBP02 9 September-

7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:

PECAN LAKE SUBDIVISION WS LA1073063

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

122 PECAN LAKE ESTATESDBP02 8 August-

100 PECAN LAKE ESTATESDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

PEG LEG COVE WATER SYSTEM LA1085018

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 2 FOXCROFT ROADDBP02 7 July-

LOT 59 BOUNTY TRAILDBP03 7 July-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

PENDLETON WATER ASSOCIATION LA1085046

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

QUEENS ROADDBP01 7 July-

HWY 6DBP03 7 July-

7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

PHILLIPS 66 LAKE CHARLES REFINERY LA2019017

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

TANK FARM CONTROL ROOM SINKDBP01 8 August-

SOUR CRUDE CONTROL ROOM SINKDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

PHOENIX MHP OF LAKE CHARLES LLC W S LA1019109

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT #28DBP02 8 August-

LOT #55DBP03 8 August-

Wednesday, February 7, 2018 Page 109 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

PILOT STREET WATER SUPPLY LA1103193

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

23514 PILOT STREETDBP01 6 June-

72689 5TH AVEDBP03 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

PINE CREST TRAILER PARK LA1103078

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

OFFICE TAPDBP01 8 August-

LOT 110DBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

PINE HILL WATER SYSTEM LA1027007

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

802 CAMP RDDBP02 8 August-

188 WINKLER RDDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

PINE PRAIRIE CORRECTIONAL FACILITY WS LA1039018

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

INTAKEDBP02 10 October-

TOOL ROOMDBP03 10 October-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

PINE TRAILER PARK LA1005152

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 11DBP01 9 September-

LOT 9DBP02 9 September-

4/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

PINECREST MOBILE HOME VILLAGE LA1017092

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

MRT LOCATIONDBP01 9 September-

MIDPOINTDBP02 9 September-

Wednesday, February 7, 2018 Page 110 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2012 QT Monitoring Begin Date: Frequency of Sampling:

PINEHILL WATERWORKS DISTRICT LA1017027

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

WOMACK RDDBP01 12 December-

SHEPARD ROADDBP02 12 December-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

PINEY RIDGE TRAILER PARK LA1103028

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 51DBP02 8 August-

LOT 4DBP03 8 August-

1/1/2012 YR Monitoring Begin Date: Frequency of Sampling:

PINNACLE PLACE SUBDIVISION WATER SYSTEM LA1055175

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

105 PINNACLEDBP02 7 July-

138 PINNACLEDBP03 7 July-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

PINNACLE POLYMERS LA2095041

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LAB SINKDBP02 8 August-

WAREHOUSEDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

PIONEER DARNELL WATER SYSTEM LA1123007

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2268 HURT ROADDBP02 7 July-

HWY 588DBP03 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

PITKIN WATER SYSTEM LA1115026

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

385 LARRY COOK RDDBP01 6 June-

109 HILL STDBP02 6 June-

Wednesday, February 7, 2018 Page 111 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

PLAISANCE WATER SYSTEM LA1097012

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

DUPRE ROADDBP01 6 June-

7941 I49 SOUTHDBP02 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

PLANET KIDS ACADEMY #2 LA2103484

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

317 HWY 21 - FRONT OF BLDG NE CORNERDBP02 7 July-

317 HWY 21 - FRONT OF BLDG SE CORNERDBP03 7 July-

1/1/2016 3Y Monitoring Begin Date: Frequency of Sampling:

PLANTATION MOBILE HOME VILLAGE LA1005148

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

TAP 2DBP01 8 August-

TAP 1DBP02 8 August-

1/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

PLANTATION TRACE MOBILE HOME PARK LA1015006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

61 DAVIDSONDBP01 8 August-

74 DAVIDSON DRIVEDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

PLEASANT HILL WATER SYSTEM, TOWN OF LA1085021

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HIGHWAY 175DBP01 8 August-

STODDARD STDBP02 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

PLEASANT HILLS-CROSSROADS WATER SYSTEMS LA1127023

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

5016 HWY 124DBP02 7 July-

3939 HWY 84DBP03 7 July-

Wednesday, February 7, 2018 Page 112 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

PLEASANT RIDGE WATER SYSTEM LA1059006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1647 HWY 124 EASTDBP05 8 August-

536 JOHN HENRYDBP06 8 August-

1/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

PLEASANT RIDGE WATER SYSTEM SOUTH LA1059019

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

240 TROYVILLE RDDBP01 8 August-

195 CRUSE RDDBP02 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

PLEASANT VALLEY WATER SYSTEM LA1119023

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

14330 HWY 371DBP02 8 August-

NETLES ROAD@FULLER ROADDBP03 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

PLEASURE BEND WATER SUPPLY LA1095006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

213 RUE ST MARTINDBP02 8 August-

318 DES ALLEMANDS BLVDDBP03 8 August-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

PNO 3401 JOURDAN ROAD LA2071121

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

WEST END, NORTHWALLDBP01 8 August-

CITY-SIDE, US OF ADMIN BLDGDBP02 8 August-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

PNO ALABO STREET WHARF LA2071120

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BELLE CHASSE TRANSPORT METERDBP01 8 August-

COMFORT STATION, SECTION 12DBP02 8 August-

Wednesday, February 7, 2018 Page 113 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

PNO CRUISE TERMINALS LA2071117

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SHIP SERVICE CONNECTION AT FP 5DBP01 8 August-

SHIP SERVICE CONNECTION BLUE BOX 3DBP02 8 August-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

PNO ELAINE STREET WHARF LA2071125

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

COMFORT STATION OF WHARFDBP01 8 August-

7501 TERMIANL RD - DEDICATED FAUCETDBP02 8 August-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

PNO GOV NICHOLLS WHARF LA2071126

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SHIP SERVICE METERDBP01 8 August-

COMFORT STATIONDBP02 8 August-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

PNO HARMONY ST. WHARF LA2071122

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SHIP SERVICE CONNECTION HARMONY OPENDBP01 8 August-

SHIP SERVICE CONNECTION SECTION 14DBP02 8 August-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

PNO LOUISIANA NEXT COTTON WAREHOUSE LA2071119

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

COASTAL CARGO OFFICE BLDG CITY-SIDEDBP01 8 August-

SHIP SERVICE CONNECTION, SECTION 45DBP02 8 August-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

PNO UPTOWN FACILITIES LA2071118

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HENRY CLAY COLD STORAGE COMFORT STATIONDBP01 8 August-

NAPOLEON C COMFORT STATIONDBP02 8 August-

Wednesday, February 7, 2018 Page 114 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

POINT BLUE WATER SYSTEM INC LA1039006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

3365 CHATAIGNIER RDDBP01 7 July-

6558 PINE PT RDDBP02 7 July-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

POINT WILHITE WS LA1111012

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

CURTIS DEANDBP02 8 August-

MT. ARARAT CHURCH HWY 553DBP03 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

POINTE A LA HACHE WATER SYSTEM LA1075005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

TABONYDBP01 9 September-

PLANTDBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

POINTE COUPEE DETENTION CENTER LA1077046

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

WORK RELEASE BUILDINGDBP01 8 August-

BLUE CELLSDBP02 8 August-

10/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

POINTE COUPEE WATER WORKS DISTRICT 1 LA1077043

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

15415 CHENAL ROADDBP01 9 September-

9296 ISLAND RD (HWY 413)DBP03 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

POINTE COUPEE WWKS DISTRICT 2 - HWY 10 LA1077047

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

6947 HIGHWAY 81 EASTDBP02 9 September-

7992 BAYOU FORDOCHE ROADDBP03 9 September-

Wednesday, February 7, 2018 Page 115 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

POINTE COUPEE WWKS DISTRICT 2- BATCHELOR LA1077045

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

12348 HWY 417DBP01 9 September-

5010 HWY 419DBP02 9 September-

1/1/2012 YR Monitoring Begin Date: Frequency of Sampling:

POLAND WATER ASSOCIATION LA1079025

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2563 HWY 457DBP02 8 August-

6 HATHORNE ROADDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

POLLOCK AREA WATER SYSTEM INC LA1043017

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

476 HARDWATER LAKE ROADDBP02 7 July-

8893 HWY 165DBP03 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

PONCHATOULA WATER SYSTEM LA1105019

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

S 9TH & HWY 22 WDBP02 7 July-

COLVER & ESTERBROOK ROADDBP03 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

PONDEROSA RANCHES SUBDIVISION LA1103077

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

102 STALLION RUNDBP02 7 July-

774 BUCK RUNDBP03 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

PORT ALLEN WATER SYSTEM LA1121014

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

OAKS AT S JEFFERSONDBP01 9 September-

CORNER 7TH & BURBRIDGEDBP02 9 September-

Wednesday, February 7, 2018 Page 116 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

PORT LOUIS TOWNHOMES LA1103153

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

CONDO 5 @ RUE DE SUD DRDBP02 7 July-

CONDO 49 @ RUE DE SUD DRDBP03 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

PORT OF GREATER BATON ROUGE LA2121007

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2161 HWY 1 SOUTHDBP01 8 August-

1300 ERNEST WILSON DRDBP02 8 August-

7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

PORT OF WEST ST MARY LA1101013

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

100 KIM LANEDBP01 9 September-

324 ALICE B ROADDBP02 9 September-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

PORT SULPHUR WATER DISTRICT LA1075006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

TIGER PASSDBP04 9 September-

SHELL HELIPORTDBP06 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

PORT VINCENT WATER SYSTEM LA1063033

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

CORNER LEE 7 HWY 16DBP01 9 September-

OFF GOURDON LNDBP02 9 September-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

POWHATAN WATER SYSTEM LA1069008

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 485 @ GOOCH COMMUNITY CENTERDBP02 9 September-

HWY 562 AND HWY 485DBP03 9 September-

Wednesday, February 7, 2018 Page 117 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

PRAIRIE ROAD WATER DISTRICT LA1073040

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

UNDERWOODDBP02 5 May-

375 PRAIRIE ROADDBP03 5 May-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

PRAIRIE RONDE WATER SYSTEM INC LA1097014

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

WHITE CHAPEL ROADDBP01 6 June-

MINI ROADDBP02 6 June-

1/1/2015 YR Monitoring Begin Date: Frequency of Sampling:

PROGRESSIVE WASTE SOLUTIONS LA2103511

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

NORTH SIDE OF MAINT BUILDINGDBP01 8 August-

SCALE HOUSEDBP02 8 August-

7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

PROVENCAL WATER SYSTEM LA1069009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

RUTH RACHELDBP02 9 September-

MCCAIN TIBBETT HWY 117 NDBP03 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

PUNKIN CENTER HILLTOP WS LA1049013

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

3829 BEECH SPRINGS ROADDBP01 7 July-

705 LOCKHART DRIVEDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

QUAIL RIDGE ESTATES WATER SYSTEM LA1019105

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 102DBP01 8 August-

AT GULLYDBP02 8 August-

Wednesday, February 7, 2018 Page 118 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

QUITMAN WATER SYSTEM LA1049014

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

ANDERSON ROAD AND BEAR KNOLL RDDBP02 7 July-

DENTON RD AND MT OLIVE RDDBP03 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

R & D PROPERTIES, LLC, MOBILE HOME PARK LA1045041

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2815 DAGO LANEDBP01 9 September-

2905 BUCKSKIN RDDBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

RAMBIN-WALLACE WATER SYSTEM LA1031012

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SAM BOOKER ROADDBP02 8 August-

HIGHWAY 483DBP03 8 August-

4/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

RAMSEY WATER SYSTEM LA1073025

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

137 MUSIC ROADDBP03 10 October-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

RANDOLPH WATER SYSTEM LA1111018

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1201 HWY 167DBP01 7 July-

874 BETHEL CHURCH RDDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

RAPIDES ISLAND WATER ASSOCIATION INC LA1079020

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 1 & HWY 121DBP01 8 August-

428 BELGARD BENDDBP02 8 August-

Wednesday, February 7, 2018 Page 119 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

RAPIDES PARISH WATERWORKS DISTRICT 3 LA1079017

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

RIFLE RANGE RDDBP02 6 June-

TIOGA RD & ADAMS DRDBP03 6 June-

POINT OF ENTRYDBP05 6 June-

DONAHUE FERRY & WHITTINGTONDBP06 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

RAVENWOOD SUBDIVISION LA1103080

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

101 FOREST STDBP01 8 August-

118 CHARWOOD DRDBP02 8 August-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

RAW POWER INDUSTRIES MHC WATER SYSTEM LA1017001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BARBER SHOPDBP02 4 April-

LOT 50DBP03 4 April-

10/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

RAYVILLE WATER SYSTEM LA1083006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

MCGOWEN AND COTTONLANDDBP02 7 July-

LOUISA AND PEACH STREETDBP03 7 July-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

RED HILL WATERWORKS INC LA1043018

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

513 HWY 123DBP03 8 August-

146 GENE KEEN RDDBP04 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

REDDELL VIDRINE WATER DISTRICT LA1039007

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

MILLER LIKE ROADDBP01 8 August-

7616 VETERAN'S MEMORIAL HWYDBP02 8 August-

Wednesday, February 7, 2018 Page 120 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

RESOLVE WHISPERWOOD ESTATES SD WS LA1103046

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

60451 DIXIE ROADDBP01 9 September-

310 PALERMODBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

RICHLAND HEIGHTS SUBD WATER SYSTEM LA1083015

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

25 BAKER LNDBP01 8 August-

14 BAKER LNDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

RINGGOLD WATER SYSTEM LA1013013

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SUSAN DRIVEDBP02 8 August-

HALL @ BATESDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

RISER ROAD WATER SYSTEM LA1061021

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2017 RISER ROADDBP01 8 August-

MASTER METER AT RISER ROADDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

RIVER PINES PLANTATION UTILITIES LA1063018

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

31765 RIVER PINES DRIVEDBP02 8 August-

31722 INDIAN MOUND ROADDBP03 8 August-

4/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

RIVER POINT WATER SYSTEM LA1015030

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BARN NO. 7DBP01 8 August-

5223 RUE ROYALE DRDBP02 8 August-

Wednesday, February 7, 2018 Page 121 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

RIVER RIDGE ESTATES WATER SYSTEM LA1099023

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2913 ATCHAFALAYA LOT 2DBP01 9 September-

LOT 20DBP02 9 September-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

RIVER ROAD WATER SYSTEM LA1083008

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

952 SCALES ROADDBP01 9 September-

752 FERGUSON ROADDBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

RIVERSCAPE @ CLIO SUBDIVISION LA1063106

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

17030 COLES CREEKDBP02 8 August-

1700 PEACE POINTDBP03 8 August-

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

ROBELINE MARTHAVILLE WATER SYSTEM LA1069010

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

TRULY FREE ROADDBP01 6 June-

2491 ROBELINE PROVENCAL ROADDBP02 6 June-

7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

ROBINSON CHAPEL WATER SYSTEM LA1049027

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

662 ROBINSON CHAPELDBP01 9 September-

4371 HWY 144DBP02 9 September-

7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

ROCKY BRANCH WATER SYSTEM LA1111013

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BILL BROWN & HIGHWAY 143DBP02 5 May-

1158 CHAPMAN ROADDBP03 5 May-

Wednesday, February 7, 2018 Page 122 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2016 3Y Monitoring Begin Date: Frequency of Sampling:

RODDY ROAD VILLAGE ASCENSION, LLC LA1005112

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 23DBP01 8 August-

TAP 1DBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

RODESSA WATER SYSTEM LA1017028

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

PITTS ROADDBP01 7 July-

10053 WEST MAIN STDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ROGERS COMMUNITY WATER SYSTEM INC LA1059013

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

111 BODIE ROADDBP01 8 August-

150 HWY 776DBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

RON SON BEAR LA1117022

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

END OF WATER LINEDBP01 9 September-

2 CONNECT FROM WELLDBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ROSELAND WATER SYSTEM LA1105022

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

63127 WASHINGTON STDBP02 8 August-

61569 BENNETT RDDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ROYAL MOBILE ESTATES WATER SYSTEM LA1055074

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

7727 CAMERON ST LOT 48DBP01 8 August-

7727 CAMERON ST LOT 5DBP02 8 August-

Wednesday, February 7, 2018 Page 123 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ROYAL VISTA MHP WATER SYSTEM LA1055123

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

100 DULA STREETDBP01 8 August-

104 RANA STREETDBP02 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

RURAL FRANKLINTON WATER LA1117003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

46175 JENKINS ROADDBP01 6 June-

STORAGE TANKDBP02 6 June-

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

RUSTON WATER SYSTEM LA1061017

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SANTIAM RD & MCDONALD AVEDBP04 4 April-

MINDEN ST AND CAROLINA STDBP06 4 April-

3600 ST. TRENTON STREETDBP07 4 April-

BARRETT SPRINGS AND LAKEVIEWDBP08 4 April-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

RUTHERFORD TRAILER PARK WATER SYSTEM LA1019124

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 13DBP01 8 August-

LOT 3DBP02 8 August-

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

S AND J RV PARK LA1103175

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT #26DBP01 8 August-

BETWEEN LOT#1&LOT#2DBP02 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

SABINE PARISH WATER DISTRICT 1 LA1085036

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1682 SHADY HILLDBP03 6 June-

1027 LEE JORDANDBP04 6 June-

Wednesday, February 7, 2018 Page 124 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

SALEM WATER SYSTEM LA1111014

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

TURKEY CREEK RD AND PLATT RDDBP02 8 August-

LANDFILL RDDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SALINE WATER SYSTEM LA1013014

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

FIRE STATIONDBP01 8 August-

MILL CREEK ROADDBP02 8 August-

1/1/2016 3Y Monitoring Begin Date: Frequency of Sampling:

SALMON & ASSOCIATES LA2033131

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

626 BLDG LUNCH ROOM SINKDBP02 8 August-

MEN'S ROOM SINKDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SALT WORKS WATER SYSTEM LA1119024

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

8836 HWY 371DBP02 8 August-

851 YELLOW PINE RDDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SANDERSON FARMS, INC LA2105004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

WASTE WATER OFFICEDBP01 8 August-

NURSE'S OFFICEDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SANDSTONE LAKE WATER SUPPLY LA1117127

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 77DBP01 7 July-

LOT 35DBP02 7 July-

Wednesday, February 7, 2018 Page 125 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SANDY HILL WATER & SEWER LA1115090

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

POC 3DBP02 9 September-

#249DBP03 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SANDY LAKE WATER SUPPLY LA1025008

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

165 ERNEST RDDBP02 7 July-

129 BROWN RDDBP03 7 July-

7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

SANDY POINT 480 WATER SYSTEM LA1069013

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

DALTON RANCHDBP01 8 August-

SANDY POINT ROAD AND M. SALINE ROADDBP02 8 August-

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

SARDIS WATER SYSTEM LA1111021

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

917 FLORENCE WILLIAMS ROADDBP01 4 April-

2046 HICKS/FRASIER RDDBP03 4 April-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SAREPTA WATER WORKS DISTRICT LA1119025

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

CHURCH STREETDBP01 7 July-

HIGHWAY 371 SOUTHDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SAVOY SWORDS WATER SYSTEM INC LA1097024

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1085 BEAUGH STDBP02 9 September-

BOULET ROADDBP03 9 September-

Wednesday, February 7, 2018 Page 126 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

10/1/2012 QT Monitoring Begin Date: Frequency of Sampling:

SCHRIEVER WATER TREATMENT SERVICE AREA LA1109002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

TEXACO MASTER METER,DBP01 6 June-

BAYOUSIDE DR @ SARAHDBP02 6 June-

RHETT PUMPING STATIONDBP03 6 June-

CROSSTEXDBP05 6 June-

LOISDBP06 6 June-

HUMBLEDBP07 6 June-

SENIOR CITIZENSDBP08 6 June-

WESTSIDEDBP09 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SHADOW LAKE MHP WATER SYSTEM LA1017082

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SHOPDBP01 5 May-

LOT 23DBP02 5 May-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SHADY GROVE WATER SYSTEM LA1049016

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

327 LINDEY LANEDBP01 7 July-

187 RED STEWART LOOPDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SHADY OAKS ESTATES WATER SYSTEM LA1055125

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

241 BASIN RD LOT 2DBP01 6 June-

241 BEAU BASIN RD @ SHOPDBP02 6 June-

1/1/2016 3Y Monitoring Begin Date: Frequency of Sampling:

SHADY OAKS MOBILE HOME PARK WATER SYSTEM LA1005114

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

TR 1DBP01 8 August-

TAP 1DBP02 8 August-

Wednesday, February 7, 2018 Page 127 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:

SHADY PINES TRAILER PARK LA1103040

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT #136DBP02 8 August-

LOT #131DBP03 8 August-

1/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

SHELL CHEMICAL COMPANY LA2005034

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

EAST ADMIN KITCHENDBP01 2 February-

EYEWASH/SAFETY SHOWER @ UTILITIES PUMPDBP02 2 February-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SHERWOOD APARTMENTS WATER SYSTEM LA1017066

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

TAP @ APARTMENT 25DBP01 8 August-

TAP BEHIND OFFICEDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SHILOH WATERWORKS DISTRICT LA1013016

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

745 SHILOH ROADDBP01 8 August-

1069 BAILEY ROADDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SHONGALOO WATER SYSTEM LA1119026

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1060 BAKER ROADDBP01 8 August-

963 FIRE TOWER ROADDBP02 8 August-

Wednesday, February 7, 2018 Page 128 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2012 QT Monitoring Begin Date: Frequency of Sampling:

SHREVEPORT WATER SYSTEM LA1017031

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

6900 RICE RDDBP01 6 June-

400 HOMALOT@BITTDBP02 6 June-

NORRIS FERRY RDDBP03 6 June-

4575 N MARKET @ FS2DBP04 6 June-

LONGLAKE @ OVERTON BROOKSDBP05 6 June-

6600 LONGTIMBERS @ KINGFISHDBP06 6 June-

4200 REILY LANEDBP07 6 June-

10439 KINGSTON RDDBP08 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SIBLEY WATER SYSTEM LA1119027

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

CORPORATE DRIVEDBP02 7 July-

9090 HWY 371DBP03 7 July-

7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:

SID RICHARDSON CARBON PLANT LA2121008

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

NEW CONTROL BUILDINGDBP02 9 September-

OLD CONTROL BUILDINGDBP03 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SIEPER AREA WATER SYSTEM LA1079032

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

RIVER RIDGE RDDBP01 8 August-

OWEN MILLER RDDBP02 8 August-

7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:

SILENT CEDARS MHP WATER SYSTEM LA1017035

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 12DBP01 8 August-

LOT 5DBP02 8 August-

Wednesday, February 7, 2018 Page 129 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SIMSBORO WATER SYSTEM LA1061018

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HIGHWAY 80 EDBP01 9 September-

LOUISA STDBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SIXTH WARD CAFETERIA LA2103378

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

MAIN BUILDINGDBP02 7 July-

FIRE TANKDBP03 7 July-

1/1/2014 YR Monitoring Begin Date: Frequency of Sampling:

SIXTH WARD JR HIGH W S LA2103239

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

CONCESSION STANDDBP02 8 August-

REAR OF MAIN BLDGDBP03 8 August-

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

SLIDELL WATER SUPPLY LA1103041

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

CARUSO BLVD - MRO OUTLET MALLDBP01 8 August-

4141 PONTCHARTRAINDBP02 8 August-

58516 PEARL ACRES ROADDBP03 8 August-

505 ROBERT BLVDDBP04 8 August-

1/1/2016 QT Monitoring Begin Date: Frequency of Sampling:

SLIDELL WATER SUPPLY SYSTEM NO. 2 LA2103284

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

102 NORTHSHORE BLVDDBP02 12 December-

MALL NORTH/NW CORNER OF NORTHSHORE MALLDBP03 12 December-

10/1/2015 YR Monitoring Begin Date: Frequency of Sampling:

SLIGO WATER SYSTEM INCORPORATED LA1015044

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

365 SLIGO ROADDBP02 6 June-

245 CANE BENDDBP03 6 June-

Wednesday, February 7, 2018 Page 130 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SMITH MOBILE HOME VILLAGE WATER SYSTEM LA1019085

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 109DBP01 9 September-

LOT 20DBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SOCIAL SPRINGS WATER SYSTEM NORTH LA1081009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

POC #10DBP01 9 September-

POC #6DBP02 9 September-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

SOCIAL SPRINGS WATER SYSTEM SOUTH LA1081011

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1546 HWY 507DBP02 5 May-

6541 HWY 371DBP03 5 May-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SORRENTO LUMBER COMPANY LA2005255

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

KITCHENDBP02 7 July-

OLD BATHROOM#1DBP03 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SOUTH BAYOU MACON WS LA1041008

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HIGHWAY 4 @ HIGHWAY 128DBP02 8 August-

4328 RIVER ROADDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SOUTH BONNE IDEE WATER SYSTEM LA1067020

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

KOVAC 6263 OAK RIDGE HWTDBP01 8 August-

5183 VINEY WOODS RDDBP02 8 August-

Wednesday, February 7, 2018 Page 131 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

SOUTH BOSSIER WATER SYSTEM LA1015029

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

POOLE RD AND HWY 71DBP01 6 June-

HWY 154 AND HWY 157DBP02 6 June-

10/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

SOUTH CALCASIEU ESTATES SUBDIVISION W S LA1019098

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1812 MCHUGH M BLDG 1DBP02 8 August-

1821 MONAGHAN BLDG 16DBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SOUTH CLAIBORNE WATER SYSTEM LA1027006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HOOD TOWNDBP01 9 September-

HIGHWAY 79DBP02 9 September-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

SOUTH DESOTO WATER SYSTEM LA1031029

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LULA LANEDBP02 9 September-

SPRINGFIELD ROADDBP03 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SOUTH GRANT WATER CORPORATION LA1043008

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

100 IRENE DRIVEDBP01 9 September-

469 MUNDY LOOPDBP02 9 September-

7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

SOUTH MANSFIELD WATER SYSTEM LA1031014

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

KYLE PORTER ROADDBP01 8 August-

COOPER ROADDBP02 8 August-

Wednesday, February 7, 2018 Page 132 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

SOUTH MONROE WS GOWC LA1073046

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

109 MARY STDBP04 5 May-

328 AUDUBONDBP05 5 May-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SOUTH OAKDALE WATER SYSTEM LA1003008

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LEROY MEAUX COTTINGIN RDDBP01 6 June-

4143 NORRIS AND WARD RDDBP02 6 June-

7/1/2016 QT Monitoring Begin Date: Frequency of Sampling:

SOUTH RAYNE WATER CORPORATION LA1001022

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

8178 E WHITNEY HWYDBP02 8 August-

126 LLAMA RDDBP03 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

SOUTH TOLEDO BEND WATER DISTRICT LA1085055

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

RIDGECREST & PINECRESTDBP02 9 September-

BETH STREETDBP03 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SOUTH VERNON PARISH WATERWORKS DISTRICT LA1115118

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

DIAMOND CHURCH ROADDBP01 6 June-

HWY 3226 AND BROAD STDBP02 6 June-

7/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

SOUTHEAST BIENVILLE WATER SYSTEM LA1013017

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1601 SHIVELY ROADDBP01 8 August-

2234 PINE GROVE RDDBP02 8 August-

Wednesday, February 7, 2018 Page 133 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SOUTHEAST GRANT WATER SYSTEM LA1043015

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

3501 CAMP HARDTNER ROADDBP02 6 June-

7450 HIGHWAY 165DBP03 6 June-

4/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

SOUTHEAST HODGE WATER SYSTEM LA1049017

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

451 LOCKHART DRIVEDBP01 9 September-

771 HWY 813-3DBP02 9 September-

7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:

SOUTHEAST WW DISTRICT NO 2 LA1113031

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

STATE HWY 330 EASTDBP02 8 August-

HWY 82DBP03 8 August-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

SOUTHEASTERN MILLS WATER SYSTEM LA2099094

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

MAINTENANCE SHOP SINKDBP01 8 August-

QA LABDBP02 8 August-

1/1/2014 YR Monitoring Begin Date: Frequency of Sampling:

SOUTHERN MANOR M H P LA1103111

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 36DBP01 8 August-

LOT 147DBP02 8 August-

4/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

SOUTHGATE MHP WATER SYSTEM LA1015024

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 1DBP02 8 August-

LOT 64DBP03 8 August-

Wednesday, February 7, 2018 Page 134 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SOUTHTOWNER MOBILE ESTATES WATER SYSTEM LA1019039

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 3DBP01 8 August-

LOT 117DBP02 8 August-

4/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

SOUTHVIEW ESTATES WATER SYSTEM LA1017070

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

OFFICEDBP02 4 April-

LOT 4DBP03 4 April-

7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

SOUTHWEST ALLEN WW DISTRICT NO 2 LA1003009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HIGHWAY 165 @ PARISH LINE RDDBP01 8 August-

210 KILBURN CAMPDBP03 8 August-

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

SOUTHWEST AVOYELLES WATER DISTRICT LA1009015

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

4234 HWY 71 SDBP01 6 June-

2732 HWY 1176DBP02 6 June-

1/1/2018 QT Monitoring Begin Date: Frequency of Sampling:

SOUTHWEST OUACHITA WATERWORKS, INC LA1073047

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

PHILPOT RD & CHARLIE MCCAIN RDDBP02 8 August-

TISDALE RD & BUD BAUGH RDDBP03 8 August-

SIMMIE WOODS @ CROWELLDBP04 8 August-

MARION SIMS AT LIBERTY GROVE CHURCHDBP05 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SPICEWOOD MOBILE HOME PARK WATER SYSTEM LA1067022

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

4434 DOWD ROAD TAP 4DBP01 7 July-

4434 DOWD ROAD POC 1DBP02 7 July-

Wednesday, February 7, 2018 Page 135 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

SPILLWAY ESTATES WATER SYSTEM LA1049030

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SUANNA ROADDBP02 8 August-

211 SPRUCE DRIVEDBP03 8 August-

7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:

SPRING BAYOU WATER WORKS DISTRICT LA1009020

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

312 DR MICHEL RDDBP01 9 September-

2164 LITTLE RIVER RDDBP02 9 September-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

SPRING CREEK SUBDIVISION WATER SYSTEM LA1049028

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

POC#4 299 SANDY POINT DRDBP02 6 June-

POC#1 518 COLBY JEAN RDDBP03 6 June-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

SPRINGHILL COMMUNITY WATER SYSTEM LA1013023

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LA 783 AND BOYETTDBP02 7 July-

SPRINGHILL CHURCH AND BOIESDBP03 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SPRINGHILL WATER SYSTEM LA1119028

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

22150 LA HIGHWAY 157DBP02 7 July-

800 7TH STREET SEDBP03 7 July-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

SPRINGLAKE MHP WATER SYSTEM LA1017033

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

8970 DIXIE BLANCHARD ROADDBP02 6 June-

6192 PINE TREE LOOPDBP03 6 June-

Wednesday, February 7, 2018 Page 136 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ST AMANT BAPTIST CHURCH SCHOOL LA2005268

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

AT CEMETERYDBP01 6 June-

BEHIND GYMDBP02 6 June-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

ST AMANT TRAILER PARK LA1005210

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

PRIVATE RD PRIOR TO LOT 2DBP02 6 June-

PRIVATE RD LOT #23DBP03 6 June-

1/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

ST BERNARD PARISH WATERWORKS LA1087001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

TOCA BOOSTER STATIONDBP05 11 November-

SOUTHLAKE FOOD STOREDBP06 11 November-

WATER TREATMENT PLANTDBP07 11 November-

5401 PARIS ROADDBP09 11 November-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ST CHARLES MOBILE HOME PARK LA1105067

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 27DBP01 7 July-

LOT 1DBP02 7 July-

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

ST CHARLES WATER DISTRICT 1 EAST BANK LA1089001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

TEAL ST-JAMES BUSINESS PKDBP01 9 September-

EVANGELINE OF ORMOND NURSING HOME ORMONDDBP03 9 September-

THOROUGHBRED AVENUEDBP05 9 September-

ORMOND AVE AND L&A RAILROADDBP06 9 September-

Wednesday, February 7, 2018 Page 137 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

ST CHARLES WATER DISTRICT 2 WEST BANK LA1089002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BAYOU GAUCHEDBP01 9 September-

ANNA ST@T&P BRIDGEDBP04 9 September-

DES ALLEMANDS SCHOOLDBP05 9 September-

HAHN STREETDBP06 9 September-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

ST JAMES WATER DISTRICT 1 LA1093004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HYMEL PROPERTYDBP01 11 November-

PAULINA PARKDBP02 11 November-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

ST JAMES WATER DISTRICT 2 LA1093005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

VACHERIE WELCOME TOWERDBP01 10 October-

PARISH UTILITY OFFICEDBP02 10 October-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ST JAMES WATER SYSTEM LA1119035

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SCOOTER ROACH ROADDBP01 8 August-

HATTEN ROBERTSDBP02 8 August-

7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

ST JOHN WATER DISTRICT 3 LA1095007

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1300 EAST AIRLINE AT COLONIALDBP01 9 September-

434 ELM STREETDBP02 9 September-

301 RUE DE SANTEDBP03 9 September-

2247 PINE VALLEYDBP04 9 September-

Wednesday, February 7, 2018 Page 138 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

ST JOHN WATER DISTRICT 1 LA1095003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

473 CENTRAL AVEDBP03 6 June-

3772 HWY 44DBP05 6 June-

4080 HWY 44 - MT AIRYDBP09 6 June-

731 BELLE POINTDBP10 6 June-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

ST JOHN WATER DISTRICT 2 LA1095002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

GOODWILL PLANTATIONDBP03 8 August-

EDGARD COURT HOUSEDBP04 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ST JOSEPH ABBEY LA1103032

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

FRONT OF STP BUILDINGDBP01 8 August-

REAR OF BAKERY BUILDINGDBP02 8 August-

4/1/2016 QT Monitoring Begin Date: Frequency of Sampling:

ST JOSEPH WATER SYSTEM LA1107004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

131 LEVEE STREETDBP01 5 May-

306 MARTHA STREETDBP02 5 May-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ST LANDRY WATER WORKS DISTRICT 2 RURAL LA1097033

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1056 HWY 356DBP01 8 August-

HIGHWAY 754 @ ROBERT DAILEY ROADDBP02 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

ST LANDRY WWD 2 RURAL PURCHASE LA1097038

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

321 MENDELL RDDBP01 8 August-

825 SUPERIOR ROADDBP02 8 August-

Wednesday, February 7, 2018 Page 139 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ST LANDRY WWD 3 PORT BARRE AREA A LA1097034

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

NORTH END OF NEZAT ROADDBP01 8 August-

1142 LA HWY 743DBP02 8 August-

7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

ST LANDRY WWD 3 PORT BARRE AREA B LA1097035

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

FIRE DISTRICT NO 2 WAXIA SUB STATIONDBP01 8 August-

4954 LA HWY 103DBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ST LANDRY WWD 3 PORT BARRE AREA C LA1097036

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

3135 COURTABLEU ROADDBP02 8 August-

EAST OF WHITE FENCE ON COURTABLEUDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ST LANDRY WWD 3 PORT BARRE AREA D LA1097037

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

EAST OF 2 O'CLOCK BAYOUDBP01 8 August-

HWY 190 AND PERNIE BAILEY ROADDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ST MARTIN PARISH INDUSTRIAL PARK WS LA1099029

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1004 ST JOHN BRIDGE RDDBP01 7 July-

1036 MOORE AVEDBP02 7 July-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

ST MARTIN PARISH WW DISTRICT 3 - CADE LA1099028

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

7190 MAIN HWYDBP01 6 June-

1086 MARION DRIVEDBP02 6 June-

Wednesday, February 7, 2018 Page 140 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

ST MARTIN PARISH WW DISTRICT 4 CATAHOULA LA1099004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1637 BURTON PLANTATION HWYDBP03 9 September-

2958-B CATAHOULA HWYDBP04 9 September-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

ST MARTIN WATER AND SEWER COMMISSION 1 LA1099010

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

T-MAN BAILEY'S BOOSTER STATION HWY 70DBP01 2 February-

FOUR MILE BAYOUDBP02 2 February-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

ST MARY PAR JT WATER SEWER COMMISSION 5 LA1101012

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1773 HWY 83DBP02 9 September-

1572 CYPREMORT ROADDBP03 9 September-

10/1/2015 QT Monitoring Begin Date: Frequency of Sampling:

ST MARY PARISH W&S #2 BAYOU VISTA LA1101015

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

504 VICTORIE RIVERSIDEDBP01 7 July-

100 PLUTO&HWY182DBP02 7 July-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

ST MARY PARISH WATER SEWERAGE COMM 1 LA1101009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1117 SIRACUSA ROADDBP03 7 July-

9752 HIGHWAY 182DBP04 7 July-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

ST MARY WATER & SEWER COMM #3 LA1101010

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

3600 HWY 90DBP02 7 July-

11517 HIGHWAY 182DBP03 7 July-

Wednesday, February 7, 2018 Page 141 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

ST MARYS WATER SYSTEM LA1015023

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

233 HWY 2DBP01 8 August-

1111 HWY 2 WESTDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ST TAM PARISH - CHRISTWOOD LIVING LA1103158

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

80 CHRISTWOOD BLVDDBP01 8 August-

391 CHRISTWOODDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ST TAM PARISH - NORTHLAKE BEHAVIORAL LA1103039

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

N. ROBIN RD @ CHILD KITCHENDBP02 5 May-

CARDINAL COVE @ ADU BUILDINGDBP03 5 May-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ST TAM PARISH - ST GERTRUDE LA1103154

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

17240 ST. GERTRUDE DRDBP01 8 August-

17204 ST. GERTRUDE DRDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ST TAM PARISH - ABITA LAKES LA1103173

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

237 THORNWOOD DRDBP01 8 August-

284 KISSENA PARK CTDBP02 8 August-

7/1/2016 QT Monitoring Begin Date: Frequency of Sampling:

ST TAM PARISH - ALTON LA1103145

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

38276 N 5TH AVE (ALTON ELEM)DBP01 8 August-

61471 N 7T STDBP02 8 August-

Wednesday, February 7, 2018 Page 142 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

4/1/2015 YR Monitoring Begin Date: Frequency of Sampling:

ST TAM PARISH - BRIARWOOD TERRACE LA1103079

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SW CORNER OF HWY 1088 & FOREST BROOKDBP03 11 November-

220 WESTWOOD DRDBP04 2 February-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ST TAM PARISH - CROSS GATES SD LA1103053

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

521 DOCKSIDE DRDBP02 8 August-

575 WINBOURNE DRDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ST TAM PARISH - INDIAN TRACE LA1103162

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

612 STILLWOOD DRDBP01 8 August-

201 GAGE CTDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ST TAM PARISH - LAKE HILLS VILLAGE LA1103128

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

AT LOT OF WASTEWATER TREATMENT PLANTDBP01 8 August-

15209 HWY 1078DBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ST TAM PARISH - MEADOWLAKE SUBDIVISION LA1103146

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BRIDGEWATER DRIVEDBP02 8 August-

204 RUE JONATHANDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ST TAM PARISH - MEDCATH (LA HEART) LA2103476

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

NEAR METER NEAR NORTH OFFICE BLDGDBP02 8 August-

NEAR METER FOR SOUTH OFFICE BLDGDBP03 8 August-

Wednesday, February 7, 2018 Page 143 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ST TAM PARISH - RIVER OAKS LA1103180

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2004 MARPLE LANEDBP01 8 August-

1017 CLAIRE DRIVEDBP02 8 August-

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

ST TAM PARISH - TAMANEND LA1103199

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

65278 HWY 434 (CORONER'S OFFICE)DBP01 8 August-

65556 CENTERPOINT BLVD (NTCC)DBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ST TAM PARISH- BEN THOMAS RD LA1103105

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

37274 POWELL DRDBP01 8 August-

37290 BEN THOMASDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ST TAM PARISH -NORTHRIDGE ESTATES LA1103181

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

199 NORTHRIDGE DRDBP02 8 August-

317 BEE BALM CIRCLEDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ST TAM PARISH PINELAND PARK SUBD LA1103093

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

DELOAKS RD & DELOAKS DRDBP02 8 August-

201-A LIBRA DRDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ST TAM PARISH SALVATION MANOR ST JOE LA1103184

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

NW CORNER OF ST JOE APARTMENT BLDGDBP01 8 August-

SE CORNER OF SALVATION MANOR BLDGDBP02 8 August-

Wednesday, February 7, 2018 Page 144 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ST TAM PARISH-BEDICO CREEK LA1103191

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

716 SUGAR PINE CR. LOT 22DBP01 8 August-

177 ST CALAISDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ST TAM PARISH-FAUBOURG-COQUILLE LA1103149

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

640 PINEY RIDGE CIRCLE - RUELLE DU CHENEDBP02 8 August-

END OF INNWOOD DR - CULDESACDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ST TAM PARISH-MADISONVILLE WOODS LA1103147

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

102 WOODS DRDBP01 8 August-

121 WOODS DRDBP02 8 August-

1/1/2014 YR Monitoring Begin Date: Frequency of Sampling:

ST TAM SCHOOL BOARD EDUCATION CENTER LA2103389

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

OFFICE BATHDBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ST TAMMANY WATER DIST 2 LA1103033

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

72481 KUSTENMACHER RDDBP03 6 June-

21418 LOWE DAVIS ROADDBP04 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

ST TAMMANY WATER DISTRICT 3 LA1103056

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

20 DENI COURTDBP01 7 July-

8 PAILET DRIVEDBP02 7 July-

Wednesday, February 7, 2018 Page 145 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2018 YR Monitoring Begin Date: Frequency of Sampling:

STARC FREAMAUX LA2103525

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

MRTDBP01 7 July-

KITCHEN SINK (ACR-003)DBP02 7 July-

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

START WATER SYSTEM LA1083007

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

42 LAFOURCHE ROADDBP02 7 July-

25 CLEAR LAKEDBP03 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

STATE LINE WATER SYSTEM LA1119029

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

135 VAUGHAN DAVIS AND HWY 157DBP02 8 August-

1467 WILLOW ROADDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

STATE OF LA MILITARY DEPT - CAMP MINDEN LA1119018

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SHIPPING AND RECEIVINGDBP01 8 August-

DINING FACILITYDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

STATE POLICE TROOP L LA2103094

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

OUTSIDE MECHANIC SHOP- WEST SIDEDBP01 8 August-

UNTHREADED TAP SW CORNER BLDGDBP02 8 August-

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

STONEGATE MANUFACTURED HOME COMMUNITY LA1017091

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 32DBP01 8 August-

LOT 83DBP02 8 August-

Wednesday, February 7, 2018 Page 146 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

SULPHUR CITY OF WATER SYSTEM LA1019044

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1528 WEEKLY ROADDBP01 8 August-

1009 CASS STREETDBP02 8 August-

901 PRATER ROADDBP03 8 August-

1317 MEADOWDBP04 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SUMMERFIELD SUBDIVISION LA1005036

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

17596 N SUMMERFIELDDBP01 8 August-

17458 N SUMMERFIELDDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SUMMERFIELD WATER SYSTEM LA1027011

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

964 HORSESHOE RDDBP02 7 July-

SID LEWIS RDDBP03 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SUMMERVILLE WATER SYSTEM LA1059009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 124 & DEAN RDDBP02 8 August-

HWY 126 & FIRE TOWER RDDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SUN WATER SUPPLY LA1103038

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

28666 HWY 16DBP02 8 August-

31336 COOPER RDDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

SUNRISE ADDITION TRAILER PARK WS LA1055103

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 9DBP02 7 July-

LOT 4DBP03 7 July-

Wednesday, February 7, 2018 Page 147 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TABIS HOUSE LA2103494

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BATHROOM INSIDE DAYCAREDBP01 8 August-

OUTSIDE MAIN BUILDING SAMPLE TAPDBP02 8 August-

7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

TALLULAH WATER SYSTEM LA1065003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

101 PARISH RDDBP01 9 September-

1015 WEST GREEN STDBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TAMMANY MOBILE HOME PARK LA1103042

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

130 BOSWORTH STDBP02 8 August-

100A ALFORD STDBP03 8 August-

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

TAMMANY SUPPLY WATER SYSTEM LA2103521

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

NE SIDE CENTER OF BLDGDBP01 11 November-

TAMMANY SUPPLY OFFICEDBP02 11 November-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TANGI MOBILE HOME PARK LA1105042

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 3DBP01 7 July-

LOT 227DBP02 7 July-

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

TANGIPAHOA (SECOND WARD) WATER DISTRICT LA1105077

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 10 @ HWY 1061DBP04 8 August-

HWY 1055 @ SPRING RDDBP05 8 August-

Wednesday, February 7, 2018 Page 148 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

7/1/2014 YR Monitoring Begin Date: Frequency of Sampling:

TANGIPAHOA PARISH WATER DISTRICT LA1105008

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

15062 CLUB DELUXEDBP02 8 August-

15062 CLUB DELUXEDBP02 11 November-

7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

TANNEHILL WATER SYSTEM LA1127017

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

359 KVCL ROADDBP01 9 September-

4382 HIGHWAY 501DBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TAYLOR WATER SYSTEM LA1013015

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

I-20 W AT REST STOPDBP02 8 August-

OSCAR KILPATRICK RDDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TCHEFUNCTA CLUB ESTATES LA1103043

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

101 RIVERDALE DRIVEDBP01 8 August-

#2 PINECREST DRIVEDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TE MAMOU WATER DISTRICT LA1039009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

3153 VIDRINE RDDBP01 7 July-

1971 CHICOT PARK RDDBP02 7 July-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

TENSAS WATER DISTRICT ASSOCIATION LA1107009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BETHANY - 1287 HWY 4DBP02 8 August-

MARY GADSPYDBP03 8 August-

Wednesday, February 7, 2018 Page 149 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TESI ATCHAFALAYA ACRES LA1099013

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1041 VERMILIONDBP01 8 August-

1039 ACADIANADBP02 8 August-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

TESI BEAU PARTERRE WATER SYSTEM LA1055164

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

143 WILLOW BENDDBP04 9 September-

208 FERN HOLLOWDBP05 9 September-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

TESI BEAU PRE LA1103134

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

105 E MEADOWDBP02 8 August-

202 W BRIAR CTDBP03 8 August-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

TESI CARENCRO VILLAGE LA1055088

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

242 LINDSEYDBP03 9 September-

127 LINDSEYDBP04 9 September-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

TESI CHERRYWOOD LA1103129

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

216 CHERRYWOODDBP02 10 October-

155 S CHERRYWOOD LNDBP04 10 October-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

TESI COACH HOUSE MANOR LA1055144

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

407 RUE PLAISANCEDBP02 8 August-

1009 CARRIAGE LIGHT LOOPDBP03 8 August-

Wednesday, February 7, 2018 Page 150 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

TESI COTE GELEE LA1055131

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BUILDING HDBP04 8 August-

BUILDING NDBP05 8 August-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

TESI COUNTRY LANE LA1055124

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

119 COUNTRY LANEDBP01 8 August-

102 & 104 COUNTRY LANEDBP03 8 August-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

TESI COUNTRY PINES LA1055040

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 47DBP04 9 September-

LOT 43DBP05 9 September-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

TESI FOX RUN LA1055043

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

124 BURROWDBP04 9 September-

129 TAMARACDBP05 9 September-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

TESI GRANDE STAKES LA1055116

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

311 NASHUADBP04 8 August-

100 RUFFIANDBP05 8 August-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

TESI HIGHLAND RIDGE LA1063087

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

21476 BONNIEDBP04 8 August-

21419 BONNIEDBP05 8 August-

Wednesday, February 7, 2018 Page 151 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

TESI JACKSON SQUARE WATER SYSTEM LA1055101

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

314 MARIGNYDBP03 9 September-

608 MARIGNY CIRCLEDBP04 9 September-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

TESI LAKE STREET LA1019091

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

5805 BERWICK LNDBP02 8 August-

1086 SPANISH MISSION TRAILDBP04 8 August-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

TESI LAKESIDE EAST LA1063098

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

27270 LAKEFRONTDBP01 8 August-

27352 E LAKESIDE DRDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TESI LEXINGTON HEIGHTS LA1055147

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

100 KILBOURNEDBP02 8 August-

224 BLUE RIDGE DRDBP03 8 August-

1/1/2012 YR Monitoring Begin Date: Frequency of Sampling:

TESI OSSUN HEIGHTS LA1055140

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

100 GERMAN LANEDBP02 8 August-

104 LATINDBP03 8 August-

1/1/2012 YR Monitoring Begin Date: Frequency of Sampling:

TESI PLANTATION GARDENS LA1047028

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

5505 ROSEDOWNDBP02 8 August-

1330 MADEWOODDBP03 8 August-

Wednesday, February 7, 2018 Page 152 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

TESI PORT EAST LA1045037

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

3810 COULEEDBP03 8 August-

3518 COULEEDBP04 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

TESI RIGOLETS ESTATES LA1103122

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

233 MARLIN DRDBP02 8 August-

110 MARLIN DRDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TESI RIGOLETS HARBOR LA1103144

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

APARTMENT 1DBP02 8 August-

BY THE BOAT WASHDBP03 8 August-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

TESI SHENANDOAH LA1055155

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

109 BULL RUN CIRCLEDBP02 9 September-

219 JANIN RDDBP03 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TESI SOUTHFIELD SQUARE WATER SYSTEM LA1055128

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

111 & 113 SOUTHFIELD PARKWAYDBP02 9 September-

199 SOUTHFIELD PARKWAYDBP03 9 September-

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

TESI TREWHILL LA1055148

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

205 TREWHILL PKWYDBP03 8 August-

239 CROOKED CREEKDBP04 8 August-

Wednesday, February 7, 2018 Page 153 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

TESI WINDY MEADOWS LA1055169

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

100 WIND SONGDBP02 8 August-

120 COUNTRY VILLAGEDBP04 8 August-

1/1/2014 YR Monitoring Begin Date: Frequency of Sampling:

THE LITTLE ACADEMY LA2103318

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

FRONT RIGHT OF BUILDINGDBP01 8 August-

RESTROOM INSIDE TAPDBP02 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

THE MEADOWS LA1103106

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

538 RED BUDDBP01 8 August-

1000 MADELINE LANEDBP03 8 August-

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

THIBODAUX WATERWORKS LA1057003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

THIBODAUX LAB TAPDBP01 8 August-

OAKLEY STDBP02 8 August-

EAST 8TH STDBP03 8 August-

MELROSEDBP04 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

THOMASVILLE WATER SYSTEM LA1119030

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

5521 CVOC ROADDBP01 7 July-

22556 HWY 371DBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TICKFAW WATER SYSTEM LA1105027

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

49181 HWY 51DBP02 9 September-

49459 PARDO LNDBP03 9 September-

Wednesday, February 7, 2018 Page 154 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

TIMBERLAND MOBILE HOME PARK LA1103194

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 20DBP01 8 August-

LOT 1DBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TORBERT- FRISCO WATER WORKS LA1077037

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

3890 HWY 978DBP01 9 September-

4931 MOSHER ROADDBP02 9 September-

4/1/2012 QT Monitoring Begin Date: Frequency of Sampling:

TOWN & COUNTRY SERVICE LA1073054

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

41 LESLIE LANEDBP03 8 August-

132 SHADY LANEDBP04 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF ALBANY WATER SYSTEM LA1063022

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

28571 HWY 43DBP01 8 August-

30509 LA 441 HOLDENDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF AMITE WATER SYSTEM LA1105001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

400 FOULKS LANEDBP02 7 July-

105 S DUNCANDBP03 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF ARNAUDVILLE WATER SYSTEM LA1099001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

339 MAGNOLIA STDBP01 6 June-

1027 ANNE DRIVEDBP03 6 June-

Wednesday, February 7, 2018 Page 155 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

10/1/2016 QT Monitoring Begin Date: Frequency of Sampling:

TOWN OF BALDWIN WATER SUPPLY LA1101001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

612 LABUE STDBP01 7 July-

100 RESWEBER LANEDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF BASILE WATER SYSTEM LA1039001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1239 BEARCAT RDDBP01 5 May-

2921 STAGGDBP02 5 May-

4/1/2012 QT Monitoring Begin Date: Frequency of Sampling:

TOWN OF BENTON WATER SYSTEM LA1015002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

572 HWY 162 EDBP01 1 January-

4606 PALMETTO RDDBP02 1 January-

10/1/2015 QT Monitoring Begin Date: Frequency of Sampling:

TOWN OF BERWICK LA1101014

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

950 RIVER ROADDBP01 7 July-

3007 HWY182DBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF BOYCE WATER SYSTEM LA1079003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

RYAN STREETDBP03 8 August-

DUBLINDBP04 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF BUNKIE WATER SYSTEM LA1009004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SHIRLEY RD & BRIARWOOD (SITE #1)DBP01 5 May-

SPRUCE & COTTONWOOD ST (SITE #5)DBP02 5 May-

Wednesday, February 7, 2018 Page 156 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF CHENEYVILLE WATER SYSTEM LA1079005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

167 & PRATT CEMETERY RDDBP01 8 August-

1245 SOUTH BAYOU RDDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF CHURCH POINT WATER SYSTEM LA1001001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

340 W MLK MIDDLE SCHOOLDBP01 9 September-

100 LILLE ST LOT 10DBP02 9 September-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

TOWN OF CLAYTON WATER SYSTEM LA1029002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

154 CARTERDBP02 9 September-

LOOMIS STDBP03 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF CLINTON LA1037001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

10434 BANK STREETDBP01 7 July-

12305 JACKSON STREETDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF COLFAX LA1043002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

10 2ND STREETDBP02 8 August-

1208 MAINDBP03 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

TOWN OF COTTONPORT WATER SYSTEM LA1009005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BAYOU EXPRESSDBP02 5 May-

WOMENS PRISONDBP03 5 May-

Wednesday, February 7, 2018 Page 157 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF DELCAMBRE WATER SYSTEM LA1113004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

506 KEN DRIVEDBP01 5 May-

507 E. HICKMANDBP02 5 May-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF DUSON WATER SYSTEM LA1055011

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

NW CORNER OF SOUTH A & MOISEDBP01 6 June-

SW CORNER OF LA 90 & AUSTRIADBP02 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF ELIZABETH WATER SYSTEM LA1003002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

11620 HIGHWAY 112 NDBP01 9 September-

PRESTON KINGDBP02 9 September-

7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

TOWN OF ELTON WATER SYSTEM LA1053001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

307 2ND STREETDBP02 9 September-

1003 YOAKUMDBP03 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF ERATH WATER SYSTEM LA1113005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1009 S. BROADWAYDBP01 7 July-

BARES CENTERDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF EVERGREEN WATER SYSTEM LA1009006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

4182 HWY 29DBP02 5 May-

RICHE ROADDBP03 5 May-

Wednesday, February 7, 2018 Page 158 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

TOWN OF FERRIDAY WATER SYSTEM LA1029005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1427 HWY 568DBP01 11 November-

490 LINCOLN AVENUEDBP02 11 November-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF FRANKLINTON WATER SYSTEM LA1117002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SECTION LINE AND HIGHWAY 436DBP02 5 May-

506 RIVERSIDEDBP03 5 May-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF GLENMORA WATER SYSTEM LA1079011

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

KEPLER AND VICTOR RAMUS ROADDBP01 8 August-

1738 7TH AVENUEDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF GRAND COTEAU WATER SYSTEM LA1097001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2085 I-49 SOUTH SERVICE ROADDBP01 5 May-

182 ACADEMY STREETDBP02 5 May-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

TOWN OF GREENWOOD WATER SYSTEM LA1017014

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

10746 DEVERS ROADDBP02 10 October-

9381 HWY 80 TOWN HALLDBP03 10 October-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF GUEYDAN WATER SYSTEM LA1113006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SIMON ADDITIONDBP01 7 July-

ELEMENTARY SCHOOLDBP02 7 July-

Wednesday, February 7, 2018 Page 159 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

10/1/2015 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF HAUGHTON WATER SYSTEM LA1015011

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

815 W MCKINLEYDBP02 7 July-

139 HAYNES RDDBP03 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF HORNBECK WATER SYSTEM LA1115016

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

INTERSECT GILLIAM & MAPLE NEAR PENTACOSTDBP01 9 September-

INTERESECT HWY 118 & HARRINGTONDBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF IOTA WATER SYSTEM LA1001004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

J & W STORE - 5TH STREETDBP01 12 December-

ELEMENTARY SCHOOL - W KENNEDY STDBP02 12 December-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF IOWA WATER SYSTEM LA1019026

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BROUSSARDDBP02 8 August-

SOUTH SHERMANDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF JACKSON WATER SYSTEM LA1037006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

3866 COOKS LANEDBP01 8 August-

3036 CHURCH STDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF JENA WATER SYSTEM LA1059003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1806 E OAKDBP01 9 September-

3691 WEST OAKDBP02 9 September-

Wednesday, February 7, 2018 Page 160 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF JONESVILLE WATER SYSTEM LA1025006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

200 THIRD STREETDBP04 8 August-

800 AUDUBON STREETDBP05 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF KINDER WATER SYSTEM LA1003005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

106 S 17TH STREETDBP01 9 September-

108 W 6TH AVENUEDBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF KROTZ SPRINGS WATER SYSTEM LA1097003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 105DBP02 3 March-

11TH STREETDBP03 3 March-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF LAKE ARTHUR WATER SYSTEM LA1053005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

3RD AND PELICANDBP01 6 June-

625 IOWADBP02 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF LECOMPTE (LAWCO) LA1079014

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1211 LATANIER ROADDBP01 8 August-

3220 HWY 71 SDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF LEONVILLE WATER SYSTEM LA1097005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1742 HIGHWAY 742DBP02 6 June-

366 OVEY BENOIT ROADDBP03 6 June-

Wednesday, February 7, 2018 Page 161 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF LIVINGSTON WATER SYSTEM LA1063013

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

14740 FLORIDA BLVDDBP01 9 September-

25410 RED OAK ROADDBP02 9 September-

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

TOWN OF MAMOU WATER SYSTEM LA1039005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

4038 VETERANS MEMORIAL BLVDDBP01 5 May-

HWY 104 @ T-BOYSDBP02 5 May-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF MARINGOUIN LA1047003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

NORTH IBERVILLEDBP01 6 June-

MAINTENANCE BARNDBP02 6 June-

4/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

TOWN OF MELVILLE WATER SYSTEM LA1097007

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1256 FIRST ST (POC#4)DBP01 5 May-

HWY 105 N (MRT-011)DBP03 5 May-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF MERRYVILLE WATER SYSTEM LA1011007

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 190 W-PARISH BARNDBP01 8 August-

HWY 389 - END OF TOWN LIMITDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF MONTGOMERY WATER SYSTEM LA1043005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

3015 HWY 71DBP02 6 June-

431 EVA STDBP03 6 June-

Wednesday, February 7, 2018 Page 162 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF OBERLIN WATER SYSTEM LA1003007

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

5497 HWY 26 EASTDBP02 6 June-

521 NORTH FUSELIER LANEDBP03 6 June-

1/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

TOWN OF OLLA WATER SYSTEM LA1059004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

5209 ROSFIELD ROADDBP01 9 September-

2853 HWY 127 (MRT)DBP03 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF PEARL RIVER LA1103157

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

64105 HWY 3081DBP02 6 June-

39460 WILLIS ALLEYDBP03 6 June-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

TOWN OF PLAIN DEALING WATER SYSTEM LA1015016

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

PALMETTO AND ARKANSAS ROADDBP01 5 May-

2189 HIGHWAY 2 EASTDBP02 5 May-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF PLAUCHEVILLE WATER SYSTM LA1009013

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2595 HWY 1181DBP01 7 July-

146 GIN STDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF POLLOCK WATER SYSTEM LA1043007

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

4858 HWY 8DBP02 7 July-

DYSON CREEK RD AND NORTH TOWER RDDBP03 7 July-

Wednesday, February 7, 2018 Page 163 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF PORT BARRE WATER SYSTEM LA1097013

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

712 RAYNE ROADDBP02 9 September-

207 FRISCO STREETDBP03 9 September-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

TOWN OF RIDGECREST WATER SUPPLY LA1029009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

119 COTTONWOOD DRIVEDBP02 9 September-

800 FERRIDAY DRIVEDBP03 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF ROSEPINE WATER SYSTEM LA1115028

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LEACH RD UNDER APPT SIGNDBP01 5 May-

HWY 171 S @ TILLEY RD NEAR TELEPHONE POLDBP02 5 May-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF SIMMESPORT WATER SYSTEM LA1009014

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SYCAMORE & N. MAINDBP02 5 May-

N. MLKDBP03 5 May-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF SLAUGHTER WATER SYSTEM LA1037008

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2087 MIDWAYDBP02 8 August-

137 HWY 19DBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF ST FRANCISVILLE WATER SYSTEM LA1125006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

#2-ROSEDOWN APT, HWY 10DBP02 7 July-

#3 LEGION & WILCOXDBP03 7 July-

Wednesday, February 7, 2018 Page 164 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF SUNSET WATER SYSTEM LA1097015

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1760 NAPOLEONDBP01 5 May-

855 NAPOLEON AVENUEDBP02 5 May-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

TOWN OF TULLOS WATER SYSTEM LA1059010

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 125 SDBP01 6 June-

HWY 84 AND HWY 165DBP02 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF URANIA WATER SYSTEM LA1059011

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1401 N. PINE ROADDBP01 7 July-

7129 SOUTH PINE RDDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF VINTON WATER SYSTEM LA1019048

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1804 SHORT STREETDBP01 8 August-

1805 WEST STDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF WASHINGTON WATER SYSTEM LA1097016

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

CORNER OF ANDERSON & CARRIERDBP01 5 May-

FIRE STATION ON HWY 103 & CEDAR HILL DRDBP02 5 May-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF WELSH WATER SYSTEM LA1053006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

113 PLANK ROADDBP01 8 August-

550 BEAUFORT STDBP02 8 August-

Wednesday, February 7, 2018 Page 165 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

TOWN OF WHITE CASTLE WATER SYSTEM LA1047009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

32015 HWY 1 BORDELON CHEVRONDBP02 8 August-

33660 BOWIE STDBP04 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

TOWN OF WOODWORTH WATER SYSTEM LA1079027

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

EOL BAYOU CLEAR RDDBP01 8 August-

699 HWY 457DBP03 8 August-

7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

TOWN OF ZWOLLE WATER SYSTEM LA1085032

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

CORNER OF CANE & W OAKDBP01 9 September-

FESTIVAL GROUNDDBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TREMONT WATER DISTRICT LA1061031

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

CAMPBELL ROADDBP02 6 June-

HWY 80 AND WALKER ROADDBP03 6 June-

1/1/2016 3Y Monitoring Begin Date: Frequency of Sampling:

TREYVILLE COURTS TRAILER PARK LA1005175

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

TAP 2DBP01 8 August-

TAP 1DBP02 8 August-

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

TRINITY MARINE GROUP LA2103343

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HR OFFICE - EAST SIDEDBP03 8 August-

TRAINING OFFICE - WEST SIDEDBP04 8 August-

Wednesday, February 7, 2018 Page 166 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:

TRI-WATER SYSTEM LA1111020

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

5707 HWY 549DBP03 8 August-

386 MASONIC ROADDBP04 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TRUNKLINE LNG CO WATER SYSTEM LA2019098

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

TGC DIVISION OFFICE BLDGDBP01 9 September-

CONTROL BLDGDBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TULANE UNIVERSITY PRIMATE CENTER LA2103216

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

QUARANTINE BLDG #19DBP02 8 August-

F BUILDING #6DBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TUNICA WATER SYSTEM LA1125011

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

12113 FARRIA DAVICE ROADDBP02 6 June-

17493 HWY 66DBP03 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TURKEY CREEK WATER SYSTEM LA1041012

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HIGHWAY 562 @ BRUSHY BAYOU ROADDBP02 8 August-

216 BLUE ROBERTS RDDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

TYS MOBILE HOME PARK WATER SYSTEM LA1097031

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 1DBP01 8 August-

LOT 22DBP02 8 August-

Wednesday, February 7, 2018 Page 167 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

7/1/2016 QT Monitoring Begin Date: Frequency of Sampling:

TYSON COMMUNITY WATER SYSTEM LA1017036

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

RODESSA CHURCH ROADDBP01 7 July-

8390 TYSON ROADDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

UNION GROVE WATER SYSTEM LA1119031

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1623 PENAL FARM ROADDBP01 9 September-

CARVER ROADDBP02 9 September-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

UNION PARISH WATERWORKS DISTRICT 1 LA1111015

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

158 DOGWOOD DRDBP02 8 August-

528 FOURWAY LOOP RDDBP04 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

UNION SPRINGS WATER SYSTEM LA1085044

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

252 HWY 191DBP01 7 July-

HWY 191 AND FLATWOOD RIDGE RDDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

UNITED WATER SYSTEM LA1099009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1010 DIVISION RDDBP02 7 July-

1191 DECLOUET HWYDBP03 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

UOP, LLC LA2033041

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

NE SIDE OF WAREHOUSEDBP02 10 October-

Wednesday, February 7, 2018 Page 168 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

UPPERROOM BIBLE CHURCH INC LA2103497

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

FAR OUTSIDE WALLDBP01 8 August-

KITCHENDBP02 8 August-

4/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

US FISH & WILDLIFE HQ LA2103479

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LAW ENFORCEMENT OFFICEDBP01 8 August-

FAUCET AT RV SITEDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

US FORESTRY - GUM SPRINGS LA2127003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HORSE TRAILHEADDBP01 8 August-

BIOMAXDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

UTILITIES INC - GREEN BRIER WATER SUPPLY LA1103130

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

201 GREENBRIAR BLVDDBP02 8 August-

114 AMELIA LANEDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

UTILITIES INC - HUNTWYCK VILLAGE LA1103073

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

536 QUEEN ANNE DRDBP01 8 August-

308 QUEEN ANNE DRDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

UTILITIES INC - KINGSPOINT SUBDIVISION LA1103055

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

235 FOXBRIAR DRDBP01 8 August-

PH 55081 HWY 433DBP02 8 August-

Wednesday, February 7, 2018 Page 169 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

UTILITIES INC - LAKE VILLAGE SD LA1103064

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1209 LAKE VILLAGE RDDBP01 8 August-

709 LAKE SUPERIORDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

UTILITIES INC - MAGNOLIA FOREST SUBD LA1103054

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

915 TRANQUILITY DRDBP01 8 August-

427 PARLANGE DRDBP02 8 August-

10/1/2016 YR Monitoring Begin Date: Frequency of Sampling:

UTILITIES INC - NORTH FOLSOM HILLS LA1117026

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

42984 RIVER BIRCHDBP01 8 August-

14538 SWEET OLIVE DRDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

UTILITIES INC - NORTH PARK WATER SUPPLY LA1103124

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

188 CHEROKEE DRDBP01 8 August-

95 E FAIRWAY DRDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

UTILITIES INC - OAKMONT SUBD LA1103108

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

212 RIVIERA DRDBP01 8 August-

113 OAKMONT DRDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

UTILITIES INC - QUAIL RIDGE SUBDIVISION LA1103074

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

202 BLUE CRANE DRDBP01 8 August-

473 CLAYTON CRTDBP02 8 August-

Wednesday, February 7, 2018 Page 170 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

UTILITIES INC - WOODRIDGE SUBDIVISION LA1103075

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

101 FOREST LOOPDBP01 8 August-

412 WATER OAKDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

UTILITY SERVICE OF LAKE CHARLES W S LA1019024

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

6503 MEADOW RIDGE LANEDBP02 8 August-

6701 SUN MEADOWDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

VARNADO WATER WORKS LA1117006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

20301 MITCH ROADDBP02 5 May-

27268 HWY 21DBP03 5 May-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

VARNADO WATER WORKS - PINE LA1117025

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

30341 HWY 424DBP01 5 May-

26475 HWY 62DBP02 5 May-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

VERNON PARISH WATER AND SEWER COMMISSION LA1115071

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BOLTON'S TRAILER PARKDBP01 6 June-

CARNEY JEANESDBP02 6 June-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

VETERANS ADMINISTRATION LA1079028

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BUILDING NO. 2DBP01 9 September-

BUILDING NO. 45DBP02 9 September-

Wednesday, February 7, 2018 Page 171 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

VILLA FELICIANA MEDICAL COMPLEX LA1037009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

RESIDENT #2DBP01 8 August-

ADMIN BUILDINGDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

VILLAGE GUTHRIE SUBDIVISION LA1103066

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

228 SECOND STREETDBP01 7 July-

408 FOURTHDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

VILLAGE OF ANACOCO LA1115001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

CITY HALLDBP01 5 May-

114 EAST ROADDBP02 5 May-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

VILLAGE OF CALVIN WATER SYSTEM LA1127002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

108 ED CARPENTER ROADDBP02 8 August-

HIGHWAY 1233 @ YANKEE SPRINGSDBP03 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

VILLAGE OF CANKTON WATER SYSTEM LA1097025

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

619 HIGHWAY 93DBP02 2 February-

182 CREDEUR ROADDBP03 2 February-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

VILLAGE OF DODSON WATER SYSTEM LA1127005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

L.E. VINES RD AND 167 NORTHDBP02 8 August-

HWY 167 AND EAST MURPHYDBP03 8 August-

Wednesday, February 7, 2018 Page 172 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

VILLAGE OF DRY PRONG WATER SYSTEM LA1043003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2789 DYSON CREEK RDDBP01 8 August-

737 DRY PRONG CREEK RDDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

VILLAGE OF ESTHERWOOD WATER SYSTEM LA1001003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

124 N LEBLANCDBP01 6 June-

404 LOUISIANA STREETDBP02 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

VILLAGE OF FENTON WATER SYSTEM LA1053007

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

KEYS ROADDBP01 8 August-

4TH AVENUEDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

VILLAGE OF FOREST WATER SYSTEM LA1123003

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2187 FOREST CEM RDDBP01 7 July-

4322 HWY 589DBP02 7 July-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

VILLAGE OF GEORGETOWN WATER SUPPLY LA1043004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 500DBP01 9 September-

NEW TOWN HALLDBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

VILLAGE OF GROSSE TETE WATER SYSTEM LA1047001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

18105 SIDNEY RDDBP01 7 July-

18360 HWY 77DBP02 7 July-

Wednesday, February 7, 2018 Page 173 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

VILLAGE OF HARRISONBURG WATER SYSTEM LA1025004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

8733 HWY 8DBP01 8 August-

HWY 124DBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

VILLAGE OF HESSMER WATER SYSTEM LA1009008

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

VOICHEDBP01 5 May-

HIGHWAY 114 EDBP02 5 May-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

VILLAGE OF MAURICE WATER SYSTEM LA1113019

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

E VINCENT & ANDRE AVEDBP01 6 June-

S LAFAYETTE & HWY 92DBP02 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

VILLAGE OF MCNARY WATER SYSTEM LA1079015

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

1735 EAST RIVER RDDBP02 9 September-

385 HESTER LANDING RDDBP03 9 September-

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

VILLAGE OF MERMENTAU WATER SYSTEM LA1001005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

FOURTH STREETDBP01 6 June-

104 7TH STDBP03 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

VILLAGE OF MOREAUVILLE WATER SYSTEM LA1009012

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

618 MAIN STREETDBP02 8 August-

WATER TOWERSDBP03 8 August-

Wednesday, February 7, 2018 Page 174 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

VILLAGE OF MORSE WATER SYSTEM LA1001006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

334 COON RICHARD RDDBP01 6 June-

435 BRADFORDDBP02 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

VILLAGE OF NORWOOD WATER SYSTEM LA1037007

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

4472 AZALEADBP01 8 August-

13403 JAMES LANEDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

VILLAGE OF PALMETTO WATER SYSTEM LA1097011

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

13677 HWY 105 (POC#8)DBP01 5 May-

224 E. RAILROAD (POC#2)DBP02 5 May-

4/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

VILLAGE OF PARKS WATER SYSTEM LA1099008

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

3615 GRAND POINT HWY (POC #14)DBP01 5 May-

1187 NURSERY HWY (POC#15)DBP03 5 May-

1193 STEVEN WILTZ RDDBP04 5 May-

1021 RUSSO-MILAZZO RDDBP07 5 May-

7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

VILLAGE OF ROSEDALE WATER SYSTEM LA1047006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

14660 HIGHWAY 411DBP01 9 September-

14645 HIGHWAY 77DBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

VILLAGE OF SICILY ISLAND WATER SYSTEM LA1025009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

117 HIGHWAY 15DBP02 8 August-

101 SICILY STDBP03 8 August-

Wednesday, February 7, 2018 Page 175 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

VILLAGE OF SIKES WATER SYSTEM LA1127010

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 499DBP02 8 August-

HWY 126 XBAPTISTCHURCHDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

VILLAGE OF SIMPSON WATER SYSTEM LA1115032

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HIGHWAY 465 CLECO POWERLINEDBP01 8 August-

DOGWOOD LANEDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

VILLAGE OF TANGIPAHOA WATER SYSTEM LA1105026

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

72098 HWY 1051DBP01 9 September-

69661 HWY 51DBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

VILLAGE OF TURKEY CREEK WATER SYSTEM LA1039013

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

3356 CROOKED CREEK PKWYDBP01 6 June-

1888 ST LANDRY HIGHWAYDBP02 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

VILLAGE OF WILSON WATER SYSTEM LA1037010

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 68 & HWY 952DBP01 7 July-

7571 CURRUTH RDDBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

VILLAGE QUEST SUBDIVISION WATER SYSTEM LA1055070

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

106 LA RUE BLANC(TCR008)DBP02 8 August-

136 LA RUE BLANC (MRT002)DBP03 8 August-

Wednesday, February 7, 2018 Page 176 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

VILLAGE WATER SYSTEM LA1015018

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

WHISP PINE & PINE CONEDBP01 8 August-

TAYLOR BEND & HUMPHREYDBP02 8 August-

676 PRINCETON ROADDBP03 8 August-

219 FLAGG DRIVEDBP04 8 August-

1/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

VILLAGES OF BOCAGE- MADISONVILLE LA1103195

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

69597 TAVERNY COURTDBP01 8 August-

28669 VENETTE COURTDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

VIOLA MOBILE HOME PARK LA1105084

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

MAILBOX SAMPLE TAPDBP01 7 July-

LOT ODBP02 7 July-

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

VIVIAN WATER SYSTEM LA1017037

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HOSSTON RDDBP01 10 October-

959 S PINE STDBP02 10 October-

7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:

VIXEN WATER SYSTEM EAST LA1021011

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

JIM REEVES @ BELLE COTE RDDBP01 8 August-

HWY4 AT PALESTINE CHURCH RD (POC#1)DBP02 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

VIXEN WATER SYSTEM WEST LA1049031

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 4 AT HARRIS LOOP RDDBP02 8 August-

END OF FLOYD JOHNSTON RDDBP04 8 August-

Wednesday, February 7, 2018 Page 177 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2012 QT Monitoring Begin Date: Frequency of Sampling:

W JEFFERSON WW DISTRICT 2 LA1051004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

857 TERRY PARKWAYDBP02 9 September-

650 LA HIGHWAY 1, GRAND ISLEDBP06 9 September-

4500 WESTBANK EXPRESSWAYDBP07 9 September-

500 SOUTH JAMIE BLVDDBP08 9 September-

9464 WESTBANK EXPRESSWAYDBP09 9 September-

616 WEST NIAGARA CIRCLE DRDBP10 9 September-

3470 MARTIN STREETDBP11 9 September-

2100 POTOMAC DRIVEDBP12 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WALKER COMMUNITY SYSTEM LA1049023

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

353 MIDWAY CHURCH RDDBP01 8 August-

5244 WALKER RDDBP02 8 August-

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

WALKER WATER SYSTEM LA1063017

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BUDDY ELLIS AT HWY 447DBP01 5 May-

29762 WALKER S. RD (CARTER'S)DBP02 5 May-

ALVIN SIBLEY AT HWY 447DBP03 5 May-

14286 COURTNEY ROADDBP04 5 May-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WALMART DISTRIBUTION WATER SYSTEM LA2097051

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

NORTH SIDE OF SYSTEMDBP01 8 August-

SOUTH SIDE OF SYSTEMDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WALNUT BAYOU WATER ASSOCIATION LA1065004

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SHARKEY ROADDBP02 8 August-

BAILEY @ HIGHWAY 65 NDBP03 8 August-

Wednesday, February 7, 2018 Page 178 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WARD 3 WATER ASSOCIATION LA1067016

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

5727 UP AND DOWN RDDBP02 7 July-

4404 DEW DROP RDDBP03 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WARD 5 WW DISTRICT 1 - LONE PINE LA1039017

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2961 HWY 115DBP01 9 September-

BLOOD BEND ROADDBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WARD 6 WATER ASSOCIATION OF RAPIDES LA1079037

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

FREEDOM CHURCH & HWY 113DBP02 6 June-

HOPEWELL CHURCH & CHESTER MACDBP03 6 June-

7/1/2014 YR Monitoring Begin Date: Frequency of Sampling:

WARD II WATER DISTRICT LA1063039

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

KIDS CORNER AND EDEN CHURCH ROADDBP02 5 May-

JUBAN PARC JR HIGH @ BROWN ROADDBP03 5 May-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WARD IV WATER DISTRICT LA1039015

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

175 CALLAHAN ROADDBP01 9 September-

2054 CYPRESS CRDBP02 9 September-

7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

WARD NINE WATER SYSTEM LA1027013

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

SCOTLAND @ HOLLYDBP01 8 August-

HWY 9 & N. FELLOWSHIP ROADDBP02 8 August-

Wednesday, February 7, 2018 Page 179 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

10/1/2016 QT Monitoring Begin Date: Frequency of Sampling:

WARDEN WATER SYSTEM LA1083011

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

190 WADE ROADDBP02 10 October-

MCGOWAN AND DEARMAN ROADDBP03 10 October-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WARDS 4 & 5 WATER SYSTEM LA1021010

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 3239 AND HWY 126DBP02 9 September-

HWY 846 AND HWY 4DBP03 9 September-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

WARDS CHAPEL WATER SYSTEM LA1111016

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 828 AND HWY 2DBP01 9 September-

1260 WEST PORT UNION RDDBP03 9 September-

7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

WARE YOUTH CENTER WATER SYSTEM LA2081007

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BEHIND IR COTTAGE #3DBP01 7 July-

BETWEEN MP BLDG & COTTAGE 1DBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WASTE MANAGEMENT LA2103373

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

POC 7DBP01 6 June-

POC 2DBP02 6 June-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

WATER & SEWER COMMISSION 4 OF ST MARY LA1101011

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

975 ST PETER STREETDBP02 7 July-

207 YOKLEY ROADDBP03 7 July-

Wednesday, February 7, 2018 Page 180 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

WATER WORKS DISTRICT #1 OF VERMILION LA1113034

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 167 @ RIVER RDDBP01 8 August-

HWY 35@CLINT DRDBP03 8 August-

KIRK RD @ BAUDOIN RDDBP04 8 August-

HWY 14 @ SPRINGHILLDBP05 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WATER WORKS DISTRICT 2 - CROSS ROADS LA1091001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

6554 HWY 1042DBP02 8 August-

9216 HWY 10DBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WATER WORKS DISTRICT 2 - PHASE 3 LA1091008

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

19620 HWY 43DBP01 8 August-

14801 HWY 10DBP02 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

WATERPROOF WATER SYSTEM LA1107005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

CHURCH STREETDBP01 12 December-

HWY 568DBP03 12 December-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WATERWORKS 1 OF MOREHOUSE, INC LA1067011

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

9570 COOPER LAKE ROADDBP01 8 August-

RUSTIC ACRES ROADDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WATERWORKS DISTRICT 7 LA1017052

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

MORTON ROADDBP02 5 May-

12117 PROVIDENCE ROADDBP03 5 May-

Wednesday, February 7, 2018 Page 181 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WATERWORKS DISTRICT NO 5 OF ST LANDRY PA LA1097039

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 190 OFF RAMPDBP01 8 August-

10963 HWY 105DBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WBR DISTRICT 4 - ARBROTH LA1121026

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

10240 BUECHE ROADDBP01 6 June-

18525 N RIVER ROADDBP02 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WBR DISTRICT 4 - HOLIDAY INN LA1121024

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

553 LOBDELLDBP01 6 June-

5131 REBELLE LANEDBP03 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WBR DISTRICT 4 -SECTION ROAD WINTERVILLE LA1121027

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

8236 ROSEHILL DR - SECTION RDDBP01 6 June-

13921 ROSEDALE ROADDBP05 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WBR PUBLIC UTILITIES LA1121008

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

4142 RIVERVIEW RDDBP05 6 June-

2180 PLANTATION AVENUEDBP06 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WESLEY CHAPEL WATER SYSTEM LA1061020

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

GRIGSBY AND RADIO TOWERDBP02 7 July-

4220 HWY 818DBP03 7 July-

Wednesday, February 7, 2018 Page 182 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

WEST ALLEN PARISH WATER SYSTEM LA1003010

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

11448 HWY 113DBP02 7 July-

108 S LYLES STREETDBP03 7 July-

7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:

WEST BATON ROUGE WATER WORKS DISTRICT 2 LA1121018

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

ELLWOOD ROADDBP01 7 July-

BIRD HEIGHTSDBP02 7 July-

5352 EUDORA DRDBP03 7 July-

5133 SOUTH FLORENCE STDBP04 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WEST FELICIANA CONSOL WWKS DISTRICT 13 LA1125010

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

6251 FREELAND RDDBP02 6 June-

5140 ROSEMOUND LOOPDBP03 6 June-

7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:

WEST FRASER (SOUTH) INC LA2127009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOG SCALER'S OFFICEDBP01 8 August-

GUARD HOUSEDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WEST GATE TRAILER PARK WATER SYSTEM LA1055149

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

3750 LANDRY RD LOT 6DBP02 9 September-

3750 LANDRY RD LOT 36DBP03 9 September-

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

WEST GRANT WATER ASSOCIATION LA1043014

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

580 JD CAMP ROADDBP01 7 July-

BEA'S GROCERYDBP03 7 July-

Wednesday, February 7, 2018 Page 183 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

WEST HWY 80 ARK ROAD WS LA1073055

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

104 WEST HIGHLANDDBP01 2 February-

HARRELL AND COUNTRY ESTATESDBP02 2 February-

202 PARKWOODDBP03 2 February-

2805 ARKANSASDBP04 2 February-

1/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

WEST MONROE WATER SYSTEM LA1073056

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

411 FILHIOL STDBP01 4 April-

303 LUDWIGDBP02 4 April-

614 GRANTHAMDBP03 4 April-

102 REDWOODDBP04 4 April-

7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

WEST OUACHITA IND PARK LA2073027

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

379 HUEY LENARD LOOPDBP01 8 August-

904 INDUSTRIAL PARKWAYDBP02 8 August-

7/1/2015 YR Monitoring Begin Date: Frequency of Sampling:

WEST STERLINGTON WATER SYSTEM LA1111017

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

112 HILL ROADDBP01 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WEST VERNON PARISH WATERWORKS DISTRICT LA1115121

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

464 ROBERTS ROADDBP01 8 August-

HOLLY ESTATESDBP02 8 August-

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

WEST WINN WATER SYSTEM INC LA1127011

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

POST OFFICEDBP01 5 May-

7354 HWY 84DBP02 5 May-

Wednesday, February 7, 2018 Page 184 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WEST WINNSBORO WATER SYSTEM LA1041009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HWY 4 @ RISER ROADDBP02 8 August-

HWY 128 @ HWY 876DBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WESTERN UTILITIES, INC LA1073097

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

100 YELLOWSTONE CIRCLEDBP02 8 August-

208 WINTERPARK DRIVEDBP03 8 August-

1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:

WESTLAKE CHEMICAL CORP NATURE LAB WS LA2019164

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

HSE FIRST AIDDBP01 8 August-

SECL (TCR-001)DBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WESTLAKE CHEMICAL CORP WATER SYSTEM LA2019016

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

RAILROAD TRACKS SILICA DITCHDBP01 8 August-

RIVERSIDE POWERHOUSEDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WESTLAKE CITY OF WATER SYSTEM LA1019054

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

MOSSVILLEDBP03 8 August-

PELICAN DRIVEDBP04 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WESTLAKE VINYLS COMPANY, LP LA2005006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

MOMMENTIVE TANK FARMDBP01 8 August-

VCM KITCHENDBP02 8 August-

Wednesday, February 7, 2018 Page 185 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

WESTON WATER SYSTEM LA1049019

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

620 JOHN WATTS RDDBP03 4 April-

360 HALFWAY CREEKDBP04 4 April-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WESTVIEW WATER WORKS LA1105028

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

INTERSECTION HWY 1046 & WHEAT RDDBP02 7 July-

30036 HWY 16 WDBP03 7 July-

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

WESTWEGO WATERWORKS LA1051005

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

WACDBP01 6 June-

PECAN AT CENTRALDBP05 6 June-

TOURIST INFODBP06 6 June-

AVENUE D AT WESTBANK EXPRESSWAYDBP07 6 June-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WEYERHAEUSER NR - ARCADIA OSB LA2061009

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

ROLLING STOCK SHOPDBP01 8 August-

TAP NEAR SEPTIC PLANTDBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WHEELING WATER SYSTEM INC LA1127019

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

CAMPGROUND HWY 71DBP01 9 September-

UNION CH. ON HWY 34DBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WHITE ROAD MOBILE HOME PARK LA1005147

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 12DBP01 8 August-

LOT 26DBP02 8 August-

Wednesday, February 7, 2018 Page 186 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WHITEHALL WATER SYSTEM INC LA1059012

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

332 FANNIN ROADDBP02 8 August-

281 OLD RIVER LOOPDBP03 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WILDWOOD FOREST SUBDIVISION WATER SYSTEM LA1017061

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

2258 J & J TRAILDBP02 6 June-

7248 N. TAMIDBP03 6 June-

1/1/2016 QT Monitoring Begin Date: Frequency of Sampling:

WILDWOOD MHP WS LA1073110

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

131 SWARTZ SCHOOL RD #63DBP02 10 October-

131 SWARTZ SCHOOL RD #21DBP03 10 October-

1/1/2014 QT Monitoring Begin Date: Frequency of Sampling:

WILDWOOD SOUTH WATER SYSTEM LA1017042

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

537 DIXONDBP02 7 July-

FIRE STATIONDBP03 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WILLA VILLA MOBILE HOME LA1117019

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT #32DBP02 8 August-

LOT #21DBP03 8 August-

1/1/2017 3Y Monitoring Begin Date: Frequency of Sampling:

WINDMILL NURSERY LA2117178

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

TAP BEHIND SHOPDBP02 8 August-

Wednesday, February 7, 2018 Page 187 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WINNSBORO WATER SYSTEM LA1041006

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

DAVIS PARK & HIGHWAY 15DBP01 7 July-

HWY 618 AND HWY 869DBP02 7 July-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WISNER WATER SYSTEM LA1041007

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

169 MORGAN STDBP02 8 August-

2146 CALHOUNDBP03 8 August-

1/1/2014 YR Monitoring Begin Date: Frequency of Sampling:

WOODLAND INDUSTRIAL PARK WATER SYSTEM LA2075002

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

BC CABINETS 1500 WOODLAND HWYDBP01 9 September-

OMI 130 KEATINGDBP02 9 September-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WOODSIDE MHP LA1105090

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

LOT 1DBP01 8 August-

LOT 40DBP02 8 August-

1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:

WWKS DISTRICT 2 OF ST HELENA LA1091007

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

ROHNER RD & HWY 449DBP01 8 August-

HWY 10 & LATHAN BRIDGES RDDBP02 8 August-

4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:

ZACHARY WATER SYSTEM LA1033030

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

4348 HWY 19 @ RUSHDBP01 5 May-

8000 MCHOST ROADDBP02 5 May-

AVENUE A TOWERDBP03 5 May-

1080 PLAINS PORT HUDSON RDDBP04 5 May-

Wednesday, February 7, 2018 Page 188 of 189

Stage 2 D/DBP Sample Schedules

Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.

Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If

the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)

All public water systems must collect a TTHMs/HAA5 sample set at each sample site.

PHM = Peak Historical Month

MBD = Monitoring Begin Date

7/1/2015 YR Monitoring Begin Date: Frequency of Sampling:

ZONE 2 WATER SYSTEM INC LA1043001

Sample Point ID Sample Address/Location

PWS ID

PHM or Collection Month:

KATELAND ROADDBP02 8 August-

HIGHWAY 8DBP03 8 August-

Wednesday, February 7, 2018 Page 189 of 189