Stage 1 Development Application

9
Masterplanning Stage 1DA Buchan Friday, 3 rd April 2020 Sydney Studio buchangroup.com.au APPENDIX 1A - Envelopes for Approval Stage 1 Development Application/ 3 rd April 2020/

Transcript of Stage 1 Development Application

Page 1: Stage 1 Development Application

MasterplanningStage 1DA

BuchanFriday, 3rd April 2020

Sydney Studiobuchangroup.com.au

APPENDIX 1A - Envelopes for Approval

Stage 1 Development Application/

3rd April 2020/

Page 2: Stage 1 Development Application

UPPERPODIUM @ 9.5m

2.5m SETBACK

0m

ST

RE

ET

SE

TB

AC

K U

PT

O 9

.5M

UP

PE

R P

OD

IUM

@ 9

.5m

2.5

m S

ET

BA

CK

UP

PE

R P

OD

IUM

@ 9

.5m

1m S

ET

BA

CK

0m STREET SETBACK UPTO 9.5M

0m STREET SETBACK UPTO 9.5m

SE

TB

AC

K @

21m

6m

TO

WE

R

UP

PE

R P

OD

IUM

@ 1

5m

2.5

m S

ET

BA

CK

0m STREET SETBACK UPTO 15m

0m

ST

RE

ET

SE

TB

AC

K U

PT

O 1

5M

UPPER PODIUM @ 15m

1m SETBACK

SETBACK @ 21m

12m TOWER

SE

TB

AC

K @

15

m

1m U

PP

ER

PO

DIU

M

SE

TB

AC

K @

21m

6m

TO

WE

R

SETBACK @ 15m

0m UPPER PODIUM

SETBACK @ 21m

6m TOWER

0m STREET SETBACK UPTO 15m

LEP HEIGHT LIMIT 15m LEP HEIGHT

LIMIT 30m

LEP HEIGHT

LIMIT 48m

LEP HEIGHT

LIMIT 36m

SE

TB

AC

K @

21m

12m

TO

WE

R

UP

PE

R P

OD

IUM

@ 1

5m

2.5

m S

ET

BA

CK

DONNISON ST

HE

NR

Y P

AR

RY

DR

IVE

WILLIAM ST

AL

BA

NY

ST

(N

)

UPPERPODIUM @ 9.5m2.5m SETBACK

GCC PODIUM

GCC TOWER

0

N

Status

Date Plotted

Date Issued

Scale

Project Number

Project Drawing Title

Drawing Number0 0 0 0 0mm

RevisionDevelopment Application/

Rev Date Description

D 27.09.19 STAGE 1 DEVELOPMENT APPLICATION

E REVISED STAGE 1 DA

Gosford Alive/ 218155

3/31/2020 10:17:46 PM

E

218155

GOSFORD ALIVE MASTERPLANGCC- SETBACKS136 DONNISON STREET, GOSFORD 2250

03.04.20

DA-01

03.04.20

03.04.20

Page 3: Stage 1 Development Application

DONNISON ST

HE

NR

Y P

AR

RY

DR

IVE

WILLIAM ST

AL

BA

NY

ST

(N

)

MIN. 2.5m MAX: 63m PODIUM

SHARED STREET

MIN:18m MAX: 120m PODIUM

ALBANY ST

NIL SETBACK

TOWER 1

TOWER 2

TOWER 4

TOWER 5

TOWER 3

ADJOINING FUTURE

BUILDING

MIN

.2.5

mM

AX

. 3

6m

PO

DIU

MM

IN. 14

mM

AX

. 3

7m

PO

DIU

MM

IN. 1m

MIN

. 2.5

mM

AX

. 8

7m

PO

DIU

MM

IN. 1m

MIN

. 2.5

mP

OD

IUM

MIN

. 2.5

m

MIN. 1m MAX. 80m

ALBANY ST

NIL SETBACK

MIN

. 6

mM

AX

. 22m

MIN

. 12

m

MIN

. 1m

MA

X. 3

8m

PO

DIU

MM

IN. 2m

MIN

. 12

m

MAX. RL 82.4

MAX. RL 73.0

MAX. RL 101

MAX. RL 101

MAX. RL 88.6

PODIUM RL 21

MIN. 15m MAX. 48m MIN. 24m MAX. 42m MIN. 24m MAX.42m MIN.6m

MIN 2.5m MAX: 63m PODIUM

SHARED STREET

MIN: 18m MAX: 36m PODIUM MIN.1m

MIN. 14m MAX. 48m MIN. 22m MAX. 24m MIN.12m

MIN

. 6

mM

IN. 27m

MIN

. 24

mM

AX

. 28

mM

IN.6

m

MIN

. 6

m

MA

X. 22m

MIN

. 5

mM

IN. 7.5

m

MIN. 2.5m

PODIUM RL 21 PODIUM RL 31

MAX.

RL 91.7

MAX. RL 70.00

MAX.

RL 60.7

MAX.

RL 91.7MAX. RL

91.7

14000

8500

16300

PO

DIU

M R

L 2

4

PROPOSED PODIUM ENVELOPE

EXAMPLE TOWER DESIGN

(NOT FOR APPROVAL)

PROPOSED TOWER ENVELOPE

EXAMPLE PODIUM DESIGN

(NOT FOR APPROVAL)

TOWER SETOUTSXX

XX PODIUM SETOUTS

0

PN

N

Status

Date Plotted

Date Issued

Scale

Project Number

1 : 1000 @A3

Project Drawing Title

Drawing Number5 10 20 30 40M

RevisionDevelopment Application/

Rev Date Description

D 27.09.19 STAGE 1 DEVELOPMENT APPLICATION

E REVISED STAGE 1 DA

Gosford Alive/ 218155

3/31/2020 10:17:52 PM

E

218155

GOSFORD ALIVE MASTERPLANPROPOSED BUILDING ENVELOPE136 DONNISON STREET, GOSFORD 2250

DA-02

03.04.20

03.04.20

Page 4: Stage 1 Development Application

RETAIL

EXAMPLE TOWER DESIGN(NOT FOR APPROVAL)

COMMERCIAL

LOBBY

CARPARK

SERVICES

COMMON AREAPROPOSED PODIUM ENVELOPE

-2.5m setback at Henry Parry Drive-1m setback at Donnison St- NIL setback at Albany St-2.5m setback at William St

-0m Setback upto 9.5m at Henry parry drive and part of Donnison St and William St-0m Setback upto 15m to the remainder street-2.5m Setback from 9.5m to 15m

GCC SEPP PODIUM SETBACK

PODIUM SETBACK

PROPOSED TOWER ENVELOPE

-17m setback at Henry Parry Drive for Tower 1 15m setback at Henry Parry Drive for Tower 2 -6m setback at Donnison-6m setback at Albany St-6m setback at William St -12m setback from Adjoining plot

TOWER SETBACK

GCC TOWER SETBACK

-6-8m from all streets

SIT

E B

OU

ND

AR

Y

SIT

E B

OU

ND

AR

Y

WILLIAM STDONNISON ST

GCC SEPP

HEIGHT LIMIT 15m

RL 9.09RL 9.40 RL 11.08

TOWER 1 TOWER 2

RL 82.40

RL 60.70

RL 70.00

RL 21.00

REV: A ENVELOPE

RL 73.00

RL 21.00

AD

JO

ININ

G B

OU

ND

AR

Y

AD

JO

ININ

G B

OU

ND

AR

Y

0

Status

Date Plotted

Date Issued

Scale

Project Number

1 : 1000 @A3

Project Drawing Title

Drawing Number5 10 20 30 40M

RevisionDevelopment Application/

Rev Date Description

D 27.09.19 STAGE 1 DEVELOPMENT APPLICATION

E REVISED STAGE 1 DA

Gosford Alive/ 218155

3/31/2020 10:17:41 PM

E

218155

GOSFORD ALIVE MASTERPLANMASTERPLAN - ELEVATION HENRYPARRY DRIVE

136 DONNISON STREET, GOSFORD 2250

DA-20

03.04.20

03.04.20

Page 5: Stage 1 Development Application

SIT

E B

OU

ND

AR

Y

SIT

E B

OU

ND

AR

Y

ALBANY ST

HENRY PARRY DRIVE

SIT

E B

OU

ND

AR

Y

RL 11.72

ADJOINING FUTURE BUILDING

RL 20.31

GCC SEPP HEIGHT

LIMIT 30m

GCC SEPP

HEIGHT LIMIT 15m

GCC SEPP HEIGHT

LIMIT 48m

TOWER 1TOWER 3

RL 88.60

RL 82.40

RL 70.00

REV A: ENVELOPE

REV A: ENVELOPE

AD

JO

ININ

G B

OU

ND

AR

Y

18m SHARED STREET

RL 24.00

RL 21.00

AD

JO

ININ

G B

OU

ND

AR

Y

ADJOINING BUILDING ENVELOPE

RETAIL

EXAMPLE TOWER DESIGN(NOT FOR APPROVAL)

COMMERCIAL

LOBBY

CARPARK

SERVICES

COMMON AREAPROPOSED PODIUM ENVELOPE

-2.5m setback at Henry Parry Drive-1m setback at Donnison St- NIL setback at Albany St-2.5m setback at William St

-0m Setback upto 9.5m at Henry parry drive and part of Donnison St and William St-0m Setback upto 15m to the remainder street-2.5m Setback from 9.5m to 15m

GCC SEPP PODIUM SETBACK

PODIUM SETBACK

PROPOSED TOWER ENVELOPE

-17m setback at Henry Parry Drive for Tower 1 15m setback at Henry Parry Drive for Tower 2 -6m setback at Donnison-6m setback at Albany St-6m setback at William St -12m setback from Adjoining plot

TOWER SETBACK

GCC TOWER SETBACK

-6-8m from all streets

0

Status

Date Plotted

Date Issued

Scale

Project Number

1 : 1000 @A3

Project Drawing Title

Drawing Number5 10 20 30 40M

RevisionDevelopment Application/

Rev Date Description

D 27.09.19 STAGE 1 DEVELOPMENT APPLICATION

E REVISED STAGE 1 DA

Gosford Alive/ 218155

3/31/2020 10:17:45 PM

E

218155

GOSFORD ALIVE MASTERPLANMASTERPLAN - ELEVATIONWILLIAM ST

136 DONNISON STREET, GOSFORD 2250

DA-21

03.04.20

03.04.20

Page 6: Stage 1 Development Application

SIT

E B

OU

ND

AR

Y

ALBANY ST

HENRY PARRY DRIVE

RL 19.40

RL 101.00

TOWER 5TOWER 4

SIT

E B

OU

ND

AR

Y

TOWER 2

GCC SEPP HEIGHT

LIMIT 30m

GCC SEPP HEIGHT LIMIT 15m

GCC SEPP HEIGHT

LIMIT 48m

RL 91.70

RL 60.70

REV: A ENVELOPE

REV: A ENVELOPE

REV: A ENVELOPE

RL 31.00

RL 24.00

RL 21.00

ADJOINING BUILDING

18m SHARED STREET

AD

JO

ININ

G B

OU

ND

AR

Y

RL 73.00

AD

JO

ININ

G B

OU

ND

AR

Y

RL 101.00

RL 91.70

RETAIL

EXAMPLE TOWER DESIGN(NOT FOR APPROVAL)

COMMERCIAL

LOBBY

CARPARK

SERVICES

COMMON AREAPROPOSED PODIUM ENVELOPE

-2.5m setback at Henry Parry Drive-1m setback at Donnison St- NIL setback at Albany St-2.5m setback at William St

-0m Setback upto 9.5m at Henry parry drive and part of Donnison St and William St-0m Setback upto 15m to the remainder street-2.5m Setback from 9.5m to 15m

GCC SEPP PODIUM SETBACK

PODIUM SETBACK

PROPOSED TOWER ENVELOPE

-17m setback at Henry Parry Drive for Tower 1 15m setback at Henry Parry Drive for Tower 2 -6m setback at Donnison-6m setback at Albany St-6m setback at William St -12m setback from Adjoining plot

TOWER SETBACK

GCC TOWER SETBACK

-6-8m from all streets

0

Status

Date Plotted

Date Issued

Scale

Project Number

1 : 1000 @A3

Project Drawing Title

Drawing Number5 10 20 30 40M

RevisionDevelopment Application/

Rev Date Description

D 27.09.19 STAGE 1 DEVELOPMENT APPLICATION

E REVISED STAGE 1 DA

Gosford Alive/ 218155

3/31/2020 10:17:56 PM

E

218155

GOSFORD ALIVE MASTERPLANMASTERPLAN-ELEVATIONDONNISON STREET

136 DONNISON STREET, GOSFORD 2250

DA-22

03.04.20

03.04.20

Page 7: Stage 1 Development Application

SIT

E B

OU

ND

AR

Y

SIT

E B

OU

ND

AR

Y

GCC SEPP HEIGHT LIMIT 15m

GCC SEPP HEIGHT

LIMIT 48m

WILLIAM ST

DONNISON ST

SIT

E B

OU

ND

AR

Y

RL 20.09

ADJOINING FUTURE BUILDING

RL 20.06

TOWER 5

RL 31.00

REV: A ENVELOPE

AD

JO

ININ

G B

OU

ND

AR

Y

AD

JO

ININ

G B

OU

ND

AR

Y

RL 101.00

RL 91.70

RL 18.31

RETAIL

EXAMPLE TOWER DESIGN(NOT FOR APPROVAL)

COMMERCIAL

LOBBY

CARPARK

SERVICES

COMMON AREAPROPOSED PODIUM ENVELOPE

-2.5m setback at Henry Parry Drive-1m setback at Donnison St- NIL setback at Albany St-2.5m setback at William St

-0m Setback upto 9.5m at Henry parry drive and part of Donnison St and William St-0m Setback upto 15m to the remainder street-2.5m Setback from 9.5m to 15m

GCC SEPP PODIUM SETBACK

PODIUM SETBACK

PROPOSED TOWER ENVELOPE

-17m setback at Henry Parry Drive for Tower 1 15m setback at Henry Parry Drive for Tower 2 -6m setback at Donnison-6m setback at Albany St-6m setback at William St -12m setback from Adjoining plot

TOWER SETBACK

GCC TOWER SETBACK

-6-8m from all streets

0

Status

Date Plotted

Date Issued

Scale

Project Number

1 : 1000 @A3

Project Drawing Title

Drawing Number5 10 20 30 40M

RevisionDevelopment Application/

Rev Date Description

D 27.09.19 STAGE 1 DEVELOPMENT APPLICATION

E REVISED STAGE 1 DA

Gosford Alive/ 218155

3/31/2020 10:19:19 PM

E

218155

GOSFORD ALIVE MASTERPLANMASTERPLAN - ELEVATIONALBANY ST (N)

136 DONNISON STREET, GOSFORD 2250

DA-23

03.04.20

03.04.20

Page 8: Stage 1 Development Application

TOWER 2

TOWER 4

TOWER 5

ALBANY ST

HENRY PARRY DRIVE

SIT

E B

OU

ND

AR

Y

SIT

E B

OU

ND

AR

Y

SIT

E B

OU

ND

AR

Y

GCC-SEPP

PODIUM 48m

GCC-SEPP

PODIUM 30m

18m SHARED STREET

RL 21.00

RL 24.00

RL 31.00

RL 91.70

RL 60.70

AD

JO

ININ

G B

OU

ND

AR

Y

AD

JO

ININ

G B

OU

ND

AR

Y

ADJOINING BUILDING

EXISTING BUILDING

EXISTING BUILDING

RL 91.70

RL 101.00

RL 73.00

RL 101.00

PROPOSED TOWER ENVELOPE

-17m setback at Henry Parry Drive for Tower 1 15m setback at Henry Parry Drive for Tower 2 -6m setback at Donnison-6m setback at Albany St-6m setback at William St -12m setback from Adjoining plot

TOWER SETBACK

GCC TOWER SETBACK

-6-8m from all streets

RETAIL

EXAMPLE TOWER DESIGN(NOT FOR APPROVAL)

COMMERCIAL

LOBBY

CARPARK

SERVICES

COMMON AREAPROPOSED PODIUM ENVELOPE

-2.5m setback at Henry Parry Drive-1m setback at Donnison St- NIL setback at Albany St-2.5m setback at William St

-0m Setback upto 9.5m at Henry parry drive and part of Donnison St and William St-0m Setback upto 15m to the remainder street-2.5m Setback from 9.5m to 15m

GCC SEPP PODIUM SETBACK

PODIUM SETBACK

0

Status

Date Plotted

Date Issued

Scale

Project Number

1 : 1000 @A3

Project Drawing Title

Drawing Number5 10 20 30 40M

Revision

Development Application/

Rev Date Description

D 27.09.19 STAGE 1 DEVELOPMENT APPLICATION

E REVISED STAGE 1 DA

Gosford Alive/ 218155

3/31/2020 10:20:34 PM

E

218155

GOSFORD ALIVE MASTERPLANMASTERPLAN - SECTION A136 DONNISON STREET, GOSFORD 2250

DA-24

03.04.20

03.04.20

Page 9: Stage 1 Development Application

TOWER 3 TOWER 4

GCC-SEPP- 30m

SIT

E B

OU

ND

AR

Y

SIT

E B

OU

ND

AR

Y

WILLIAM STDONNISON ST

RL 88.60

RL 101.00

RL 24.00

AD

JO

ININ

G B

OU

ND

AR

Y

AD

JO

ININ

G B

OU

ND

AR

Y

RL 91.70

PROPOSED TOWER ENVELOPE

-17m setback at Henry Parry Drive for Tower 1 15m setback at Henry Parry Drive for Tower 2 -6m setback at Donnison-6m setback at Albany St-6m setback at William St -12m setback from Adjoining plot

TOWER SETBACK

GCC TOWER SETBACK

-6-8m from all streets

RETAIL

EXAMPLE TOWER DESIGN(NOT FOR APPROVAL)

COMMERCIAL

LOBBY

CARPARK

SERVICES

COMMON AREAPROPOSED PODIUM ENVELOPE

-2.5m setback at Henry Parry Drive-1m setback at Donnison St- NIL setback at Albany St-2.5m setback at William St

-0m Setback upto 9.5m at Henry parry drive and part of Donnison St and William St-0m Setback upto 15m to the remainder street-2.5m Setback from 9.5m to 15m

GCC SEPP PODIUM SETBACK

PODIUM SETBACK

0

Status

Date Plotted

Date Issued

Scale

Project Number

1 : 1000 @A3

Project Drawing Title

Drawing Number5 10 20 30 40M

Revision

Development Application/

Rev Date Description

D 27.09.19 STAGE 1 DEVELOPMENT APPLICATION

E REVISED STAGE 1 DA

Gosford Alive/ 218155

3/31/2020 10:20:37 PM

E

218155

GOSFORD ALIVE MASTERPLANMASTERPLAN - SECTION B136 DONNISON STREET, GOSFORD 2250

DA-25

03.04.20

03.04.20