Page 1 TO: FOR: FROM: General Manager Vote Dept.: General Manager Author: Robert B. Davis x Board Members x Information Subject: Report on Woods Hole Terminal Reconstruction Project Timeline and Budget STAFF SUMMARY Date: February 17, 2020 File# GM-739 PURPOSE: To advise the Members and the Port Council of the results thus far of the staff’s review of the Woods Hole Terminal Reconstruction Project Timeline and Budget. BACKGROUND: On Tuesday, January 21, 2020, I provided an update on the Woods Hole Terminal Reconstruction Project to the Members and the attendees at the Authority’s monthly meeting. Later in the meeting, I presented Change Order No. 53 to Contract No. 9B-2012, “Woods Hole Terminal Design Services” from BIA.Studio, which seeks an additional $885,681 in fees relating to schematic design services for the recently approved one-story terminal building and two-story utility building, the existing temporary terminal building and the previously submitted two-story terminal designs that did not obtain approvals. During my presentation, some Members expressed concern about Change Order No. 53 and requested (1) an independent review of the reasonableness of BIA.Studio’s fees and (2) a projected total cost for BIA.Studio to complete the project. Some Members also expressed concerns about the costs submitted by marine contractor, Jay Cashman, Inc. Consideration of Change Order No. 53 was postponed pending the results of an independent review of the reasonableness of BIA.Studio’s fees. Following the Members’ meeting on January 21, 2020, I instructed staff to produce a complete and updated accounting of BIA.Studio’s Contract No. 9B-2012 and Jay Cashman, Inc.’s Contract No. 16-2017, including all change orders. In addition, I instructed staff to investigate potential vendors to complete an independent review of BIA.Studio’s fees. To date, staff have contacted the State Designer Selection Board, which declined to provide any referrals to review the reasonableness of BIA.Studio’s fees. Efforts to source a qualified reviewer continue at the present writing. Meanwhile, I have requested that former General Counsel, Steven Sayers, review the accounting of BIA.Studio’s fees in conjunction with the language of Contract No. 9B-2012 to determine whether the fees are aligned with the applicable contractual terms and conditions. Staff have also compiled a full and complete accounting of BIA.Studio’s Contract No.

Transcript of Staff Summary - GM#739 Report on Woods Hole Terminal ... · Construction administration services...

  •  

    Page 1

    TO:  

    FOR: FROM:

      

    General Manager

      Vote Dept.: General Manager

    Author: Robert B. Davis

    x  

    Board Members

    x  Information Subject: Report on Woods Hole Terminal Reconstruction Project Timeline and Budget  

    STAFF SUMMARY Date: February 17, 2020 File# GM-739   

     

     

     

         PURPOSE: To advise the Members and the Port Council of the results thus far of the staff’s review of the Woods Hole Terminal Reconstruction Project Timeline and Budget. BACKGROUND: On Tuesday, January 21, 2020, I provided an update on the Woods Hole Terminal Reconstruction Project to the Members and the attendees at the Authority’s monthly meeting.

    Later in the meeting, I presented Change Order No. 53 to Contract No. 9B-2012, “Woods Hole Terminal Design Services” from BIA.Studio, which seeks an additional $885,681 in fees relating to schematic design services for the recently approved one-story terminal building and two-story utility building, the existing temporary terminal building and the previously submitted two-story terminal designs that did not obtain approvals. During my presentation, some Members expressed concern about Change Order No. 53 and requested (1) an independent review of the reasonableness of BIA.Studio’s fees and (2) a projected total cost for BIA.Studio to complete the project. Some Members also expressed concerns about the costs submitted by marine contractor, Jay Cashman, Inc. Consideration of Change Order No. 53 was postponed pending the results of an independent review of the reasonableness of BIA.Studio’s fees.

    Following the Members’ meeting on January 21, 2020, I instructed staff to produce a

    complete and updated accounting of BIA.Studio’s Contract No. 9B-2012 and Jay Cashman, Inc.’s Contract No. 16-2017, including all change orders. In addition, I instructed staff to investigate potential vendors to complete an independent review of BIA.Studio’s fees. To date, staff have contacted the State Designer Selection Board, which declined to provide any referrals to review the reasonableness of BIA.Studio’s fees. Efforts to source a qualified reviewer continue at the present writing. Meanwhile, I have requested that former General Counsel, Steven Sayers, review the accounting of BIA.Studio’s fees in conjunction with the language of Contract No. 9B-2012 to determine whether the fees are aligned with the applicable contractual terms and conditions.

    Staff have also compiled a full and complete accounting of BIA.Studio’s Contract No.

  •  

    Page 2

    9B-2012 and Jay Cashman, Inc.’s Contract No. 16-2017, including all change orders. A summation of staff’s accounting is illustrated in a PowerPoint presentation attached hereto as Exhibit A and in spreadsheets attached hereto as Exhibit B. Applicable change orders for BIA.Studios and Jay Cashman, Inc. are summarized in spreadsheets attached hereto as Exhibit C. RECOMMENDATION: This summary and its attachments are provided for informational purposes. In light of the information presented, it is my recommendation that the Authority complete its review of the accounting of BIA.Studio’s Contract No. 9B-2012 and Jay Cashman, Inc.’s Contract No. 16-2017, including all change orders, and determine the results of Attorney Sayers’ review of BIA.Studio’s Contract No. 9B-2012 before committing additional funds to pay for an independent review of BIA.Studio’s fees. In addition, staff should continue its investigation into sourcing potential vendors to perform an independent review of BIA.Studio’s fees, including obtaining reliable estimates concerning the costs of such a review.   ____________________________ Robert B. Davis General Manager

  •  

    Page 3

    EXHIBIT A

    PowerPoint Presentation - Summation of Staff’s Accounting of BIA.Studio’s Contract No. 9B-2012 and Jay Cashman, Inc.’s Contract No. 16-2017 as of February 17, 2020

  • WO

    OD

    S H

    OLE

    TER

    MIN

    AL

    REC

    ON

    STR

    UC

    TIO

    N P

    RO

    JEC

    TPr

    ojec

    t cos

    t upd

    ate

    Stea

    msh

    ip A

    utho

    rity

    Boar

    d &

    Por

    t Cou

    ncil

    mee

    ting

    Febr

    uary

    18,

    202

    0

  • COST

    BRE

    AK

    DO

    WN

    BY

    PRO

    JECT

    ELE

    MEN

    T

    Bu

    dget

    Net

    Cha

    nge

    Ord

    ers*

    To

    tal c

    ost

    Feas

    ibili

    ty S

    tudy

    30

    0,00

    0$

    69

    3,20

    4$

    99

    3,20

    4$

    Ad

    min

    istr

    atio

    n Bu

    ildin

    g14

    ,824

    ,886

    $

    97

    0,99

    3$

    15

    ,795

    ,879

    $

    Te

    mpo

    rary

    Ter

    min

    al B

    uild

    ing

    2,75

    4,18

    2$

    274,

    013

    $

    3,02

    8,19

    5$

    Wat

    ersi

    de

    54,5

    47,9

    15$

    2,51

    3,34

    1$

    57,0

    61,2

    56$

    Perm

    anen

    t Ter

    min

    al B

    uild

    ing

    & S

    tora

    ge B

    uild

    ing

    15,2

    36,2

    57$

    652,

    492

    $

    15,8

    88,7

    49$

    Woo

    ds H

    ole

    Term

    inal

    Rec

    onst

    ruct

    ion

    Tota

    l87

    ,663

    ,240

    $

    5,

    104,

    043

    $

    92

    ,767

    ,283

    $

    *Inc

    lude

    s add

    ition

    al se

    rvic

    es, r

    egul

    ator

    y re

    quire

    men

    ts, a

    nd ch

    ange

    s to

    scop

    e of

    cont

    ract

    Febr

    uary

    18,

    202

    02

    Sheet1

    BudgetNet Change Orders* Total cost

    Feasibility Study $ 300,000$ 693,204$ 993,204

    Administration Building$ 14,824,886$ 970,993$ 15,795,879

    Temporary Terminal Building$ 2,754,182$ 274,013$ 3,028,195

    Waterside $ 54,547,915$ 2,513,341$ 57,061,256

    Permanent Terminal Building & Storage Building$ 15,236,257$ 652,492$ 15,888,749

    Woods Hole Terminal Reconstruction Total$ 87,663,240$ 5,104,043$ 92,767,283

    *Includes additional services, regulatory requirements, and changes to scope of contract

  • PR

    OJE

    CT

    HIS

    TOR

    Y

    Febr

    uary

    18,

    202

    03

  • AWA

    RDED

    CO

    NTR

    ACT

    S

    Fe

    asib

    ility

    stu

    dy (C

    ontr

    act 0

    9-20

    12, B

    IA.s

    tudi

    o*)

    Bo

    ard

    appr

    oved

    aw

    ard

    Apr

    il 16

    , 201

    3

    Cove

    red

    publ

    ic m

    eetin

    gs a

    nd p

    rese

    ntat

    ions

    ; ter

    min

    al, s

    ite &

    cus

    tom

    er e

    xper

    ienc

    e pl

    anni

    ng

    Cont

    ract

    am

    ount

    : $30

    0,00

    0

    W

    oods

    Hol

    e Te

    rmin

    al D

    esig

    n (C

    ontr

    act 0

    9B-2

    012,

    BIA

    .stu

    dio*

    )

    Boar

    d ap

    prov

    ed a

    war

    d A

    pril

    21, 2

    015

    Co

    vers

    per

    mitt

    ing,

    sch

    emat

    ic d

    esig

    n, c

    onst

    ruct

    ion

    docu

    men

    ts, c

    onst

    ruct

    ion

    adm

    inis

    trat

    ion

    Co

    ntra

    ct a

    mou

    nt: $

    5,04

    1,00

    0

    A

    dmin

    istr

    atio

    n bu

    ildin

    g co

    nstr

    uctio

    n (C

    ontr

    act 1

    6-20

    16, G

    &R

    Cons

    truc

    tion)

    Bo

    ard

    appr

    oved

    aw

    ard

    Oct

    ober

    18,

    201

    6

    Cove

    red

    cons

    truc

    tion

    of A

    utho

    rity’

    s ad

    min

    istr

    ativ

    e of

    fices

    Cont

    ract

    am

    ount

    : $12

    ,687

    ,000

    Febr

    uary

    18,

    202

    04

  • AWA

    RDED

    CO

    NTR

    ACT

    S

    Te

    mpo

    rary

    term

    inal

    bui

    ldin

    g (C

    ontr

    act 2

    3-20

    16, T

    rium

    ph M

    odul

    ar)

    Bo

    ard

    appr

    oved

    aw

    ard

    Nov

    embe

    r 15,

    201

    6

    Cove

    red

    mod

    ular

    tem

    pora

    ry te

    rmin

    al b

    uild

    ing

    at th

    e W

    oods

    Hol

    e te

    rmin

    al

    Cont

    ract

    am

    ount

    : $2,

    591,

    182

    W

    ater

    side

    con

    stru

    ctio

    n co

    ntra

    ct (C

    ontr

    act 1

    7-20

    17, J

    ay C

    ashm

    an In

    c.)

    Bo

    ard

    appr

    oved

    aw

    ard

    Dec

    embe

    r 5, 2

    017

    Co

    vers

    Pha

    ses

    2-4

    of w

    ater

    side

    wor

    k (d

    emol

    ition

    and

    con

    stru

    ctio

    n of

    thre

    e fe

    rry

    slip

    s)

    Cont

    ract

    am

    ount

    : $43

    ,143

    ,280

    O

    ther

    con

    trac

    ts a

    ppro

    ved

    by B

    oard

    :

    Dem

    oliti

    on o

    f ter

    min

    al b

    uild

    ing

    (Con

    trac

    t 12-

    2017

    with

    J.R.

    Vin

    agro

    , $15

    5,00

    0)

    Tem

    pora

    ry p

    asse

    nger

    tent

    (Con

    trac

    t 09-

    2018

    with

    PA

    QCO

    N, $

    186,

    000)

    Febr

    uary

    18,

    202

    05

  • BIA

    .STU

    DIO

    CO

    STS

    Orig

    inal

    des

    ign

    cont

    ract

    : $5,

    041,

    000

    Febr

    uary

    18,

    202

    06

  • BIA

    .STU

    DIO

    –CH

    AN

    GE

    ORD

    ERS

    TO D

    ATE

    Co

    nstr

    uctio

    n ad

    min

    istr

    atio

    n se

    rvic

    es (i

    nclu

    ding

    eng

    inee

    ring,

    env

    ironm

    enta

    l)

    Ant

    icip

    ated

    am

    ount

    : $3,

    157,

    000

    ($

    739,

    000

    for 2

    018;

    $65

    4,00

    0 fo

    r 201

    9; $

    667,

    000

    for 2

    020;

    $7

    05,0

    00 fo

    r 202

    1; a

    nd $

    392,

    000

    for 2

    022)

    A

    dditi

    onal

    ser

    vice

    s ab

    ove

    estim

    ate

    2018

    -202

    0: $

    612,

    234

    Te

    rmin

    al b

    uild

    ing

    desi

    gn

    B

    udge

    t: $

    2,13

    5,00

    0

    Chan

    ge o

    rder

    s: $

    652,

    492

    To

    tal t

    o da

    te: $

    2,78

    7,49

    2

    Te

    stin

    g an

    d m

    onito

    ring

    serv

    ices

    (GZA

    Envi

    ronm

    enta

    l)

    Bud

    get:

    $93

    8,66

    5

    Febr

    uary

    18,

    202

    07

  • BIA

    .STU

    DIO

    –CH

    AN

    GE

    ORD

    ERS

    TO D

    ATE

    A

    dmin

    istr

    atio

    n of

    fice

    build

    ing

    desi

    gn

    Bu

    dget

    : $81

    9,00

    0

    Chan

    ge o

    rder

    s: $

    444,

    005

    To

    tal:

    $1,2

    63,0

    05

    W

    ater

    side

    des

    ign

    Bu

    dget

    : $1,

    357,

    000

    Ch

    ange

    ord

    ers:

    $1,

    007,

    050

    To

    tal t

    o da

    te: $

    2,36

    5,05

    0

    Pe

    rmitt

    ing

    wor

    k

    Budg

    et: $

    240,

    000

    Ch

    ange

    ord

    ers:

    $53

    1,76

    7

    Tota

    l: $7

    71,7

    67Fe

    brua

    ry 1

    8, 2

    020

    8

  • JAY

    CA

    SHM

    AN

    INC

    . CO

    STS

    Orig

    inal

    con

    stru

    ctio

    n co

    ntra

    ct: $

    43,1

    43,2

    80

    Ave

    rage

    of s

    even

    bid

    s re

    ceiv

    ed: $

    53,6

    00,0

    00

    Febr

    uary

    18,

    202

    09

  • CASH

    MA

    N –

    CHA

    NG

    E O

    RDER

    S TO

    DAT

    E

    •A

    ppro

    ved

    by th

    e Bo

    ard

    –10

    cha

    nge

    orde

    rs•

    $135

    ,918

    .88

    Chan

    ge O

    rder

    18,

    add

    ition

    al p

    ile le

    ngth

    s•

    $241

    ,500

    .00

    Chan

    ge O

    rder

    20,

    tran

    spor

    t/di

    spos

    e of

    urb

    an fi

    ll at

    wha

    rf e

    xcav

    atio

    n •

    $124

    ,273

    .61

    Chan

    ge O

    rder

    27,

    add

    ition

    al w

    ork

    requ

    ired

    due

    to S

    lip 3

    she

    et p

    ile

    obst

    ruct

    ions

    •$1

    68,4

    50.5

    7Ch

    ange

    Ord

    er 3

    2, o

    bstr

    uctio

    n im

    pact

    s fo

    r 96-

    inch

    mon

    opile

    s in

    Slip

    3•

    $314

    ,862

    .41

    Chan

    ge O

    rder

    33,

    bul

    khea

    d an

    d de

    adm

    an w

    all r

    ealig

    nmen

    t in

    Slip

    3

    •$3

    98,1

    92.2

    7Ch

    ange

    Ord

    er 4

    4, a

    dditi

    onal

    wor

    k on

    mon

    opile

    8 in

    Slip

    3•

    $216

    ,289

    .69

    Chan

    ge O

    rder

    52,

    woo

    d pl

    atfo

    rm a

    nd p

    asse

    nger

    foot

    ing

    at S

    lip 1

    $159

    ,274

    .27

    Chan

    ge O

    rder

    53,

    fend

    er m

    odifi

    catio

    ns a

    nd m

    ater

    ial c

    osts

    in S

    lip 3

    •$2

    71,5

    62.7

    5Ch

    ange

    Ord

    er 5

    6, b

    argi

    ng a

    nd o

    fflo

    adin

    g ex

    cava

    ted

    mat

    eria

    ls o

    ffsi

    te

    from

    Slip

    2•

    $127

    ,410

    .03

    Chan

    ge O

    rder

    62,

    pas

    seng

    er ra

    mps

    and

    acc

    ess

    at S

    lip 1

    TOTA

    L: $

    2,15

    7,73

    4.48

    Febr

    uary

    18,

    202

    010

  • CASH

    MA

    N –

    CHA

    NG

    E O

    RDER

    S TO

    DAT

    E

    •A

    ppro

    ved

    by P

    roje

    ct M

    anag

    er, T

    reas

    urer

    and

    Gen

    eral

    Man

    ager

    –54

    cha

    nge

    orde

    rs•

    Each

    less

    than

    $10

    0,00

    0 pe

    r Par

    t F, S

    ectio

    n 2(

    B) o

    f Aut

    horit

    y Pr

    ocur

    emen

    t Pol

    icy

    TOTA

    L:

    $2,1

    86,6

    99.1

    8CH

    AN

    GE

    ORD

    ERS

    TO D

    ATE:

    $4

    ,344

    ,333

    .66

    Maj

    or re

    ason

    s fo

    r cha

    nge

    orde

    rs to

    dat

    e•

    Obs

    truc

    tions

    enc

    ount

    ered

    whi

    le p

    ile d

    rivin

    g•

    Del

    ays

    in c

    onst

    ruct

    ion

    and

    wor

    k ac

    cele

    rate

    d to

    mee

    t sch

    edul

    e pr

    ior t

    o re

    sum

    ptio

    n of

    su

    mm

    er s

    easo

    n •

    Sout

    hern

    mos

    t slip

    cha

    nges

    for o

    pera

    tiona

    l nee

    ds (p

    asse

    nger

    pla

    tfor

    m, o

    il sh

    ed

    conv

    ersi

    on to

    pas

    seng

    er s

    helte

    r, in

    stal

    latio

    n of

    bus

    she

    lter)

    •Si

    te e

    xcav

    atio

    n an

    d fil

    l rem

    oval

    Bulk

    head

    failu

    re in

    Slip

    3Fe

    brua

    ry 1

    8, 2

    020

    11

  • WH

    AT’

    S TO

    CO

    ME

    Febr

    uary

    18,

    202

    012

  • FUTU

    RE C

    OST

    S, K

    NO

    WN

    AN

    D U

    NK

    NO

    WN

    Upc

    omin

    g ch

    ange

    ord

    ers

    and

    proj

    ect p

    hase

    s

    A

    nti-s

    cour

    pad

    des

    ign

    and

    cons

    truc

    tion

    B

    ulkh

    ead

    rem

    edia

    tion

    to th

    e no

    rth

    of S

    lip 3

    Co

    nstr

    uctio

    n ad

    min

    istr

    atio

    n se

    rvic

    es 2

    021

    and

    beyo

    nd

    Te

    rmin

    al b

    uild

    ing/

    utili

    ty b

    uild

    ing

    desi

    gn a

    nd c

    onst

    ruct

    ion

    Pote

    ntia

    l cha

    nge

    orde

    rs

    O

    bstr

    uctio

    ns d

    urin

    g Sl

    ip 1

    (sou

    ther

    nmos

    t slip

    ) and

    sou

    ther

    n pa

    ssen

    ger p

    ier

    cons

    truc

    tion.

    Wor

    k to

    beg

    in fa

    ll 20

    20.

    Febr

    uary

    18,

    202

    013

  • QU

    ESTI

    ON

    S?

    Febr

    uary

    18,

    202

    014

  •  

    Page 4

    EXHIBIT B

    Woods Hole Reconstruction Project Cost Summation Spreadsheets

  •  

    Page 5

    EXHIBIT C

    Woods Hole Reconstruction Project Change Order Summaries

  • Sheet 11 2 3 4

    ORIGINAL CHANGE CHANGE REVISEDPROJECT ORDER ORDER PROJECT

    DESCRIPTION AMOUNT NUMBER AMOUNT TOTAL

    1 Changed electrical work 43,143,280.00 1 12,490.85 43,155,770.85 12 Removal of unsuitable fill 2 96,540.00 43,252,310.85 23 Electrical enabling work 3 32,354.47 43,284,665.32 34 Telecommunications enabling work 4 27,011.60 43,311,676.92 45 Changes to power supply for slip 2 transfer bridge 5 6,333.66 43,318,010.58 56 Additional 5 removable bollards 6 10,023.83 43,328,034.41 67 Furnish/deliver 2 replacement fenders 7 68,134.24 43,396,168.65 78 Modifications to relocated passenger platform 8 49,217.49 43,445,386.14 89 Recovery for lost time on dolphin/platform work 9 75,483.57 43,520,869.71 9

    10 Additional cost for contaminated soil disposal 10 16,272.84 43,537,142.55 1011 Additional work at fender 28 11 75,959.92 43,613,102.47 1112 Support SSA staff for upgrades to slip #2 (exp 404104) 12 31,453.88 43,644,556.35 1213 Rehab/improve slip 3 bollard 13 49,241.97 43,693,798.32 1314 Accelerated excavation 14 5,967.34 43,699,765.66 1415 Added gangway electrical work 15 19,973.27 43,719,738.93 1516 Additional paving 16 11,783.15 43,731,522.08 1617 Impact/on-site work required due to UST discovery 17 60,353.06 43,791,875.14 1718 Additional pile length and extension impacts 18 135,918.88 43,927,794.02 1819 Float pile guide changes 19 26,061.62 43,953,855.64 1920 Transport/dispose of urban fill at wharf excavation 20 241,500.00 44,195,355.64 2021 Study pile length alternatives 21 9,879.23 44,205,234.87 2122 Pre-trench below 10' for obstructions 22 84,841.68 44,290,076.55 2223 Study on and testing of pile length alternatives 23 21,352.71 44,311,429.26 2324 Handle, store, and manage excess soils at L. Lynch 24 41,676.18 44,353,105.44 2425 Additional obstruction impacts during Deadman removal 25 87,030.74 44,440,136.18 2526 Soil loadout delays 26 21,013.88 44,461,150.06 2627 Add'l work required due to obstructions slip 3 sheet pile 27 124,273.61 44,585,423.67 2728 Supply and install additional tie rod 28 5,595.09 44,591,018.76 2829 Revisions to sheet wall CIP Capwall 29 38,863.12 44,629,881.88 2930 Phase 2B Catwalk length revisions 30 68,706.95 44,698,588.83 3031 Change to wale system northwest corner 31 18,553.46 44,717,142.29 3132 Change for obstruction impacts 96" monopile driving 32 168,450.57 44,885,592.86 3233 Change for bulkhead and Deadman wall realignment 33 314,862.41 45,200,455.27 3334 Changes in orientation distribution panels Slip #3 34 38,059.09 45,238,514.36 3435 Obstructions encountered bulkhead at Slip #3 35 76,413.34 45,314,927.70 3536 Add guardrails around mooring bollards 36 88,737.93 45,403,665.63 3637 Add lights for electrical maintenance 37 3,357.33 45,407,022.96 3738 Moniz Pit monitoring and maintenance 38 36,283.77 45,443,306.73 3839 Sheet pile survey monitoring program 39 28,668.09 45,471,974.82 3940 Pile driving Testing Impacts 40 48,535.73 45,520,510.55 4041 Schedule recovery due to delays: 22,28,29,34,35,36 41 94,254.69 45,614,765.24 4142 Transfer Bridge 42 25,397.04 45,640,162.28 4243 Storage of dredge materials 43 11,188.76 45,651,351.04 4344 Changes for additional work on monopile 9 44 398,192.27 46,049,543.31 4445 electrical changes for Slip 3 45 18,149.59 46,067,692.90 4546 Change for geometry changes to gallows & cap 46 37,952.31 46,105,645.21 4647 Alternate Pile coating 47 73,116.73 46,178,761.94 4748 Slip 3 boundary fence and delays w/ pipe pile 48 76,123.38 46,254,885.32 4849 Unknown obstruction delays during utility installations 49 5,389.31 46,260,274.63 4950 Slip 3#3 Fender Modifications 50 94,593.64 46,354,868.27 50

    3,211,588.27 7.4%

    08/19/201910/09/2019

    07/11/201907/11/201907/11/201907/31/201908/07/201908/19/2019

    03/31/201903/31/201904/23/201904/23/201907/11/201907/11/2019

    02/28/201903/19/201903/19/201903/31/201903/31/201903/31/2019

    12/21/201801/15/201902/19/201901/18/201901/18/201902/22/2019

    10/16/201810/24/201811/02/201811/19/201812/17/2018

    08/31/2018

    Jay Cashman, IncWoods Hole Terminal Reconstruction Marine Work

    Contract # 16-2017

    DATE

    02/05/201802/20/2018

    05/23/201805/17/201804/23/2018

    07/17/201807/17/201807/17/201807/25/201809/25/2018

    05/30/201806/20/201807/17/2018

    02/20/201802/20/201803/12/201803/23/201805/08/2019

  • Sheet 21 2 3 4

    ORIGINAL CHANGE CHANGE REVISEDPROJECT ORDER ORDER PROJECT

    DESCRIPTION AMOUNT NUMBER AMOUNT TOTALBalance from Sheet 1 46,354,868.27

    1 Moniz Pit SWPP 51 15,648.07 46,370,516.34 12 Added Slip #2 Passenger Footing & Wood Platform 52 216,289.69 46,586,806.03 23 Fender Modifications and Material Cost 53 159,274.27 46,746,080.30 34 North Wharf 16in diameter Pile Modifications 54 38,841.38 46,784,921.68 45 Supply 200 LF of Precast Concrete Barrier 55 9,987.12 46,794,908.80 56 Barging and Offloading Excavatec Materials Offsite 56 271,562.75 47,066,471.55 67 Precast Paver Additional Stock 57 14,548.43 47,081,019.98 78 Changes due to ASI 9, 9R & 10 58 14,000.13 47,095,020.11 89 Canopy Column Cap Plate Detail Revisions 59 28,508.54 47,123,528.65 9

    10 Telecommunication & Electrical at Slip 2 60 68,784.57 47,192,313.22 1011 Modifications to Bollard Platform at MP#9 61 14,249.31 47,206,562.53 1112 Slip 2 Passenger Ramps and Access 62 127,410.03 47,333,972.56 1213 Premium hours for phase 3 operations 63 75,935.44 47,409,908.00 1314 Premium hours for phase 3 operations 64 77,705.66 47,487,613.66 1415 65 1516 66 1617 67 1718 68 1819 69 1920 70 2021 71 2122 72 2223 73 2324 74 2425 75 2526 76 2627 77 2728 78 2829 79 2930 80 3031 81 3132 82 3233 83 3334 84 3435 85 3536 86 3637 87 3738 88 3839 89 3940 90 4041 91 4142 92 4243 93 4344 94 4445 95 4546 96 4647 97 4748 98 4849 99 4950 100 50

    4,344,333.66 10.1%

    01/22/2020

    11/20/201911/20/201911/20/201911/20/201912/11/201912/18/201912/18/2019

    10/09/201910/16/201910/16/201911/04/201911/04/201911/19/2019

    Jay Cashman, IncWoods Hole Terminal Reconstruction Marine Work

    Contract # 16-2017

    DATE

  • Sheet 11 2 3 4

    ORIGINAL CHANGE CHANGE REVISEDPROJECT ORDER ORDER PROJECT

    DESCRIPTION AMOUNT NUMBER AMOUNT TOTAL

    1 MEPA permit support, vessel measurement A 5,041,000.00 1 35,809.00 5,076,809.00 12 Geotechnical & environmental services A 2 43,422.00 5,120,231.00 2 3 Geotechnical & environmental services A 3 57,606.00 5,177,837.00 34 Asbestos & haxardous assessment A 4 9,460.00 5,187,297.00 45 Provide add'l asbestos & haz assessment A 5 7,205.00 5,194,502.00 56 Add'l groundwater monitoring, data evaluatio A 6 11,137.00 5,205,639.00 67 GZA to provide add'l borings, test & analysis A 7 20,900.00 5,226,539.00 78 Multiple support tasks, alternatives A 8 28,718.00 5,255,257.00 89 Support services for utilities incentives A 9 20,000.00 5,275,257.00 9

    10 GZA Environmental probing for obstructions A 10 232,968.00 5,508,225.00 1011 GZA support tasks for ENF and NOI A 11 27,543.00 5,535,768.00 1112 Geotechnical review of peat & organic silt A 12 33,527.00 5,569,295.00 1213 GZA design sewage pumping station A 13 39,930.00 5,609,225.00 1314 MAAB Vessel Variance Application A 14 22,579.00 5,631,804.00 1415 GZA eelgrass study per Fal. Conservation C A 15 23,430.00 5,655,234.00 1516 Prequalification submission reviews A 16 5,850.00 5,661,084.00 1617 Provide Environmental Monitoring Services A 17 533,390.00 6,194,474.00 1718 GZA to perform topographic & bathymetric A 18 34,540.00 6,229,014.00 1819 Admin office add'l server racks and HVAC A 19 20,439.00 6,249,453.00 1920 Comuter generated 3D visualization Admin O A 20 12,000.00 6,261,453.00 2021 Technical support for Administrative appeal A 21 29,150.00 6,290,603.00 2122 Add'l waterside subsurface investigation A 22 49,802.00 6,340,405.00 2223 Owner Testing Services for quality control A 23 159,500.00 6,499,905.00 2324 Marine design review service (GZA & Childs A 24 11,000.00 6,510,905.00 2425 Conf Rm Sound System, Security revisions A 25 20,630.00 6,531,535.00 2526 Provide assitance in office systems furniture A 26 14,500.00 6,546,035.00 2627 Changes to security & telecom. A 27 2,740.00 6,548,775.00 2728 Provide marine design services-peer review A 28 11,000.00 6,559,775.00 2829 Initial eelgrass survey - Order of Conditions A 29 23,430.00 6,583,205.00 2930 Evaluate hydrostatic/hydrodynamic load A 30 7,150.00 6,590,355.00 3031 Study bulkhead canopy options A 31 49,274.00 6,639,629.00 3132 Provide D&C for master key & split rm 219 A 32 6,460.00 6,646,089.00 3233 Electrical and Data supply for furniture A 33 7,850.00 6,653,939.00 3334 Additional admin svcs during construction A 34 82,306.00 6,736,245.00 3435 Owners testing for Phases 2-4 of waterside c A 35 938,665.00 7,674,910.00 3536 Construction Admin Svcs waterside A 36 739,000.00 8,413,910.00 3637 Additional admin svcs during construction A 37 41,800.00 8,455,710.00 3738 Additional admin svcs during construction A 38 42,100.00 8,497,810.00 3839 Additional site/engineering/bid phase svcs A 39 90,314.00 8,588,124.00 3940 Additional admin svcs during construction A 40 25,000.00 8,613,124.00 4041 Additional landscape design svcs SSA GO A 41 5,720.00 8,618,844.00 4142 GZA dynamic pile load testing services A 42 15,452.00 8,634,296.00 4243 Allow vibration monitoring in con admin A 43 0.00 8,634,296.00 4344 Allow additional services in con admin A 44 0.00 8,634,296.00 4445 Design delays and more schematic work A 45 237,275.00 8,871,571.00 4546 Extend schematic design work for terminal A 46 49,798.00 8,921,369.00 4647 Additional time/materials new terminal desig A 47 30,000.00 8,951,369.00 4748 Community participation 10/2018 - 01/2019 A 48 75,000.00 9,026,369.00 4849 2019 Construction Admin services A 49 824,280.00 9,850,649.00 4950 2019 Construction Admin services GZA A 50 253,908.00 10,104,557.00 50

    5,063,557.00 100.4%

    06/11/2015

    Bertaux + Iwerks ArchitectsWoods Hole Terminal Reconstruction Project

    Contract # 09B-2012

    DATE

    06/11/2015

    06/22/2016

    09/28/201509/30/201510/22/201512/21/201512/30/201502/25/201603/18/201603/18/201603/18/201603/30/201604/20/2016

    03/27/2017

    06/22/201608/04/201609/27/201609/16/201610/26/201611/16/201611/16/201611/29/201612/07/201612/07/201602/20/2017

    02/28/2018

    05/08/201705/08/201705/25/201707/25/201707/26/201709/29/201710/11/201711/07/201711/07/201712/07/201701/24/2018

    02/19/2019

    03/04/201805/04/201805/16/201805/31/201806/14/201806/14/201809/25/201808/23/201808/31/201812/04/201802/19/2019

  • Sheet 21 2 3 4

    ORIGINAL CHANGE CHANGE REVISEDPROJECT ORDER ORDER PROJECT

    DESCRIPTION AMOUNT NUMBER AMOUNT TOTAL

    1 Balance Forward from Sheet 1 5,041,000.00 5,063,557.00 10,104,557.00 12 Hydrographic beach survey to south slip 2 A 51 50,765.00 10,155,322.00 2 3 Study of WH Terminal Building changes A 52 99,000.00 10,254,322.00 34 Marine engineering changes - Childs & GZA A 53 301,581.00 10,555,903.00 45 Woods Hole Ferry reconstruction admin A 54 1,179,600.00 11,735,503.00 56 A 55 67 A 56 78 A 57 89 A 58 9

    10 A 59 1011 A 60 1112 A 61 1213 A 62 1314 A 63 1415 A 64 1516 A 65 1617 A 66 1718 A 67 1819 A 68 1920 A 69 2021 A 70 2122 A 71 2223 A 72 2324 A 73 2425 A 74 2526 A 75 2627 A 76 2728 A 77 2829 A 78 2930 A 79 3031 A 80 3132 A 81 3233 A 82 3334 A 83 3435 A 84 3536 A 85 3637 A 86 3738 A 87 3839 A 88 3940 A 89 4041 A 90 4142 A 91 4243 A 92 4344 A 93 4445 A 94 4546 A 95 4647 A 96 4748 A 97 4849 A 98 4950 A 99 50

    6,694,503.00 132.8%

    Bertaux + Iwerks ArchitectsWoods Hole Terminal Reconstruction Project

    Contract # 09B-2012

    DATE

    04/21/201906/28/201911/19/201912/18/2019

    20200218 WHTRP cost presentation.pdfWoods hole terminal reconstruction projectCost Breakdown by Project elementProject historyAwarded contractsAwarded contractsBIA.Studio COSTSBIA.STUDIO – CHANGE ORDERS TO DATEBIA.STUDIO – CHANGE ORDERS TO DATEJAY CASHMAN INC. COSTSCashman – change orders to dateCashman – change orders to dateWhat’s to comeFuture costs, known and unknownQuestions?