TO:
FOR: FROM:
General Manager
Vote Dept.: General Manager
Author: Robert B. Davis
x
Board Members
x Information Subject: Report on Woods Hole Terminal Reconstruction Project Timeline and Budget
STAFF SUMMARY Date: February 17, 2020 File# GM-739
PURPOSE: To advise the Members and the Port Council of the results thus far of the staff’s review of the Woods Hole Terminal Reconstruction Project Timeline and Budget. BACKGROUND: On Tuesday, January 21, 2020, I provided an update on the Woods Hole Terminal Reconstruction Project to the Members and the attendees at the Authority’s monthly meeting.
Later in the meeting, I presented Change Order No. 53 to Contract No. 9B-2012, “Woods Hole Terminal Design Services” from BIA.Studio, which seeks an additional $885,681 in fees relating to schematic design services for the recently approved one-story terminal building and two-story utility building, the existing temporary terminal building and the previously submitted two-story terminal designs that did not obtain approvals. During my presentation, some Members expressed concern about Change Order No. 53 and requested (1) an independent review of the reasonableness of BIA.Studio’s fees and (2) a projected total cost for BIA.Studio to complete the project. Some Members also expressed concerns about the costs submitted by marine contractor, Jay Cashman, Inc. Consideration of Change Order No. 53 was postponed pending the results of an independent review of the reasonableness of BIA.Studio’s fees.
Following the Members’ meeting on January 21, 2020, I instructed staff to produce a
complete and updated accounting of BIA.Studio’s Contract No. 9B-2012 and Jay Cashman, Inc.’s Contract No. 16-2017, including all change orders. In addition, I instructed staff to investigate potential vendors to complete an independent review of BIA.Studio’s fees. To date, staff have contacted the State Designer Selection Board, which declined to provide any referrals to review the reasonableness of BIA.Studio’s fees. Efforts to source a qualified reviewer continue at the present writing. Meanwhile, I have requested that former General Counsel, Steven Sayers, review the accounting of BIA.Studio’s fees in conjunction with the language of Contract No. 9B-2012 to determine whether the fees are aligned with the applicable contractual terms and conditions.
Staff have also compiled a full and complete accounting of BIA.Studio’s Contract No.
-
Page 2
9B-2012 and Jay Cashman, Inc.’s Contract No. 16-2017, including all change orders. A summation of staff’s accounting is illustrated in a PowerPoint presentation attached hereto as Exhibit A and in spreadsheets attached hereto as Exhibit B. Applicable change orders for BIA.Studios and Jay Cashman, Inc. are summarized in spreadsheets attached hereto as Exhibit C. RECOMMENDATION: This summary and its attachments are provided for informational purposes. In light of the information presented, it is my recommendation that the Authority complete its review of the accounting of BIA.Studio’s Contract No. 9B-2012 and Jay Cashman, Inc.’s Contract No. 16-2017, including all change orders, and determine the results of Attorney Sayers’ review of BIA.Studio’s Contract No. 9B-2012 before committing additional funds to pay for an independent review of BIA.Studio’s fees. In addition, staff should continue its investigation into sourcing potential vendors to perform an independent review of BIA.Studio’s fees, including obtaining reliable estimates concerning the costs of such a review. ____________________________ Robert B. Davis General Manager
-
Page 3
EXHIBIT A
PowerPoint Presentation - Summation of Staff’s Accounting of BIA.Studio’s Contract No. 9B-2012 and Jay Cashman, Inc.’s Contract No. 16-2017 as of February 17, 2020
-
WO
OD
S H
OLE
TER
MIN
AL
REC
ON
STR
UC
TIO
N P
RO
JEC
TPr
ojec
t cos
t upd
ate
Stea
msh
ip A
utho
rity
Boar
d &
Por
t Cou
ncil
mee
ting
Febr
uary
18,
202
0
-
COST
BRE
AK
DO
WN
BY
PRO
JECT
ELE
MEN
T
Bu
dget
Net
Cha
nge
Ord
ers*
To
tal c
ost
Feas
ibili
ty S
tudy
30
0,00
0$
69
3,20
4$
99
3,20
4$
Ad
min
istr
atio
n Bu
ildin
g14
,824
,886
$
97
0,99
3$
15
,795
,879
$
Te
mpo
rary
Ter
min
al B
uild
ing
2,75
4,18
2$
274,
013
$
3,02
8,19
5$
Wat
ersi
de
54,5
47,9
15$
2,51
3,34
1$
57,0
61,2
56$
Perm
anen
t Ter
min
al B
uild
ing
& S
tora
ge B
uild
ing
15,2
36,2
57$
652,
492
$
15,8
88,7
49$
Woo
ds H
ole
Term
inal
Rec
onst
ruct
ion
Tota
l87
,663
,240
$
5,
104,
043
$
92
,767
,283
$
*Inc
lude
s add
ition
al se
rvic
es, r
egul
ator
y re
quire
men
ts, a
nd ch
ange
s to
scop
e of
cont
ract
Febr
uary
18,
202
02
Sheet1
BudgetNet Change Orders* Total cost
Feasibility Study $ 300,000$ 693,204$ 993,204
Administration Building$ 14,824,886$ 970,993$ 15,795,879
Temporary Terminal Building$ 2,754,182$ 274,013$ 3,028,195
Waterside $ 54,547,915$ 2,513,341$ 57,061,256
Permanent Terminal Building & Storage Building$ 15,236,257$ 652,492$ 15,888,749
Woods Hole Terminal Reconstruction Total$ 87,663,240$ 5,104,043$ 92,767,283
*Includes additional services, regulatory requirements, and changes to scope of contract
-
PR
OJE
CT
HIS
TOR
Y
Febr
uary
18,
202
03
-
AWA
RDED
CO
NTR
ACT
S
Fe
asib
ility
stu
dy (C
ontr
act 0
9-20
12, B
IA.s
tudi
o*)
Bo
ard
appr
oved
aw
ard
Apr
il 16
, 201
3
Cove
red
publ
ic m
eetin
gs a
nd p
rese
ntat
ions
; ter
min
al, s
ite &
cus
tom
er e
xper
ienc
e pl
anni
ng
Cont
ract
am
ount
: $30
0,00
0
W
oods
Hol
e Te
rmin
al D
esig
n (C
ontr
act 0
9B-2
012,
BIA
.stu
dio*
)
Boar
d ap
prov
ed a
war
d A
pril
21, 2
015
Co
vers
per
mitt
ing,
sch
emat
ic d
esig
n, c
onst
ruct
ion
docu
men
ts, c
onst
ruct
ion
adm
inis
trat
ion
Co
ntra
ct a
mou
nt: $
5,04
1,00
0
A
dmin
istr
atio
n bu
ildin
g co
nstr
uctio
n (C
ontr
act 1
6-20
16, G
&R
Cons
truc
tion)
Bo
ard
appr
oved
aw
ard
Oct
ober
18,
201
6
Cove
red
cons
truc
tion
of A
utho
rity’
s ad
min
istr
ativ
e of
fices
Cont
ract
am
ount
: $12
,687
,000
Febr
uary
18,
202
04
-
AWA
RDED
CO
NTR
ACT
S
Te
mpo
rary
term
inal
bui
ldin
g (C
ontr
act 2
3-20
16, T
rium
ph M
odul
ar)
Bo
ard
appr
oved
aw
ard
Nov
embe
r 15,
201
6
Cove
red
mod
ular
tem
pora
ry te
rmin
al b
uild
ing
at th
e W
oods
Hol
e te
rmin
al
Cont
ract
am
ount
: $2,
591,
182
W
ater
side
con
stru
ctio
n co
ntra
ct (C
ontr
act 1
7-20
17, J
ay C
ashm
an In
c.)
Bo
ard
appr
oved
aw
ard
Dec
embe
r 5, 2
017
Co
vers
Pha
ses
2-4
of w
ater
side
wor
k (d
emol
ition
and
con
stru
ctio
n of
thre
e fe
rry
slip
s)
Cont
ract
am
ount
: $43
,143
,280
O
ther
con
trac
ts a
ppro
ved
by B
oard
:
Dem
oliti
on o
f ter
min
al b
uild
ing
(Con
trac
t 12-
2017
with
J.R.
Vin
agro
, $15
5,00
0)
Tem
pora
ry p
asse
nger
tent
(Con
trac
t 09-
2018
with
PA
QCO
N, $
186,
000)
Febr
uary
18,
202
05
-
BIA
.STU
DIO
CO
STS
Orig
inal
des
ign
cont
ract
: $5,
041,
000
Febr
uary
18,
202
06
-
BIA
.STU
DIO
–CH
AN
GE
ORD
ERS
TO D
ATE
Co
nstr
uctio
n ad
min
istr
atio
n se
rvic
es (i
nclu
ding
eng
inee
ring,
env
ironm
enta
l)
Ant
icip
ated
am
ount
: $3,
157,
000
($
739,
000
for 2
018;
$65
4,00
0 fo
r 201
9; $
667,
000
for 2
020;
$7
05,0
00 fo
r 202
1; a
nd $
392,
000
for 2
022)
A
dditi
onal
ser
vice
s ab
ove
estim
ate
2018
-202
0: $
612,
234
Te
rmin
al b
uild
ing
desi
gn
B
udge
t: $
2,13
5,00
0
Chan
ge o
rder
s: $
652,
492
To
tal t
o da
te: $
2,78
7,49
2
Te
stin
g an
d m
onito
ring
serv
ices
(GZA
Envi
ronm
enta
l)
Bud
get:
$93
8,66
5
Febr
uary
18,
202
07
-
BIA
.STU
DIO
–CH
AN
GE
ORD
ERS
TO D
ATE
A
dmin
istr
atio
n of
fice
build
ing
desi
gn
Bu
dget
: $81
9,00
0
Chan
ge o
rder
s: $
444,
005
To
tal:
$1,2
63,0
05
W
ater
side
des
ign
Bu
dget
: $1,
357,
000
Ch
ange
ord
ers:
$1,
007,
050
To
tal t
o da
te: $
2,36
5,05
0
Pe
rmitt
ing
wor
k
Budg
et: $
240,
000
Ch
ange
ord
ers:
$53
1,76
7
Tota
l: $7
71,7
67Fe
brua
ry 1
8, 2
020
8
-
JAY
CA
SHM
AN
INC
. CO
STS
Orig
inal
con
stru
ctio
n co
ntra
ct: $
43,1
43,2
80
Ave
rage
of s
even
bid
s re
ceiv
ed: $
53,6
00,0
00
Febr
uary
18,
202
09
-
CASH
MA
N –
CHA
NG
E O
RDER
S TO
DAT
E
•A
ppro
ved
by th
e Bo
ard
–10
cha
nge
orde
rs•
$135
,918
.88
Chan
ge O
rder
18,
add
ition
al p
ile le
ngth
s•
$241
,500
.00
Chan
ge O
rder
20,
tran
spor
t/di
spos
e of
urb
an fi
ll at
wha
rf e
xcav
atio
n •
$124
,273
.61
Chan
ge O
rder
27,
add
ition
al w
ork
requ
ired
due
to S
lip 3
she
et p
ile
obst
ruct
ions
•$1
68,4
50.5
7Ch
ange
Ord
er 3
2, o
bstr
uctio
n im
pact
s fo
r 96-
inch
mon
opile
s in
Slip
3•
$314
,862
.41
Chan
ge O
rder
33,
bul
khea
d an
d de
adm
an w
all r
ealig
nmen
t in
Slip
3
•$3
98,1
92.2
7Ch
ange
Ord
er 4
4, a
dditi
onal
wor
k on
mon
opile
8 in
Slip
3•
$216
,289
.69
Chan
ge O
rder
52,
woo
d pl
atfo
rm a
nd p
asse
nger
foot
ing
at S
lip 1
•
$159
,274
.27
Chan
ge O
rder
53,
fend
er m
odifi
catio
ns a
nd m
ater
ial c
osts
in S
lip 3
•$2
71,5
62.7
5Ch
ange
Ord
er 5
6, b
argi
ng a
nd o
fflo
adin
g ex
cava
ted
mat
eria
ls o
ffsi
te
from
Slip
2•
$127
,410
.03
Chan
ge O
rder
62,
pas
seng
er ra
mps
and
acc
ess
at S
lip 1
TOTA
L: $
2,15
7,73
4.48
Febr
uary
18,
202
010
-
CASH
MA
N –
CHA
NG
E O
RDER
S TO
DAT
E
•A
ppro
ved
by P
roje
ct M
anag
er, T
reas
urer
and
Gen
eral
Man
ager
–54
cha
nge
orde
rs•
Each
less
than
$10
0,00
0 pe
r Par
t F, S
ectio
n 2(
B) o
f Aut
horit
y Pr
ocur
emen
t Pol
icy
TOTA
L:
$2,1
86,6
99.1
8CH
AN
GE
ORD
ERS
TO D
ATE:
$4
,344
,333
.66
Maj
or re
ason
s fo
r cha
nge
orde
rs to
dat
e•
Obs
truc
tions
enc
ount
ered
whi
le p
ile d
rivin
g•
Del
ays
in c
onst
ruct
ion
and
wor
k ac
cele
rate
d to
mee
t sch
edul
e pr
ior t
o re
sum
ptio
n of
su
mm
er s
easo
n •
Sout
hern
mos
t slip
cha
nges
for o
pera
tiona
l nee
ds (p
asse
nger
pla
tfor
m, o
il sh
ed
conv
ersi
on to
pas
seng
er s
helte
r, in
stal
latio
n of
bus
she
lter)
•Si
te e
xcav
atio
n an
d fil
l rem
oval
•
Bulk
head
failu
re in
Slip
3Fe
brua
ry 1
8, 2
020
11
-
WH
AT’
S TO
CO
ME
Febr
uary
18,
202
012
-
FUTU
RE C
OST
S, K
NO
WN
AN
D U
NK
NO
WN
Upc
omin
g ch
ange
ord
ers
and
proj
ect p
hase
s
A
nti-s
cour
pad
des
ign
and
cons
truc
tion
B
ulkh
ead
rem
edia
tion
to th
e no
rth
of S
lip 3
Co
nstr
uctio
n ad
min
istr
atio
n se
rvic
es 2
021
and
beyo
nd
Te
rmin
al b
uild
ing/
utili
ty b
uild
ing
desi
gn a
nd c
onst
ruct
ion
Pote
ntia
l cha
nge
orde
rs
O
bstr
uctio
ns d
urin
g Sl
ip 1
(sou
ther
nmos
t slip
) and
sou
ther
n pa
ssen
ger p
ier
cons
truc
tion.
Wor
k to
beg
in fa
ll 20
20.
Febr
uary
18,
202
013
-
QU
ESTI
ON
S?
Febr
uary
18,
202
014
-
Page 4
EXHIBIT B
Woods Hole Reconstruction Project Cost Summation Spreadsheets
-
Page 5
EXHIBIT C
Woods Hole Reconstruction Project Change Order Summaries
-
Sheet 11 2 3 4
ORIGINAL CHANGE CHANGE REVISEDPROJECT ORDER ORDER PROJECT
DESCRIPTION AMOUNT NUMBER AMOUNT TOTAL
1 Changed electrical work 43,143,280.00 1 12,490.85 43,155,770.85 12 Removal of unsuitable fill 2 96,540.00 43,252,310.85 23 Electrical enabling work 3 32,354.47 43,284,665.32 34 Telecommunications enabling work 4 27,011.60 43,311,676.92 45 Changes to power supply for slip 2 transfer bridge 5 6,333.66 43,318,010.58 56 Additional 5 removable bollards 6 10,023.83 43,328,034.41 67 Furnish/deliver 2 replacement fenders 7 68,134.24 43,396,168.65 78 Modifications to relocated passenger platform 8 49,217.49 43,445,386.14 89 Recovery for lost time on dolphin/platform work 9 75,483.57 43,520,869.71 9
10 Additional cost for contaminated soil disposal 10 16,272.84 43,537,142.55 1011 Additional work at fender 28 11 75,959.92 43,613,102.47 1112 Support SSA staff for upgrades to slip #2 (exp 404104) 12 31,453.88 43,644,556.35 1213 Rehab/improve slip 3 bollard 13 49,241.97 43,693,798.32 1314 Accelerated excavation 14 5,967.34 43,699,765.66 1415 Added gangway electrical work 15 19,973.27 43,719,738.93 1516 Additional paving 16 11,783.15 43,731,522.08 1617 Impact/on-site work required due to UST discovery 17 60,353.06 43,791,875.14 1718 Additional pile length and extension impacts 18 135,918.88 43,927,794.02 1819 Float pile guide changes 19 26,061.62 43,953,855.64 1920 Transport/dispose of urban fill at wharf excavation 20 241,500.00 44,195,355.64 2021 Study pile length alternatives 21 9,879.23 44,205,234.87 2122 Pre-trench below 10' for obstructions 22 84,841.68 44,290,076.55 2223 Study on and testing of pile length alternatives 23 21,352.71 44,311,429.26 2324 Handle, store, and manage excess soils at L. Lynch 24 41,676.18 44,353,105.44 2425 Additional obstruction impacts during Deadman removal 25 87,030.74 44,440,136.18 2526 Soil loadout delays 26 21,013.88 44,461,150.06 2627 Add'l work required due to obstructions slip 3 sheet pile 27 124,273.61 44,585,423.67 2728 Supply and install additional tie rod 28 5,595.09 44,591,018.76 2829 Revisions to sheet wall CIP Capwall 29 38,863.12 44,629,881.88 2930 Phase 2B Catwalk length revisions 30 68,706.95 44,698,588.83 3031 Change to wale system northwest corner 31 18,553.46 44,717,142.29 3132 Change for obstruction impacts 96" monopile driving 32 168,450.57 44,885,592.86 3233 Change for bulkhead and Deadman wall realignment 33 314,862.41 45,200,455.27 3334 Changes in orientation distribution panels Slip #3 34 38,059.09 45,238,514.36 3435 Obstructions encountered bulkhead at Slip #3 35 76,413.34 45,314,927.70 3536 Add guardrails around mooring bollards 36 88,737.93 45,403,665.63 3637 Add lights for electrical maintenance 37 3,357.33 45,407,022.96 3738 Moniz Pit monitoring and maintenance 38 36,283.77 45,443,306.73 3839 Sheet pile survey monitoring program 39 28,668.09 45,471,974.82 3940 Pile driving Testing Impacts 40 48,535.73 45,520,510.55 4041 Schedule recovery due to delays: 22,28,29,34,35,36 41 94,254.69 45,614,765.24 4142 Transfer Bridge 42 25,397.04 45,640,162.28 4243 Storage of dredge materials 43 11,188.76 45,651,351.04 4344 Changes for additional work on monopile 9 44 398,192.27 46,049,543.31 4445 electrical changes for Slip 3 45 18,149.59 46,067,692.90 4546 Change for geometry changes to gallows & cap 46 37,952.31 46,105,645.21 4647 Alternate Pile coating 47 73,116.73 46,178,761.94 4748 Slip 3 boundary fence and delays w/ pipe pile 48 76,123.38 46,254,885.32 4849 Unknown obstruction delays during utility installations 49 5,389.31 46,260,274.63 4950 Slip 3#3 Fender Modifications 50 94,593.64 46,354,868.27 50
3,211,588.27 7.4%
08/19/201910/09/2019
07/11/201907/11/201907/11/201907/31/201908/07/201908/19/2019
03/31/201903/31/201904/23/201904/23/201907/11/201907/11/2019
02/28/201903/19/201903/19/201903/31/201903/31/201903/31/2019
12/21/201801/15/201902/19/201901/18/201901/18/201902/22/2019
10/16/201810/24/201811/02/201811/19/201812/17/2018
08/31/2018
Jay Cashman, IncWoods Hole Terminal Reconstruction Marine Work
Contract # 16-2017
DATE
02/05/201802/20/2018
05/23/201805/17/201804/23/2018
07/17/201807/17/201807/17/201807/25/201809/25/2018
05/30/201806/20/201807/17/2018
02/20/201802/20/201803/12/201803/23/201805/08/2019
-
Sheet 21 2 3 4
ORIGINAL CHANGE CHANGE REVISEDPROJECT ORDER ORDER PROJECT
DESCRIPTION AMOUNT NUMBER AMOUNT TOTALBalance from Sheet 1 46,354,868.27
1 Moniz Pit SWPP 51 15,648.07 46,370,516.34 12 Added Slip #2 Passenger Footing & Wood Platform 52 216,289.69 46,586,806.03 23 Fender Modifications and Material Cost 53 159,274.27 46,746,080.30 34 North Wharf 16in diameter Pile Modifications 54 38,841.38 46,784,921.68 45 Supply 200 LF of Precast Concrete Barrier 55 9,987.12 46,794,908.80 56 Barging and Offloading Excavatec Materials Offsite 56 271,562.75 47,066,471.55 67 Precast Paver Additional Stock 57 14,548.43 47,081,019.98 78 Changes due to ASI 9, 9R & 10 58 14,000.13 47,095,020.11 89 Canopy Column Cap Plate Detail Revisions 59 28,508.54 47,123,528.65 9
10 Telecommunication & Electrical at Slip 2 60 68,784.57 47,192,313.22 1011 Modifications to Bollard Platform at MP#9 61 14,249.31 47,206,562.53 1112 Slip 2 Passenger Ramps and Access 62 127,410.03 47,333,972.56 1213 Premium hours for phase 3 operations 63 75,935.44 47,409,908.00 1314 Premium hours for phase 3 operations 64 77,705.66 47,487,613.66 1415 65 1516 66 1617 67 1718 68 1819 69 1920 70 2021 71 2122 72 2223 73 2324 74 2425 75 2526 76 2627 77 2728 78 2829 79 2930 80 3031 81 3132 82 3233 83 3334 84 3435 85 3536 86 3637 87 3738 88 3839 89 3940 90 4041 91 4142 92 4243 93 4344 94 4445 95 4546 96 4647 97 4748 98 4849 99 4950 100 50
4,344,333.66 10.1%
01/22/2020
11/20/201911/20/201911/20/201911/20/201912/11/201912/18/201912/18/2019
10/09/201910/16/201910/16/201911/04/201911/04/201911/19/2019
Jay Cashman, IncWoods Hole Terminal Reconstruction Marine Work
Contract # 16-2017
DATE
-
Sheet 11 2 3 4
ORIGINAL CHANGE CHANGE REVISEDPROJECT ORDER ORDER PROJECT
DESCRIPTION AMOUNT NUMBER AMOUNT TOTAL
1 MEPA permit support, vessel measurement A 5,041,000.00 1 35,809.00 5,076,809.00 12 Geotechnical & environmental services A 2 43,422.00 5,120,231.00 2 3 Geotechnical & environmental services A 3 57,606.00 5,177,837.00 34 Asbestos & haxardous assessment A 4 9,460.00 5,187,297.00 45 Provide add'l asbestos & haz assessment A 5 7,205.00 5,194,502.00 56 Add'l groundwater monitoring, data evaluatio A 6 11,137.00 5,205,639.00 67 GZA to provide add'l borings, test & analysis A 7 20,900.00 5,226,539.00 78 Multiple support tasks, alternatives A 8 28,718.00 5,255,257.00 89 Support services for utilities incentives A 9 20,000.00 5,275,257.00 9
10 GZA Environmental probing for obstructions A 10 232,968.00 5,508,225.00 1011 GZA support tasks for ENF and NOI A 11 27,543.00 5,535,768.00 1112 Geotechnical review of peat & organic silt A 12 33,527.00 5,569,295.00 1213 GZA design sewage pumping station A 13 39,930.00 5,609,225.00 1314 MAAB Vessel Variance Application A 14 22,579.00 5,631,804.00 1415 GZA eelgrass study per Fal. Conservation C A 15 23,430.00 5,655,234.00 1516 Prequalification submission reviews A 16 5,850.00 5,661,084.00 1617 Provide Environmental Monitoring Services A 17 533,390.00 6,194,474.00 1718 GZA to perform topographic & bathymetric A 18 34,540.00 6,229,014.00 1819 Admin office add'l server racks and HVAC A 19 20,439.00 6,249,453.00 1920 Comuter generated 3D visualization Admin O A 20 12,000.00 6,261,453.00 2021 Technical support for Administrative appeal A 21 29,150.00 6,290,603.00 2122 Add'l waterside subsurface investigation A 22 49,802.00 6,340,405.00 2223 Owner Testing Services for quality control A 23 159,500.00 6,499,905.00 2324 Marine design review service (GZA & Childs A 24 11,000.00 6,510,905.00 2425 Conf Rm Sound System, Security revisions A 25 20,630.00 6,531,535.00 2526 Provide assitance in office systems furniture A 26 14,500.00 6,546,035.00 2627 Changes to security & telecom. A 27 2,740.00 6,548,775.00 2728 Provide marine design services-peer review A 28 11,000.00 6,559,775.00 2829 Initial eelgrass survey - Order of Conditions A 29 23,430.00 6,583,205.00 2930 Evaluate hydrostatic/hydrodynamic load A 30 7,150.00 6,590,355.00 3031 Study bulkhead canopy options A 31 49,274.00 6,639,629.00 3132 Provide D&C for master key & split rm 219 A 32 6,460.00 6,646,089.00 3233 Electrical and Data supply for furniture A 33 7,850.00 6,653,939.00 3334 Additional admin svcs during construction A 34 82,306.00 6,736,245.00 3435 Owners testing for Phases 2-4 of waterside c A 35 938,665.00 7,674,910.00 3536 Construction Admin Svcs waterside A 36 739,000.00 8,413,910.00 3637 Additional admin svcs during construction A 37 41,800.00 8,455,710.00 3738 Additional admin svcs during construction A 38 42,100.00 8,497,810.00 3839 Additional site/engineering/bid phase svcs A 39 90,314.00 8,588,124.00 3940 Additional admin svcs during construction A 40 25,000.00 8,613,124.00 4041 Additional landscape design svcs SSA GO A 41 5,720.00 8,618,844.00 4142 GZA dynamic pile load testing services A 42 15,452.00 8,634,296.00 4243 Allow vibration monitoring in con admin A 43 0.00 8,634,296.00 4344 Allow additional services in con admin A 44 0.00 8,634,296.00 4445 Design delays and more schematic work A 45 237,275.00 8,871,571.00 4546 Extend schematic design work for terminal A 46 49,798.00 8,921,369.00 4647 Additional time/materials new terminal desig A 47 30,000.00 8,951,369.00 4748 Community participation 10/2018 - 01/2019 A 48 75,000.00 9,026,369.00 4849 2019 Construction Admin services A 49 824,280.00 9,850,649.00 4950 2019 Construction Admin services GZA A 50 253,908.00 10,104,557.00 50
5,063,557.00 100.4%
06/11/2015
Bertaux + Iwerks ArchitectsWoods Hole Terminal Reconstruction Project
Contract # 09B-2012
DATE
06/11/2015
06/22/2016
09/28/201509/30/201510/22/201512/21/201512/30/201502/25/201603/18/201603/18/201603/18/201603/30/201604/20/2016
03/27/2017
06/22/201608/04/201609/27/201609/16/201610/26/201611/16/201611/16/201611/29/201612/07/201612/07/201602/20/2017
02/28/2018
05/08/201705/08/201705/25/201707/25/201707/26/201709/29/201710/11/201711/07/201711/07/201712/07/201701/24/2018
02/19/2019
03/04/201805/04/201805/16/201805/31/201806/14/201806/14/201809/25/201808/23/201808/31/201812/04/201802/19/2019
-
Sheet 21 2 3 4
ORIGINAL CHANGE CHANGE REVISEDPROJECT ORDER ORDER PROJECT
DESCRIPTION AMOUNT NUMBER AMOUNT TOTAL
1 Balance Forward from Sheet 1 5,041,000.00 5,063,557.00 10,104,557.00 12 Hydrographic beach survey to south slip 2 A 51 50,765.00 10,155,322.00 2 3 Study of WH Terminal Building changes A 52 99,000.00 10,254,322.00 34 Marine engineering changes - Childs & GZA A 53 301,581.00 10,555,903.00 45 Woods Hole Ferry reconstruction admin A 54 1,179,600.00 11,735,503.00 56 A 55 67 A 56 78 A 57 89 A 58 9
10 A 59 1011 A 60 1112 A 61 1213 A 62 1314 A 63 1415 A 64 1516 A 65 1617 A 66 1718 A 67 1819 A 68 1920 A 69 2021 A 70 2122 A 71 2223 A 72 2324 A 73 2425 A 74 2526 A 75 2627 A 76 2728 A 77 2829 A 78 2930 A 79 3031 A 80 3132 A 81 3233 A 82 3334 A 83 3435 A 84 3536 A 85 3637 A 86 3738 A 87 3839 A 88 3940 A 89 4041 A 90 4142 A 91 4243 A 92 4344 A 93 4445 A 94 4546 A 95 4647 A 96 4748 A 97 4849 A 98 4950 A 99 50
6,694,503.00 132.8%
Bertaux + Iwerks ArchitectsWoods Hole Terminal Reconstruction Project
Contract # 09B-2012
DATE
04/21/201906/28/201911/19/201912/18/2019
20200218 WHTRP cost presentation.pdfWoods hole terminal reconstruction projectCost Breakdown by Project elementProject historyAwarded contractsAwarded contractsBIA.Studio COSTSBIA.STUDIO – CHANGE ORDERS TO DATEBIA.STUDIO – CHANGE ORDERS TO DATEJAY CASHMAN INC. COSTSCashman – change orders to dateCashman – change orders to dateWhat’s to comeFuture costs, known and unknownQuestions?