Staff House Keeping Training
Transcript of Staff House Keeping Training
-
7/27/2019 Staff House Keeping Training
1/14
Rendering Webinar TrainingHouse-Keeping
Allana Sons Ltd Since 1865
-
7/27/2019 Staff House Keeping Training
2/14
What is House-Keeping
Housekeeping in simple words means
maintaining a workplace on a daily or longterm basis or looking after its cleanliness,tidiness, upkeep and smooth running.
Allana Sons Ltd Since 1865
-
7/27/2019 Staff House Keeping Training
3/14
Raw Material Loading Old Raw material must be processed first, loading of
fresh Raw material before old Raw material leads toincreased FFA in Raw material.
Raw material must be weight each time before loading,this unable to calculate capacity utilisation, etc.
Offals must be washed before loading, this is reducewater quantity & FFA.
Raw material collected from floor must always beprocessed through RM Bin. Any inclusion of metal in Rawmaterial may lead to unexpected breakdown.
Allana Sons Ltd Since 1865
-
7/27/2019 Staff House Keeping Training
4/14
Routine Maintenance
Grinder Holder Knife replacement. Reactor Bearing Greasing.
Shear pin check (Bush & Coupling).
Loader Arm Oiling.
Metal Detectors Belt Bearing Greasing.
Decanter Greasing.
Dryer Burner Filter Cleaning.
Hammer Mill Magnet surface Cleaning. pH Probe Cleaning & Calibration (pH= 4.5).
Metal Detector Sensitivity Check.
Allana Sons Ltd Since 1865
-
7/27/2019 Staff House Keeping Training
5/14
Geared Motor & Gear units:
Gear units require only a minimum of maintenance whichis confined to regular checking of Oil levels.
Greased packed bearing should be cleaned and re-greased every 10000 working hours, care being that only1/3 of free volume of bearing is filled with grease in orderto avoid overheating of bearing.
Particular attention should be paid to motor by removing
all deposits from between the motor cooling fins and alsofrom the air intake on fan guard.
Allana Sons Ltd Since 1865
-
7/27/2019 Staff House Keeping Training
6/14
Pre-Breaker & Chain loader
Never clean the Rotor before the power to motor has beenswitched off and insulated.
The rotor is cleaned with high pressure cleaner. If it is not
possible to clean the rotor without rotor rotating, make sure
that no one get hurt.
Direct flushing with high pressure water, etc on lifting chains,
side tubes should be avoided.
The chain and central slide tube should be cleaned regularly of
old grease and dirt followed by a new greasing. That is of
special importance in bottom of loader at chain wheels where
greasing substance etc tend to accumulate.
Allana Sons Ltd Since 1865
-
7/27/2019 Staff House Keeping Training
7/14
Decanter
CIP of Decanter is carried in 2 steps:
High Speed CIP at full bowl speedfollowed by
Low Speed CIP at speed corresponding to50- 150 rpm
Allana Sons Ltd Since 1865
-
7/27/2019 Staff House Keeping Training
8/14
Decanter: High Speed CIP
CIP flow to feed tube of Decanter shouldbe 7000 l/hr at 3 bar.
In most cases, Water alone cannotremove the dirt and deposits.
Chemicals such as sodium hydroxide(Caustic soda) 1-1.5% to ensure pH valueof 12 -13.
Nitric acid (HNO) with concentration 0.5%can be used as supplement to causticcleaning.
Allana Sons Ltd Since 1865
-
7/27/2019 Staff House Keeping Training
9/14
Decanter: Low Speed CIP
CIP flow to feed tube of Decanter shouldbe 2000 l/hr.
Bowl rotating direction can be reversed atcertain intervals to achieve washing
machine effect. This results in mechanical cleaning effect
on bowl & conveyor.
CIP liquid recovered is polluted withsludge and need to be rinsed before it isre-used.
Allana Sons Ltd Since 1865
-
7/27/2019 Staff House Keeping Training
10/14
Decanter: SS Vessel Cover
All the locking nuts must be properlytighten.
Gear box shielding cover must be properly
bolted.
Cleaning of SS Vessel cover & Decanter
frame must be done on daily basis.
Allana Sons Ltd Since 1865
-
7/27/2019 Staff House Keeping Training
11/14
Separator: Frame/ Motor
Never wash down a separator with a direct water stream.Totally enclosed motors can be damaged by direct hosing to
same extent as open motors.
Water directed on hot motor may cause condensation and
subsequently produce grounding and internal corrosion.
The external cleaning of machine should be restricted to
brushing sponging or wiping while the motor is running or is
still hot.
Allana Sons Ltd Since 1865
-
7/27/2019 Staff House Keeping Training
12/14
Screw Conveyors Safety circuit of Screw conveyor must be checked at regular
interval.After 100 hours operation (weekly):
Trough & screw flights must be checked for abnormal wear.
Geared motor alignment must be checked.
On chain transmission the chain alignment & tightening mustbe checked.
Coupling & bearing must be checked for wear.
When operated & maintained correctly , screw conveyor is
dust tight.
Allana Sons Ltd Since 1865
-
7/27/2019 Staff House Keeping Training
13/14
Hammer Mill Stone trap at bottom of Grinding chamber must be cleaned
for any foreign matters.
Grinding chamber must be cleaned with brush or a scraper.
H. Mill screen must be cleaned with brush.
The use of Hammers which are not dimensionally stable may
cause great imbalance in rotor upon exchange of hammers.
The number of hammers in each row must be same.
Allana Sons Ltd Since 1865
-
7/27/2019 Staff House Keeping Training
14/14
Bucket Elevator Elevator belt must be checked for wear at least once a year.
Elevator head wear plate must be checked once in a year.
Elevator belt must be tighten at least twice a year.
Speed guard stop function must be checked by releasing
bottom belt pulley & lifting it. (Guard must disconnect the
main motor)
Reverse brake must be checked, Brake is designed to prevent
reverse operation.
Allana Sons Ltd Since 1865