St4 Prop Tubes Detectors• Jan. 20, 2011 first 9-module V-plane(1X) completed
![Page 2: St4 Prop Tubes Detectors](https://reader035.fdocuments.us/reader035/viewer/2022062520/5681619e550346895dd15654/html5/thumbnails/2.jpg)
The first completed plane
![Page 3: St4 Prop Tubes Detectors](https://reader035.fdocuments.us/reader035/viewer/2022062520/5681619e550346895dd15654/html5/thumbnails/3.jpg)
Completed St4 Prop Tubes: V1
![Page 4: St4 Prop Tubes Detectors](https://reader035.fdocuments.us/reader035/viewer/2022062520/5681619e550346895dd15654/html5/thumbnails/4.jpg)
Completed 2nd Plane: H1 (1Y) 01/26/2011
![Page 5: St4 Prop Tubes Detectors](https://reader035.fdocuments.us/reader035/viewer/2022062520/5681619e550346895dd15654/html5/thumbnails/5.jpg)
E906 Collaboration Meeting 5
Station 4 Muon Identifier Design• 2 X and 2 Y layers, coverage = 12’ x 12’
• Aluminum drift tubes for good position resolution track matching to Station 3 drift chambers
• Each plane constructed of 2 staggered rows of 2” diameter tubes for excellent efficiency and reasonable channel count
• Nanometrics amplifier / discriminator electronics with ECL output. • Well tested design with 1000’s of operational tubes.
• Works with a variety of gas mixtures @ ~ +2300V
End view of a 16 tube module
![Page 6: St4 Prop Tubes Detectors](https://reader035.fdocuments.us/reader035/viewer/2022062520/5681619e550346895dd15654/html5/thumbnails/6.jpg)
Cosmic TDC SpectraThanks Kaz and Grass!
ΔT~3uS
![Page 7: St4 Prop Tubes Detectors](https://reader035.fdocuments.us/reader035/viewer/2022062520/5681619e550346895dd15654/html5/thumbnails/7.jpg)
I-beam support structure
![Page 8: St4 Prop Tubes Detectors](https://reader035.fdocuments.us/reader035/viewer/2022062520/5681619e550346895dd15654/html5/thumbnails/8.jpg)
Module support at Bottom • Lumber block support HomeDepot!
![Page 9: St4 Prop Tubes Detectors](https://reader035.fdocuments.us/reader035/viewer/2022062520/5681619e550346895dd15654/html5/thumbnails/9.jpg)
Problem with Glued Al frames
![Page 10: St4 Prop Tubes Detectors](https://reader035.fdocuments.us/reader035/viewer/2022062520/5681619e550346895dd15654/html5/thumbnails/10.jpg)
LV distribution Card
![Page 11: St4 Prop Tubes Detectors](https://reader035.fdocuments.us/reader035/viewer/2022062520/5681619e550346895dd15654/html5/thumbnails/11.jpg)
ECL signal patch panel
![Page 12: St4 Prop Tubes Detectors](https://reader035.fdocuments.us/reader035/viewer/2022062520/5681619e550346895dd15654/html5/thumbnails/12.jpg)
HV distribution
![Page 13: St4 Prop Tubes Detectors](https://reader035.fdocuments.us/reader035/viewer/2022062520/5681619e550346895dd15654/html5/thumbnails/13.jpg)
cables
![Page 14: St4 Prop Tubes Detectors](https://reader035.fdocuments.us/reader035/viewer/2022062520/5681619e550346895dd15654/html5/thumbnails/14.jpg)
Two completed planes (1X,1Y)
![Page 15: St4 Prop Tubes Detectors](https://reader035.fdocuments.us/reader035/viewer/2022062520/5681619e550346895dd15654/html5/thumbnails/15.jpg)
Two completed frames (2X, 2Y)
![Page 16: St4 Prop Tubes Detectors](https://reader035.fdocuments.us/reader035/viewer/2022062520/5681619e550346895dd15654/html5/thumbnails/16.jpg)
A beautiful night @E906
![Page 17: St4 Prop Tubes Detectors](https://reader035.fdocuments.us/reader035/viewer/2022062520/5681619e550346895dd15654/html5/thumbnails/17.jpg)
Working hard and happily
![Page 18: St4 Prop Tubes Detectors](https://reader035.fdocuments.us/reader035/viewer/2022062520/5681619e550346895dd15654/html5/thumbnails/18.jpg)
E906 Hall on 1/20/2011
![Page 19: St4 Prop Tubes Detectors](https://reader035.fdocuments.us/reader035/viewer/2022062520/5681619e550346895dd15654/html5/thumbnails/19.jpg)
Target
![Page 20: St4 Prop Tubes Detectors](https://reader035.fdocuments.us/reader035/viewer/2022062520/5681619e550346895dd15654/html5/thumbnails/20.jpg)
St-1
![Page 21: St4 Prop Tubes Detectors](https://reader035.fdocuments.us/reader035/viewer/2022062520/5681619e550346895dd15654/html5/thumbnails/21.jpg)
St-2,3
![Page 22: St4 Prop Tubes Detectors](https://reader035.fdocuments.us/reader035/viewer/2022062520/5681619e550346895dd15654/html5/thumbnails/22.jpg)
St-4
![Page 23: St4 Prop Tubes Detectors](https://reader035.fdocuments.us/reader035/viewer/2022062520/5681619e550346895dd15654/html5/thumbnails/23.jpg)
Summary and To do list• Detectors
– Completed 1X and 1Y detectors– Assembled the remaining 2X and 2Y frames
• Statistics– 3500+ Screws/T-Nuts– 15+hr a day
• Installation – 1X and 1Y ready to go– 2X and 2Y later in Feb.?
• Final Gas test– MIPP?
• Ready for beam– Timing, efficiency etc.