SSEMBLY INSTRUCTIONS A · Please carry out the steps in the order set out in these instructions. Do...

29
ASSEMBLY INSTRUCTIONS Multi Line 6’x8’ 255x193x203cm / 100 1 / 2”x76”x80” English - 69717

Transcript of SSEMBLY INSTRUCTIONS A · Please carry out the steps in the order set out in these instructions. Do...

Page 1: SSEMBLY INSTRUCTIONS A · Please carry out the steps in the order set out in these instructions. Do not tighten the screws of the Greenhouse until completion of the assembly of the

ASSEMBLY INSTRUCTIONS

Multi Line 6’x8’

255x193x203cm / 1001/2”x76”x80”

En

glis

h -

69

71

7

Page 2: SSEMBLY INSTRUCTIONS A · Please carry out the steps in the order set out in these instructions. Do not tighten the screws of the Greenhouse until completion of the assembly of the

IMPORTANT

Please read theseinstructions carefullybefore you start toassemble this greenhouse.

Please carry out the stepsin the order set out inthese instructions.

Do not tighten the screwsof the Greenhouse untilcompletion of theassembly of the panels.

Keep these instructions ina safe place for futurereference.

Make sure the base in steps 1&2 is squareby measuring the diagonals and level byusing a spirit level.We strongly recommend the use

of work gloves during assembly .

Do not attempt to assemble the

greenhouse in windy or wet

conditions.

Do not touch overhead power

cables with the aluminum profiles.

Always wear shoes and safety

goggles when working with

extruded aluminum. Dispose of all

plastic bags safely - keep them out

of reach of small children. The

greenhouse must be positioned

and fixed on a flat level surface. Do

not lean against or push the

greenhouse during construction.

Keep children away from the

assembly area. Do not position your

greenhouse in an area exposed to

excessive wind.

Do not attempt to assemble this

greenhouse if you are tired, have

taken drugs or alcohol or if you are

prone to dizzy spells. If using a step

ladder or power tools ensure that

you follow the manufacturers safety

advice. Hot items such as recently

used grills, blowtorches etc. must

not be stored in the greenhouse.

Ensure there are no hidden pipes

or cables in the ground before

inserting the pegs.

Safety Advice

When your greenhouse needs to becleaned, use a mild detergent solutionand rinse with cold clean water. DO NOTuse acetone, abrasive cleaners or otherspecial detergents to clean the clearpanels.Replacement parts - call our service line.For additional information please visitour web site: www.palram.com

Sort the parts and check against the contents parts list.

Carry out the assembly steps in the order set out in the instructions.

Screws 411 are to be assembled from the outside and nuts 412 from the inside of the greenhouse.

Tighten screws and nuts (411 & 412), 2- 3 turns only, do not fasten them until completion of the assembly, if not specified otherwise.

4 Prefix of the parts reference in the assembly instructions:

A-Aluminum profiles and parts P5XX–Polycarbonate panels P3XX–Plastic parts. M–Metal parts 4XX–Screws, nuts, disks, etc.

The end of all profiles, indicated by an arrow, is always upward.

The oval hole in the crossbars A256 should always be assembled to the base of the greenhouse.

The front of the greenhouse is the wall including the door, and the back is the opposite wall.

Firmly connect the greenhouse to a leveled final position immediately after completion of the assembly.

This is a multi-part assembly bestachived by two people. Allow at leasthalf a day for assembly process.Selecting a site - choose a sunny levelposition away from overhanging trees.If you are fixing your greenhouse directlyto a solid concrete foundation use thepre drilled holes in the metal basesupplied. The component parts shouldbe checked and laid out close at hand.Keep all small parts (screws etc.) in abowl so they do not get lost.Do not tighten the screws of thegreenhouse until completion of theassembly of the panels, unless it saysotherwise.

Tape measure Work gloves Plastic or rubber mallet Lubricant Phillipshead screwdriver Step ladder Drill bit Large hammer Scissors Spanner

Tools & Equipment

Care & Maintenance

General Advice

Page 3: SSEMBLY INSTRUCTIONS A · Please carry out the steps in the order set out in these instructions. Do not tighten the screws of the Greenhouse until completion of the assembly of the

A102 44.33/1126 12A103 62.40/1585 1A104 62.40/1585 1

A111 44.69/1135 2A112 44.69/1135 2A113 44.69/1142 1A114 44.69/1142 1A115 44.69/1142 1A116 44.69/1142 1

A136 96.73/2457 2

A141 97/2463 1

A151 23.07/586 1

A162 36.1/917 1

A173 59/1500 2

A182 24.17/614 1

A174 24.17/614 1

A192 24.17/614 1

A203 61.5/1563 1A204 61.5/1563 1

A211 24.25/616 1

A222 48.82/1240 1

A256 50.79/1290 8

A261 15.75/400 1

A271 23.07/586 1

A282 21.77/553 2

A260 24.85/631 1

P544 17.32x24.09 2 432x614

P545 17.32x24.09 2 432x614

M243 91.7/2330 2

P543 25.79x24.09 1 666x612

P546 9.45x23.94 1 240x608

P541 12.9x24.09 1 330x612

P542 22.64x24.09 1 575x612

R303 59.6/1515 2

P540 44.69x24.09 14 1143x612

P580 44.69x24.09 7 1143x612

P547 23.62x21.65 1 600x550

Item Inc./mm Qty. Item Inc./mm Qty. Item Inc./mm Qty. Item Inc./mm Qty. Item Inc./mm Qty.

Contents

M244 91.7/2330 2

PA351 44.09/1120 14PA352 22/570 2PA353 11.8/445 2

PR351 44.09/1120 20PR353 11.8/300 2PR356 17.5/445 2

Page 4: SSEMBLY INSTRUCTIONS A · Please carry out the steps in the order set out in these instructions. Do not tighten the screws of the Greenhouse until completion of the assembly of the

Item Inc./mm Qty. Item Inc./mm Qty. Item Inc./mm Qty. Item Inc./mm Qty.

M285 1847/72.7 1

P304 2

423 M4 2P333 1

P399 2 441 M6x1.77/M6x45 1

A306 1

P328 (1 spare ) 26

A323 2

P324 4

411 M6x0.39/M6x10 95

412 M6 100

421 M4x0.63/M4x16 4

422 M4 2

442 0.26/6.5 1

445 8x1/5/M8x7 4

447 M8x0.63/M8x16 4

4008 0.6x0.16/16x4.2 6

M307 4

A283 589/23 5

T340 7

T341 8

R360 2

P361 113

Page 5: SSEMBLY INSTRUCTIONS A · Please carry out the steps in the order set out in these instructions. Do not tighten the screws of the Greenhouse until completion of the assembly of the

18

OR

193cm /76”255cm /100”

255cm /100”193cm /76”

Page 6: SSEMBLY INSTRUCTIONS A · Please carry out the steps in the order set out in these instructions. Do not tighten the screws of the Greenhouse until completion of the assembly of the
Page 7: SSEMBLY INSTRUCTIONS A · Please carry out the steps in the order set out in these instructions. Do not tighten the screws of the Greenhouse until completion of the assembly of the

1 2

Be sure to bend in tabs onthe base profiles M243 intoa 90° angle before insertingthe screws.Tighten firmly the screws447 at the lower hole asseen in the lower picture.

Attach the sides of the base(M244) to the front andback base pieces (M243).Use the screws and nuts(411, 412) as shown.Tighten nut completely.

M243 / 2

M243

M243

a

b

447

c

M244 / 2

M243

M244

M244

M243

412

411

Page 8: SSEMBLY INSTRUCTIONS A · Please carry out the steps in the order set out in these instructions. Do not tighten the screws of the Greenhouse until completion of the assembly of the

3

Assemble profile A162 usingscrews and nuts (411,412)as shown and tighten nutcompletely.Be sure to assemble profilesA111 & A112 as shownbelow with the arrow facingupwards.

A162 / 1 A112 / 2 A111 / 2

411

Back

A112

A111

A112

A111

A162

A162

412

411

412

412

411

411 aa

A162

A111

412

411

412

411

b

A111

c

Page 9: SSEMBLY INSTRUCTIONS A · Please carry out the steps in the order set out in these instructions. Do not tighten the screws of the Greenhouse until completion of the assembly of the

4

NOTE: The drain setincludes two left and tworights cups P324 and fourplugs. Assemble a plug inall four cups P324.Insert each one of theminto the gutters A136 endsas shown below.

NOTE: Leave the end cupsopen on the side youwould like the water todrain.

P324 / 4 A136 / 2

b

b

A136

P324

P324

a

P324

Page 10: SSEMBLY INSTRUCTIONS A · Please carry out the steps in the order set out in these instructions. Do not tighten the screws of the Greenhouse until completion of the assembly of the

5*Insert the screws from the outside, tighten nuts only 2-3 turns and leave loose.

Assemble the gutters A136to the profiles (A111 / A112)one on each end.

NOTE: Assemble thecrossbars A256simultaneously with thegutter A136 using the samescrews and nuts. The ovalholes should be connectedto the base of thegreenhouse.

!

A256

A136 / 2 A256 / 4

A256

A136

411

412

411

412

Inside view

A256

A256

A256

A256

A256

A136

411

412

411

Outside view

411

411

A256

Page 11: SSEMBLY INSTRUCTIONS A · Please carry out the steps in the order set out in these instructions. Do not tighten the screws of the Greenhouse until completion of the assembly of the

6*Insert the screws from the outside, tighten nuts only 2-3 turns and leave loose.

Assemble M285 at the backof the greenhouse to profilesA111, A112 using the lowerhole of M285.

NOTE: Assemble thecrossbars A256simultaneously with theM285 using the same screwsand nuts. The oval holesmust be connected to thebase of the greenhouse.

A256 / 2 M285 / 1

M285

A256

411

412

Inside

BackA256

M285

A256

411

411

412

412

Page 12: SSEMBLY INSTRUCTIONS A · Please carry out the steps in the order set out in these instructions. Do not tighten the screws of the Greenhouse until completion of the assembly of the

7*Insert the screws from the outside, tighten nuts only 2-3 turns and leave loose.

Assemble profiles A103,A104 to the base using thebase inner holes and toconnector M285 in themiddle hole as shown indrawing a & b.Aluminum profiles A115 andA116 are to be connectedat the back to the guttersA136 on its upper holes andto profiles A103 and A104 asshown in drawing c.

NOTE: Assemble profilesA103 and A104simultaneously to the base,using the base inner holesand crossbars A256 on eachside.

A103 / 1 A104 / 1 A115 / 1 A116 / 1

Outside

!Innerhole

A103

A104

a

!! Backview

A104A103

c

Back

M285

A136

412

412

A136

A116

A115

A104 A103

411

411

411

411

BackviewA116 A115

Back

!

M285

A103A104

412

412 411

411

411

412

412411

b

Page 13: SSEMBLY INSTRUCTIONS A · Please carry out the steps in the order set out in these instructions. Do not tighten the screws of the Greenhouse until completion of the assembly of the

8*Insert the screws from the outside, tighten nuts only 2-3 turns and leave loose.

Assemble profiles A283 onthe back of connectorM285.

NOTE: On the sides youshould slide profile A283onto the existing screws asshown on figure (a).On the other end slide thescrews 411 and thenconnect it to M285 (b).Follow steps (a) & (b) insections 1&3.

A283 / 3

A283

a

b

M285

a

a

(b)

(b)

1

2

3

A283

A283

A283

412

412

412

412

411

411

411

411

Page 14: SSEMBLY INSTRUCTIONS A · Please carry out the steps in the order set out in these instructions. Do not tighten the screws of the Greenhouse until completion of the assembly of the

9*Insert the screws from the outside, tighten nuts only 2-3 turns and leave loose.

Aluminum profiles A113and A114 are to beconnected at the front tothe gutters A136 on itsupper holes and to profilesA203 and A204 as shownbelow.

NOTE: Assemble profilesA203 and A204simultaneously to the base.

A113 / 1 A114 / 1 A203 / 1 A204 / 1

Front

Outside

411

411

Front

A114

411

A113

A136

A204

A203

411

411

411

411

412

412

412

412

412

Front

A203A204

Page 15: SSEMBLY INSTRUCTIONS A · Please carry out the steps in the order set out in these instructions. Do not tighten the screws of the Greenhouse until completion of the assembly of the

10*Insert the screws from the outside, tighten nuts only 2-3 turns and leave loose.

Assemble the ridge A141under and to profiles A113,A114 at the front, and toprofiles A115, A116 at theback. Assemble profileA211, from the outside, toprofiles A113, A114.

A211 / 1 A141 / 1

A211

A141

A113

A114

A136

A116

A115

411

412

411

411

411

412

A211

A113

412

411

411

Page 16: SSEMBLY INSTRUCTIONS A · Please carry out the steps in the order set out in these instructions. Do not tighten the screws of the Greenhouse until completion of the assembly of the

11*Insert the screws from the outside, tighten nuts only 2-3 turns and leave loose.

Insert two screws 411 in thegroove of profile A283 ateach end (a). Assembleprofiles A283 from theoutside to the corner profilesA111 and A112 at the twoends and simultaneously toprofiles A203 and A204 andcrossbars A256 (b ).Connect the crossbars A256to profile A111 & A112 inboth corners using the A283lower screw.

The oval holes must beconnected to the base of thegreenhouse.

A256 / 2 A283 / 2Outside

Inside

411

411

412

A283

Front

A256

A256 A204

A203

A283

A283

a

Inside

Outside

A283

411

412

412

412

b

Page 17: SSEMBLY INSTRUCTIONS A · Please carry out the steps in the order set out in these instructions. Do not tighten the screws of the Greenhouse until completion of the assembly of the

12*Insert the screws from the outside, tighten nuts only 2-3 turns and leave loose.

Slide profile A102 on to thesquare head of screw 411(connected to the base)(a).On the other end slide thehead of screw 411 into thegroove on profile A102,insert the screw intopredrilled holes in thegutter A136 and close (DONOT TIGHTEN) with nut412(b).

NOTE: Repeat the aboveassembly procedure to allprofiles A102 on the walls.

A102 / 6

a

Outside

411

b

412

411

A102

c

A102

412

A102

A102

412

Page 18: SSEMBLY INSTRUCTIONS A · Please carry out the steps in the order set out in these instructions. Do not tighten the screws of the Greenhouse until completion of the assembly of the

13*Insert the screws from the outside, tighten nuts only 2-3 turns and leave loose.

Slide screw 411 insideprofiles A102 at the topconnect it to the ridge A141and at the bottom-to thegutter A136.

NOTE: Repeat the aboveassembly procedure to allprofiles A102 on the roof.

NOTE: The vent in the roofcan be inserted replacingone of the middle panels.In order to assemble thevent you have to insert anadditional screw 411 intoboth profiles A102 (a) oneither side of the vent.These two additionalscrews will be used later.

* Use only one screw 411 instep (b).

A102 / 6

a

412

A102

A102

412

411

411

b

A102

A102

A102

412

412

412

412

412

412

411

b

411

a

a

411

Page 19: SSEMBLY INSTRUCTIONS A · Please carry out the steps in the order set out in these instructions. Do not tighten the screws of the Greenhouse until completion of the assembly of the

14 15

*Insert the screws from theoutside, tighten nuts only2-3 turns and leave loose.

Assemble aluminum profileA260 using the additionalscrews you inserted on theprevious step.

Assemble aluminum profilesA222 onto aluminumprofiles A211 (a). Connectaluminum profile A222 (b)and aluminum profile A261to profile A113 (c).

Note: level profile A222 onthe left side with profileA211.Push profile A222 towardsthe upper end of profileA211 and nuts on profileA222.

A260 / 1

412

412

A260

a

A261 / 1A222 / 1

A222

A211

412

411

a

A222

412

441

442

A261

412

b

411

412

c

Page 20: SSEMBLY INSTRUCTIONS A · Please carry out the steps in the order set out in these instructions. Do not tighten the screws of the Greenhouse until completion of the assembly of the

16

Lay the first profiles A173(the second profile A173will be used later) on a flatsurface. Connect profilesA182, A174 and A192 onone side using screws 4008.Tighten all screws.Slide panel P540 betweenprofiles A192 and profileA174. Slide panel P541between profiles A174 andA182, push them all theway against profile A173.

P540

P541

A174

A173

A182

b

4008

4008

A173

A174

A182

A192

4008

a

A182 / 1 A192 / 1 A173 / 2 A174 / 1 P541 / 1 P540 / 1

A192

Page 21: SSEMBLY INSTRUCTIONS A · Please carry out the steps in the order set out in these instructions. Do not tighten the screws of the Greenhouse until completion of the assembly of the

17

PR351 / 2421 / 2 423 / 2 P304 / 2 PR353 / 2

Assemble the second profileA173 and attach it to theother side of profiles A174,A182 and A192 using screws4008. Tighten all screws.Assemble the plastic stripsPR351 and PR353.During the assembly of theplastic strips you must putpressure on them until theysnap into place. Put thepressure at one end of theplastic strip and continue allthe way to the other end.Connect the wheels P304using screws 421 and self-locking nuts 423 (d). 423

PR353

PR351

PR351

PR353

423

P304

421P304

421

d

P304

A173

4008 A174

A182

4008

4008

c

4008

A192

Page 22: SSEMBLY INSTRUCTIONS A · Please carry out the steps in the order set out in these instructions. Do not tighten the screws of the Greenhouse until completion of the assembly of the

18

VENT SUBASSEMBLY

Slide panel P512 intothe groove in profileA151(b). Slide profilesA282 on each side ofpanel P512 until theyfit the holes on profileA151 ends and the twoholes on panel P512(c).Connect corners withscrews 411 and nuts412.

Slide the final profileA271 until it fits theholes on both profilesA282 and the two holeson the panel P512(d).Connect corners withscrews 411 and nuts412.Assemble the handleA306 to profile A271and tighten screws421(a) and nuts 422(a).Tighten all screws andnuts.

A151 / 1 A282 / 2 A271 / 1 A306 / 1

P547 / 1

When inserting the rubberR303 apply somelubrication solution on thealuminum A173 if needed.

P303 / 2

R303

421 / 2 422 / 2

19

A271

A151 c

d

A282

412

412

411

411

P547

411

411

A282

bb

c

421

422

422

A306

422

A271

421 a

Page 23: SSEMBLY INSTRUCTIONS A · Please carry out the steps in the order set out in these instructions. Do not tighten the screws of the Greenhouse until completion of the assembly of the

21

To install the vent on the main beam aluminum profiles A141, hold it atan angle of 45° relative to the profile’s plane (a) (slide it to the positionbetween the two roof aluminum profiles A102 (b). The handle A306should rest on brackets A323 when the vent is in the CLOSED position.In the OPEN position, the vent can be secured in one of several angles,by catching a selected hole in the handle with the protruding tip ofbrackets A323.

The brackets A323 shouldbe connected to profileA260 using screws 445(a).

A260

A141

A323 / 2445 / 4

aA323

445Inside

20

A260

A306

A141

Page 24: SSEMBLY INSTRUCTIONS A · Please carry out the steps in the order set out in these instructions. Do not tighten the screws of the Greenhouse until completion of the assembly of the

22

When you mount thepanels on the walls slidethem into the groove in thelower part of the gutterA136. Assemble panel P540,as shown in step 23 Duringthe assembly of the plasticstrips PA and PR you mustput pressure on them fromthe inside as well as theoutside, until they snap intoplace. Put the pressure atone end of the plastic stripand continue all the way tothe other end. Use toolP333.

Insert two panel supportsP328 in every wall section,into the predrilled holes inthe base. Simply push ituntil you here a “CLICK”sound.

NOTE: The smooth part ofpanel holders should facethe wall panel.

P333

P540 / 13 P333 / 1 PA351 / 8

a b c d e

P328

PA351

A136

P540

P328 / 26

Page 25: SSEMBLY INSTRUCTIONS A · Please carry out the steps in the order set out in these instructions. Do not tighten the screws of the Greenhouse until completion of the assembly of the

23

18

1

2

3

4

11

12

13

14

17

16

19

20

PR351

PR351

6

7

5

P544

P540

P540

P540

PR356

P545

P546

PR351 / 14 PA353 / 2PA351 / 8 PR356 / 2 P544 / 2

P545 / 2

P546 / 1

P540

P540 / 13

Pay special attention whenassembling the panels at thefront and the back of thegreenhouse (P546, P544,P545 and P543). The plasticstrips (PA351, PR351 ) shouldbe installed only after ALLthe panels (P546, P544 P545and P543) are in position.

a

b

P540

P540

8

9

10

16

P545

P544

P543PA353

PR351

PA353

PR351

PA353

PR351

PR351

PR351

P543 / 1

Page 26: SSEMBLY INSTRUCTIONS A · Please carry out the steps in the order set out in these instructions. Do not tighten the screws of the Greenhouse until completion of the assembly of the

24

P580 / 7

When you mount thepanels on the roof slidethem into the groove in themain beam A141 and thenslide them, into the groovein A136. In this step you willneed to support thestructure profiles from theinside.Assemble the plastic stripsas shown below.

NOTE: A stepladder will beneeded for this step.

PA351X3

2

34

67

8

1

5

PR351 / 4

R360 / 2

PA352 / 2 PA351 / 4

P542 / 1

R360

c

PA351

R360

P542

P580

PA352

PA351

a b

PA351

PR351

c

Page 27: SSEMBLY INSTRUCTIONS A · Please carry out the steps in the order set out in these instructions. Do not tighten the screws of the Greenhouse until completion of the assembly of the

25 26

Tighten all screws and nuts.The greenhouse includesspecial screws and nutstighten them withreasonable force.

412

411

A222

a

b

a

b

Insert the door lower trackA192 inside the specialaluminum rail A162 (a),simultaneously with thedoor wheels into the uppertrack A222. After youassemble the door to itsplace, assemble screw andnut 411,412 into the doorstopper hole on profileA222(b).

Page 28: SSEMBLY INSTRUCTIONS A · Please carry out the steps in the order set out in these instructions. Do not tighten the screws of the Greenhouse until completion of the assembly of the

27 28

T340

A141

307

a Push on the top cover P399until it clicks.

PUSH HERE

Insert the tube T340 fromthe inside under each of theroof panels in the groove ofthe main beam A141(tosupport the panel from theinside).Insert the tube T341 fromthe inside under each of thewall panels in the groove ofthe gutter A136 (to supportthe panel from the inside).

P399

P399 / 2

P399

T340 / 7 T341 / 8

A136

T341

b

Outside view

Outside view

Page 29: SSEMBLY INSTRUCTIONS A · Please carry out the steps in the order set out in these instructions. Do not tighten the screws of the Greenhouse until completion of the assembly of the

29 30

Firmly connect thegreenhouse to its final, levelposition immediately aftercompletion of the assembly,to withstand high windseffects.

The pegs M307 (spikes) areassembled from the insideof the greenhouse. Makesure to use the pre-punchednotch in the bottom of thebase.

M307

P361 / 113M307 / 4

a b