SREL Biogas.Pdf
-
Upload
sumedhbapat -
Category
Documents
-
view
4.508 -
download
1
Transcript of SREL Biogas.Pdf
BIOGAS – The future of energy
SPECTRUM RENEWABLE ENERGY LTD.HYDERABAD - PUNE - NEW JERSEY - BRISBANE
www.srel.in www.srela.com.au
A JOINT VENTURE OF GREENLEAF RENEWABLE ENERGY PVT. LTD AND
SPRECTRUM RENEWABLE ENERGY PVT. LTD.
BIO-
DEGRADABLE
WASTE FROM
HOTEL
SPECTRUM RENEWABLE ENERGY LTD.
HOTEL
&
KITCHEN
EXISTING SYSTEM OF WASTE DISPOSAL
SPECTRUM RENEWABLE ENERGY LTD.
SAD STATE OF GARBAGE DISPOSAL
SPECTRUM RENEWABLE ENERGY LTD.
UNFORTUNATE STATE OF GARBAGE
SEPERATION AND UNHYGENIC CONDITIONS
OF WASTE MANAGEMENT
SPECTRUM RENEWABLE ENERGY LTD.
Energy Value of kitchen/canteen waste
• 15 Kg’s of kitchen waste = 1 m3 Biogas
• 1 m3 Biogas = 5500 KCal worth of heat energy
• 1 m3 Biogas = 0.54 Kg’s worth of L.P.G.
• 0.54 Kg Propane/Day = 0.76 Tons CO /Year • 0.54 Kg Propane/Day = 0.76 Tons CO2/Year
• 15 Kg Kitchen waste/Day = 5.17 Tons CO2/Year
• 2.5 Tons waste/Day Biogas Plant = 862 Tons CO2
Emissions saved/Year
SPECTRUM RENEWABLE ENERGY LTD.
SPECTRUM – GREENLEAF
3EBT-1 TECHNOLOGY UNIQUENESS
• Fixed Dome CSTR Model – 100% Gas collection
• Sulphur degrading bacteria – H2S < 0.2%
• Advanced Process controls – Gas meters, Digital pH
indicators, thermostats for efficient data collection
• Safety equipments – Gas Flares/Flame Traps etc.• Safety equipments – Gas Flares/Flame Traps etc.
• Enclosed processing - Odour Free operations
• 2.5 Tons Kitchen Waste/Day – 180 m3 Biogas – 90 Kg’s
L.P.G. replaced + 150 Kg Organic Manure
• Organic Manure – N:3, P:1.5, K:1, Organic Carbon:20%
(necessary for water retention)
SPECTRUM RENEWABLE ENERGY LTD.
BIOGAS PLANT ECONOMICS
Per Day Cost Savings from 2.5 TPD Biogas Plant
Particulars Qty. Rate (Rs.) Amount (Rs.)
L.P.G. Replaced 90 Kg's 54.00 4860.00
Organic Manure 150 Kg's 2.00 300.00
Dumping Expenses 2500 Kg's 0.50 1250.00
Dumping Manpower
Cost 300.00Cost 300.00
Gross Savings 6710.00
Less:
Biogas Plant Operating
Expenses 1200.00
Net Savings/Day 5071.00
SPECTRUM RENEWABLE ENERGY LTD.
Hydrolytic
Digester
Waste
Processing
Area
Methanogenic
Digester Overflow
Moisture
Trap
Flame
Trap
Biogas
To
Kitchen
Emergency
Gas Flaring Unit
Gas storage
BalloonGas Blower
CONCRETE DIGESTER BIOGAS SYSTEM PROCESS FLOW DIAGRAM
Crusher
Manure Pit
SPECTRUM RENEWABLE ENERGY LTD.
Bio Bowser Process Flow Diagram
Segregated waste
Crusher
BIO BOWSERT
Gas-Fluid
Separation
Unit
Raw
Biogas
H2S Scrubber
CO2 Scrubber
Biogas storage
Balloon
Biogas
Blower
Clean Gas
To Burner/Generator
Feed Buffer Tank
Feed Pump
BIO BOWSERT
Submersible
Agitator
Solar powered
Heat Exchanger
Solar Panels
Unit
Thermal
Controller
Tank
Liquid Manure
SPECTRUM (EcoSolutions) INSTALLATIONS
1 TPD Canteen waste plant at
Tata Consultancy Services, Thane.
SPECTRUM RENEWABLE ENERGY LTD.
Latest Peshawe Udyan Plant done for
Pune Municipal Corporation
3EBT Fixed Dome Installation
at Ashish Cans and Containers Pvt. Ltd.,
Talegaon
BIO BOWSER ® Installed at Pratibha International School
Chinchwad, Pune
3EBT Industrial Application
Industrial Burner High Methane Content
CH4 > 72%
GREEN LEAF – PROUD WINNER OF IIT INDIA ASSOCIATION
INNOVATIONS 2009 AWARD FOR 3EBT
Latest SPECTRUM Projects Under Construction
1. Warana Sugar Industry ltd.,
100 Ton Press Mud/Day – Bio CNG Project
Approx CNG expected/day – 7200 Kg’s
2. Bio Bowser 1000 – To be installed at Albany,
U.S.A.
SPECTRUM RENEWABLE ENERGY PVT. LTD.
FINANCIAL OPTIONS
Option 1 = As per our Proposal. Entire CAPEX to be invested by TCS.
Option 2 Financial Model –
a) SREL will Invest and construct the Entire Plant
SPECTRUM RENEWABLE ENERGY PVT. LTD.
a) SREL will Invest and construct the Entire Plant
b) Land, Water & Electricity requirement will be TCS
Responsibility
c) TCS will pay Rs.1/- per Kg of Waste equal to the
Designed Capacity of the Plant i.e. 2,500 Kg’s. of Waste
per Day X Rs.1/- per Kg. = Rs.2500/- X 365 Days X 10 Years
d) TCS will pay the O & M Cost (Man Power Cost only) of
Rs.3,84,000/- per Annum for 10 Years
FINANCIAL OPTIONS
Option 3
a) SREL will Invest and construct the Entire Plant
b) Land, Water & Electricity requirement will be Clients Responsibility
c) TCS will buy the entire gas @ Rs.45/- per Kg equal to the Designed Capacity of
the Plant i.e. 85 Kgs. of Gas / Day X 10 Years irrespective of the gas used or not
used by the Client.
Option 4
SPECTRUM RENEWABLE ENERGY PVT. LTD.
Option 4
a) SREL will Invest 50% of the Project Cost & Client will invest 50% of the balance
of Project Cost
b) Land, Water & Electricity requirement will be Clients Responsibility
c) TCS will pay Rs.0.50 / Kg of Waste equal to the Designed Capacity of the Plant
i.e. 2,500 Kgs. of Waste per Day X Rs.0.50/- per Kg. = Rs.1250/- X 365 Days X 10
Years
d) TCS will pay the O & M Cost (Man Power Cost only) of Rs.3,84,000/- per Annum
for 10 Years
THANK YOU
SPECTRUM RENEWABLE ENERGY PVT. LTD.
PUNE BRISBANE HYDERABAD NEW JERSEY
www.srel.in www.srela.com.au