SPS Schemes for Grid Security (With Generation at Palatana) Case 1: When Palatana unit trips Case 2: 400 kV Palatana-Silcher (D/C) lines trip Case 3: 400 kV Silchar – Byrnihat line trips

Transcript of SPS Schemes for Grid Security (With Generation at Palatana) Case 1: When Palatana unit trips Case 2:...

Page 1: SPS Schemes for Grid Security (With Generation at Palatana) Case 1: When Palatana unit trips Case 2: 400 kV Palatana-Silcher (D/C) lines trip Case 3: 400.

SPS Schemes for Grid Security(With Generation at Palatana)

Case 1: When Palatana unit trips

Case 2: 400 kV Palatana-Silcher (D/C) lines trip

Case 3: 400 kV Silchar – Byrnihat line trips

Page 2: SPS Schemes for Grid Security (With Generation at Palatana) Case 1: When Palatana unit trips Case 2: 400 kV Palatana-Silcher (D/C) lines trip Case 3: 400.

Initial Conditions :Pre condition:

Following lines should be kept in open condition

132 kV Khliehriat – Lumshnong S/C

132 kV Pailapool – Jiribam line at Jiribam end

132 kV Khleihriat (PG) – Khliehriat (Me) D/C (Based on Leshka Generation and System Conditions)

Load (Drawal from Grid) in Southern Part of NER :

Peak

South Assam : 100 MW

Manipur : 115 MW

Mizoram : 75 MW

Tripura : 145 MW

Meghalaya : 15 MW

(Lumshnong load)

Total : 440 MW

ISGS Generation in Southern Part of NER :

Peak

AGTPP : 75 MW

Loktak : 105 MW

Palatana : 350 MW

Total : 530 MW

Page 3: SPS Schemes for Grid Security (With Generation at Palatana) Case 1: When Palatana unit trips Case 2: 400 kV Palatana-Silcher (D/C) lines trip Case 3: 400.

Badarpur (PG)

Dullavchera

Pailapool

Lumsnong

Khliehriat (Me)

Panchgram

Srikona

Khliehriat (PG)

Dharmanagar

P K Bari

Jiribam(PG)

UdaipurS. Nagar

Silchar

Palatana Nehu

NEIGRIHMS

Line Flow in Initial Conditions

System Requirement

Shall be kept open

Byrnihat Shall be kept open

20 MW

25 MW

35 MW

15 MW

90 MW

10 MW

6 MW

72 MW

Khandong Kopili

34 MW

Loktak(NH)

105 MW

Imphal(PG)

Dimapur(PG)

Kumarghat(PG)

AGTPP(NO)

75 MW

1 MW

19 MW

350 MW

Page 4: SPS Schemes for Grid Security (With Generation at Palatana) Case 1: When Palatana unit trips Case 2: 400 kV Palatana-Silcher (D/C) lines trip Case 3: 400.

Case 1: When Palatana unit trips (PEAK Case)

Scheme:

i. When generator at Palatana trips a signal will be generated from trip relay of the unit.

ii. This signal should trip the CB of 132 kV Silchar – Srikona D/C & 132 kV Silchar – Panchgram lines

at Silchar.

iii. Subsequently, tripping of 132 kV Silchar – Panchgram line a signal will be generated from trip relay of 132 kV Silchar –Panchgram line. This signal should trip the CB of 132 kV Badarpur – Panchgram line at Badarpur.

iv. After these trippings a instant load relief of 60 MW at off-peak & 105 MW in peak which will avert the system from cascade tripping

v. Then manual demand disconnection should be imposed.

Load Relief Off-Peak Peak

Srikona : 15 MW 25 MW

Pailapool : 10 MW 20 MW

Panchgram: 20 MW 35 MW

Lumsnong : 15 MW 25 MW

Total 60 MW 105 MW

Page 5: SPS Schemes for Grid Security (With Generation at Palatana) Case 1: When Palatana unit trips Case 2: 400 kV Palatana-Silcher (D/C) lines trip Case 3: 400.

Badarpur (PG)

Dullavchera

Pailapool

Lumsnong

Khliehriat (Me)

Panchgram

Srikona

Khliehriat (PG)

Dharmanagar

P K Bari

Jiribam(PG)

UdaipurS. Nagar

Silchar

Palatana Nehu

NEIGRIHMS

Line Flow After Tripping of Palatana Module-1 (350 MW)

Shall be kept open

Byrnihat Shall be kept open

20 MW

25 MW

35 MW

15 MW

82 MW

53MW

50 MW

Khandong Kopili

59 MW

Loktak(NH)

105 MW

Imphal(PG)

Dimapur(PG)

Kumarghat(PG)

AGTPP(NO)

75 MW

27 MW

143 MW

System Requirement

Page 6: SPS Schemes for Grid Security (With Generation at Palatana) Case 1: When Palatana unit trips Case 2: 400 kV Palatana-Silcher (D/C) lines trip Case 3: 400.

Badarpur (PG)

Dullavchera

Pailapool

Lumsnong

Khliehriat (Me)

Panchgram

Srikona

Khliehriat (PG)

Dharmanagar

P K Bari

Jiribam(PG)

UdaipurS. Nagar

Silchar

Palatana Nehu

NEIGRIHMS

Line Flow After SPS Operation

Shall be kept open

Byrnihat Shall be kept open

20 MW

25 MW

35 MW

15 MW

54 MW

Khandong Kopili

28 MW

Loktak(NH)

105 MW

Imphal(PG)

Dimapur(PG)

Kumarghat(PG)

AGTPP(NO)

75 MW

16 MW

CB shall trip

CB shall trip

CB shall trip

CB shall trip

A signal will be

generated from trip

relay of 132 kV Silchar

–Panchgram

line

When generator trips signal will be generated from trip

relay of the unit80 MW

System Requirement

Page 7: SPS Schemes for Grid Security (With Generation at Palatana) Case 1: When Palatana unit trips Case 2: 400 kV Palatana-Silcher (D/C) lines trip Case 3: 400.

Case 2: When 400 kV Palatana-Silchar (D/C) lines trip (PEAK Case)

Scheme:i. When both the ckts of 400 kV Palatana – Silchar lines trip, a signal will be generated from trip

relays at Silchar

ii. This signal should trip the CB of 132 kV Silchar – Srikona D/C & 132 kV Silchar – Panchgram

lines at Silchar.

iii. Subsequently, tripping of 132 kV Silchar – Panchgram line a signal will be generated from trip relay of 132 kV Silchar –Panchgram line. This signal should trip the CB of 132 kV Badarpur – Panchgram line at Badarpur.

iv. After these trippings a instant load relief of 60 MW at off-peak & 105 MW in peak which will avert the system from cascade tripping

v. Then manual demand disconnection should be imposed.

Load Relief Off-Peak Peak

Srikona : 15 MW 25 MW

Pailapool : 10 MW 20 MW

Panchgram: 20 MW 35 MW

Lumsnong : 15 MW 25 MW

Total 60 MW 105 MW

Page 8: SPS Schemes for Grid Security (With Generation at Palatana) Case 1: When Palatana unit trips Case 2: 400 kV Palatana-Silcher (D/C) lines trip Case 3: 400.

Badarpur (PG)

Dullavchera

Pailapool

Lumsnong

Khliehriat (Me)

Panchgram

Srikona

Khliehriat (PG)

Dharmanagar

P K Bari

Jiribam(PG)

UdaipurS. Nagar

Silchar

Palatana Nehu

NEIGRIHMS

Line Flow After Tripping of 400kV Silchar-Palatana D/C

Shall be kept open

Byrnihat Shall be kept open

20 MW

25 MW

35 MW

15 MW

92 MW

38MW

54 MW

Khandong Kopili

86 MW

Loktak(NH)

105 MW

Imphal(PG)

Dimapur(PG)

Kumarghat(PG)

AGTPP(NO)

75 MW

43 MW

132 MW

350 MW

System Requirement

Page 9: SPS Schemes for Grid Security (With Generation at Palatana) Case 1: When Palatana unit trips Case 2: 400 kV Palatana-Silcher (D/C) lines trip Case 3: 400.

Badarpur (PG)

Dullavchera

Pailapool

Lumsnong

Khliehriat (Me)

Panchgram

Srikona

Khliehriat (PG)

Dharmanagar

P K Bari

Jiribam(PG)

UdaipurS. Nagar

Silchar

Palatana Nehu

NEIGRIHMS

Line Flow After SPS Operation

Shall be kept open

Byrnihat Shall be kept open

20 MW

25 MW

35 MW

15 MW

56 MW

Khandong Kopili

35 MW

Loktak(NH)

105 MW

Imphal(PG)

Dimapur(PG)

Kumarghat(PG)

AGTPP(NO)

75 MW

20 MW

CB shall trip

CB shall trip

CB shall trip

CB shall trip

A signal will be

generated from trip

relay of 132 kV Silchar

–Panchgram

line

When both the ckts of 400 kV Palatana – Silchar lines trip, signal will be generated from trip relays

at Silchar

75 MW

350 MW

System Requirement

Page 10: SPS Schemes for Grid Security (With Generation at Palatana) Case 1: When Palatana unit trips Case 2: 400 kV Palatana-Silcher (D/C) lines trip Case 3: 400.

Case 3: When 400 kV Silchar – Byrnihat S/C line trips (OFFPEAK Case)

Load Relief Off-Peak Peak

Srikona : 15 MW 25 MW

Pailapool : 10 MW 20 MW

Panchgram: 20 MW 35 MW

Lumsnong : 15 MW 25 MW

Total 60 MW 105 MW

Scheme:i. When 400 kV Byrnihat – Silchar lines trip, signal will be generated from trip relays at

Silchar

ii. This signal should trip CB of GTG/STG of at Palatana. But unit will be running in FSNL

iii. A instant relief in line loading of 230/130 MW which will avert the system from cascade tripping.

v. Then manual demand disconnection should be imposed.

Page 11: SPS Schemes for Grid Security (With Generation at Palatana) Case 1: When Palatana unit trips Case 2: 400 kV Palatana-Silcher (D/C) lines trip Case 3: 400.

Badarpur (PG)

Dullavchera

Pailapool

Lumsnong

Khliehriat (Me)

Panchgram

Srikona

Khliehriat (PG)

Dharmanagar

P K Bari

Jiribam(PG)

UdaipurS. Nagar

Silchar

Palatana Nehu

NEIGRIHMS

Line Flow After Tripping of Silchar - Brynihat

Shall be kept open

Byrnihat Shall be kept open

10 MW

15 MW

20 MW

15 MW

12 MW

Khandong Kopili

59 MW

Loktak(NH)

105 MW

Imphal(PG)

Dimapur(PG)

Kumarghat(PG)

AGTPP(NO)

75 MW

1 MW

34 MW

350 MW

System Requirement

177 MW

Page 12: SPS Schemes for Grid Security (With Generation at Palatana) Case 1: When Palatana unit trips Case 2: 400 kV Palatana-Silcher (D/C) lines trip Case 3: 400.

Badarpur (PG)

Dullavchera

Pailapool

Lumsnong

Khliehriat (Me)

Panchgram

Srikona

Khliehriat (PG)

Dharmanagar

P K Bari

Jiribam(PG)

UdaipurS. Nagar

Silchar

Palatana Nehu

NEIGRIHMS

Line Flow After Tripping of Silchar - Brynihat

Shall be kept open

Byrnihat Shall be kept open

10 MW

15 MW

20 MW

15 MW

101 MW

Khandong Kopili

174 MW

Loktak(NH)

105 MW

Imphal(PG)

Dimapur(PG)

Kumarghat(PG)

AGTPP(NO)

75 MW

32 MW

51 MW

350 MW

System Requirement

Page 13: SPS Schemes for Grid Security (With Generation at Palatana) Case 1: When Palatana unit trips Case 2: 400 kV Palatana-Silcher (D/C) lines trip Case 3: 400.

Badarpur (PG)

Dullavchera

Pailapool

Lumsnong

Khliehriat (Me)

Panchgram

Srikona

Khliehriat (PG)

Dharmanagar

P K Bari

Jiribam(PG)

UdaipurS. Nagar

Silchar

PalatanaNehu

NEIGRIHMS

Line Flow After SPS Operation

Shall be kept open

Byrnihat Shall be kept open

20 MW

25 MW

35 MW

15 MW

39 MW

Khandong Kopili

94 MW

Loktak(NH)

105 MW

Imphal(PG)

Dimapur(PG)

Kumarghat(PG)

AGTPP(NO)

75 MW

9 MW

43 MW

220 MW

When 400 kV Byrnihat

– Silchar lines trip,

signal will be generated from trip relays at Silchar

ST-1 shall trip

System Requirement