SPRING ROAD / SR 34 6+00 5+00 4+00 3+00 2+00 1+00 …files.dep.state.pa.us/ProgramIntegration/PA...

1
GAS GAS GAS GAS GAS GAS GAS GEOTECH SB-02 SPRING RD / SR 34 N40.240006 W77.180054 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 GEOTECH SB-01 GEOTECH SB-03 HDD ENTRY / EXIT N40.240473 W77.181060 HDD ENTRY / EXIT N40.237014 W77.173584 200 300 400 500 600 200 300 400 500 600 -1+00 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 25+50 EDGE OF CONODOGUINET CREEK BANK S-I53 14+48 EDGE OF CONODOGUINET CREEK BANK S-I53 12+70 HDD ENTRY / EXIT 24+38 EL.402' HDD ENTRY / EXIT 0+00 EL.416' 47' 59' 1503' 93' STA. 19+80 EL. 346' STA. 4+77 EL. 346' STA. 0+90 EL. 394' 182' STA. 22+58 EL. 370' 10° CL CONODOGUINET CREEK S-I53 13+50 36' 14° SPRING RD / SR 34 21+10 CL STREAM S-I54 19+62 STRUCTURE EDGE REED BEDS 9+00 UTILITY SANITARY SEWER 10+20 UTILITY WATER 10+03 UTILITY SANITARY SEWER 18+39 UTILITY TELEPHONE 21+73 UTILITY WATER 21+59 OVERHEAD ELECTRIC 20+83 R=1600' L=387' S=391' R=1600' L=278' S=279' APPROXIMATE BEDROCK GEOTECH SB-02 14+74, 265' LT GEOTECH SB-01 21+73, 73' LT CL STREAM S-K45 4+47 DRIVEWAY 9+87 STRUCTURE EDGE REED BEDS 7+06 UTILITY SANITARY SEWER 3+42 UTILITY SANITARY SEWER 1+76 UTILITY WATER 18+62 UTILITY WATER 7+03 EDGE OF ROAD 20+97 UTILITY WATER 21+57 EDGE OF ROAD 21+23 DRIVEWAY 10+62 CULVERT 10+54 STRUCTURE 10+30 UTILITY WATER 9+02 UTILITY WATER 9+42 OVERHEAD ELECTRIC 9+57 OVERHEAD ELECTRIC 9+86 59' UTILITY WATER 12+18 STRUCTURE 10+21 GEOTECH SB-03 5+08, 118' RT APPROXIMATE BEDROCK EDGE OF WETLAND K44 EDGE OF WETLAND K44 EDGE OF WETLAND I36 EDGE OF WETLAND I36 EDGE OF WETLAND J10 EDGE OF WETLAND J9 EDGE OF WETLAND J9 56' 61' PULLBACK ALONG ROW PA-CU-0130.0001 PA-CU-0127.0000 SPRING ROAD / SR 34 CONODOGUINET CREEK 0 FEET 100 100 200 PROPOSED 16" PIPELINE PROPOSED 20" PIPELINE GRADE REED BEDS NOTE: REFER TO TEST BORING LOG S2-0190 FOR COMPLETE SOIL MATERIAL DESCRIPTION GEOTECH SB-01 -NG EL. 402' -CL (2.0' - 8.5') -TOPSOIL (0' - 2.0') -SM (8.5' - 13.5') -SHALE (13.5' - 18.8') -COMPLETION DEPTH EL. 383.2' GEOTECH SB-02 -NG EL. 410' -CL (0.5' - 9.0') -TOPSOIL (0' - 0.5') -SM (9.0' - 25.0') -SHALE (25.0' - 28.2') -COMPLETION DEPTH EL. 381.8' -GROUNDWATER (11.0') -GROUNDWATER (17.0') -AUGER REFUSAL (18.8') GEOTECH SB-03 -NG EL. 407' -TOPSOIL (0' - 0.6') -SM (0.6' - 14.0') -GRAY CALCEROUS SHALE (20.0' - 30.0') -COMPLETION DEPTH EL. 377' -AUGER REFUSAL (14.0') SUNOCO EASEMENT LIMITS - NOT LOD LEGEND PERMANENT ROW TEMPORARY CONSTRUCTION ROW TEMPORARY WORKSPACE TEMPORARY ACCESS ROAD PERMANENT ACCESS ROAD SPOIL SPACE ONLY PROPOSED HDD PROPOSED 20" PIPELINE PROPOSED 16" PIPELINE HDD ENTRY-EXIT PEM WETLANDS PSS WETLANDS PFO WETLANDS -INCH HORIZONTAL DIRECTIONAL DRILL REF. DRAWING EROSION & SEDIMENT PLAN AERIAL SITE PLAN PLAN VIEW PROFILE VIEW NO. DESCRIPTION DATE BY CHK DATE REVISIONS DATE APP NOTES Sunoco Logistics Partners L.P. SUNOCO PIPELINE, L.P. 1. ALL COORDINATES SHOWN ARE IN LATITUDE AND LONGITUDE. ALL MSL ELEVATIONS ARE NAD83 2. STATIONING IS BASED ON HORIZONTAL DISTANCES. 3. ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE, LP ARE NOT RESPONSIBLE FOR LOCATION OF FOREIGN UTILITIES SHOWN IN PLOT PLAN OR PROFILE. THE INFORMATION SHOWN HEREON IS FURNISHED WITHOUT LIABILITY ON THE PART OF ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE, LP, FOR ANY DAMAGES RESULTING FROM ERRORS OR OMISSIONS THEREIN. 4. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES. CONTACT ONE CALL AT 811 PRIOR TO DIGGING. 5. SUNOCO EMERGENCY HOTLINE NUMBER IS #1-800-786-7440. PENNSYLVANIA PIPELINE PROJECT DESIGN AND CONSTRUCTION: 1. CONTRACTOR SHALL FIELD VERIFY DEPTH OF ALL EXITING UTILITIES SHOWN OR NOT SHOWN ON THIS DRAWING. 2. THE MINIMUM SEPARATION DISTANCE FROM EXISTING SUBSURFACE UTILITIES SHALL NOT BE LESS THAN 10 FEET AS MEASURED FROM THE OUTSIDE EDGE OF THE UTILITY TO OUTSIDE OF PROPOSED PIPELINE. 3. DESIGNED IN ACCORDANCE WITH CFR 49 195 & ASME B31.4 4. CROSSING PIPE SPECIFICATION: HDD HORZ. LENGTH (L=): HDD PIPE LENGTH (S=): 16" x 0.438" W.T., X-70, API5L, PSL2, ERW, BFW COATING: 14-16 MILS FBE WITH 30-35 MIL ARO (POWERCRETE R95) 5. INTERNAL DESIGN PRESSURE 1480 PSIG (SEAM FACTOR 1.0, DESIGH FACTOR 0.50). 6. INSTALLATION METHOD: HORIZONTAL DIRECTIONAL DRILL (HDD). 7. PIPELINE WARNING MARKERS SHALL BE INSTALLED ON BOTH SIDES OF ALL ROAD, RAILWAY, AND STREAM CROSSINGS. 8. CARRIER PIPE NOT ENCASED. 9. PIPE / AMBIENT TEMPERATURE MUST BE NO LESS THAN 30°F DURING PULLBACK WITHOUT PRIOR WRITTEN APPROVAL FROM THE ENGINEER. 10. CONDUCT 4-HOUR PRE-INSTALLATION HYDROTEST OF HDD PIPE STRING TO MINIMUM 1850 PSIG. 11. SEE SUNOCO PENNSYLVANIA PIPELINE PROJECT ESRI WEBMAP FOR ACCESS ROAD ALIGNMENT. 12. SUNOCO PIPELINE, L.P.'S HORIZONTAL DIRECTIONAL DRILL INADVERTENT RETURN CONTINGENCY PLAN WILL BE IMPLEMENTED AT ALL TIMES. 13. SUNOCO PIPELINE, L.P.'S EROSION AND SEDIMENTATION CONTROL PLAN WILL BE IMPLEMENTED AT ALL TIMES. TO TO DWG NO DWG NO DESCRIPTION 16 08/31/15 05/20/16 10/07/16 CONODOGUINET CREEK 1"=200' PA-CU-0128.0000-WX-16 CUMBERLAND COUNTY, PA - NORTH MIDDLETON TOWNSHIP S2-0190-16 A ISSUED FOR BID MRS RMB AAW 08/31/15 03/15/16 08/31/15 09/06/15 EP2 REVISED PER PADEP COMMENTS RECEIVED 09-06-16 MRS RMB AAW 10/07/16 ES-4.51 10/07/16 EP1 REVISED PER PADEP COMMENTS MRS RMB AAW 05/20/16 SHEET 32 05/20/16 EP JTW RMB AAW 03/15/16 ES-4.52 03/15/16 B ADDED GEOTECH INFO MRS RMB AAW 09/06/15 SHEET 32 09/06/15 2438' 2448'

Transcript of SPRING ROAD / SR 34 6+00 5+00 4+00 3+00 2+00 1+00 …files.dep.state.pa.us/ProgramIntegration/PA...

Page 1: SPRING ROAD / SR 34 6+00 5+00 4+00 3+00 2+00 1+00 …files.dep.state.pa.us/ProgramIntegration/PA Pipeline Portal... · bank s-i53 14+48 edge of bank s-i53 12+70 hdd entry / exit 0+00

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

GEOTECH SB-02

SPRING RD / SR 34

N40.240006

W77.180054

0+

00

1+

00

2+

00

3+

00

4+

00

5+

00

6+

00

7+

00

8+

00

9+

00

10

+0

0

11

+0

0

12

+0

0

13

+0

0

14

+0

0

15

+0

0

16

+0

0

17

+0

0

18

+0

0

19

+0

0

20

+0

0

21

+0

0

22

+0

0

23

+0

0

24

+00

GEOTECH SB-01

GEOTECH SB-03

HDD ENTRY / EXIT

N40.240473

W77.181060

HDD ENTRY / EXIT

N40.237014

W77.173584

200

300

400

500

600

200

300

400

500

600

-1+000+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+0016+0017+0018+0019+0020+0021+0022+0023+0024+0025+0025+50

ED

GE

O

F

CO

NO

DO

GU

IN

ET

C

RE

EK

BA

NK

S

-I5

3

14

+4

8

ED

GE

O

F

CO

NO

DO

GU

IN

ET

C

RE

EK

BA

NK

S

-I5

3

12

+7

0

HD

D E

NT

RY

/ E

XIT

24

+3

8

EL

.4

02

'

HD

D E

NT

RY

/ E

XIT

0+

00

EL

.4

16

'

47'

59'

1503'

93'

STA. 19+80

EL. 346'

STA. 4+77

EL. 346'

STA. 0+90

EL. 394'

182'

STA. 22+58

EL. 370'

10°

CL

C

ON

OD

OG

UIN

ET

C

RE

EK

S

-I5

3

13

+5

0

36'

14°

SP

RIN

G R

D / S

R 3

4

21

+1

0

CL

S

TR

EA

M S

-I5

4

19

+6

2

ST

RU

CT

UR

E E

DG

E

RE

ED

B

ED

S

9+

00

UT

IL

IT

Y S

AN

IT

AR

Y S

EW

ER

10

+2

0

UT

IL

IT

Y W

AT

ER

10

+0

3

UT

IL

IT

Y S

AN

IT

AR

Y S

EW

ER

18

+3

9

UT

IL

IT

Y T

EL

EP

HO

NE

21

+7

3

UT

IL

IT

Y W

AT

ER

21

+5

9

OV

ER

HE

AD

E

LE

CT

RIC

20

+8

3

R=1600'

L=387'

S=391'

R=1600'

L=278'

S=279'

APPROXIMATE

BEDROCK

GE

OT

EC

H S

B-0

2

14

+7

4, 2

65

' L

T

GE

OT

EC

H S

B-0

1

21

+7

3, 7

3' L

T

CL

S

TR

EA

M S

-K

45

4+

47

DR

IV

EW

AY

9+

87

ST

RU

CT

UR

E E

DG

E

RE

ED

B

ED

S

7+

06

UT

IL

IT

Y S

AN

IT

AR

Y S

EW

ER

3+

42

UT

IL

IT

Y S

AN

IT

AR

Y S

EW

ER

1+

76

UT

IL

IT

Y W

AT

ER

18

+6

2

UT

IL

IT

Y W

AT

ER

7+

03

ED

GE

O

F R

OA

D

20

+9

7

UT

IL

IT

Y W

AT

ER

21

+5

7

ED

GE

O

F R

OA

D

21

+2

3

DR

IV

EW

AY

10

+6

2

CU

LV

ER

T

10

+5

4

ST

RU

CT

UR

E

10

+3

0

UT

IL

IT

Y W

AT

ER

9+

02

UT

IL

IT

Y W

AT

ER

9+

42

OV

ER

HE

AD

E

LE

CT

RIC

9+

57

OV

ER

HE

AD

E

LE

CT

RIC

9+

86

59'

UT

IL

IT

Y W

AT

ER

12

+1

8

ST

RU

CT

UR

E

10

+2

1

GE

OT

EC

H S

B-0

3

5+

08

, 1

18

' R

T

APPROXIMATE

BEDROCK

ED

GE

O

F W

ET

LA

ND

K

44

ED

GE

O

F W

ET

LA

ND

K

44

ED

GE

O

F W

ET

LA

ND

I3

6

ED

GE

O

F W

ET

LA

ND

I3

6

ED

GE

O

F W

ET

LA

ND

J1

0

ED

GE

O

F W

ET

LA

ND

J9

ED

GE

O

F W

ET

LA

ND

J9

56'

61'

P

U

L

L

B

A

C

K

A

L

O

N

G

R

O

W

PA-CU-0130.0001

PA-CU-0127.0000

S

P

R

I

N

G

R

O

A

D

/

S

R

3

4

C

O

N

O

D

O

G

U

IN

E

T

C

R

E

E

K

0

FEET

100 100 200

PROPOSED 16" PIPELINE

PROPOSED 20" PIPELINE

GRADE

REED BEDS

NOTE: REFER TO TEST BORING LOG S2-0190

FOR COMPLETE SOIL MATERIAL DESCRIPTION

GEOTECH SB-01

-NG EL. 402'

-CL (2.0' - 8.5')

-TOPSOIL (0' - 2.0')

-SM (8.5' - 13.5')

-SHALE (13.5' - 18.8')

-COMPLETION

DEPTH EL. 383.2'

GEOTECH SB-02

-NG EL. 410'

-CL (0.5' - 9.0')

-TOPSOIL (0' - 0.5')

-SM (9.0' - 25.0')

-SHALE (25.0' - 28.2')

-COMPLETION

DEPTH EL. 381.8'

-GROUNDWATER (11.0')

-GROUNDWATER (17.0')

-AUGER REFUSAL (18.8')

GEOTECH SB-03

-NG EL. 407'

-TOPSOIL (0' - 0.6')

-SM (0.6' - 14.0')

-GRAY CALCEROUS

SHALE (20.0' - 30.0')

-COMPLETION

DEPTH EL. 377'

-AUGER REFUSAL (14.0')

SUNOCO EASEMENT

LIMITS - NOT LOD

LEGEND

PERMANENT ROW

TEMPORARY CONSTRUCTION ROW

TEMPORARY WORKSPACE

TEMPORARY ACCESS ROAD

PERMANENT ACCESS ROAD

SPOIL SPACE ONLY

PROPOSED HDD

PROPOSED 20" PIPELINE

PROPOSED 16" PIPELINE

HDD ENTRY-EXIT

PEM WETLANDS

PSS WETLANDS

PFO WETLANDS

-INCH HORIZONTAL DIRECTIONAL DRILL

REF. DRAWING

EROSION & SEDIMENT PLAN

AERIAL SITE PLAN

PLAN VIEW

PROFILE VIEW

NO. DESCRIPTION DATEBY CHK DATE

REVISIONS

DATEAPP

NOTES Sunoco LogisticsPartners L.P.

SUNOCO PIPELINE, L.P.

1. ALL COORDINATES SHOWN ARE IN LATITUDE AND LONGITUDE. ALL MSL ELEVATIONS ARE NAD83

2. STATIONING IS BASED ON HORIZONTAL DISTANCES.

3. ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE, LP ARE NOT RESPONSIBLE FOR LOCATION

OF FOREIGN UTILITIES SHOWN IN PLOT PLAN OR PROFILE. THE INFORMATION SHOWN HEREON IS

FURNISHED WITHOUT LIABILITY ON THE PART OF ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE,

LP, FOR ANY DAMAGES RESULTING FROM ERRORS OR OMISSIONS THEREIN.

4. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES. CONTACT ONE CALL AT 811 PRIOR TO

DIGGING.

5. SUNOCO EMERGENCY HOTLINE NUMBER IS #1-800-786-7440.

PENNSYLVANIA PIPELINE PROJECT

DESIGN AND CONSTRUCTION:

1. CONTRACTOR SHALL FIELD VERIFY DEPTH OF ALL EXITING UTILITIES SHOWN OR NOT SHOWN ON

THIS DRAWING.

2. THE MINIMUM SEPARATION DISTANCE FROM EXISTING SUBSURFACE UTILITIES SHALL NOT BE LESS

THAN 10 FEET AS MEASURED FROM THE OUTSIDE EDGE OF THE UTILITY TO OUTSIDE OF PROPOSED

PIPELINE.

3. DESIGNED IN ACCORDANCE WITH CFR 49 195 & ASME B31.4

4. CROSSING PIPE SPECIFICATION:

HDD HORZ. LENGTH (L=):

HDD PIPE LENGTH (S=):

16" x 0.438" W.T., X-70, API5L, PSL2, ERW, BFW

COATING: 14-16 MILS FBE WITH 30-35 MIL ARO (POWERCRETE R95)

5. INTERNAL DESIGN PRESSURE 1480 PSIG (SEAM FACTOR 1.0, DESIGH FACTOR 0.50).

6. INSTALLATION METHOD: HORIZONTAL DIRECTIONAL DRILL (HDD).

7. PIPELINE WARNING MARKERS SHALL BE INSTALLED ON BOTH SIDES OF ALL ROAD, RAILWAY, AND

STREAM CROSSINGS.

8. CARRIER PIPE NOT ENCASED.

9. PIPE / AMBIENT TEMPERATURE MUST BE NO LESS THAN 30°F DURING PULLBACK WITHOUT PRIOR

WRITTEN APPROVAL FROM THE ENGINEER.

10. CONDUCT 4-HOUR PRE-INSTALLATION HYDROTEST OF HDD PIPE STRING TO MINIMUM 1850 PSIG.

11. SEE SUNOCO PENNSYLVANIA PIPELINE PROJECT ESRI WEBMAP FOR ACCESS ROAD ALIGNMENT.

12. SUNOCO PIPELINE, L.P.'S HORIZONTAL DIRECTIONAL DRILL INADVERTENT RETURN CONTINGENCY PLAN

WILL BE IMPLEMENTED AT ALL TIMES.

13. SUNOCO PIPELINE, L.P.'S EROSION AND SEDIMENTATION CONTROL PLAN WILL BE IMPLEMENTED AT ALL

TIMES.

TO

TO

DWG NO DWG NO DESCRIPTION

16

08/31/15

05/20/16

10/07/16

CONODOGUINET CREEK

1"=200'

PA-CU-0128.0000-WX-16

CUMBERLAND COUNTY, PA - NORTH MIDDLETON TOWNSHIP

S2-0190-16

A ISSUED FOR BID MRS RMB AAW08/31/15

03/15/16

08/31/15

09/06/15

EP2 REVISED PER PADEP COMMENTS RECEIVED 09-06-16MRS RMB AAW10/07/16

ES-4.51

10/07/16

EP1 REVISED PER PADEP COMMENTS MRS RMB AAW05/20/16

SHEET 32

05/20/16

EPJTW RMB AAW03/15/16

ES-4.52

03/15/16

B ADDED GEOTECH INFOMRS RMB AAW09/06/15

SHEET 32

09/06/15

2438'

2448'

AutoCAD SHX Text
S-K45S-K45
AutoCAD SHX Text
S-K42S-K42
AutoCAD SHX Text
S-K43S-K43
AutoCAD SHX Text
S-I54S-I54
AutoCAD SHX Text
S-I53S-I53
AutoCAD SHX Text
W-BB139W-BB139
AutoCAD SHX Text
W-I36W-I36
AutoCAD SHX Text
W-K39W-K39
AutoCAD SHX Text
W-K38W-K38
AutoCAD SHX Text
W-K44W-K44
AutoCAD SHX Text
W-K44W-K44
AutoCAD SHX Text
W-J9W-J9
AutoCAD SHX Text
W-K44W-K44
AutoCAD SHX Text
W-K37W-K37
AutoCAD SHX Text
W-K39W-K39
AutoCAD SHX Text
W-K38W-K38
AutoCAD SHX Text
W-I36W-I36
AutoCAD SHX Text
W-I36W-I36
AutoCAD SHX Text
(303) 792-5911