![Page 1: Spent Fuel Pool Island Southern California Edison, San Diego Gas & Electric, Cities of Anaheim and Riverside CDP Application #: 9-15-0162 August 13, 2015.](https://reader036.fdocuments.us/reader036/viewer/2022081520/5697c0251a28abf838cd549a/html5/thumbnails/1.jpg)
Spent Fuel Pool Island
Southern California Edison, San Diego Gas & Electric,
Cities of Anaheim and Riverside
CDP Application #:9-15-0162
August 13, 2015
![Page 2: Spent Fuel Pool Island Southern California Edison, San Diego Gas & Electric, Cities of Anaheim and Riverside CDP Application #: 9-15-0162 August 13, 2015.](https://reader036.fdocuments.us/reader036/viewer/2022081520/5697c0251a28abf838cd549a/html5/thumbnails/2.jpg)
Objectives
• Present proposed project (independent cooling system)
• Describe purpose and benefits of project• Discuss impact on coastal resources• Request CCC approval of Coastal
Development Permit
2
![Page 3: Spent Fuel Pool Island Southern California Edison, San Diego Gas & Electric, Cities of Anaheim and Riverside CDP Application #: 9-15-0162 August 13, 2015.](https://reader036.fdocuments.us/reader036/viewer/2022081520/5697c0251a28abf838cd549a/html5/thumbnails/3.jpg)
Spent Fuel Pool Island Video
3
![Page 4: Spent Fuel Pool Island Southern California Edison, San Diego Gas & Electric, Cities of Anaheim and Riverside CDP Application #: 9-15-0162 August 13, 2015.](https://reader036.fdocuments.us/reader036/viewer/2022081520/5697c0251a28abf838cd549a/html5/thumbnails/4.jpg)
Purpose & Need
• Sets stage for a safe and prompt decommissioning– Systems de-energized and drained– Safe dismantlement of systems and structures
• Modification achieves:– Elimination of once-through cooling– Continued safe management of used fuel– Reduced overall operating costs for customers
5
![Page 5: Spent Fuel Pool Island Southern California Edison, San Diego Gas & Electric, Cities of Anaheim and Riverside CDP Application #: 9-15-0162 August 13, 2015.](https://reader036.fdocuments.us/reader036/viewer/2022081520/5697c0251a28abf838cd549a/html5/thumbnails/5.jpg)
Project Description
• Replaces current ocean cooling system with a compact system better suited for a shutdown plant with lower heat load
• Spent Fuel Pool Island (SFPI) involves installation of chillers, heat exchangers, pumps, and piping
• System in use until all spent fuel is moved to dry storage
9
![Page 6: Spent Fuel Pool Island Southern California Edison, San Diego Gas & Electric, Cities of Anaheim and Riverside CDP Application #: 9-15-0162 August 13, 2015.](https://reader036.fdocuments.us/reader036/viewer/2022081520/5697c0251a28abf838cd549a/html5/thumbnails/6.jpg)
Selected Technology
No water usage
No vapor plumes
Reliable, off-the-shelf technology
Consistent temperature control
11
![Page 7: Spent Fuel Pool Island Southern California Edison, San Diego Gas & Electric, Cities of Anaheim and Riverside CDP Application #: 9-15-0162 August 13, 2015.](https://reader036.fdocuments.us/reader036/viewer/2022081520/5697c0251a28abf838cd549a/html5/thumbnails/7.jpg)
Unit 3 Fuel
Handling Building
Unit 2 Fuel
Handling Building
2
3
12
![Page 8: Spent Fuel Pool Island Southern California Edison, San Diego Gas & Electric, Cities of Anaheim and Riverside CDP Application #: 9-15-0162 August 13, 2015.](https://reader036.fdocuments.us/reader036/viewer/2022081520/5697c0251a28abf838cd549a/html5/thumbnails/8.jpg)
Unit 3 Fuel
Handling Building
Unit 2 Fuel
Handling Building
23
Equipment Container
Chiller Unit
13
![Page 9: Spent Fuel Pool Island Southern California Edison, San Diego Gas & Electric, Cities of Anaheim and Riverside CDP Application #: 9-15-0162 August 13, 2015.](https://reader036.fdocuments.us/reader036/viewer/2022081520/5697c0251a28abf838cd549a/html5/thumbnails/9.jpg)
Public View of Project Site
14
![Page 10: Spent Fuel Pool Island Southern California Edison, San Diego Gas & Electric, Cities of Anaheim and Riverside CDP Application #: 9-15-0162 August 13, 2015.](https://reader036.fdocuments.us/reader036/viewer/2022081520/5697c0251a28abf838cd549a/html5/thumbnails/10.jpg)
Spent Fuel Cooling
Existing Spent Fuel Cooling System
• Complex system
• Requires ~ 20% of the operating plant systems
• Requires ocean cooling
Proposed Spent Fuel Pool Island
• Simple and compact
• Self-contained system
• Eliminates ocean cooling
• Reduces by 50% amount of ocean water needed
15
![Page 11: Spent Fuel Pool Island Southern California Edison, San Diego Gas & Electric, Cities of Anaheim and Riverside CDP Application #: 9-15-0162 August 13, 2015.](https://reader036.fdocuments.us/reader036/viewer/2022081520/5697c0251a28abf838cd549a/html5/thumbnails/11.jpg)
Requesting Coastal Commission approval of CDP for proposed project:
• No adverse environmental impact
• Proven, safe technology
• Facilitates timely decommissioning
• Results in cost savings for customers
Summary
18